Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
February 26, 2024 FY 2023 310201101094000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101094000
Project ID: P00705505MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads


Pagadian City-Zamboanga City Rd - K1897 + 120.00 - K1900 + 640.00
CW1- Road Widening/ 7.04 lane-km
Unit Cost: ₱17,769,886.36/ lane-km
ROW Acquisition 23,584.00 sq.m.
Unit Cost: ₱ 424.02/ sq.m.
EAO: ₱4,900,000.00
Allocation: ₱140,000,000.00
February 26, 2024 2024 WIN3F07758 GAA 2024 December 25, 2023 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00736129LZ
UACS : 300219101630000

From :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Rongos, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Revetment - 413.532 Lineal meters

To :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Rongos, Libmanan, Camarines Sur


Physical Target :
CW1 - Construction of Revetment - 413.532 Lineal meters
February 26, 2024 FY 2023 310204102129000 March 29, 2023 Region IX Regional Office IX
UACS No. 310204102129000
Project ID: P00705509MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 4, Zamboanga City

CW1- Construction of Concrete Bridge/ 652.536 Square Meters
Unit Cost: ₱ 155,278.79/Square Meters
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 WIN3F07673 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Tacloban City Master Drainage and Flood Control System, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 144.750 M
: 11,362.827 Lineal meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Tacloban City Master Drainage and Flood Control System, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 144.750 M
: 2,348.56 Lineal meters

EAO P 5.250 M

Total P 150.00 M
February 26, 2024 FY 2023 300222100134000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100134000
Project ID: P00735053MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Concreting of Road at Mohammad Jamalul Kiram, Barangay Laum Maimbung, Maimbung, Sulu

CW1- Construction of Concrete Road: 2.193 lane km
Unit Cost: ₱ 15,800,273.59 /lane km
EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00
February 26, 2024 FY 2023 WIN3B01092 300221102342000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102342000
Project ID: P00732175MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Kabangkalan - Higad Dagat Road (Phase 1), Siasi, Sulu

CW1- Rehabilitation of Concrete Road: 1.79 lane km
Unit Cost: ₱ 16,173,184.36 /lane km
EAO: ₱ 300,000.00
EXCESS: ₱ 750,000.00
Allocation: ₱ 30,000,000.00
February 26, 2024 FY 2023 WIN3E03083 310204102130000 March 29, 2023 Region IX Regional Office IX
UACS No. 310204102130000
Project ID: P00705510MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 5, Zamboanga City

CW1- Construction of Concrete Bridge/867.186 Square Meters
Unit Cost: ₱ 116,843.45 /Square Meters
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0899 + 555 - K0900 + 005, K0900 + 495 - K0903 + 056, K0903 + 596 - K0904 + 676

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 72.375 M
Structure: 4,166.67 Square meters

EAO P 2.625 M

Total P 75.00 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0899 + 579-K0899+599,K0901+551-K0901+586,K0902+176-K0902+186,K0903+005-K0903+051,K0903+409-K0903+434,K0903+728-K0903+793,K0904+170-K0904+212,K0904+390-K0904+460

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.372525 M
Structure: 836.854 Square meters

EAO P 0.412475 M

EXC P 63.215 M

Total P 75.00 M
February 26, 2024 FY 2023 WIN3B01108 300221102348000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102348000
Project ID: P00732176MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Bangdayan - Kungan Road, Luuk, Sulu

CW1- Rehabilitation of Concrete Road: 1.33 lane km
Unit Cost: ₱ 14,887,218.04 /lane km
EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00
February 26, 2024 FY 2023 310204101586000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204101586000
Project ID: P00705518MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte

CW1-Construction of Concrete Bridge/1,156.248 sq.m.
Unit Cost: ₱ 33,383.84 /sq.m.
EAO: ₱ 1,400,000.00
Allocation: ₱ 40,000,000.00
February 26, 2024 2023 WIN3F07620 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0898 + 482 - K0898 + 706, K0900 + 202 - K0900 + 372, K0900 + 965 - K0901 + 908, K0903 + 883 - K0905 + 416, K0905 + 472 - K0906 + 630

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 118.695 M
Structure: 6,833.333 Square meters

EAO P 4.305 M

Total P 123.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0898+180-K0898+429,K0898+960-K0898+971,K0899+877-K0899+882,K0901+158-K0901+179,K0901+905-K0901+934,K0902+323-K0902+341

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 27.116500 M
Structure: 748.96 Square meters

EAO P 0.983500 M

EXC P 94.900

Total P 123.00 M
February 26, 2024 FY 2023 310201101097000 April 25, 2023 Region IX Regional Office IX
UACS No. 310201101097000
Project ID: P00705520MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

Sindangan-Liloy Rd - K1953 + 500 - K1954 + 105.25, K1954 + 142.12 - K1956 + 040.00

