April 11, 2018 |
FY - 2018 |
WIN8F05131 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM:
Bongabong - Sagana - Roxas - Sn Aquilino Rd
K0105+767 - K0106+345,
K0106+368 - K0110+734
CW1: 14,832.00 sq.m. ( Off-Carriageway Improvement: Shoulder Paving/Construction )
Allocation: 100,000,000 Php
TO:
Bongabong - Sagana - Roxas - San Aquilino Road
K0105+767 - K0106+345,
K0106+368 - K0110+734
CW1: 30,116.60 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 100,000,000Php
|
April 11, 2018 |
2018 |
WIN8G02017 |
WIN8G02017 |
March 28, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0509 + 065 - K0509 + 465, K0513 + 100 - K0513 + 500, K0517 + 915 - K0518 + 000, K0518 + 674 - K0519 + 000, K0519 + 168 - K0520 + 240, K0523 + 015 - K0523 + 655, K0523 + 725 - K0524 + 000, K0524 + 810 - K0524 + 893, K0525 + 096 - K0525 + 617; Physical Target:7.616 Lane km; Allocation = Php 110,734,000
To: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0503 + 900 - K0504 + 792, K0509 + 063 - K0509 + 463, K0513 + 083 - K0513 + 483, K0517 + 904 - K0518 + 050, K0518 + 662 - K0520 + 022, K0520 + 234 - K0520 + 279, K0523 + 014 - K0523 + 654, K0523 + 720 - K0524 + 000, K0524 + 810 - K0524 + 888, K0525 + 096 - K0525 + 610; Physical Target:11.966 Lane Km; Allocation = Php 110,734,000
|
April 11, 2018 |
2018 |
WIN8G01824 |
WIN8G01824 |
March 12, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of New Permanent Bridges - Tanudan Br. along Tabuk-Banawe via Tanudan-Barlig Rd; Physical Target:954.00 Square Meters; Allocation = Php 100,000,000
To: Construction of New Permanent Bridges - Tanudan Br. along Tabuk-Banawe via Tanudan-Barlig Rd; Physical Target:858.60 Square Meters; Allocation = Php 100,000,000
|
April 11, 2018 |
2018 |
WIN8G01770 |
WIN8G01770 |
March 13, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro Rizal (Liwan), Kalinga; Physical Target:3.808 Lane Km; Allocation = Php 50,000,000
To: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro Rizal (Liwan), Kalinga; Physical Target:5.00 Lane Km; Allocation = Php 50,000,000
|
April 11, 2018 |
2018 |
WIN8G01830 |
WIN8G01830 |
March 13, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads, Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 955 - K0496 +1007, K0496 + 690 - K0496 + 884, K0501 + 783 - K0501 + 838, K0513 + 700 - K0513 + 800, K0514 + 700 - K0514 + 800, K0515 + 300 - K0515 + 800, K0516 + 532 - K0516 + 545, K0516 + 568 - K0516 + 582, K0516 + 613 - K0516 + 623, K0516 + 680 - K0516 + 695, K0516 + 725 - K0516 + 763, K0516 + 850 - K0516 + 864, K0517 + 220 - K0517 + 269; Physical Target:6,653.00 Square Meters; Allocation = Php 32,232,000
To: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Primary Roads, Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 995 - K0497 +007, K0496 + 698 - K0496 + 884, K0501 + 783 - K0501 + 838, K0513 + 700 - K0513 + 800, K0514 + 700 - K0514 + 800, K0515 + 300 - K0515 + 800, K0516 + 532 - K0516 + 545, K0516 + 568 - K0516 + 582, K0516 + 613 - K0516 + 623, K0516 + 680 - K0516 + 695, K0516 + 725 - K0516 + 763, K0516 + 850 - K0516 + 864, K0517 + 220 - K0517 + 269; Physical Target:6,653.00 Square Meters; Allocation = Php 32,232,000
|
April 11, 2018 |
2018 |
WIN8G01771 |
WIN8G01771 |
March 13, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Road Widening - Tertiary Roads, Nambaran-Isabela Rd - K0513 + 503 - K0514 + 000, K0516 + 000 - K0516 + 197; Physical Target:1.366 Lane Km.; Allocation = Php 21,319,000
To: Nambaran-Isabela Rd - K0513 + 503 - K0514 + 000, K0516 + 000 - K0516 + 169, K0516 + 169 - K0516 + 197; Physical Target:1.388 Lane Km.; Allocation = Php 21,319,000
|
April 11, 2018 |
2018 |
WIN8G01772 |
WIN8G01772 |
March 12, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Local Infrastructure Program - Water Management Facilities, Construction of Potao, Apatan Waterworks, Apatan, Pinukpuk, Kalinga; Physical Target:1.00 No. of water supply; Allocation = Php 500,000
To: Local Infrastructure Program - Water Management Facilities, Construction of Apatan Water works, Apatan, Pinukpuk, Kalinga; Physical Target:1.00 No. of water supply; Allocation = Php 500,000
|
April 11, 2018 |
2018 |
WIN8G01823 |
WIN8G01823 |
March 13, 2018 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Replacement of Permanent Weak Bridges - Umaboy Br. 2 (B04783LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect); Physical Target:1.00 No. of Bridges; Allocation = Php 6,600,000
To: Replacement of Permanent Weak Bridges - Umaboy Br. II (B02816LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) ; Physical Target:13.70 Lineal Meters; Allocation = Php 6,600,000
|
April 11, 2018 |
2018 |
WIN8C02341 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities
FROM:
Construction of Multi-Purpose Building, Bingcongan, Bigaan, Bislig City, Surigao del Sur
Project ID: P00252774MN
Physical Target:
- 1 Number of Building
Allocation:
- Php 2.0M (Total)
- Php 1.98M (Building)
- Php 0.02M (EAO)
TO:
Construction of Multi-Purpose Building, Bingcongan, Bigaan, Hinatuan, Surigao del Sur
