April 16, 2018 |
FY 2018 |
WIN8C02496 |
UACS No. 300117202006000 |
April 10, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117202006000
Project ID: P00255819MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Asphalt Overlay along Jct. Polo to Dapitan Park Road, Dapitan City
K1826+000 - K1826+915
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 3.660 lane km'
Unit Cost: P 5,409.84/lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
April 16, 2018 |
2018 |
WIN8C02336 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-carriageway Improvement
FROM:
Daang Maharlika (Agusan-Davao Sect) – K1306+805 – K1307+471, K1309+112 – K1310+482, K1308+496 – K1309+112
Project ID No. P00200809MN
Scope of Work: Shoulder Paving / Construction
Physical Target: 12,620 sq.m.
Allocation: Php 57,474,000.00 (Total)
Php 55,462,410.00 (Road)
Php 2,011,590.00 (EAO)
TO:
Daang Maharlika (Agusan-Davao Sect) – K1306+550 – K1307+471, K1308+496 – K1308+619, K1308+619 - K1309+112, K1309+112 - K1309+183, K1309+311 - K1310+482
Project ID No. P00200809MN
Scope of Work: Shoulder Paving / Construction
Physical Target: 12,927.5 sq.m.
Allocation: Php 57,474,000.00 (Total)
Php 55,462,410.00 (Road)
Php 2,011,590.00 (EAO) |
April 16, 2018 |
FY 2018 |
WIN8C02472 |
UACS No. 320101102185000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 320101102185000
Project ID: P00221199MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Usugan Flood Control, Brgy. Tungawan, Tambulig, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 517.00 l.m.
Unit Cost: P 86,384.06/l.m.
EAO: P 911,440.00
Allocation: P 45,572,000.00 |
April 16, 2018 |
Fy - 2018 |
WIN8F05147 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Busuanga River Flood Control Structures
( Adela Section ), Rizal, Occidental Mindoro
CW1: 446 l.m ( Construction of Flood Mitigation Structure )
Allocation: 56,550,000 Php
TO:
Construction of Busuanga River Flood Control Structures
( Adela Section ), Rizal, Occidental Mindoro
CW1: 318 l.m ( Construction of Flood Mitigation Structure )
Allocation; 56,550,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05124 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Anahawin River Flood Control Structures,
Phase 2, Calintaan, Occidental Mindoro
CW1: 205 l.m ( Construction of Flood Mitigation Structure )
Allocation: 26,170,000 Php
TO:
Construction of Anahawin River Flood Control Structure,
Phase 2, Calintaan, Occidental Mindoro
CW1: 144 l.m (Construction of Flood Mitigation Structure )
Allocation: 26,170,000 Php
|
April 16, 2018 |
FY - 2018 |
WIN8F05107 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Junction MWCR (Labangan) - Murtha - Jct Iriron Road,
incl Bridge, Mindoro Occidental
CW1: 4.286 lane km ( Construction of Concrete Road )
CW2: 476 sq.m ( Construction of Bridge )
Allocation: 100,000,000 Php
TO:
Junction MWCR (Labangan) - Murtha - Jct. Iriron Road,
incl. Bridge, Mindoro Occidental
CW1: 4.774 lane km ( Constructin of Concrete Road )
CW2: 476 sq.m ( Construction of Bridge )
Allocation: 100,000,000 Php
|
April 16, 2018 |
FY - 2018 |
WIN8F05083 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction and Improvement of Drainage System of
Mamburao, Occidental Mindoro
CW1: 3,375 l.m (Construction of Flood Mitigation Structure)
Allocation: 25,000,000Php
TO:
Construction and Improvement of Drainage System of
Mamburao, Occidental Mindoro
CW1: 3,042 l.m (Construction of Flood Mitigation Structure)
Allocation: 25,000,000 Php
3,042 l.m |
April 16, 2018 |
Fy - 2018 |
WIN8F05141 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Mindoro West Coastal Rd.
K0235+000 - K0235+594,
K0237+050 - K0237+984,
K0237+1000 - K0238+065,
K0239+700 - K0239+750,
K0340+300 - K0340+469,
K0404+816 - K0405+477,
K0407+400 - K0408+543
CW1: 9.444 lane km ( Rehabilitation of Paved Road )
Allocation: 99,800,000
TO:
Mindoro West Coastal Rd.
K0235+000 - K0235+594,
K0237+050 - K0237+984,
K0237+1000 - K0238+065,
K0239+700 - K0239+750,
K0340+300 - K0340+469,
K0404+816 - K0405+377,
K0407+400 - K0408+543,
K0395+434+K0396+653
CW1: 9.444 lane km ( Rehabilitation of Paved Road )
Allocation: 99,800,000 Php |
April 16, 2018 |
FY 2018 |
WIN8C02478 |
UACS No. 300203100518000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100518000
Project ID: P00230022MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Bugwak Spring, Brgy. Lower Dimalinao, Molave, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.66 lane km
Unit Cost: P 9,210,000.00
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02475 |
UACS No. 320101102178000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 320101102178000
Project ID: P00222663MN
OO2: Protect Lives and Properties Against Major Floods
Management Programs
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Lower Landing Bridge (Downstream) along Mahayag-Dumingag Road, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 204.00 l.m.
Unit Cost: P 120,098.04/l.m.