CW1- Road Widening/ 5.006 lane-km
Unit Cost: ₱ 20,008,960.91/lane-km
ROW Acquisition 11,970.28 sq.m.
Unit Cost: ₱ 500.00 / sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00

February 26, 2024 FY 2023 310202101313000 March 30, 2023 Region IX Regional Office IX
UACS No. 310202101313000
Project ID: P00705521MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads

Liloy-Siocon Rd - K1997 + 000 - k1999 + 680

CW1- Road Widening/ 5.36 lane-km
Unit Cost: ₱ 18,144,589.55/lane-km
ROW Acquisition 20,000.00 sq.m.
Unit Cost: ₱ 300 / sq.m.
EAO: ₱ 3,745,000.00
Allocation: ₱107,000,000.00
February 26, 2024 FY 2023 310201101098000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101098000
Project ID: P00705526MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd – K1878 + 684.00 – K1879 + 044.00, K1885 + 153.00 – K1887 + 240.00

CW1- Road Widening/ 4.894 lane-km
Unit Cost: ₱17,879,012.11 /lane-km
ROW Acquisition 16,394.9 sq.m.
Unit Cost: ₱ 607.82 /sq.m.
EAO: ₱ 3,535,000.00
Allocation: ₱ 101,000,000.00
February 26, 2024 FY 2023 310201101213000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101213000
Project ID: P00705529MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Jct Blancia-Molave-Josefina Rd - K1661 + 290.00 - K1665 + 020.00

CW1- Road Widening/ 7.460 lane-km
Unit Cost: ₱12,241,957.10 /lane-km
ROW Acquisition 24,991 sq.m.
Unit Cost: ₱ 400.14 / sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Barangay Nabang- Gadgaran road, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 96.500 M
: 3.24 Lane Km

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Barangay Nabang- Gadgaran Road, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 96.500 M
: 8.80 Lane Km

EAO P 3.500 M

Total P 100.00 M
February 26, 2024 FY 2023 310204102385000 May 29, 2023 Region IX Regional Office IX
UACS No. 310204102385000
Project ID: P00705530MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads

Labangan - Pagadian City -Dumalinao By- Pass Road, Zamboanga Del Sur

CW1- Construction of Concrete Road /3.21 lane km
Unit Cost: ₱ 17,010,709.48/ lane km
CW2- Construction of Concrete Bridge /294.786 Square meters
Unit Cost: ₱ 144,327.15 /Square Meters
ROW Acquisition / 18,000.00 Square Meters
Unit Cost: ₱ 500.00 /Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00


February 26, 2024 FY 2023 WIN3E03084 310204102386000 May 31, 2023 Region IX Regional Office IX
UACS No. 310204102386000
Project ID: P00705531MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads

NRJ Balucot-Lower Usugan-Tungawan Road, Zamboanga del Sur

CW1- Construction of Concrete Bridge /294.786 Square Meters
Unit Cost: ₱ 326,168.81 /Square Meters
ROW Acquisition /2,040.816Square Meters
Unit Cost: ₱ 4,900.00 /Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00

February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Barangay Puhagan - Libertad - Kabugaw - Matalud, San Jorge, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 2.50 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Road, Barangay Puhagan - Libertad - Kabugaw - Matalud, San Jorge, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 49.00 M
: 4.12 Lane Km

EAO P 1.00 M

Total P 50.00 M
February 26, 2024 FY 2023 310204102387000 June 14, 2023 Region IX Regional Office IX
UACS No. 310204102387000
Project ID: P00705532MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Sominot-Dumingag Road, Zamboanga del Sur

CW1- Road Widening/1.450 Lane-km
Unit Cost: ₱ 14,600,584.44 /lane-km
CW2- Construction of Road Slope Protection Structure/ 5,522.66 Square Meters
Unit Cost: ₱ 3,185.197 /Square Meters
ROW Acquisition 18,976.787 sq.m.
Unit Cost: ₱ 500.00/sq.m
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00

February 26, 2024 FY 2023 310205101045000 March 9, 2023 Region IX Regional Office IX
UACS No. 310205101045000
Project ID: P00705535MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads

Midsalip-Buboan Road, Zamboanga del Sur

CW1- Construction of Concrete Road / 1.24 lane-km
Unit Cost: ₱23,346,774.19 /lane-km
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00

February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Gandara - Matuginao - Las Navas Road, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 1.52 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Gandara - Matuginao - Las Navas Road, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 34.41600263 M
: 2.08 Lane Km

CW2-Construction of Road Slope Protection P 14.58399737 M
Structure: 1,610.00 Square meters

EAO P 1.00 M

Total P 50.00 M
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road Brgy. Balocawe- Nipa, Tagapul-an, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 1.400 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Road Brgy. Balocawe- Nipa, Tagapul-an, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 39.49807176 M
: 1.440 Lane Km

CW2-Construction of Road Slope Protection P 9.50192824 M
Structure: 2,124.72 Square meters


