February 26, 2024 |
FY 2023 |
|
310201101094000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101094000
Project ID: P00705505MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd - K1897 + 120.00 - K1900 + 640.00
CW1- Road Widening/ 7.04 lane-km
Unit Cost: ₱17,769,886.36/ lane-km
ROW Acquisition 23,584.00 sq.m.
Unit Cost: ₱ 424.02/ sq.m.
EAO: ₱4,900,000.00
Allocation: ₱140,000,000.00
|
February 26, 2024 |
2024 |
WIN3F07758 |
GAA 2024 |
December 25, 2023 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736129LZ
UACS : 300219101630000
From :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Rongos, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 413.532 Lineal meters
To :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Rongos, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 413.532 Lineal meters |
February 26, 2024 |
FY 2023 |
|
310204102129000 |
March 29, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102129000
Project ID: P00705509MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Package 4, Zamboanga City
CW1- Construction of Concrete Bridge/ 652.536 Square Meters
Unit Cost: ₱ 155,278.79/Square Meters
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
|
February 26, 2024 |
2023 |
WIN3F07673 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Tacloban City Master Drainage and Flood Control System, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 144.750 M
: 11,362.827 Lineal meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Tacloban City Master Drainage and Flood Control System, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 144.750 M
: 2,348.56 Lineal meters
EAO P 5.250 M
Total P 150.00 M
|
February 26, 2024 |
FY 2023 |
|
300222100134000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100134000
Project ID: P00735053MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Concreting of Road at Mohammad Jamalul Kiram, Barangay Laum Maimbung, Maimbung, Sulu
CW1- Construction of Concrete Road: 2.193 lane km
Unit Cost: ₱ 15,800,273.59 /lane km
EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01092 |
300221102342000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102342000
Project ID: P00732175MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Kabangkalan - Higad Dagat Road (Phase 1), Siasi, Sulu
CW1- Rehabilitation of Concrete Road: 1.79 lane km
Unit Cost: ₱ 16,173,184.36 /lane km
EAO: ₱ 300,000.00
EXCESS: ₱ 750,000.00
Allocation: ₱ 30,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3E03083 |
310204102130000 |
March 29, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102130000
Project ID: P00705510MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Package 5, Zamboanga City
CW1- Construction of Concrete Bridge/867.186 Square Meters
Unit Cost: ₱ 116,843.45 /Square Meters
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
|
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) - K0899 + 555 - K0900 + 005, K0900 + 495 - K0903 + 056, K0903 + 596 - K0904 + 676
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 4,166.67 Square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) - K0899 + 579-K0899+599,K0901+551-K0901+586,K0902+176-K0902+186,K0903+005-K0903+051,K0903+409-K0903+434,K0903+728-K0903+793,K0904+170-K0904+212,K0904+390-K0904+460
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 11.372525 M
Structure: 836.854 Square meters
EAO P 0.412475 M
EXC P 63.215 M
Total P 75.00 M
|
February 26, 2024 |
FY 2023 |
WIN3B01108 |
300221102348000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102348000
Project ID: P00732176MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Bangdayan - Kungan Road, Luuk, Sulu
CW1- Rehabilitation of Concrete Road: 1.33 lane km
Unit Cost: ₱ 14,887,218.04 /lane km
EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204101586000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204101586000
Project ID: P00705518MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte
CW1-Construction of Concrete Bridge/1,156.248 sq.m.
Unit Cost: ₱ 33,383.84 /sq.m.
EAO: ₱ 1,400,000.00
Allocation: ₱ 40,000,000.00
|
February 26, 2024 |
2023 |
WIN3F07620 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0898 + 482 - K0898 + 706, K0900 + 202 - K0900 + 372, K0900 + 965 - K0901 + 908, K0903 + 883 - K0905 + 416, K0905 + 472 - K0906 + 630
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 118.695 M
Structure: 6,833.333 Square meters
EAO P 4.305 M
Total P 123.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0898+180-K0898+429,K0898+960-K0898+971,K0899+877-K0899+882,K0901+158-K0901+179,K0901+905-K0901+934,K0902+323-K0902+341
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 27.116500 M
Structure: 748.96 Square meters
EAO P 0.983500 M
EXC P 94.900
Total P 123.00 M
|
February 26, 2024 |
FY 2023 |
|
310201101097000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101097000
Project ID: P00705520MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Sindangan-Liloy Rd - K1953 + 500 - K1954 + 105.25, K1954 + 142.12 - K1956 + 040.00
CW1- Road Widening/ 5.006 lane-km
Unit Cost: ₱ 20,008,960.91/lane-km
ROW Acquisition 11,970.28 sq.m.
Unit Cost: ₱ 500.00 / sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310202101313000 |
March 30, 2023 |
Region IX |
Regional Office IX |
UACS No. 310202101313000
Project ID: P00705521MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Liloy-Siocon Rd - K1997 + 000 - k1999 + 680
CW1- Road Widening/ 5.36 lane-km
Unit Cost: ₱ 18,144,589.55/lane-km
ROW Acquisition 20,000.00 sq.m.