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
April 16, 2018 |
2018 |
WIN8C02479 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
FROM:
Lanuza Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. P00200448MN
Physical Target: 3.76 Lane Km (Construction of Concrete Road)
11,971.834 Square meters (ROW Acquisition)
Allocation - Php 100,000,000.00 (Total)
- Php 88,297,500 (Road)
- Php 8,202,500 (ROW Acquisition)
- Php 3,500,000 (EAO)
TO:
Lanuza Bypass Road (SDCR Alternate Route) with bridge, incl. ROW, Surigao del Sur
Project ID No. P00200448MN
Physical Target:
0.146 Lane Km (Construction of Concrete Road)
429.30 Square meters (Construction of Concrete Bridge)
3.00 Lane Km (Construction of Gravel Road)
11,971.834 Square meters (ROW Acquisition)
Allocation - Php 100,000,000.00 (Total)
- Php 12,594,914 (Concrete Road)
- Php 29,651,687 (Bridge)
- Php 46,050,899 (Gravel Road)
- Php 8,202,500 (ROW Acquisition)
- Php 3,500,000 (EAO)
|
April 16, 2018 |
2018 |
WIN8C02485 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
LOCAL PROGRAM
Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads
FROM:
Completion of Quezon-San Isidro Road with Bridge, Barangay Quezon, Tandag City, Surigao del Sur
Project ID No. P00240326MN
Physical Target: 3.480 Lane Km (Construction of Concrete Road)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000 (Road)
- Php 1,000,000 (EAO)
TO:
Completion of Quezon-San Isidro Road, Barangay Quezon, Tandag City, Surigao del Sur
Project ID No. P00240326MN
Physical Target: 4.20 Lane Km (Construction of Concrete Road)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000 (Road)
- Php 1,000,000 (EAO)
|
April 16, 2018 |
GAA FY 2018 |
WIN8F05313 |
UACS No. 300104200139000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104200139000
Project ID: P00252116LZ
WIN8F05313
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi-Purpose Facilities
Construction of Multipurpose Building, Paso de Blas ES, Brgy. Karuhatan, Valenzuela City
Physical Target: CW1-Construction of Multi-Purpose Building 1 Building
EAO – P 0.050 M
Unit Cost (P’000): P4,950/Building
Allocation: P 4.950 M
Total: P 5.0 M
As Modified
As per GAA/Original
UACS No. 300104200139000
Project ID: P00252116LZ
WIN8F05313
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi-Purpose Facilities
Construction of Multipurpose Building, Paso de Blas ES, Brgy. Paso De Blas, Valenzuela City
Physical Target: CW1-Construction of Multi-Purpose Building 1 Building
EAO – P 0.050 M
Unit Cost (P’000): P4,950/Building
Allocation: P 4.950 M
Total: P 5.0 M
|
April 16, 2018 |
GAA FY 2018 |
WIN8F05302 |
UACS No. 300107200005000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300107200005000
Project ID: P00257647LZ
WIN8F05302
Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures and Facilities
Construction of a Flood Control Wall along the left bank of ShelterVille Creek,
Barangay 171, Caloocan City, Metro Manila
Physical Target: CW1-Construction of Flood Mitigation Structure 1,444 l.m.
EAO – P 1.00 M
Unit Cost (P’000): P68.56/ l.m.
Allocation: P 99.00 M
Total: P 100.00 M
As Modified
UACS No. 300107200005000
Project ID: P00257647LZ
WIN8F05302
Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures and Facilities
Construction of a Flood Control Wall along the bank of ShelterVille Creek,
Barangay 171, Caloocan City, Metro Manila
Physical Target: CW1-Construction of Flood Mitigation Structure 1,444 l.m.
EAO – P 1.00 M
Unit Cost (P’000): P68.56/ l.m.
Allocation: P 99.00 M
Total: P 100.00 M
|
April 16, 2018 |
FY 2018 |
WIN8G02090 |
SR2018-01-000940 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program
Road Widening - Primary Roads
Jose Abad Santos Ave (JASA)
K0076 + (-010) - K0076 + 319, K0076 + 571.03 - K0077 + 174, K0077 + 421.40 - K0078 + 291.30, K0078 + 680 - K0079 + 630.40, K0079+789.70 - K0081+000 |
April 16, 2018 |
FY 2018 |
WIN8G02053 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads - Nueva Ecija - Aurora Rd, K0217 + 757 - K0218 + 000, K0219 + 010 - K0220 + 000, K0220 + 640 - K0224 + 000, K0226 + 000 - K0229 + 000, K0229 + 928 - K0230 + 698 |
April 16, 2018 |
FY 2018 |
WIN8G02052 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dilaguidi, Dilasag, Aurora |
April 16, 2018 |
FY 2018 |
WIN8G01944 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads - Baler - Casiguran Rd (Baler - Dinadiawan), K0251 + 000 - K0252 + 213, K0252 + 309 - K0253 + 945, K0253 + 959 - K0254 + 160, K0254 + 173.55 - K0256 + 693, K0257 + 414 - K0262 + 970, K0262 + 995 - K0264 + 508, K0264 + 669 - K0264 + 802.57, K0264 + 812.18 - K0265 + 831.18 |
April 14, 2018 |
FY 2018 |
WIN8C02500 |
UACS No. 320101102155000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102155000
Project ID: P00221249MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction/Extension of Flood Control at Saaz River (Including Right of Way Aquisition), San Ramon, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 618.50 ln.m
Unit Cost: P 31,371.82/ln.m
Physical Target:
ROW: 194.0 sq.m.
Unit Cost: P 1,013.04/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02495 |
UACS No. 320101102149000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102149000
Project ID: P00222071MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along San Roque River, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 696.70 ln.m
Unit Cost: P 20,294.76/ln.m
Physical Target:
ROW: 553 sq.m.
Unit Cost: P 1,013.82/sq.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02503 |
UACS No. 320101102145000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102145000
Project ID: P00220449MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control at Sinunuc River (Including Right of Way Aquisition), Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 599.24 ln.m
Unit Cost: P 23,815.99/ln.m
Physical Target:
ROW: 423 sq.m.
Unit Cost: P 1,013.00/sq.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02499 |
UACS No. 320101102152000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102152000
Project ID: P00220544MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Talisayan, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 440.00 ln.m
Unit Cost: P 43,640.72/ln.m
Physical Target:
ROW: 393 sq.m.
Unit Cost: P 1,012.93/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02498 |
UACS No. 320101102153000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102153000
Project ID: P00222072MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Tinuba River, Sinubong, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 466.22 ln.m
Unit Cost: P 21,020.12/ln.m
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
April 13, 2018 |
FY - 2018 |
WIN8F05130 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
Mindoro Oriental/Occidental East Coastal Rd
K0188+928 - K0189+681,
K0189+781 - K0190+428,
K0190+733 - K0191+381,
K0191+613 - K0193+000,
K0193+596 - K0193+840
CW1: 10,509.00 sq.m.