EAO P 1.00 M

Total P 50.00 M
February 26, 2024 FY 2023 310205100695000 March 9, 2023 Region IX Regional Office IX
UACS No. 310205100695000
Project ID: P00705537MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads

Midsalip - Buboan Road, Zamboanga del Sur

CW1- Construction of Concrete Road/ 0.700 Lane-km
Unit Cost: ₱ 27,571,428.57/lane-km
EAO: ₱ 700,000.00
Allocation: ₱ 20,000,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of road, Bugtong - Bayo, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 2.80 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of road, Bugtong - Bayo, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 42.06193271 M
: 4.60 Lane Km

CW2-Construction of Road Slope Protection P 6.93806729 M
Structure: 41.6 Square meters

EAO P 1.00 M

Total P 50.00 M
February 26, 2024 FY 2023 310204102138000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204102138000
Project ID: P00705544MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Zamboanga Sibugay

CW1- Construction of Concrete Road/4.36 lane-km
Unit Cost: ₱ 20,946,100.92 /Lane-km
ROW Acquisition 24,800.00 sq.m.
Unit Cost: ₱ 403.23/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road Phase 1, Brgy. Curry - Agrufacion to Brgy. Jolacao - Camperito, Sta. Margarita, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 3.89 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

JConstruction of Road Phase 1, Brgy. Curry - Agrufacion to Brgy. Jolacao - Camperito, Sta. Margarita, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 30.22217333 M
: 3.89 Lane Km

CW2-Construction of Road Slope Protection P 18.77782667 M
Structure: 1,955.00 Square meters

EAO P 1.00 M

Total P 50.00 M
February 26, 2024 FY 2023 310201101100000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101100000
Project ID: P00705940MN


OO1: Ensure Safe and Reliable National Road System –
Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1768 + 694 - K1770 + 502, K1770 + 539 - K1770 + 550, K1777 + 831 - K1777 + 846, K1777 + 928 - K1777 + 932.57, K1784 + 070.00 – K1784 + 900.00


CW1- Road Widening/ 5.34 Lane-km
Unit Cost: ₱ 17,289,325.84 /lane-km
ROW Acquisition 17,879.41 sq.m.
Unit Cost: ₱ 503.37 / sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 FY 2023 310102101177000 March 9, 2023 Region IX Regional Office IX
UACS No. 310102101177000
Project ID: P00706092MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Zamboanga City-Labuan-Limpapa Rd – K1961 + 507.00 – K1962 + 743.01, K1963 + 051.00 – K1964+104.04

CW1- Preventive Maintenance of Road: Asphalt Overlay / 9.013 lane-km
Unit Cost: ₱10,920,782.99 /lane-km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
February 26, 2024 FY 2023 310101100859000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101100859000
Project ID: P00706093MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd – K1861 + 004.00 – K1861 + 388.00, K1861 + 436.00 – K1862 + 000.00, K1863 + 000.00 – K1864 + 000.00, K1867 + 469.00 – K1867 + 618.00, K1867 + 721.00 – K1868 + 106.00, K1869 + 000.00 – K1869 + 810.00

CW1- Preventive Maintenance of Road: Asphalt Overlay / 6.58 lane-km
Unit Cost: ₱15,398,936.17 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 FY 2023 310101100865000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101100865000
Project ID: P00706097MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads


Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd – K1868 + 000.00 – K1868 + 360.00, K1868 + 360.00 – K1868 + 560.00, K1868 + 560.00 – K1868 + 875.00, K1868 + 936.00 – K1869 + 818.00

CW1- Preventive Maintenance of Road: Asphalt Overlay / 6.828 lane-km
Unit Cost: ₱14,274,311.66 /lane-km
EAO: ₱ 3,535,000.00
Allocation: ₱ ₱ 101,000,000.00
February 26, 2024 2023 WIN3F07439 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of road Brgy Langoyon - Brgy Campaeig - Brgy Camperito, Sta. Margarita, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.500 M
: 3.50 Lane Km

EAO P 0.500 M

Total P 50.00 M

AS MODIFIED:

Construction of road Brgy Langoyon - Brgy Campaeig - Brgy Camperito, Sta. Margarita, Samar

Physical Target: Allocation:

CW1-Construction of Gravel Road P 44.45099705 M
: 2.50 Lane Km

CW2-Construction of Road Slope Protection P 5.04900295 M
Structure: 600.00 Square meters

EAO P 0.500 M

Total P 50.00 M
February 26, 2024 FY 2023 310104100597000 May 16, 2023 Region IX Regional Office IX
UACS No. 310104100597000
Project ID: P00706098MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Jct. Aurora - Ozamis City - K1645 + 000 - K1647 + 418.65, K1647 + 745.37 - K1649 + 000.00, K1651 + 000.00 - K1651 + 156.00

CW1- Reconstruction to Concrete Pavement/ 7.66 Lane Km
Unit Cost: ₱ 13,433,420.37 /Lane Km
EAO: ₱ 2,100,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 FY 2023 310101101076000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101101076000
Project ID: P00706099MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Jct Blancia-Molave-Josefina Rd - K1651 + 157.00 - K1655 + 190.00