Project ID: P00252774MN
Physical Target:
- 1 Number of Building
Allocation:
- Php 2.0M (Total)
- Php 1.98M (Building)
- Php 0.02M (EAO)
|
April 11, 2018 |
2018 |
WIN8C02375 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Network Development – Construction of Bypass and Diversion Roads
FROM:
NRJ SDCR – San Isidro – Quezon Tandag Airport Bypass Road, Surigao del Sur
Project ID No: P00200455MN
Physical Target:
– 4.774 Lane Km (Construction of Concrete Road)
Allocation:
- Php 58,900,000.00 (Total)
- Php 56,838,500 (Concrete Road)
- Php 2,061,500 (EAO)
TO:
NRJ SDCR – San Isidro – Quezon Tandag Airport Bypass Road Surigao del Sur
Project ID No: P00200455MN
Physical Target:
– 0.383 Lane Km (Construction of Concrete Road)
– 3,329.77 Square meters (Slope Protection)
– 200.343 Square meter (Construction of Concrete Bridge)
Allocation:
– Php 58,900,000.00 (Total)
- Php 15,313,262.44 (Road)
- Php 34,964,759.62 (Slope Protection)
- Php 6,560,477.94 (Bridge)
- Php 2,061,500 (EAO) |
April 11, 2018 |
2018 |
WIN8C02377 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ leading to Lubcon Falls Road, Brgy. Mabahin, Cortes, Surigao del Sur
Project ID No: P00230316MN
Physical Target:
– 0.70 Lane Km (Construction of Concrete Road)
– 85.86 Square meter (Construction of Concrete Bridge)
Allocation:
- Php 13,200,000.00 (Total)
- Php 4,116,000.00 (Road)
- Php 8,820,000.00 (Bridge)
- Php 264,000.00 (EAO)
TO:
NRJ leading to Lubcon Falls Road, Brgy. Mabahin, Cortes, Surigao del Sur
Project ID No: P00230316MN
Physical Target:
- 0.518 Lane Km (Construction of Concrete Road)
- 200.34 Square meter (Construction of Concrete Bridge)
Allocation:
- Php 13,200,000.00 (Total)
- Php 8,101,576.04 (Road)
- Php 4,834,423.96 (Bridge)
- Php 264,000.00 (EAO)
|
April 11, 2018 |
2018 |
WIN8C02338 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads
FROM:
Concreting of Cagbo-Awasian Road, Sta. 0+000 – Sta. 2+000, Tandag City, Surigao del Sur
Project ID No. P00240327MN
Physical Target:
– 1.66 lane km (Construction of Concrete Road)
Allocation:
- Php 20,000,000.00 (Total)
- Php 19,600,000.00 (Concrete Road)
- Php 400,000.00 (EAO)
TO:
Concreting of Cagbo-Awasian Road, Sta. 2+720 – Sta. 3+500, Tandag City, Surigao del Sur
Project ID No. P00240327MN
Physical Target:
– 1.56 lane km (Construction of Concrete Road)
Allocation:
- Php 20,000,000.00 (Total)
- Php 19,600,000.00 (Concrete Road)
- Php 400,000.00 (EAO)
|
April 11, 2018 |
2018 |
WIN8F05119 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to Airports, Jct. Dauis-Panglao road to Lourdes Bolod-Tawala leading to New Bohol International Airport, incl. ROW, Bohol |
April 11, 2018 |
2018 |
WIN8F05117 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to Airports, Jct. PICR via Biking-Libaong-Bolod Access Road leading to New Bohol International Airport, incl. ROW, Bohol
|
April 11, 2018 |
2018 |
WIN8F05120 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program - Road Widening - Primary Roads, N. Bacalso Ave. (Cebu South Rd) incl. ROW - K0027+429 - K0029+060, K0029+072 - K0030+680
|
April 11, 2018 |
2018 |
WIN8F05118 |
R.A. 10964 |
December 19, 2018 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation, Rehabilitation/Reconstruction of National Roads with slips, slope Collapse and Landslide, Secondary
Roads, Tagbilaran East Rd (Tagbilaran-Jagna) K0214+270 - K0214+420 |
April 11, 2018 |
2018 |
WIN8C02340 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ SDCR - Cagbo - Hitaub Access Road leading to Hitaub Campsite, Waterfalls, Bird Watching & Picnic Area, Brgy. Awasian, Tandag City, Surigao del Sur
Project ID No. – P00230323MN
Physical Target:
– 2.00 lane km (Construction of Concrete Road)
Allocation:
- Php 30,000,000.00 (Total)
- Php 29,400,000.00 (Road)
- Php 600,000.00 (EAO)
TO:
NRJ SDCR - Cagbo - Hitaub Access Road leading to Hitaub Campsite, Waterfalls, Bird Watching & Picnic Area, Brgy. Awasian, Tandag City, Surigao del Sur
Project ID No. – P00230323MN
Physical Target:
– 1.191 lane km (Construction of Concrete Road)
– 200.34 Square meters (Construction of Concrete Bridge)
Allocation:
- Php 30,000,000.00 (Total)
- Php 24,570,313.43 (Road)
- Php 4,829,686.57 (Bridge)
- Php 600,000.00 (EAO)
|
April 11, 2018 |
2018 |
WIN8F05121 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program - Road Widening - Primary Roads, N. Bacalso Ave (Cebu South Rd) incl. ROW-K0031+350 - K0033+740
|
April 11, 2018 |
2018 |
WIN8C02276 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to Tourism Destinations, Pilipog-Gabi (Rock Causeway) Coastal Road leading to Gilutongan Marine Sanctuary, Nalusuan Marine Sactuary, Hotels & Resort, Brgy, Pilipog, Cordova, Cebu |
April 11, 2018 |
2018 |
WIN8C02275 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads with Slips, Slope Collapses and Landslide, Tertiary Road, Vallehermoso-Canlaon City-La Castellana Rd- K0155+000-K0155+240, K0155+300-K0155+480, K0157+175-K0157+315, K0159+(-811)-K0159+(-678) |
April 11, 2018 |
2018 |