Unit Cost: ₱ 300 / sq.m.
EAO: ₱ 3,745,000.00
Allocation: ₱107,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310201101098000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101098000
Project ID: P00705526MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd – K1878 + 684.00 – K1879 + 044.00, K1885 + 153.00 – K1887 + 240.00
CW1- Road Widening/ 4.894 lane-km
Unit Cost: ₱17,879,012.11 /lane-km
ROW Acquisition 16,394.9 sq.m.
Unit Cost: ₱ 607.82 /sq.m.
EAO: ₱ 3,535,000.00
Allocation: ₱ 101,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310201101213000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101213000
Project ID: P00705529MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Jct Blancia-Molave-Josefina Rd - K1661 + 290.00 - K1665 + 020.00
CW1- Road Widening/ 7.460 lane-km
Unit Cost: ₱12,241,957.10 /lane-km
ROW Acquisition 24,991 sq.m.
Unit Cost: ₱ 400.14 / sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Barangay Nabang- Gadgaran road, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 96.500 M
: 3.24 Lane Km
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Barangay Nabang- Gadgaran Road, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 96.500 M
: 8.80 Lane Km
EAO P 3.500 M
Total P 100.00 M
|
February 26, 2024 |
FY 2023 |
|
310204102385000 |
May 29, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102385000
Project ID: P00705530MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Labangan - Pagadian City -Dumalinao By- Pass Road, Zamboanga Del Sur
CW1- Construction of Concrete Road /3.21 lane km
Unit Cost: ₱ 17,010,709.48/ lane km
CW2- Construction of Concrete Bridge /294.786 Square meters
Unit Cost: ₱ 144,327.15 /Square Meters
ROW Acquisition / 18,000.00 Square Meters
Unit Cost: ₱ 500.00 /Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
|
February 26, 2024 |
FY 2023 |
WIN3E03084 |
310204102386000 |
May 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102386000
Project ID: P00705531MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
NRJ Balucot-Lower Usugan-Tungawan Road, Zamboanga del Sur
CW1- Construction of Concrete Bridge /294.786 Square Meters
Unit Cost: ₱ 326,168.81 /Square Meters
ROW Acquisition /2,040.816Square Meters
Unit Cost: ₱ 4,900.00 /Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
|
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Barangay Puhagan - Libertad - Kabugaw - Matalud, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 2.50 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Road, Barangay Puhagan - Libertad - Kabugaw - Matalud, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 49.00 M
: 4.12 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
February 26, 2024 |
FY 2023 |
|
310204102387000 |
June 14, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102387000
Project ID: P00705532MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Sominot-Dumingag Road, Zamboanga del Sur
CW1- Road Widening/1.450 Lane-km
Unit Cost: ₱ 14,600,584.44 /lane-km
CW2- Construction of Road Slope Protection Structure/ 5,522.66 Square Meters
Unit Cost: ₱ 3,185.197 /Square Meters
ROW Acquisition 18,976.787 sq.m.
Unit Cost: ₱ 500.00/sq.m
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310205101045000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310205101045000
Project ID: P00705535MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Midsalip-Buboan Road, Zamboanga del Sur
CW1- Construction of Concrete Road / 1.24 lane-km
Unit Cost: ₱23,346,774.19 /lane-km
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
|
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Gandara - Matuginao - Las Navas Road, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 1.52 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Gandara - Matuginao - Las Navas Road, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 34.41600263 M
: 2.08 Lane Km
CW2-Construction of Road Slope Protection P 14.58399737 M
Structure: 1,610.00 Square meters
EAO P 1.00 M
Total P 50.00 M
|
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road Brgy. Balocawe- Nipa, Tagapul-an, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 1.400 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Road Brgy. Balocawe- Nipa, Tagapul-an, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 39.49807176 M
: 1.440 Lane Km
CW2-Construction of Road Slope Protection P 9.50192824 M
Structure: 2,124.72 Square meters
EAO P 1.00 M
Total P 50.00 M
|
February 26, 2024 |
FY 2023 |
|
310205100695000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310205100695000
Project ID: P00705537MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Midsalip - Buboan Road, Zamboanga del Sur
CW1- Construction of Concrete Road/ 0.700 Lane-km
Unit Cost: ₱ 27,571,428.57/lane-km
EAO: ₱ 700,000.00
Allocation: ₱ 20,000,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of road, Bugtong - Bayo, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 2.80 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of road, Bugtong - Bayo, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 42.06193271 M
: 4.60 Lane Km
CW2-Construction of Road Slope Protection P 6.93806729 M
Structure: 41.6 Square meters
EAO P 1.00 M
Total P 50.00 M |
February 26, 2024 |
FY 2023 |
|
310204102138000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102138000
Project ID: P00705544MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Ipil Circumferential Road, Zamboanga Sibugay
CW1- Construction of Concrete Road/4.36 lane-km
Unit Cost: ₱ 20,946,100.92 /Lane-km
ROW Acquisition 24,800.00 sq.m.