CW1- Preventive Maintenance of Road: Asphalt Overlay: 8.07 lane-km
Unit Cost: ₱12,555,762.08 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 WIN3F07531 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL:

Calbayog City Coastal Road Package B, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 0.98 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Calbayog City Coastal Road Package B, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 24.88858599 M
: 0.743 Lane Km

CW2-Construction of Road Slope Protection P 24.11141401 M
Structure: 1,135.41 Square meters

EAO P 1.00 M

Total P 50.00 M
February 26, 2024 FY 2023 310101101077000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101101077000
Project ID: P00706100MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1622 + 426.51 - K1626 + 466.12

CW1- Preventive Maintenance of Road: Asphalt Overlay / 8.08 lane-km
Unit Cost: ₱12,540,222.77 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 FY 2023 310101100866000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101100866000
Project ID: P00706102MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1726 + 298 - K1726 + 441, K1733 + 726 - K1735 + 357

CW1- Preventive Maintenance of Road: Asphalt Overlay/ 7.10
Lane-km
Unit Cost: ₱ 14,077,039.44 /lane-km
EAO: ₱ 3,625,020.00
Allocation: ₱ 103,572,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Bridge - Replacement of Permanent Weak Bridges

AS PER GAA/ORIGINAL:

Nijaga Br. (B00594SM) along Calbayog Diversion Rd

Physical Target: Allocation:

CW1-Widening of Bridge: 228.49 Square meters P 34.300 M

EAO P 0.700 M

Total P 35.00 M

AS MODIFIED:

Nijaga Br. (B00594SM) along Calbayog Diversion Rd

Physical Target: Allocation:

CW1-Widening of Bridge: 606.27 Square meters P 34.050 M

ROW-ROW Acquisition: 23.10 Square meters P 0.250 M

EAO P 0.700 M

Total P 35.00 M
February 26, 2024 FY 2023 310101100867000 March 9, 2023 Region IX Regional Office IX
UACS No. 310101100867000
Project ID: P00706103MN


OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1760 + 776 - K1762 + 920

CW1- Preventive Maintenance of Road: Asphalt Overlay/ 8.58 Lane-km
Unit Cost: ₱ 11,809,440.56 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 26, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Bridge - Replacement of Permanent Weak Bridges

AS PER GAA/ORIGINAL:

Gandara 2 Parallel Br. along Gandara Diversion Rd

Physical Target: Allocation:

CW1-Construction of Parallel Bridge: P 96.500 M
: 1,335.60 Square meters

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Gandara 2 Parallel Br. along Gandara Diversion Rd

Physical Target: Allocation:

CW1-Construction of Parallel Bridge: P 92.650 M
: 1,335.60 Square meters

ROW-ROW Acquisition: 572.40 Square meters P 3.850 M

EAO P 3.500 M

Total P 100.00 M
February 26, 2024 FY 2023 310104100490000 May 31, 2023 Region IX Regional Office IX
UACS No. 310104100490000
Project ID: P00706248MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd – K1848 + 280.00 – K1848 + 856.18, K1848 + 892.92 – K1850 + 000.00, K1856 + 266.00 – K1857 + 622.25, K1857 + 640.40 – K1859 + 802.00

CW1- Reconstruction to Concrete Pavement/ 10.402 Lane Km
Unit Cost: ₱ 9,462,603.34/Lane Km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
February 26, 2024 FY 2023 310104100491000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100491000
Project ID: P00706249MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd - K1922 + 402.00 - K1925 + 000.00, K1927 + 035.00 – K1928 + 000.00, K1926 + 337.00 – K1927 + 035.00, K1928 + 000.00 – K1928 + 297.00

CW1- Reconstruction to Concrete Pavement/ 9.116 Lane Km
Unit Cost: ₱ 10,797,498.90 /Lane Km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
February 26, 2024 2023 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0801 + 781 - K0801 + 847, K0802 + 880 -K0802 + 892, K0860 + 698 - K0860 + 726, K0860 + 973 - K0861 + 000, K0861 + 890 - K0862 + 000, K0868 + 900 - K0869 + 000, K0890 + 000 - K0893 + 133

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 146.584465 M
Overlay: 13.582 Lane Km

EAO P 5.316535 M

Total P 151.901 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0801+912-K0802+000,K0802+000-K0803+110,K0804+446-K0804+537,K0810+136-K0810+183,K0816+037-K0818+000,K0823+000-K0824+000,K0827+000-K0827+305,K0851+200-K0852+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 146.584465 M
Overlay: 10.896 Lane Km