Allocation: 41,164,000 Php
TO:
Mindoro Oriental/Occidental East Coastal Road
K0188+928 - K0189+677.80
K0189+781 - K0190+419,
K0190+733 - K0191+354.90,
K0191+587 - K0193+000,
K0193+596 - K0193+840
CW1: 17,263.60 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 41,164,000 Php
|
April 13, 2018 |
FY - 2018 |
WIN8F05129 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary roads
FROM:
Bongabong - Sagana - Roxas - Sn Aquilino Rd
K0103+ (-781) - K0103+433
CW1: 2.428 lane km ( Rehabilitation of Paved Road )
Allocation: 29,136,000 Php
TO:
Bongabong - Sagana - Roxas - Sn Aquilino Rd
K0103+(-781) - K103+(-050)
CW1: 1.462 lane km ( Rehabilitation of Paved Road )
Allocation: 29,136,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05123 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Maragooc Seawall,
Gloria, Oriental Mindoro
CW1: 1,603.50 lineal meters ( Construction of Revetment )
Allocation: 100,000,000 Php
TO:
Construction of Maragooc Seawall,
Gloria, Oriental Mindoro
CW1: 954.00 lineal meters ( Construction of Revetment )
Allocation: 100,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05127 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of San Miguel River Control,
Roxas, Oriental Mindoro
CW1: 760 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000
TO:
Construction of San Miguel River Control,
Roxas, Oriental Mindoro
CW1: 706 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000 Php |
April 13, 2018 |
2018 |
320101101010000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods: Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Magat River Flood Control Project (Phase I), Estrella, San Mateo, Isabela
|
April 13, 2018 |
FY - 2018 |
WIN8F05146 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect lives and Properties Against Major Floods
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along major River Basins and Principal Rivers
FROM:
Construction of Panluan River Control,
Bongabong, Oriental Mindoro
CW1: 400.00 lineal meters ( Construction of Revetment )
Allocation; 30,000,000 Php
TO:
Construction of Panluan River Control,
Bongabong, Oriental Mindoro
CW1: 566.00 lineal meters ( Construction of Revetment)
Allocation: 30,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05146 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/
Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Gallego Road leading to Casabangan beach and Mangal Marine Protected Area ( MMPA ), incl Bridge,
Don Pedro, Mansalay, Oriental Mindoro
CW1: 1.400 lane km ( Construction of Concrete Road )
CW2: 782.280 sq.m. ( Construction of Concrete Bridge )
Allocation: 98,100,000 Php
TO:
Gallego Road leading to Casabangan Beach and Mangal Marine Protected Area ( MMPA ), incl. Bridge,
Don Pedro, Mansalay, Oriental Mindoro
CW1: 2.5679 lane km ( Construction of Concrete Road )
CW2: 772.740 sq.m. ( Construction of Concrete Bridge )
Allocation: 98,1000,000 Php
|
April 13, 2018 |
FY - 2018 |
WIN8F05126 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ leading to Buktot Beach, Brgy. Cabalwa,
Mansalay, Oriental Mindoro
CW1: 3.280 lane km ( Construction of Concrete Road )
Allocation: 37,720,000 Php
TO:
NRJ leading to Buktot Beach, Brgy. Cabalwa,
Mansalay, Oriental Mindoro
CW1:
2.880 lane km ( Construction of Concrete Road )
Allocation: 37,720,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05222 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
GAA 2018 Other Infrastructure ( CSSP )
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Bacungan - Talaudyong Road, Palawan
CW1: 12.114 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php
TO:
Bacungan - Talaudyong Road, Palawan
CW1: 5.96 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8C02279 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Tertiary Roads
FROM:
Palawan Circum. Rd. ( Panalingaan - tagbita - Latud )
K0272+519 - K0276+000
CW1: 7.098 lane km ( Paving of Unpaved Road )
Allocation: 125,088,000 Php
TO:
Palawan Circum. Rd. ( Panalingaan - Tagbita - Latud )
K0272+519 - K0275+844
CW1: 6.76652 lane km ( Paving of Unpaved Road )
Allocation: 125,088,000 Php |
April 13, 2018 |
Fy - 2018 |
WIN8C02280 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Mindoro Island Circumferential Road
( Puerto Galera - Abra De Ilog ), Occidental Mindoro
CW1: 4.35 lane km ( Construction of Gravel Road )
Allocation: 150,000,000
TO:
Mindoro Island Circumferential Road
( Puerto Galera - Abra De Ilog ), Occidental Mindoro
CW1: 2.247 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php |
April 13, 2018 |
FY 2018 |
WIN8G01984 |
SR2018-01-001378 |
January 29, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
San Ildefonso - San Rafael Bypass Road, incl. ROW, Bulacan |
April 13, 2018 |
FY 2018 |
WIN8G01978 |
SR2018-01-000575 |
January 26, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Daang Maharlika (LZ), K0193+500 - K0193+600 |
April 13, 2018 |
FY 2018 |
WIN8G02025 |
SR2018-01-001419 |
January 29, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System Network Development Program
Construction of Missing Links/New Roads
Capas - Botolan Road, Zambales |
April 13, 2018 |
FY 2018 |
WIN8G01988 |
SR2018-01-000969 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Secondary Roads - Angeles - Porac - Floridablanca - Dinalupihan Rd, K0091+000 - K0096+698 |
April 13, 2018 |
FY 2018 |
WIN8G01993 |
SR2018-01-000931 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW, K0064+369 - K0065+000, K0068+584 - K0068+777, K0068+801.60 - K0069+173, K0069+210.20 - K0069+300, K0073+000 - K0073+718, K0074+388 - K0074+909, K0074+924.60 - K0075+156, K0078+000 - K0079+080, K0079+113.80 - K0079+404, K0079+440.49 - K0080+245, K0081+000 - K0082+180 |
April 13, 2018 |
2018 |