WIN8C02339 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ - Cagwait Road leading White Beach Resort, Cagwait, Surigao del Sur
Project ID No. – P00230330MN
Physical Target:
– 2.694 lane km (Construction of Concrete Road)
Allocation:
- Php 40,000,000.00 (Total)
- Php 39,200,000.00 (Road)
- Php 800,000.00 (EAO)
TO:
NRJ - Cagwait Road leading White Beach Resort, Cagwait, Surigao del Sur
Project ID No. – P00230330MN
Physical Target:
– 0.698 lane km (Construction of Concrete Road)
– 1 Number of (Construction of Concrete Bridge)
– 4,565.17 Square meters (Slope Protection Structure)
Allocation:
- Php 40,000,000.00 (Total)
- Php 20,113,096.41 (Concrete Road)
- Php 5,146,664.97 (Concrete Bridge)
- Php 13,940,238.62 (Slope)
- Php 800,000.00 (EAO)
|
April 10, 2018 |
FY - 2018 |
WIN8F05108 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslides
- Secondary Roads
FROM:
Calapan North Road
K0036+200 - K0036+360 ,
K0036+420 - K0036+580
CW1: 2,016.00 sq.m. ( Construction of Road Slope Protection Structure)
Allocation: 16,929,000 Php
TO:
Calapan North Road
K0036+220 - K0036+517.20
CW1: 1,874.25sq.m. ( Construction of Road Slope Protection Structure )
Allocation: 16,929,000 Php |
April 10, 2018 |
FY - 2018 |
WIN8F05086 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Roads
FROM:
Calapan South Road
K0054+936 - K0055+427,
K0061+957 - K0062+800
CW1:8,322.00 sq.m. ( Off-Carriageway Improvement: Shoulder Paving/Construction )
Allocation: 44,949,000 Php
TO:
Calapan South Road
K0054+940 - K0055+367,
K0061+876.80 - K0062+662
CW!: 7,591.20 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 44,949,000 Php |
April 10, 2018 |
FY - 2018 |
WIN8F05089 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities
Local Infrastructure Program
FROM:
Construction of a Multi-Purpose Building,
Barangay Sitio Kantuhan, Baco, Oriental Mindoro
CW1: Construction of Multi-Purpose Building : 1
Allocation: 2,000,000 Php
TO:
Construction of a Multi-Purpose Building,
Sitio Kantuhan, Barangay Mamangan I,
Baco, Oriental Mindoro
CW1: Construction of Multi-Purpose Building : 1
Allocation: 2,000,000 Php
|
April 10, 2018 |
FY - 2018 |
WIN8F05133 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM:
Calapan North Road
K0010+000 - K0010+865,
K0011+411 - K0011+640,
K0012+642 - K0012+958,
K0012+958 - K0013+601,
K0013+782 - K0013+874
CW1: 11,904.00 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 50,000,000 Php
TO:
Calapan North Road
K0010+000 - K0010+865,
K0011+411 - K0011+640,
K0012+700 - K0013+443
CW1: 9,757.00 sq.m. ( Off-Carriageway Improvement :
Shoulder Paving/Construction )
Allocation: 50,000,000 Php
|
April 10, 2018 |
FY - 2018 |
WIN8F05090 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM:
Construction of Flood Control /Drainage System,
Mag-Asawang Tubig IRS, Naujan, Oriental Mindoro
CW1: 390.0 l.m. ( Construction of Flood Mitigation Structure )
Allocation: 25,000,000 Php
TO:
Construction of Flood Control/Drainage System,
Mag-Asawang Tubig RIS, Naujan, Oriental Mindoro
CW1: 390.0 l.m. ( Construction of Flood Mitigation Structure )
Allocation: 25,000,000 Php |
April 10, 2018 |
FY 2018 |
WIN8G01741 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction/Maintenance of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Rehabilitation / Improvement of Existing Dike along Rio Chico River (U/S of Rio Chico Bridge, R/S), Sta. 4+648 to Sta. 4+800, La Paz, Tarlac |
April 10, 2018 |
FY- 2018 |
WIN8F05105 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Tertiary Roads
FROM:
CSR Jct - Minas Rd
K0043+793 - K0045+621,
K0045+681 - K0046+000,
K0049+014 - K0049+697
CW1: 18,114.00 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 50,000,000 Php
TO:
CSR Jct - Minas Rd
K0043+797 - K0045+588.50,
K0045+687 - K0045+1222,
K0049+014 - K0050+209.50
CW1: 17,562.15 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 50,000,000 Php |
April 10, 2018 |
FY 2018 |
WIN8G01739 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads - Tarlac - Zambales Road, K0108+409.50 - K0108+609, K0109+150 - K0109+200, K0109+420 - K0109+450, K0109+810 - K0109+932, K0112+881.50 - K0112+913, K0112+955 - K0113+004.50 |
April 10, 2018 |
2018 |
310103100014000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program
Preventive Maintenance-Tertiary Roads Jct Ipil-Quirino Bdry Rd - K0344 + 000 - K0345 + 000, K0345 + 000 - K0345 + 060, K0348 + 540.9 - K0348 + 916.6, K0349 + 000 - K0350 + 000, K0352 + 500 - K0354 + 000, K0355 + 385.4 - K0355 + 862.1, K0356 + 591.1 - K0357 + 086.5, K0359 + (-510.6) - K0359 + 000, K0360 + 530 - K0362 + 000, K0362 + 000 - K0362 + 420
|
April 10, 2018 |
FY 2018 |
WIN8G01740 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation / Improvement of Existing Dike along Lucung River (Cut-Cut 1st Section, Left Bank), U/S of Cut-Cut Bridge, Sta. (-) 10+800 to Sta. (-) 9+980, Sta. (-) 9+950 to Sta. (-) 9+830, Capas, Tarlac |
April 10, 2018 |
FY - 2018 |
WIN8F05092 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
FROM:
Pola - Naujan Bypass Road,
Mindoro Oriental