EAO P 5.316535 M

Total P 151.901 M

February 26, 2024 FY 2023 310106100857000 May 31, 2023 Region IX Regional Office IX
UACS No. 310106100857000
Project ID: P00706251MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Dipolog-Polanco-Piñan-Jct Oroquieta Rd – K1809 + 641.65 – K1812 + 183.36, K1812 + 275.53 – K1812 + 566.29, K1813 + 569.00 - K1813 + 717.00, K0 + 446.52 – K0 + 500.00, K1815 + 000 - K1815 + 933.61, K1820 + 000.00 - K1820 + 077.00, K1820 + 088.00 - K1820 + 561.00, K1827 + 000.00 - K1827 + 234.00, K1827+ 901.00 - K1827 + 957.00

CW1- Reconstruction to Concrete Pavement/ 9.62 Lane Km
Unit Cost: ₱ 9,800,467.77 /Lane Km
EAO: ₱ 3,419,500.00
Allocation: ₱ 97,700,000.00
February 26, 2024 2023 WIN3F07466 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0815 + 550 - K0817 + 500, K0818 + 565 - K0819 + 000, K0820 + 044 - K0823 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Concrete P 58.944130 M
Reblocking: 12.134 Lane Km

EAO P 2.137870 M

Total P 61.082 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0819+000-K0821+800

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Concrete P 58.944130 M
Reblocking: 5.078 Lane Km

EAO P 2.137870 M

Total P 61.082 M





February 26, 2024 FY 2023 WIN3B01112 310202101312000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 310202101312000
Project ID: P00705489MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Romandier-Camp Andres-Tanduh Bato (S00022SL) - K0035 + 260- K0039 + 180

CW1- Road Widening: 7.84 lane km
Unit Cost: ₱ 21,997,797.18 /lane km
CW1 Cost: ₱ 172,462,729.94

ROW Acquisition: 1,027 sq.m.
Unit Cost : ₱ 500.00 /sq.m.
ROW Cost: ₱ 513,520.06

EAO: ₱ 6,273,750
Allocation: ₱ 179,250,000.00
February 26, 2024 FY 2023 WIN3B01109 300217100183000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300217100183000
Project ID: P00735024MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Sulu Circumferential National Road, Panamao Section, Sulu

CW1- Construction of Concrete Road: 4.720 lane km
Unit Cost: ₱ 23,307,203.39 /lane km

EAO: ₱ 3,990,000.00
Allocation: ₱ 114,000,000.00
February 26, 2024 FY 2023 310104100488000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 310104100488000
Project ID: P00707603MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Rehabilitation/Reconstruction Damaged Paved Roads Jct. Timbangan Romandier Road (STA.0010 + 000 - STA. 0010 + 041.82, STA. 10 + 057.21 - STA. 0013 + 000)

CW1- Reconstruction to Concrete Pavement: 5.917 lane km
Unit Cost: ₱ 17,939,834.37 /lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 WIN3B01103 300217100182000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300217100182000
Project ID: P00735023MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)


Construction of Sulu Circumferential National Road, Kalingalan Caluang Section, Kalingalan Caluang, Sulu

CW1- Construction of Concrete Road: 4.661 lane km
Unit Cost: ₱ 23,602,231.28 /lane km

EAO: ₱ 3,990,000.00
Allocation: ₱ 114,000,000.00
February 26, 2024 FY 2023 WIN3B01086 310202101310000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 310202101310000
Project ID: P00705487MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Seit Tayungan-Camp Andres (S00020SL) - K0036 + 424.91 - K0038 + 120.00

CW1- Road Widening: 3.39 lane km
Unit Cost: ₱ 22,625,818.63 /lane km
CW1 Cost: ₱ 76,701,525.16

ROW Acquisition: 1,503.96 sq.m.
Unit Cost: ₱ 300.00 /sq.m.
ROW Cost: ₱ 451,189.84

EAO: ₱ 2,798,285.00
Allocation: ₱ 79,951,000.00
February 26, 2024 FY 2023 WIN3B01074 300222100117000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 300222100117000
Project ID: P00732407MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Barangays Basnunuk, Tubig Dakula and Jakarta, 83 + 000.00 - Sta. 84+ 030.00, Languyan, Tawi-Tawi

CW1- Construction of Concrete Road: 2.060 lane km
Unit Cost: ₱ 23,422,320.10 /lane km

EAO: ₱ 500,000.00
EXCESS: ₱ 1,250,000.00
Allocation: ₱ 50,000,000.00
February 26, 2024 FY 2023 300222100123000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100123000
Project ID: P00732413MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Pagsalipangan - Maimbung, Barangay Laum, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300222100125000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100125000
Project ID: P00732415MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Maimbung - Indanan, Barangay Tabu Bato, Maimbung Sulu

CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300221102344000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102344000
Project ID: P00735035MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting Road at Brgy. Gulangan, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.864 lane km
Unit Cost: ₱ 11,458,333.33 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 WIN3B01078 300217100181000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300217100181000
Project ID: P00733933MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Rehabilitation of Jolo - Taglibi - Tiptipon Road, Sta. 021 + 500 - Sta. 025 + 000, Sulu