310103100086000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos Point Rd - K0572+489.70-K0572+565.10, K0574+166-K0574+223.50, K0574+166-K0574+223, K0574+232-K0574+317, K0574+286.50-K0574+348.50, K0574+353-K0574+376, K0574+362.50-K0574+376, K0574+385-K0574+452.50, K0574+461.50-K0574+480, K0574+466-K0574+524.50, K0574+484.50-K0574+594.90, K0574+537.50-K0574+594.90, K0574+671.90-K0574+808.40, K0575+090.60-K0575+125.50, K0575+090.60-K0575+140.30, K0575+320.40-K0575+431.10, K0575+553.50-K0575+589.80, K0575+911.70-K0575+979.70, K0576+000-K0576+061.50 |
April 13, 2018 |
FY 2018 |
WIN8G01974 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Tarlac City - Sn Jose via Tibag - Burgos Rd, K0128+750.08 - K0129+202.00, K0130+230.00 - K0130.290.00, K0130+635.00 - K0130+683.50, K0131+402.30 - K0131+607.00, K0134+180.00 - K0134+350.00, K0134+850.00 - K0135+160.00, K0136+896.00 - K0136+976.00, K0139+266.00 - K0139+376.00, K0139+481.00 - K0139+626.00, K0141+519.00 - K0141+593.00, K0141+612.46 - K0141+662.00 |
April 13, 2018 |
FY 2018 |
WIN8G01967 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Paniqui - Ramos Rd, K0146+(-236) - K0148+345.80, K0148+994.90 - K0149+348.70, K0149+406.50 - K0149+640.00, K0150+270 - K0150+619, K0150+632 - K0151+546 |
April 13, 2018 |
2018 |
310105100084000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - K0571+(-705)-K0571+(-111), K0571+000-K0571+016, K0571+016-K0571+040, K0571+040-K0571+113, K0571+113-K0571+147, K0571+147-K0571+208, K0571+208-K0571+245, K0571+245-K0571+341.40, K0571+377.40-K0571+507.85, K0571+508.85-K0571+522.40, K0571+565.80-K0571+626.70, K0571+795.70-K0571+848.20, K0571+848.20 - K0571+880, K0571+880-K0571+940.70, K0571+908.30-K0571+962, K0573+045.70-K0573+059.90, K0573+088-K0573+129.25, K0573+157-K0573+189.10, K0573+285.75-K0573+322.65, K0573+304.25-K0573+318.10, K0573+350.20-K0573+396.80, K0573+779-K0573+850, K0574+639-K0574+673.10, K0574+697.65-K0575+011.40, K0575+022.20-K0575+072.25, K0575+72.25-K0575+104.70, K0575+251-K0575+368.20, K0575+368.20-K0575+404.90, K0576+237.40-K0576+293.30, K0576+496.15-K0576+511.40, K0576+503.40-K0576+540.15, K0576+584.10-K0576+610.55, K0576+679.05-K0576+798.75, K0576+706.35-K0576+724.50, K0576+900.65-K0576+932.45, K0576+983.25-K0576+996.85, K0577+032.40-K0577+155.10, K0577+177.70-K0577+217.70, K0577+264.75-K0577+309.80, K0577+273.70-K0577+295.15, K0577+350.30-K0577+368.30, K0577+386.25-K0577+399.80, K0577+386.25-K0577+399.80, K0577+437.30-K0577+468.90, K0577+497.25-K0577+546.40, K0577+727.60-K0577+741.30, K0579+993-K0580+026.40 |
April 13, 2018 |
FY 2018 |
WIN8G02036 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Tarlac - Sta. Rosa Rd, K0137+087 - K0137+711 |
April 13, 2018 |
2018 |
310102100078000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Magapit - Mission Rd K0558+273 - K0558+379, K0558+406 -K0558+525, K0558+525-K0559+000, K0559+060-K0559+444, K0559+750-K0559+803 |
April 13, 2018 |
FY 2018 |
WIN8G01969 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads - Tarlac City - San Jose via Tibag - Burgos Rd - K0131+069.40 - K0132+038.00, K0132+600 - K0134+000, K0136+728.60 - K0136+983.00, K0137+963 - K0138+500, K0139+000 - K0139+216, K0140+216 - K0141+593 & K0141+612.46 - K0142+131.00 |
April 13, 2018 |
FY 2018 |
WIN8G01973 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Tarlac City - Sn Jose via Tibag - Burgos Rd, K0132+600.00 - K0134+000.00, K0136+482.60 - K0136+983.00, K0137+963.00 - K0138+500.00, K0139+000.00 - K0139+216.00, K0140+216.00 - K0141+593.00, K0141+612.46 - K0142+459.00 |
April 13, 2018 |
2018 |
320102100268000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Sta. 0+000 – Sta. 0+170.40 Dalenat, Angadanan, Isabela |
April 13, 2018 |
2018 |
320102100267000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Sta. 0+000 – Sta. 0+208.80, Centro I, Angadanan, Isabela |
April 13, 2018 |
2018 |
320102100266000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Projects, Sta. 0+000 - Sta. 0+130.00, Patpat, Angadanan, Isabela |
April 13, 2018 |
2018 |
320102100261000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Projects (Phase I), Sta. 0+000 - Sta. 0+112.00, Guayabal, Cauayan City, Isabela |
April 13, 2018 |
2018 |
320102100263000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Projects (Phase I), Sta. 0+000 - Sta. 0+117.00, Baringin, Cauayan City, Isabela |
April 13, 2018 |
FY - 2018 |
WIN8F05148 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
FROM:
Construction of Tawas River Control,
Bongabong, Oriental Mindoro
CW1: 180 lineal meters ( Construction of Flood Mitigation Structure )
Allocation : 10,000,000 Php
TO:
Construction of Tawas River Control,
Bongabong, Oriental Mindoro
CW1: 176 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php |
April 13, 2018 |
2018 |
320102100260000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Projects (Phase I), Sta. 0+000 - Sta. 0+120.00, Guayabal - Baringin Norte, Cauayan City, Isabela |
April 13, 2018 |
2018 |
320102100259000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Projects (Phase I), Sta. 0+000 - Sta. 0+142, Barancuag, Angadanan, Isabela |
April 13, 2018 |
2018 |
WIN8C02367 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
Network Development – Construction of Bypass and Diversion Roads
FROM:
San Francisco (NRJ Hubang – Sta. Ana – San Isidro) Bypass Road (Daang Maharlika Alternate Route), incl. ROW, Agusan del Sur
Project ID No.: P00200459MN
Scope of Work:
- Construction of Concrete Road
- ROW Acquisition
Physical Target:
- 4.70 Lane Km (Concrete Road)
- 47,000 Square meter (ROW)
Allocation:
- Php 100,000,000.00 (Total)
- Php 95,214,620.00 (Road)
- Php 1,285,380.00 (ROW)
- Php 3,500,000.00 (EAO)
TO:
San Francisco (NRJ Hubang – Sta. Ana – San Isidro) Bypass Road (Daang Maharlika Alternate Route), incl. ROW, Agusan del Sur
Project ID No.: P00200459MN
Scope of Work:
- Construction of Concrete Road
- ROW Acquisition
Physical Target:
- 4.00 Lane Km (Concrete Road)
- 47,000 Square meter (ROW)
Allocation:
- Php 100,000,000.00 (Total)
- Php 95,167,550.00 (Road)
- Php 1,332,450.00 (ROW)
Php 3,500,000.00 (EAO)
|
April 13, 2018 |
2018 |
310110100016000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads, Daang Maharlika (LZ) – K0428 + 300 – K0429 + 819.10 |
April 13, 2018 |
FY - 2018 |
WIN8F05161 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of San Mariano River Control Structure,
Roxas, Oriental Mindoro
CW1: 700 lineal meters ( Construction of Revetment )
Allocation: 50,000,000 Php
TO:
Construction of San Mariano River Control Structure,
Roxas, Oriental Mindoro
CW1: 730 lineal meters ( Construction of Revetment )
Allocation: 50,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05145 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Protection Dike, Brgy. Quinabingan to
Brgy. Pinamalayan, Oriental Mindoro
CW1: 1,260 lineal meters ( Construction of Revetment )
Allocation: 77,570,000 Php
TO:
Construction of Protection Dike, Brgy. Quinabingan,
Pinamalayan, Oriental Mindoro
CW1: 720 lineal meters ( Construction of Revetment )
Allocation: 77,570,000 Php
|
April 13, 2018 |
2018 |
310209100038000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvemen - Tertiary Roads - Jct. Natl-Sta. Victoria Rd – K0410 + (-1898) – K0410 + (-998), K0410 + (-330) - K0410 + (-135), K0410 + (-011) - K0410 + 744 |
April 13, 2018 |
FY 2018 |
WIN8C02524 |
UACS No. 310305100030000 |
April 10, 2018 |
Region IX |
Regional Office IX |
UACS No. 310305100030000
Project ID: P00201111MN
OO1: Ensure Safe and Reliable National Road System
Bridge Program
Widening of Permanent Bridges
Dicayo Bridge (B00425MN) along Dipolog - Sindangan - Liloy Rd
Physical Target:
CW-1- Widening of Bridge: 1,486.71 sq.m.
Unit Cost: P 73,729.61/sq.m
Physical Target:
ROW: 31.49 sq.m.
Unit Cost: P 300.0/sq.m.
EAO: P 3,976,000.00
Allocation: P 113,600,000.00 |
April 13, 2018 |
2018 |
310104100048000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Santiago – Tuguegarao Rd - K0433 + 000 – K0433 + 207 |
April 13, 2018 |
2018 |
310103100089000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance - Tertiary Roads – Ilagan - Delfin Albano – Mallig Rd. - K0422 + 000 – K0424 + 500 |
April 13, 2018 |
FY - 2018 |
WIN8F05224 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road Systems
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM:
Calapan South Road
K0058+736 - K0059+680,
K0059+857 - K0061+000
CW1: 4,080.0 l.m. ( Construction of Drainage Structure along Road )
Allocation: 36,000,000 Php
TO:
Calapan South Road
K0059+857 - K0061+144
CW1: 2,199.0 l.m. ( Construction of Drainage Structure along Road )
Allocation: 36,000,000Php |
April 13, 2018 |
2018 |
310112100017000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads - Calamagui – Ilagan Rd – K0399 + (-098) – K0399 +152; K0400 + 296 – K0400 + 608; K0400 + 479 – K0400 + 551 |
April 13, 2018 |
FY 2018 |
WIN8C02497 |
UACS No. 320101102147000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102147000
Project ID: P00222070MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Tulungatung Section, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 457.00 ln.m
Unit Cost: P 42,558.78/ln.m.
Physical Target:
ROW: 148.0 sq.m.
Unit Cost: P 1,017.81/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02494 |
UACS No. 320101102143000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102143000
Project ID: P00222075MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Labuan River, Labuan Section (Including Right of Way Acquisition), Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 859.66 ln.m.
Unit Cost: P 22,558.44/ln.m.
Physical Target:
ROW: 204 sq.m.
Unit Cost: P 1,016.74/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02505 |
UACS No. 320101102148000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102148000
Project ID: P00222798MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Limpapa River, (Including Right of Way Aquisition), Limpapa, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation structure: 967.0 ln.m
Unit Cost: P 24,973.69/ln.m
Physical Target:
ROW: 346 sq.m.
Unit Cost: P 1,012.83/sq.m.
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02506 |
UACS No. 320101102151000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102151000
Project ID: P00222073MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Maasin Creek, (Including Right of Way Aquisition), Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 340.00 ln.m.
Unit Cost: P 42,851.18/ln.m
Physical Target:
ROW: 129.0 sq. m.
Unit Cost: P 1,012.40/sq.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02502 |
UACS No. 310305100426000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100426000
Project ID: P00201112MN
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Miluao Br. (B01166MN) along Zamboanga City - Labuan - Limpapa Rd including RROW
Physical Target:
CW-1- Widening of Bridge: 179.73 sq.m.
Unit Cost: P 85,572.80/sq.m.
Physical Target:
ROW: 298.00 sq.m.
Unit Cost: P 1,006.71/sq.m.
EAO: P 320,000.00
Allocation: P 16,000,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02507 |
UACS No. 310305100427000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100427000
Project ID: P00201113MN
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Patalon Br. 1 (B01167MN) along Zamboanga City - Labuan - Limpapa Rd
Physical Target:
CW-1- Widening of Bridge: 198.43 sq.m.
Unit Cost: P 86,166.41/sq.m
Physical Target:
ROW: 147.00 sq.m.
Unit Cost: P 1,020.41/sq.m.