CW1: 2.20 lane km ( Construction of Concrete Road )
Allocation : 50,000,000 Php
TO:
Pola - Naujan Bypass Road
Oriental Mindoro
CW1: 3.60 lane km ( Construction of Concrete Road )
Allocation : 50,000,000 Php
|
April 10, 2018 |
2018 |
3101044100012000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads-Primary Roads
Daang Maharlika (LZ) K0328+067.30-K0329+000, K0329+000-K0329+750, K0330 + 400 - K0331 + 000, K0331+000-K0332+000, K0332+000-K0333+000, K0334 + 000 - K0334 + 614.40, K0336+000-K0336+464.80
|
April 10, 2018 |
FY 2018 |
WIN8G01971 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads - Angeles - Porac - Floridablanca - Dinalupihan Road, K0106+689 - K0107+886.50 |
April 10, 2018 |
FY 2018 |
WIN8G02063 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads – San Fernando - Lubao Road, K0077+194 - K0077+198.50, K0077+248 - K0077+270.50, K0077+273.50 - K0077+314 |
April 10, 2018 |
FY 2018 |
WIN8G01968 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along Caulaman River, Gutad Section, Sta. 0+000 to Sta. 0+254.66, Floridablanca, Pampanga |
April 10, 2018 |
FY 2018 |
WIN8G01970 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along Porac River, Poblacion to San Isidro, Sta. 0+000 to Sta. 0+233.66, Floridablanca, Pampanga |
April 10, 2018 |
FY - 2018 |
WIN8F05116 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Convergence and Special Support
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Palangan - Sabang - Sinandigan Road,
Polacion to Sabang Beach,
Puerto Galera, Oriental Mindoro
CW1: 4.0 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Palangan, Sabang, Sinandigan Road,
Poblacion to Sabang Beach,
Puerto Galera, Oriental Mindoro
CW1: 5.52 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
April 10, 2018 |
FY - 2018 |
WIN8F05091 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program
FROM:
Construction of a Multi-purpose Building at
Barangay Jordan, Victoria, Oriental Mindoro
CW1: Construction of Multi-Purpose Building : 1
Allocation: 2,000,000 Php
TO:
Construction of a Multi-purpose Building at
Sitio Jordan, Barangay Bethel, Victoria, Oriental Mindoro
CW1: Construction of Multi-Purpose Building : 1
Allocation: 2,000,000 Php |
April 10, 2018 |
2018 |
310105100009000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads-Secondary Roads
Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) K0575 + 000 - K0580 + 000
|
April 10, 2018 |
FY - 2018 |
WIN8F05136 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Cavillan River Control Structure,
Bulalacao, Oriental Mindoro
CW1: 500.00 lineal meters ( Construction of Revetment )
Allocation: 30,000,000 Php
TO:
Construction of Cavillan River Control Structure,
Bulalacao, Oriental Mindoro
CW1: 368.00 lineal meters ( Construction of Revetment )
Allocation: 30,000,000 Php |
April 10, 2018 |
FY - 2018 |
WIN8F05135 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Malayong River Control Structure,
Gloria, Oriental Mindoro
CW1: 280 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Malayong River Control Structure,
Gloria, Oriental Mindoro
CW1: 324 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
April 10, 2018 |
2018 |
310105100017000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads-Secondary Roads
Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0339 + 104 - K0339 + 187, K0339 + 447 - K0339 + 623, K0342 + 980 - K0343 + 293, K0352 + 280 - K0352 + 358, K0352 + 358 - K0353 + 485, K0353 + 485 - K0354 + 083, K0356 + 400 - K0357 + 412, K0357 + 685 - K0358 + 370, K0361 + 956 - K0362 + 081, K0362 + 086 - K0362 + 113, K0362 + 122 - K0362 + 467 |
April 10, 2018 |
2018 |
310201100198000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program-Road Widening
Santiago-Tuguegarao Rd - K0398 + 000 - K0398 + 050, K0407 + 000 - K0407 + 500, K0409 + 358.80 - K0410 + 588.5
|
April 10, 2018 |
2018 |
WIN8G01873 |
WIN8G01873 |
March 15, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - NRJ-Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to various tourist attractions, Buguias, Benguet; Physical Target:10.00 Lane Km; Allocation = Php 175,000,000
To: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - NRJ-Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to various tourist attractions, Buguias, Benguet; Physical Target:8.274 Lane Km; Allocation = Php175,000,000
|
April 10, 2018 |
2018 |
WIN8G01863 |
WIN8G01863 |
March 15, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, incl. Bridge, Bauko and Tadian, Mountain Province; Physical Target: CW1 : 5.714 Lane Km; CW2 : 302.99 Square meters; Allocation = Php 130,000,000
To: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, incl. Bridge, Bauko and Tadian, Mountain Province; Physical Target: CW1 : 5.714 Lane Km; CW2 : 302.99 Square meters; Allocation = Php130,000,000
|
April 10, 2018 |
2018 |
WIN8G01877 |
WIN8G01877 |
March 15, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Timbak Caves Road leading to Timbak Caves and Mummy of Apo Anno, incl. Bridge, Atok/Kabayan, Benguet; Physical Target: CW1 : 4.00 Lane Km; CW2 : 333.90 Square meters; Allocation = Php 104,000,000