CW1- Rehabilitation of Concrete Road: 7.0 lane km
Unit Cost: ₱ 15,164,285.7 /lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 WIN3B01063 310106100856000 March 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 310106100856000
Project ID: P00706247MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sibutu-Ligayan Road - Chainage 116.16 - Chainage 2120

CW1- Rehabilitation of Paved Road: 4.008 lane km
Unit Cost: ₱ 15,794,411.18 /lane km

EAO: ₱ 2,296,000.00
Allocation: ₱ 65,600,000.00
February 26, 2024 FY 2023 WIN3B01094 300219101752000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300219101752000
Project ID: P00735025MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu


CW1- Construction of Flood Mitigation Structure: 272.0 ln.m
Unit Cost: ₱ 90,618.40 /ln.m.
CW1 Cost: ₱ 26,648,205.12

CW2- Construction of Flood Mitigation Structure: 272.0 ln.m.
Unit Cost: ₱ 86,771.30 /ln.m.
CW2 Cost: ₱ 23,601,794.88

EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 26, 2024 FY 2023 300222100121000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100121000
Project ID: P00732411MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Lantong - Lagasan Asibih Access from Parang - Maimbung Road, Barangay Lantong, Maimbung, Sulu


CW1- Construction of Concrete Road: 0.850 lane km
Unit Cost: ₱ 11,647,058.82 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300215102740000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 300215102740000
Project ID: P00735020MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Banaran Island Circumferential Road, Barangay Tonggusong Banaran - Look Road, Sapa-Sapa, Tawi-Tawi

CW1- Construction of Concrete Road: 1.556 lane km
Unit Cost: ₱ 21,086,118.25 /lane km

EAO: ₱ 1,190,000.00
Allocation: ₱ 34,000,000.00
February 26, 2024 FY 2023 WIN3B01068 310106100855000 March 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 310106100855000
Project ID: P00706246MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads


Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1519.29, Chainage 6123.14- Chainage 7630

CW1- Rehabilitation of Paved Road: 6.052 lane km
Unit Cost: ₱ 17,539,656.31 /lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 300221102350000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102350000
Project ID: P00735038MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Road at Brgy. Tubig Samin, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.84 lane km
Unit Cost: ₱ 11,785,714.28 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 310104100489000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 310104100489000
Project ID: P00707604MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Rehabilitation/Reconstruction Damaged Paved Roads Jct. Timbangan Romandier Road (STA.0013 + 000 - STA. 0015 + 560.36, STA. 15+601.69 - STA. 16+000)

CW1- Reconstruction to Concrete Pavement: 5.917 lane km
Unit Cost: ₱ 17,939,834.37/lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 25, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 005 - K0900 + 719

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,355.00 Lineal meters

EAO P .920 M

Total P 46.00 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 719

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,607.00 Lineal meters

EAO P .920 M

Total P 46.00 M
February 25, 2024 2023 WIN3F07398 SR2023-03-007216 March 15, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(1067- K0905 +619), Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.530 M
Street Lighting: 4.705 Km

EAO P 1.470 M

Total P 42.00 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(-1067)- K0905 +619), Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.530 M
Street Lighting: 288.00 Number of Streetlights

EAO P 1.470 M

Total P 42.00 M
February 25, 2024 2023 WIN3F07298 SARO-BMB-A-23-0013913 June 3, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0904+017, Tacloban City

Physical Target: Allocation:

CW1-Road Safety: P 29.890 M
Street Lighting: 3.417 Km

EAO P .610 M

Total P 30.500 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0914+017, Tacloban City

Physical Target: Allocation:

CW1-Road Safety: P 29.890 M
Street Lighting: 209.00 Number of Streetlights

EAO P .610 M

Total P 30.500 M
February 25, 2024 2023 WIN3F07301 SARO-BMB-A-23-0013913 June 3, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-110) - K0916+568, Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.376 M
Street Lighting: 4.615 Km

EAO P .824 M

Total P 41.200 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-1000) - K0916+568, Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.376 M
Street Lighting: 283.00 Number of Streetlights

EAO P .824 M

Total P 41.200 M
February 25, 2024 2023 WIN3F07242 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Avenida Veteranos St - (S00003LT) Chainage 110 - Chainage 641, Chainage 430 - Chainage 641

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 13.230 M
Road: 742.00 Lineal meters

EAO P .270 M

Total P 13.500 M

AS MODIFIED:

Avenida Veteranos St - (S00003LT) Chainage 121 - Chainage 641, Chainage 581 - Chainage 641

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 13.230 M
Road: 580.00 Lineal meters
EAO P .270 M

Total P 13.500 M
February 25, 2024 2023 WIN3F07604 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage P 4.900 M
Structure: 378.761 Lineal meters

EAO P .100 M

Total P 5.00 M

AS MODIFIED:

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage Stucture P 4.900 M
along Road: 177.14 Lineal meters