EAO: P 352,000.00
Allocation: P 17,600,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02504 |
UACS No. 310305100428000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100428000
Project ID: P00201114MN
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Patalon Br. 2 (B01168MN) along Zamboanga City - Labuan - Limpapa Rd
Physical Target:
CW-1- Widening of Bridge: 235.07 sq. m.
Unit Cost: P 89,130.897/sq.m.
Physical Target:
ROW: 995.00 sq.m.
Unit Cost: P1,005.03/sq.m.
EAO: P 448,000.00
Allocation: P 22,400,000.00 |
April 13, 2018 |
FY 2018 |
WIN8C02494 |
UACS No. 320101102144000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102144000
Project ID: P00222076MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control at Patalon River (Including Right of Way Aquisition), Patalon Section, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 423.60 ln.m.
Unit Cost: P 34,702.55/ln.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 13, 2018 |
2018 |
WIN8C02484 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
FROM:
Rosario- Marfil -Tagbina Road, Package A, Rosario, Agusan del Sur
Project ID No. P00200457MN
Scope of Work:
Construction of Concrete Road
Physical Target:
5.339 Lane Km
Allocation: Php 100,000,000.00 (Total)
Php 96,500,000.00 (Road)
Php 3,500,000.00 (EAO)
TO:
Rosario- Marfil -Tagbina Road (Package A), Rosario, Agusan del Sur
Project ID No. P00200457MN
Scope of Work:
Construction of Concrete Road
ROW Acquisition
Physical Target:
5.339 Lane Km
44,500 Square Meters
Allocation: Php 100,000,000.00 (Total)
Php 95,338,550.00 (Road)
Php 1,161,450.00 (ROW)
Php 3,500,000.00 (EAO) |
April 13, 2018 |
2018 |
WIN8C02337 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO 1: Ensure Safe and Reliable National Road System
Network Development – Off-carriageway Improvement
FROM:
NRJ San Francisco – Bahi – Barobo Rd - K1309+(-395) – K1309 + (-210), K1309+793 – K1310+101
Project ID No. P00200821MN
Scope of Work:
Shoulder Paving / Construction
Physical Target:
2,410 sq.m.
Allocation: Php 12,050,000.00 (Total)
Php 11,809,000.00 (Road)
Php 241,000.00 (EAO)
TO:
NRJ San Francisco – Bahi – Barobo Rd - K1309+793 – K1310 +876
Project ID No. P00200821MN
Scope of Work:
Shoulder Paving / Construction
Physical Target:
5,360 sq.m.
Allocation: Php 12,050,000.00 (Total)
Php 11,809,000.00 (Road)
Php 241,000.00 (EAO) |
April 13, 2018 |
2018 |
WIN8C02374 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO 1: Ensure Safe and Reliable National Road System
Network Development – Road Widening
FROM:
NRJ Cuevas-Sampaguita Rd – K1378+598 – K1379+009
Project ID No. P00200771MN
Scope of Work: Road Widening
Physical Target: 0.826 Lane Km
Allocation: Php 12,390,000.00 (Total)
Php 12,142,200.00 (Road)
Php 247,800.00 (EAO)
TO:
NRJ Cuevas-Sampaguita Rd – K1378+598 – K1379+056
Project ID No. P00200771MN
Scope of Work:
Road Widening
ROW Acquisition
Physical Target:
0.920 Lane Km
16,440 Square meters
Allocation: Php 12,390,000.00 (Total)
Php 11,857,200.00 (Road)
Php 285,000.00 (ROW)
Php 247,800.00 (EAO) |
April 13, 2018 |
2018 |
WIN8C02335 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction /Upgrading of Damaged Paved Roads
FROM:
Butuan City - Talacogon - Loreto - Veruela - Sta. Josefa Rd K1389+529 - K1389+848
Project ID No. P00200130MN
Scope of Work: Rehabilitation of Paved Road
Physical Target: 0.638 Lane Km
Allocation: Php 19,889,000.00 (Total)
Php 19,491,220.00 (Road)
Php 397,780.00 (EAO)
TO:
Butuan City - Talacogon - Loreto - Veruela - Sta. Josefa Rd -K1389+267 - K1390+279
Project ID No. P00200130MN
Scope of Work: Rehabilitation of Paved Road
Physical Target: 1.80 Lane Km.
Allocation: Php 19,889,000.00 (Total)
Php 19,491,220.00 (Road)
Php 397,780.00 (EAO)
|
April 13, 2018 |
2018 |
WIN8C02468 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Road
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1338 + 748 - K1340 + 765
Project ID No. P00200689MN
Scope of Work: Road Widening
Physical Target: 4.034 Lane Km
Allocation: Php 57,480,000.00 (Total)
Php 55,468,200.00 (Road)
Php 2,011,800.00 (EAO)
TO:
Daang Maharlika (Agusan-Davao Section) K1338+748 – K1340+228
Project ID No. P00200689MN
Scope of Work:
Road Widening
ROW Acquisition
Physical Target:
2.960 Lane Km
80,680 Square Meters
Allocation:
Php 57,480,000.00 (Total)
Php 55,332,700.00 (Road)
Php 135,500.00 (ROW)
Php 2,011,800.00 (EAO)
|
April 13, 2018 |
2018 |
WIN8C02334 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-
Construction of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ Daang Maharlika – Purok 6 – Purok 9 – Masabong – Cossep Road leading to Dinagitan Cave and Falls, Brgy. Bayugan 3, Rosario, Agusan del Sur
Project ID No. P00230308MN
Scope of Work: Construction of Concrete Road
Physical Target: 3.78 Lane Km
Allocation: Php 45,000,000.00 (Total)
Php44,100,000.00 (Concreting)
Php 900,000.00 (EAO)
TO:
NRJ Daang Maharlika – Purok 6 – Purok 9 – Masabong – Cossep Road leading to Dinagitan Cave and Falls, Brgy. Bayugan 3, Rosario, Agusan del Sur
Project ID No. P00230308MN
Scope of Work:
Construction of Concrete Road
Construction of Gravel Road
Physical Target: 1.380 Lane Km (Concrete)
1.520 Lane Km (Gravel)
Allocation: Php 45,000,000.00 (Total)
Php 12,464,240.00 (Concreting)
Php 31,635,760.00 (Gravelling)
Php 900,000.00 (EAO)
|
April 13, 2018 |
2018 |
WIN8C02336 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Road
FROM:
NRJ Cuevas-Bislig Rd - K1375 + 000 - K1375 + 397
Project ID No. P00200700MN