To: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Timbak Caves Road leading to Timbak Caves and Mummy of Apo Anno, incl. Bridge, Atok/Kabayan, Benguet; Physical Target: CW1 : 3.19 Lane Km; CW2 : 443.61 Square meters; Allocation = Php104,000,000
|
April 10, 2018 |
2018 |
WIN8G01852 |
WIN8G01852 |
March 22, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Paving of Unpaved Roads - Tertiary Roads - Mt. Province-Isabela Rd - (S00535LZ) Chainage 21883 - Chainage 25863; Physical Target:7.96 Lane Km; Allocation = Php 140,000,000
To: Paving of Unpaved Roads - Tertiary Roads: Mt. Province-Isabela Rd - (S00535LZ) Chainage 21883 – Chainage 24699, Chainage 24699 - Chainage 25863; Physical Target:7.394 Lane Km; Allocation = Php140,000,000
|
April 10, 2018 |
2018 |
WIN8G01876 |
WIN8G01876 |
March 22, 2018 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Network Development Program- Construction of By-Pass and Diversion Roads-Magsaysay Avenue (Trinidad Road) to Rimando - Ambiong Road Bypass, Incl. Bridge, Baguio City; Physical Target:732 Square Meters; Allocation = Php 100,000,000
To: Network Development Program- Construction of By-Pass and Diversion Roads-Magsaysay Avenue (Trinidad Road) to Rimando - Ambiong Road Bypass, Incl. Bridge and ROW, Baguio City; Physical Target:950 Square Meters; Allocation = Php100,000,000
|
April 10, 2018 |
2018 |
WIN8G01874 |
WIN8G01874 |
March 16, 2018 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay West Flyover (B02192LZ) along Magsaysay Ave. (Trinidad Rd), Baguio City; Physical Target:1 No. of Bridge; Allocation = Php 70,000,000
To: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay West Flyover (B02192LZ) along Magsaysay Ave. (Trinidad Rd), Baguio City; Physical Target:1 No. of Bridge; Allocation = Php39,275,000
|
April 10, 2018 |
2018 |
310201100169000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Road Widening-Primary Roads
Manila North Rd - K0646 + 000 - K0647 + 977, K0652 + 767 - K0653 + 248, K0653 + 280 - K0653 + 399.50
|
April 10, 2018 |
2018 |
310201100064000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System- Network Development Program
Road Widening- Primary Roads
Daang Maharlika (LZ) - K0254 + 641 - K0255 + 309.50, K0259 + 899.20 - K0260 + 051.70, K0260 + 072.30 - K0260 + 225.70, K0261 + 090 - K0261 + 242, K0261 + 274 - K0261 + 673, K0261 + 700 - K0263 + 536.60, K0266 + 947.70 - K0267 + 167, K0267 + 430 - K0268 + 474, k0266+592 - k0266+947.70
|
April 10, 2018 |
2018 |
310201100031000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Road Widening-Primary Roads
Cagayan Valley Rd incl. ROW - K0519+499 - K0524 + 000
|
April 10, 2018 |
2018 |
310201100031000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Road Widening-Primary Roads
Cagayan Valley Rd incl. ROW - K0519+499 - K0524 + 000
|
April 10, 2018 |
2018 |
310201100031000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Road Widening-Primary Roads
Cagayan Valley Rd incl. ROW - K0519+499 - K0524 + 000
|
April 10, 2018 |
2018 |
310201100061000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Network Development Program: Road Widening-Primary Roads
Daang Maharlika (LZ) - K0216 + 886 - K0219 + 092.70, K0219 + 224 - K0219 + 899, K0219 + 954.70 - K0220 + 490.80, K0220 + 874.60 - K0222 + 828
|
April 10, 2018 |
2018 |
310202100048000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Network Development Program
Road Widening-Secondary Roads
Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0371 + 575 - K0371+584.50, K0371+617-K0372+242, K0372+369-K0375 + 514, K0375+583-K0375+898
|
April 10, 2018 |
2018 |
310201100071000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Regional Office II |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Network Development Program
Road Widening - Primary Roads
Daang Maharlika (LZ) - K0394+000-K0394+487, K0395 + 931 - K0396 + 400, K0397 + 070.50 - K0397 + 246, K0397 + 748 - K0397 + 922, K0397 + 968.40 - K0398 + 383.20
|
April 6, 2018 |
FY 2018 |
WIN8G01945 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads - Roman Expressway - K0119+(-303) - K0119+920, K0119+950 - K0120+662, K0120+691 - K0121+852 |
April 6, 2018 |
FY 2018 |
WIN8G01965 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike Sitio Dau (Panilao Section Phase I), Sta. 0+000 to Sta. 0+248, Pilar, Bataan |
April 6, 2018 |
FY 2018 |
WIN8G01946 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Seaports - Access Road leading to Bonifacio Port, incl. ROW and Slope Protection, Mariveles, Bataan |
April 6, 2018 |
FY 2018 |
WIN8G01736 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Jct Layac - Balanga - Mariveles Port Rd, K0104+529 - K0105+180, K0107+393 - K0107+500 |
April 6, 2018 |
FY 2018 |
WIN8G01731 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Mabatang Vicinal Road - K0118+(-557) - K0118+(-020.30), K0120+763 - K0120+900 |
April 6, 2018 |
FY 2018 |