EAO P .100 M

Total P 5.00 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + 089 - K0903 + 969, K0904 + 093 - K0904 + 360

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 9.016 M
2.456 Lane Km

EAO P .184 M

Total P 9.200 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + (-071), K0903 + 072 - K0903 + 242, K0903 + 442 - K0903 + 696

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 9.016 M
0.968 Lane Km

EAO P .184 M

Total P 9.200 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + 089

Physical Target: Allocation:

CW1-Road Widening: P 10.780 M
0.440 Lane Km

EAO P .220 M

Total P 11.000 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-123) - K0903 + (-081), K0903 + (-081) - K0903 + 089

Physical Target: Allocation:

CW1-Road Widening P 10.780 M
0.382 Lane Km

EAO P .220 M

Total P 11.000 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0902 + 115 - K0902 + 940

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,650.00 Lineal meters

EAO P .948 M

Total P 47.400 M

AS MODIFIED:

Daang Maharlika (LT) - K0902 + 147 - K0902 + 287, K0902 + 347 - K0902 + 937

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,460 Lineal meters

EAO P .948 M

Total P 47.400 M
February 24, 2024 2023 WIN3F07378 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0906 + 261 - K0906 + 505, K0906 + 705 - K0907 + 030

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.871540 M
Road: 1,140 Lineal meters

EAO P .201460 M

Total P 10.073 M

AS MODIFIED:

Daang Maharlika (LT) - K0906 + 323 - K0906 + 649

Physical Target: Allocation:

CW1-Construction of Drainage Structure Along P 9.871540 M
Road: 326.00 Lineal meters

EAO P .201460 M

Total P 10.073 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0907 + 030 - K0910 + 173, K0908 + (-830) - K0910 + 472

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 944.00 Lineal meters

EAO P .600 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0909 + 574 - K0910 + 472

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 954.00 Lineal meters

EAO P .600 M

Total P 30.00 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 145 - K0900 + 585

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 31.260040 M
1.760 Lane Km

EAO P .637960 M

Total P 31.898 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 880

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 31.260040 M
2.43 Lane Km

EAO P .637960 M

Total P 31.898 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0908 + (-677) - K0908 +131

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 808.00 Lineal meters

EAO P .600 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0908 + (-677) - K0908 +103

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 780.00 Lineal meters

EAO P .600 M

Total P 30.00 M
February 23, 2024 2023 WIN3F07319 GAA FY 2023 January 2, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0912+765,K0913+002-K0913+726

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 48.020 M
Road 2,178.00 Lineal meters

EAO P 0.980 M

Total P 49.00 M

AS MODIFIED:

Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0913+700

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 48.020 M
Road 1,812.00 Lineal meters

EAO P 0.980 M

Total P 49.00 M
February 23, 2024 2023 WIN3F07473 SR2023-03-006366 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties

Flood Management _ Construction/Maintenance of Flood Mitigation Structures and Drainage System

AS PER GAA/ORIGINAL:

Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 19.300 M
Structure: 60.00 Lineal meters

EAO P 0.700 M

Total P 20.00 M

AS MODIFIED:

Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 19.300 M
Structure: 50.00 Lineal meters

EAO P 0.700 M

Total P 20.00 M
February 23, 2024 2023 WIN3F07464 SR2023-03-006352 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage System

AS PER GAA/ORIGINAL:

Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 196.00 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 23, 2024 2023 WIN3F07383 SR2023-03-006355 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 255.00 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 23, 2024 2023 SR2023-01-003513 January 31, 2023 Region VIII Southern Leyte Sub-District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction (Completion) of Multi-Purpose Building, Barangay Samoje, San Juan, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Construction (Completion) of Multi-Purpose Building, Barangay Somoje, San Juan, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building

EAO P 0.02 M

Total P 2.00 M
February 23, 2024 2023 WIN3F07317 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT)-K0904+365-K0904+940

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 23.211300 M
along Road: 1,150.00 Lineal meters

EAO P 0.473700 M

Total P 23.685 M

AS MODIFIED:

Daang Maharlika (LT)-K0904+343-K0904+612,K0904+617-K0904+689

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 23.211300 M
along Road: 682.00 Lineal meters

EAO P 0.473700 M

Total P 23.685 M

February 23, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0898 + (-122) - K0898 + 462

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 12.152 M
along Road: 584 Lineal meters

EAO P 0.248 M

Total P 12.400 M

AS MODIFIED:

Daang Maharlika (LT) - K0899 + 299 - K0899+654

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 12.152 M
along Road: 355 Lineal meters

EAO P 0.248 M

Total P 12.400 M
February 22, 2024 2023 WIN3F07036 SR2023-12-015070 December 15, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927+(348)-K0927+(-310)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters

EAO P 3.675 M

Total P 105.00 M
February 22, 2024 2023 WIN3F07450 SR2023-09-013365 September 15, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Basey-Maydolong, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 193.00 M
: 14.502 Lane Km