Scope of Work: Road Widening
Physical Target: 0.794 Lane Km
Allocation: Php 11,917,000.00 (Total)
Php 11,678,660.00 (Road)
Php 238,340.00 (EAO)
TO:
NRJ Cuevas-Bislig Road - K1375+000 – K1375+397
Project ID No. P00200700MN
Scope of Work: Road Widening
ROW Acquisition
Physical Target: 0.794 Lane Km
15,880 Square Meters
Allocation: Php 11,917,000.00 (Total)
Php 11,568,660.00 (Road)
Php 110,000.00 (ROW)
Php 238,340.00 (EAO)
|
April 13, 2018 |
2018 |
WIN8C02470 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Road
FROM:
NRJ Sn Francisco-Bahi-Barobo Rd - K1312 + 509 - K1313 + 355, K1313 + 570 - K1314 + 178
Project ID No. P00200764MN
Scope of Work: Road Widening
Physical Target: 3.626 Lane Km
Allocation: Php 54,390,000.00 (Total)
Php 52,486,350.00 (Road)
Php 1,903,650.00 (EAO)
TO:
NRJ Sn Francisco-Bahi-Barobo Rd incl. ROW (S00463MN) - K1312 + 509 - K1313 + 355, K1313 + 570 - K1314 + 178
Project ID No. P00200764MN
Scope of Work: Road Widening
ROW Acquisition
Physical Target: 3.626 Lane Km
58,160 Square Meters
Allocation: Php 54,390,000.00 (Total)
Php 52,266,350.00 (Road)
Php 220,000.00 (ROW)
Php 1,903,650.00 (EAO) |
April 13, 2018 |
2018 |
WIN8C02469 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
FROM:
NRJ Hubang – Managbay – Alegria Diversion Road, incl. ROW and Bridge, Agusan del Sur
Project ID No. P00200452MN
Scope of Work: Construction of Concrete Road
Construction of Concrete Bridge
ROW Acquisition
Physical Target: 4.450 Lane Km
104.820 Square Meters
53,400 Square Meters
Allocation: Php 100,000,000.00 (Total)
Php 66,088,990.00 (Road)
Php 28,950,000.00 (Bridge)
Php 1,461,010.00 (ROW)
Php 3,500,000.00 (EAO)
TO:
NRJ Hubang – Managbay – Alegria Diversion Road, incl. ROW and Bridge, Agusan del Sur
Project ID No. P00200452MN
Scope of Work: Construction of Concrete Road
Construction of Concrete Bridge
Construction of Gravel Road
ROW Acquisition
Physical Target: 1.0 Lane Km
286.52 Square Meters
2.94 Lane Km
53,400 Square Meters
Allocation: Php 100,000,000.00 (Total)
Php 42,302,144.46 (Concrete)
Php 34,031,604.18 (Bridge)
Php 18,652,361.37 (Gravel)
Php 1,513,890.00 (ROW)
Php 3,500,000.00 (EAO)
|
April 12, 2018 |
FY - 2018 |
WIN8F05144 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM:
Calapan South Rd
K0085+737 - K0085+938,
K0090+750 - K0090+803,
K0144+537 - K0144+835,
K0147+063 - K0147+240,
K0147+380 - K0148+568,
K0148+980 - K0149+120,
K0149+400 - K0149+680,
K0149+900 - K0149+960,
K0151+165 - K0151+240,
K0151+960 - K0152+030,
K0154+920 - K0155+600,
K0155+700 - K0156+100
CW1: 10,929.000 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving Construction )
Allocation: 55,106,000 Php
TO:
Calapan South Rd
K0085+737 - K0085+938,
K0090+750 - K0090+803,
K0144+537 - K0144+835,
K0147+063 - K0147+240,
K0147+380 - K0148+568,
K0148+980 - K0149+120,
K0149+400 - K0149+680,
K0149+900 - K0149+960,
K0151+165 -K0151+240,
K0151+960 - K0152+030,
K0154+920 - K0155+600,
K0155+700 - K0156+100
CW1: 14,261.740 sq.m. ( Off-Carriageway Improvement :
Shoulder Paving Construction )
Allocation: 55,106,000
|
April 12, 2018 |
2018 |
310201100065000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Network Development Program
Road Widening-Primary Roads
Daang Maharlika (LZ) - K0309 + 000 - K0309 + 467, K0314 + 000 - K0314 + 208, K0317 + 000 - K0317 + 245, K0320 + 000 - K0320 + 077.6, K0320 + 203.6 - K0320 + 250, K0335 + 000 - K0336+000, K0340+303.80-K0341+223, K0341+920-K0342+547.20
|
April 12, 2018 |
FY - 2018 |
WIN8F05138 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM:
Calapan South Rd
K0185+679 - K0185+888
CW1: 418.00 lineal meters ( Construction of Drainage along National Roads )
Allocation: 2,844,000 Php
TO:
Calapan South Road
K0185+679 - K0185+885
CW1: 153.100 lineal meters ( Construction of Drainage along National Roads )
Allocation: 2,844,000 Php |
April 12, 2018 |
2018 |
310205100155000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Construction of Missing Links/ New Roads
San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road, incl. Slope Protection, Batanes
|
April 12, 2018 |
2018 |
300203100014000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Dariuk Hills, Brgy. Balintocatoc, Santiago City, Isabela
|
April 12, 2018 |
2018 |
300203100093000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM:
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations: Jct. Daang Maharlika-Masoc-Ambaguio Road leading to Mt. Pulag National Park, Ambaguio, Nueva Vizcaya
|
April 12, 2018 |
FY - 2018 |
WIN8F05125 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Inclanay River Control Structure,
Pinamalayan, Oriental Mindoro
CW1: 460 lineal meters ( Construction of Revetment )
Allocation: 30,000,000 Php
TO:
Construction of Inclanay River Control Structure,
Pinamalayan, Oriental Mindoro
CW1: 434 lineal meters ( Construction of Revetment )
Allocation: 30,000,000 Php |
April 12, 2018 |
FY - 2018 |
WIN8F05132 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Mindoro Oriental/Occidental East Coastal Rd
K0201+833 - K0202+515
CW1: 1.614 lane km ( Rehabilitation of Paved Road )
Allocation: 16,140,000 Php
TO:
Mindoro Oriental/Occidental East Coastal Road
K0201+833 - K0202+361.50
CW1: 1.297 lane km ( Rehabilitation of Paved Road )
Allocation: 16,140,000 Php |
April 12, 2018 |
FY - 2018 |
WIN8F05137 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect lives and Properties Against Major Floods
Flood Management - Construction/Rehabilitation of Flood