WIN8G01732 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads - Roman Expressway - K0116+246 - K0117+000 |
April 6, 2018 |
FY 2018 |
WIN8G01733 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads - Calaguiman Vicinal Road - K0119+000 - K0119+737, K0119+737 - K0119+905.35, K0125+000 - K0125+108 |
April 6, 2018 |
FY 2018 |
WIN8G01735 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / upgrading of Damaged Paved Roads - Secondary Roads - Roman Expressway - K0101+101 - K0101+522, K0104+833 - K0105+103, K0107+349 - K0107+739, K0115+449 - K0116+075, K0116+120 - K0116+246, K0118+065 - K0118+620 |
April 6, 2018 |
FY 2018 |
WIN8G01738 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Project in Pentor - Balsik River, Balsik Section, Brgy. Balsik, Hermosa, Bataan |
April 6, 2018 |
FY 2018 |
WIN8G01738 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Project in Pentor - Balsik River, Balsik Section, Brgy. Balsik, Hermosa, Bataan |
April 6, 2018 |
FY 2018 |
WIN8G01734 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities with Major River Basins and Principal Rivers - Rehabilitation / Improvement of Existing Dike along Parua River (Left Bank) Lilibangan Section, Sta. 15+300 to Sta. 15+614.40, Concepcion, Tarlac |
April 6, 2018 |
FY 2018 |
WIN8G01737 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Rehabilitation / Improvement of Existing Dike along Rio Chico River, (La Purisima Section, Right Bank), La Paz, Tarlac |
April 5, 2018 |
FY 2018 |
WIN8C02139 |
UACS No. 310105100167000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310105100167000
Project ID: P00200118MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Jct. Pulauan Port Road
K1827+436 - K1828+215
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 1.558 lane km
Unit Cost: P 8,703,003.85/lane km
EAO: P 276,720.00
Allocation: P 13,836,000.00 |
April 5, 2018 |
FY - 2018 |
WIN8F05093 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Mindoro Island Circumferential Road
( Puerto Galera, Abra de Ilog ), Mindoro Oriental
CW1: 2.50 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Mindoro Island Circumferential Road
( Puerto Galera, Abra de Ilog ),
Puerto Galera, Oriental Mindoro
CW1: 5.61 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
|
April 5, 2018 |
FY 2018 |
WIN8C02135 |
UACS No. 310106100014000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100014000
Project ID: P00200131MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct. Oroquieta Road
K1824+736 - K1825+434,
K1825+455 - K1826+635
Physical Target:
CW-1- Road Upgrading Asphalt to Concrete: 3.756 lane km
Unit Cost: P 15,090,095.85/lane km
Physical Target:
ROW: 196.80 sq.m
Unit Cost: P 1,500/sq m
EAO: P 2,066,400.00
Allocation: P 59,040,000.00 |
April 5, 2018 |
FY - 2018 |
WIN8F05111 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM:
Calapan North Rd.
K0019+511 - K0020+850
CW1: 2,684.00 l.m. ( Construction of Drainage Structure along Road )
Allocation: 41,867,000 Php
TO:
Calapan North rd.
K0019+511 - K0020+850,
K0008+023 - K0008+692
CW1: 3,271.40 l.m. ( Construction of Drainage Structure along Road )
Allocation: 41,867,000 Php
|
April 5, 2018 |
FY 2018 |
WIN8C02229 |
UACS No. 310104100069000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310104100069000
Project ID: P00200087MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Dipolog-Oroquieta National Road
K1795+-437 - K1795+734.635,
K1795+766.044 - K1796+286
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 3.3832 lane km
Unit Cost: P 14,187,751.24/lane km
Physical Target:
ROW: 667 sq. m
Unit Cost: P 1,499.25/sq. m
EAO: P 1,000,000.00
Allocation: P50,000,000.00 |
April 5, 2018 |
FY - 2018 |
WIN8F05109 |
FY - 2018 GAA DPWH Infra program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off- Carriageway Improvement -
Tertiary Roads
FROM:
CSR Jct - Pola Rd.
K0064+188 - K0064+360,
K0066+983 - K0067+027,
K0067+470 - K0067+812,
K0068+030 - K0068+097,
K0068+414 - K0069+000,
K0069+619 - K0069+855,
K0069+881 - K0070+738
CW1: 9,287.00 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction:)
Allocation: 50,000,000 Php
TO:
CSR Jct - Pola Rd.
K0064+188 - K0064+609,
K0069+619 - K0069+854,
K0069+881 - K0069+960,
K0069+960 - K0070+899
CW1: 9,807.00 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction:)
Allocation: 50,000,000 Php |
April 5, 2018 |
FY 2018 |
WIN8C02142 |
UACS No. 310212100066000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310212100066000
Project ID: P00200872MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Ilaya - Isis - Polanco Rd -
K1820+102 - K1820+337.60
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.471 lane km
Unit Cost: P 13,732,484.08/lane km
EAO: P 132,000.00
Allocation: P 6,600,000.00 |
April 5, 2018 |
FY - 2018 |
WIN8F05094 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
Calapan South Rd
K0004+150 - K0005+415
CW1: 2.586 lane km ( Reconstruction from Paved to Concrete)
Allocation: 34,600,000 Php
33,908,000 ( Roads)
692,000 ( EAO )
TO:
Calapan South Rd.