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Construction of Road, Basey-Maydolong, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 144.92696675 M
: 2.72 Lane Km

CW1-Construction of Drainage Structure P 48.07303325 M
along Road: 2,240.00 Lineal meters

EAO P 7.00 M

Total P 200.00 M
February 22, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening- Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista-Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista-Borongan City Road, Eastern Samar- K1013+000 - K1014+573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750M

Total P 50.00 M
February 22, 2024 2023 WIN3F07376 GAA FY 2023 January 1, 2023 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1044 + 972 - K1045 + 160, K1045 + 860 - K1046 + 445

Physical Target: Allocation:

CW1-Road Widening ; 1.39 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1044 + 972 - K1045 + 145, K1045 + 860 - K1046 + 445

Physical Target: Allocation:

CW1-Road Widening ;0.738 Lane Km P 12.306892 M

CW2-Construction of Drainage Structure P 4.405137 M
: 680.00 Lineal meters

CW3-Construction of Road Slope Protection P 2.887971 M
Structure: 38.670 Square meters

EAO P 0.400 M

Total P 20.00 M

February 22, 2024 2023 WIN3F07664 SARO-BMB-A-23-0013838 March 6, 2023 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL:

Palo West Bypass Road, Leyte

Physical Target: Allocation:

CW1-Widening of Bridge: 146.40 Square meters P 77.200 M

EAO P 2.800 M

Total P 80.00 M

AS MODIFIED:

Palo West Bypass Road, Leyte

Physical Target: Allocation:

CW1-Widening of Bridge: 209.88 Square meters P 38.99531136 M

CW2-Road Widening: 0.69 Lane Km P 38.20468864 M

EAO P 2.800 M

Total P 80.00 M
February 22, 2024 2023 WIN3F07465 SR2023-03-006370 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2; Protect Lives and Properties

Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 120 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 22, 2024 2023 WIN3F07241 SR2023-09-013268 September 7, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT)-K0898+482-K0898+706,K0900+202-K0900+372,K0900+965-K0901+908,K0903+883-K0905+416,K0905+472-K0906+630

Physical Target: Allocation:

CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 16.488 Lane Km

EAO P 4.305 M

Total P 123.00 M

AS MODIFIED:

Daang Maharlika (LT)-K0901+247-K0901+908, K0904+103-K0905+416, K0905+472-K0906+569

Physical Target: Allocation:

CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 12.688 Lane Km

EAO P 4.305 M

Total P 123.00 M
February 22, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd-K0915+(-908)-K0915+(-319)

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 2.594 Lane Km

EAO P 0.303820 M

Total P 15.191 M

AS MODIFIED:

Tacloban-Baybay South Rd-K0915+(-894)-K0915+(-439)

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 1.820 Lane Km

EAO P 0.303820 M

Total P 15.191 M
February 22, 2024 2023 WIN3F07243 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Justice Romualdez St - (S00005LT) Chainage 85-Chainage 872

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 1.574 Lane KM

EAO P 0.184340 M

Total P 9.217 M

AS MODIFIED:

Justice Romualdez St - (S00005LT) Chainage 005-Chainage 256

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 0.662 Lane KM

EAO P 0.184340 M

Total P 9.217 M
February 22, 2024 2023 WIN3F07196 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Candahug Rd-K0913+(-956)-K0914+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 4.802 Lane Km

EAO P 0.562420 M

Total P 28.121 M

AS MODIFIED:

Sn Jose-Candahug Rd-K0913+(-586)-K0914+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 3.912 Lane Km

EAO P 0.562420 M

Total P 28.121 M
February 22, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0900+005,K0900+585-K0901+000,K0901+184-K0901+199,K0902+358-K0903+056

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 5.710 Lane Km

EAO P 0.672060 M

Total P 33.603 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0899+992

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 1.748 Lane Km

EAO P 0.672060 M

Total P 33.603 M
February 21, 2024 FY 2023 GAA WIN3E02958 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
CW2: 200 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 12,851,303.69 (Construction of Concrete Road)
CW2: P 1,848,696.31 (Construction of Drainage Structure along Road)
EAO: P 300,000.00
February 21, 2024 FY 2023 GAA P00734160MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.221 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.418 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
February 21, 2024 FY 2023 GAA P00734279MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 5.086 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
February 21, 2024 FY 2023 GAA P00734285MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
February 21, 2024 FY 2023 GAA P00705977MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1474+327 - K1474+422, K1474+889 - K1473+042,
K1472+1000 - K1473+078, K1473+545 - K1473+640
Physical Target:
CW1: 426.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476+580 - K1476+988
Physical Target:
CW1: 408.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00
February 15, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista - Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista - Borongan City Road, Eastern Samar - K1013 + 000 - K1014 + 573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
February 15, 2024 2023 WIN3F07036 SR2023-12-015070 December 5, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927 +(-348)-K0927+(-310)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters

EAO P 3.675 M

Total P 105.00 M