Mitigation Facilities along major River Basins and Principal Rivers
FROM:
Construction of Balite River Control Structure,
Gloria, Oriental Mindoro
CW1: 650.00 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000 Php
TO:
Construction of Balite River Control Structure,
Gloria, Oriental Mindoro
CW1: 728.00 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000 Php |
April 12, 2018 |
GAA FY 2018 |
WIN8F05187 |
UACS No. 300116200355000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200355500
Project ID: P00240559LZ
WIN8F05187
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Tirad Pass to Mariano Ponce Road,
Brgy. 135 connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.474 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,675.11/ lane km
Allocation: P 9.800 M
Total: P 10 M
As Modified
UACS No. 300116200355500
Project ID: P00240559LZ
WIN8F05187
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Mariano Ponce Road,
Brgy. 135 connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.474 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,675.11/ lane km
Allocation: P 9.800 M
Total: P 10 M
|
April 12, 2018 |
GAA FY 2018 |
WIN8F05186 |
UACS No. 300116200354000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200354000
Project ID: P00240558LZ
WIN8F05186
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Tirad Pass to Gen. Tinio,
Brgy. 134 connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.472 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,762.71/ lane km
Allocation: P 9.800 M
Total: P 10 M
As Modified
UACS No. 300116200354000
Project ID: P00240558LZ
WIN8F05186
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Gen. Tinio Road,
Brgy. 134 from Tirad Pass connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.472 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,762.71/ lane km
Allocation: P 9.800 M
Total: P 10 M
|
April 12, 2018 |
GAA FY 2018 |
WIN8F05185 |
UACS No. 300116200353000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200353000
Project ID: P00240560LZ
WIN8F05185
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Tirad Pass to Gen. Malvar Road,
Brgy. 136 connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.472 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,762.71/ lane km
Allocation: P 9.800 M
Total: P 10 M
As Modified
UACS No. 300116200353000
Project ID: P00240560LZ
WIN8F05185
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road and Drainage System along Gen. Malvar Road,
Brgy. 136 connecting EDSA, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.472 Lane Km
EAO – P 0.200 M
Unit Cost (P’000): P20,762.71/ lane km
Allocation: P 9.800 M
Total: P 10 M
|
April 12, 2018 |
GAA FY 2018 |
WIN8F05303 |
UACS No. 310101100048000 |
January 1, 2018 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 31010110004800
Project ID: P00200003LZ
WIN8F05303
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary
Quirino Avenue, K0013+293 – K0014+206
Physical Target: CW1-Asphalt Overlay 2.715 lane km
EAO – P 409,200.00
Unit Cost (P’000): P7,385.00/ lane km
Allocation: P 20.050,800.00 M
Total: P 20,460,000.00
As Modified
UACS No. 31010110004800
Project ID: P00200003LZ
WIN8F05303
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary
Quirino Avenue, K0013+293 – K0014+206.90
Physical Target: CW1-Asphalt Overlay 3.624 lane km
EAO – P 409,200.00
Unit Cost (P’000): P5,533/ lane km
Allocation: P 20.050,800.00 M
Total: P 20,460,000.00
|
April 12, 2018 |
FY 2018 |
WIN8C02226 |
UACS No. 320101102165000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102165000
Project ID: P00221252MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Ilaya-Oyan Bridge including RROW Section along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 160 l.m.
Unit Cost: P 239,531.25/l.m.
Physical Target:
ROW: 533.0 sq.m
Unit Cost: P 1,500.94/sq.m
Physical Target:
Soil Exploration: 1 Borehole
Unit Cost: P 75,000.00/borehole
EAO: P 800,000.00
Allocation: P 40,000,000.00 |
April 12, 2018 |
2018 |
310103100016000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Quirino District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program-Preventive Maintenance-Tertiary Roads
Jct Mangandingay-Saguday-Isabela Bdry Rd - K0336 + 265 - K0338 + 219, K0344 + 535 - K0346 + 757, K0346+867-K0347+219
|
April 12, 2018 |
2018 |
310212100054000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Quirino District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Network Development Program
Paving of Unpaved Roads-Tertiary Roads
Jct Abbag-Guingin Bdry Rd - K0445 + 000 - K0445 + 054, K0445 + 4643 - K0445 + 4715.70, K0450 + 907 - K0451 + 040.40, K0453+121-K0453+475, K0460+477-K0460+880, K0463+710-K0463+834
|
April 11, 2018 |
FY - 2018 |
WIN8F05142 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Rd
K0078+466 - K0079+595,
K0091+440 - K0091+578,
K0091+920 - K0092+540,
K0092+720 - K0092+990
CW1: 4.308 lane km ( Road Widening )
Allocation: 64,620,000 Php
TO:
Calapan South Road
K0078+466 - K0079+595,
K0091+440 - K0091+578,
K0091+920 - K0092+540,
K0092+720 - K0092+990
CW1: 4.2674 lane km ( Road Widening )
Allocation: 64,620,000 Php
|
April 11, 2018 |
FY - 2018 |
WIN8F05143 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Rd
K0093+610 - K0094+191,
K0094+200 - K0096+968
CW!: 6.666 lane km ( Road Widening )
Allocation: 100,000,000 Php
TO:
Calapan South Road
K0094+160 - K0094+191,
K0094+200 - K0096+968
CW1: 5.574 lane km ( Road Widening )
Allocation: 100,000,000 Php |