K0004+150 - K0005+415
CW1: 2.586 lane km ( Reconstruction from Paved to Concrete )
Allocation: 34,600,000 Php
29,620,500 ( Roads )
692,000 ( EAO )
4,287,500 ( Excess ) |
April 5, 2018 |
FY 2018 |
WIN8C02228 |
UACS No. 310212100067000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310212100067000
Project ID: P00200873MN
OO1: Ensure Safe and Reliable National Road System
Network Development
Paving of Unpaved Roads - Tertiary Roads
Piñan-Mutia Rd including RROW -
K1834 + 068 - K1834 + 320,
K1838 + 562 - K1838 + 916.50
Physical Target:
CW-1 - Paving of Unpaved Roads: 1.213 lane km
Unit Cost: P 23,301,962.08/lane km
Physical Target:
ROW: 393 sq. m
Unit Cost: P 1,498.37/sq. m
EAO: P 588,860.00
Allocation: P 29,443,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02268 |
UACS No. 300116201154000 |
March 26, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116201154000
Project ID: P00240363MN
Local Program
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects Local Roads and Bridges
Local Roads
Concrete Paving of Road from Brgy. Venus to Brgy. Tinindogan, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 - Const. of concrete road: 2.594 lane km
Unit Cost: P 11,333,847.34/lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02231 |
UACS No. 300202100071000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300202100071000
Project ID: P00230002MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports -
Access Road Leading to Dapitan Port, incl. ROW, Zamboanga del Norte
Physical Target:
CW-1 - Road Construction of Concrete Road: 0.247 lane km
Unit Cost: P 29,538,461.54/lane km
Physical Target:
ROW: 101 sq. m
Unit Cost: P 1,504.95/sq. m
EAO: P 152,000.00
Allocation: P 7,600,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02217 |
UACS No. 300116201157000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116201157000
Project ID: P00240243MN
Local Program
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects
Local Roads and Bridges
Local Roads
Construction/Concreting of Road, Barangay San Juan-Dampalan-San Isidro, Phase ll, Municipality of Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 - Construction of concrete road: 4.966 lane km
Unit Cost: P 9,867,096.25/lane km
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02214 |
UACS No. 300116200079000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116200079000
Project ID: P00240242MN
Local Program
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects
Local Roads and Bridges
Local Roads
Construction/Concreting of Road, Barangay Alvenda-Tuburan-Pob. Sergio Osmeña, Phase ll, Municipality of Mutia and Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete road: 6.850 lane km
Unit Cost: P 9,861,313.87/lane km
EAO: P 2,450,000.00
Allocation: P 70,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02230 |
UACS No. 300117202007000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117202007000
Project ID: P00255818MN
Local Program
Local Infrastructure Program-
Local Roads and Bridges - Local Roads
Construction of Road, Brgy. Bagong Baguio, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 - Construction of concrete road: 0.477 lane km
Unit Cost: P 10,377,358.49/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02216 |
UACS No. 300117200001000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117200001000
Project ID: P00255527MN
Local Program
Local Infrastructure Program-
Local Roads and Bridges - Local Roads
Concrete Paving of Road (Phase 2), Brgy. Bagong Baguio, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 -Construction of concrete road: 5.220 lane km
Unit Cost: P 11,379,310.34/lane km
EAO: P 600,000.00
Allocation: P 60,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02211 |
UACS No. 300116201156000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116201156000
Project ID: P00240241MN
Local Program
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges
Local Roads
Construction of Sunrise Boulevard, Phase ll, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 2.326 lane km
Unit Cost: P 21,066,208.08/lane km
Physical Target:
EAO: P 1,000,000.00
Allocation: 50,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02218 |
UACS No. 300116201155000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300116201155000
Project ID: P00240244MN
Local Program
Construction/Repair/Rehabilitation/Improvement of Various Insfrastructure including Local Projects
Local Roads and Bridges
Local Roads
Construction of Dapitan - Ma. Cristina - Sibutad Road, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 3.540 lane km
Unit Cost: P 13,841,807.91/lane km
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02137 |
UACS No. 320101102161000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102161000
Project ID: P00220566MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure, De Venta Perla (Sergio Osmeña side), Including RROW, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 204 l.m
Unit Cost: P 141,176.47/l.m
Physical Target:
ROW: 400 sq.m.
Unit Cost: P 1,500.00/sq.m
EAO: P 600,000.00
Allocation: 30,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02138 |
UACS No. 300204100013000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300204100013000
Project ID: P00230006MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones -
Biayon - Wilben - San Jose Road, in Support of Biayon Corn and Coconut Production, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 5.292 lane km
Unit Cost: P 13,676,303.85/lane km
EAO: P 2,625,000.00
Allocation: P 75,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02141 |
UACS No. 320101102167000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102167000
Project ID: P00220316MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage System -
Construction/Extension of River Control (Guinles Section) including RROW along Dipolog-Polanco-Piñan-Jct. Oroquieta National Road, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 212 l.m.
Unit Cost: P 135,849.06/l.m
Physical Target:
ROW: 400 sq.m.
Unit Cost: P 1,500.00/sq.m.
EAO: P 600,000.00
Allocation: 30,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02224 |
UACS No. 320101102166000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102166000
Project ID: P00221254MN
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure (Revetment) along Dipolog River, Guinles Section Including RROW, Dipolog - Polanco - Piñan - Jct. Oroquieta Road, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 164 l.m.
Unit Cost: P 175,152,44/l.m
Physical Target:
ROW: 400 sq.m
Unit Cost: P 1,500.00/sq.m.
Soid Exploration: 1 borehole
Unit Cost: P 75,000.00/borehole
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02239 |
UACS No. 320101102164000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102164000
Project ID: P00221253MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Barcelona-Leop Section including RROW along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte
CW-1 - Construction of Flood Mitigation Structure: 162.40 l.m.
Unit Cost: P 235,991.38/l.m.
Physical Target:
ROW: 533 sq.m.
Unit Cost: P 1,500.94/sq.m.
Soil Exploration: 1 borehole
Unit Cost: P 75,000.00/borehole
EAO: P 800,000.00
Allocation: P 40,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02238 |
UACS No. 320101102159000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102159000
Project ID: P00221410MN
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structures at Dapitan City Sunrise Boulevard/River Bank Protection, including RROW Dapitan City, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 229.80 l.m.
Unit Cost: P 125,326.37/l.m.
Physical Target:
ROW: 400 sq.m.
Unit Cost: 1,500.00/sq.m
EAO: P 600,000.00
Allocation: 30,000,000.00 |
April 5, 2018 |
FY 2018 |
WIN8C02134 |
UACS No. 320101102163000 |
March 15, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102163000
Project ID: P00221454MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure (Poblacion Side) along Layawan River, including RROW Polanco, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 260.40 l.m
Unit Cost: P 184,331.80/l.m
Physical Target:
ROW: 667 sq.m.
Unit Cost: P 1,499.25/sq.m.
EAO: P 1,000,000.00
Allocation: 50,000,000.00 |
April 4, 2018 |
GAA CY2018 |
WIN8F05177 |
UACS No. 320101100148000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100148000
Project ID: P00221035LZ
WIN8F05177
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwalls (Intermittent Sections) along Malabon-Tullahan River, Sta.7+392 to Sta.7+579.50, (Upstream Side), Brgy. Potrero, Malabon City
Physical Target: CWI-Construction of Revetment: 292 lm
EAO P 2.625 M
Unit Cost: P 247,859.59/lm
Allocation: P 73.375 M
Total: P 75 M
As Modified
UACS No. 320101100148000
Project ID: P00221035LZ
WIN8F05177
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwalls (Intermittent Sections) along Malabon-Tullahan River, Sta.7+312.14 to Sta.7+477.14, (Upstream Side), Brgy. Potrero, Malabon City
Physical Target: CWI-Construction of Revetment: 165 lm
EAO P 1.5 M
Excess 0.624 M
Unit Cost: P 441,672.73/lm
Estimated Cost: P 72.876 M
Total: P 75 M
|
April 4, 2018 |
GAA CY2018 |
WIN8F05174 |
UACS No. 320101100381000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100381000
Project ID: P00221405LZ
WIN8F05174
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Raising of Riverwall along Santulan River (Sta.0+455 to 0+770), Brgy. Santulan, Malabon City
Physical Target: CWI-Construction of Revetment: 315 lm
EAO P 1M
Unit Cost: P 155,555.55/lm
Allocation: P 49 M
Total: P 50 M
As Modified
UACS No. 320101100381000
Project ID: P00221405LZ
WIN8F05174
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Raising of Riverwall along Santulan River (Sta.0+476 to 0+770), Brgy. Santulan, Malabon City
Physical Target: CWI-Construction of Revetment: 294 lm
EAO P 1 M
Excess P 0.103 M
Unit Cost: P 166,316.33/lm
Allocation: P 48.897 M
Total: P 50 M
|
April 4, 2018 |
GAA CY2018 |
WIN8F05184 |
UACS No. 310106100043000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 310106100043000
Project ID: P00202373LZ
WIN8F05184
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Road
Gov. W. Pascual Ave. – K0013+281.40 – K0013+421, K0016+890.95 – K0017+85.95
Physical Target: CW1 – Rehabilitation of Concrete Road: 0.669 lane km
EAO P 177.84
Unit Cost P 13,025.65 / lane km
Allocation (‘000): P 8,714.16
Total: P 8,892
As Modified
UACS No. 310106100043000
Project ID: P00202373LZ
WIN8F05184
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Road
Gov. W. Pascual Ave. – K0013+281.40-K0013+421, K0016+724.7-K0016+756.0, K0016+859.6- K0016+868.10, K0016+890.95-K0017+85.95
Physical Target: CW1 – Rehabilitation of Concrete Road: 0.749 lane km
EAO P 177.84
Unit Cost P 111,634.39 / lane km
Allocation (‘000): P 8,714.16
Total: P 8,892
|
April 4, 2018 |
GAA CY2018 |
WIN8F05175 |
UACS No. 320101100368000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100368000
Project ID: P00221404LZ-CW1
WIN8F05175
Organizational Outcome 2: Protect Lives and Properties
Construction/Improvement/Sealing of Riverwall including Upgrading of Road Dike with drainage Improvement along Malabon-Tullahan River (Sta.0+000 to Sta.0+175), Brgy. Longos, Malabon City
Physical Target: CW1 – Construction of Revetment: 175 lm
EAO P 1 M
Unit Cost: P 280,000.00/ lm
Allocation: P 49 M
Total: P 50 M
As Modified
UACS No. 320101100368000
Project ID: P00221404LZ-CW1
WIN8F05175
Organizational Outcome 2: Protect Lives and Properties
Construction/Improvement/Sealing of Riverwall including Upgrading of Road Dike with drainage Improvement along Malabon-Tullahan River (Sta.0+029 to Sta.0+305), Brgy. Longos, Malabon City
Physical Target: CW1 – Construction of Revetment: 276 lm
EAO P 1 M
Excess P 0.36 M
Unit Cost: P 176,231.88/ lm
Allocation: P 48.640 M
Total: P 50 M
|
April 4, 2018 |
FY - 2018 |
WIN8F05066 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa South Rd
K0013+000 - K0013+600,
K0016+000 - K0016+300,
K0017+205 - K0017+530,
K0017+568 - K0018+592,
K0018+942 - K0019+855,
K0020+000 - K0021+000,
K0021+400 - K0021+820,
K0026+000 - K0027+162
CW1: 11.238 lane km ( Rehabilitation of Paved Road )
Allocation: 176,250,000 Php
TO:
Puerto Princesa South Rd.
K0013+000 - K0013+600,
K0016+000 - K0016+300,
K0017+205 - K0017+530,
K0017+568 - K0018+592,
K0018+942 - K0019+855,
K0020+160 - K0021+000,
K0021+400 - K0021+820,
K0026+000 - K0027+162,
K0028+090 - K0029+432,
K0037+000 - K0038+000,
K0039+668 - K0039+870
CW1: 15.916 lane km ( Rehabilitation of Paved Road )
Allocation: 176,250,000 Php |
April 4, 2018 |
FY - 2018 |
WIN8C02121 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa South Rd.
K0015+807 - K0017+530,
K0017+568 - K0019+855,
K0019+956 - K0022+284
CW1: 12.542 lane km ( Road Widening )
Allocation: 200,000,000 Php
TO:
Puerto Princesa South Rd.
K0015+807 - K0017+473,
K0017+568 - K0019+769,
K0019+880 - K0022+595
CW1: 13.03 lane km ( Road Widening )
Allocation: 200,000,000 Php
|