Unit Cost: ₱ 403.23/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road Phase 1, Brgy. Curry - Agrufacion to Brgy. Jolacao - Camperito, Sta. Margarita, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 3.89 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
JConstruction of Road Phase 1, Brgy. Curry - Agrufacion to Brgy. Jolacao - Camperito, Sta. Margarita, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 30.22217333 M
: 3.89 Lane Km
CW2-Construction of Road Slope Protection P 18.77782667 M
Structure: 1,955.00 Square meters
EAO P 1.00 M
Total P 50.00 M
|
February 26, 2024 |
FY 2023 |
|
310201101100000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101100000
Project ID: P00705940MN
OO1: Ensure Safe and Reliable National Road System –
Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1768 + 694 - K1770 + 502, K1770 + 539 - K1770 + 550, K1777 + 831 - K1777 + 846, K1777 + 928 - K1777 + 932.57, K1784 + 070.00 – K1784 + 900.00
CW1- Road Widening/ 5.34 Lane-km
Unit Cost: ₱ 17,289,325.84 /lane-km
ROW Acquisition 17,879.41 sq.m.
Unit Cost: ₱ 503.37 / sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310102101177000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310102101177000
Project ID: P00706092MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Zamboanga City-Labuan-Limpapa Rd – K1961 + 507.00 – K1962 + 743.01, K1963 + 051.00 – K1964+104.04
CW1- Preventive Maintenance of Road: Asphalt Overlay / 9.013 lane-km
Unit Cost: ₱10,920,782.99 /lane-km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310101100859000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101100859000
Project ID: P00706093MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City-Zamboanga City Rd – K1861 + 004.00 – K1861 + 388.00, K1861 + 436.00 – K1862 + 000.00, K1863 + 000.00 – K1864 + 000.00, K1867 + 469.00 – K1867 + 618.00, K1867 + 721.00 – K1868 + 106.00, K1869 + 000.00 – K1869 + 810.00
CW1- Preventive Maintenance of Road: Asphalt Overlay / 6.58 lane-km
Unit Cost: ₱15,398,936.17 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310101100865000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101100865000
Project ID: P00706097MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd – K1868 + 000.00 – K1868 + 360.00, K1868 + 360.00 – K1868 + 560.00, K1868 + 560.00 – K1868 + 875.00, K1868 + 936.00 – K1869 + 818.00
CW1- Preventive Maintenance of Road: Asphalt Overlay / 6.828 lane-km
Unit Cost: ₱14,274,311.66 /lane-km
EAO: ₱ 3,535,000.00
Allocation: ₱ ₱ 101,000,000.00 |
February 26, 2024 |
2023 |
WIN3F07439 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of road Brgy Langoyon - Brgy Campaeig - Brgy Camperito, Sta. Margarita, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.500 M
: 3.50 Lane Km
EAO P 0.500 M
Total P 50.00 M
AS MODIFIED:
Construction of road Brgy Langoyon - Brgy Campaeig - Brgy Camperito, Sta. Margarita, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 44.45099705 M
: 2.50 Lane Km
CW2-Construction of Road Slope Protection P 5.04900295 M
Structure: 600.00 Square meters
EAO P 0.500 M
Total P 50.00 M
|
February 26, 2024 |
FY 2023 |
|
310104100597000 |
May 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100597000
Project ID: P00706098MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Jct. Aurora - Ozamis City - K1645 + 000 - K1647 + 418.65, K1647 + 745.37 - K1649 + 000.00, K1651 + 000.00 - K1651 + 156.00
CW1- Reconstruction to Concrete Pavement/ 7.66 Lane Km
Unit Cost: ₱ 13,433,420.37 /Lane Km
EAO: ₱ 2,100,000.00
Allocation: ₱ 105,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310101101076000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101101076000
Project ID: P00706099MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Jct Blancia-Molave-Josefina Rd - K1651 + 157.00 - K1655 + 190.00
CW1- Preventive Maintenance of Road: Asphalt Overlay: 8.07 lane-km
Unit Cost: ₱12,555,762.08 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
2023 |
WIN3F07531 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL:
Calbayog City Coastal Road Package B, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 0.98 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Calbayog City Coastal Road Package B, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 24.88858599 M
: 0.743 Lane Km
CW2-Construction of Road Slope Protection P 24.11141401 M
Structure: 1,135.41 Square meters
EAO P 1.00 M
Total P 50.00 M
|
February 26, 2024 |
FY 2023 |
|
310101101077000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101101077000
Project ID: P00706100MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1622 + 426.51 - K1626 + 466.12
CW1- Preventive Maintenance of Road: Asphalt Overlay / 8.08 lane-km
Unit Cost: ₱12,540,222.77 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310101100866000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101100866000
Project ID: P00706102MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1726 + 298 - K1726 + 441, K1733 + 726 - K1735 + 357
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 7.10
Lane-km
Unit Cost: ₱ 14,077,039.44 /lane-km
EAO: ₱ 3,625,020.00
Allocation: ₱ 103,572,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge - Replacement of Permanent Weak Bridges
AS PER GAA/ORIGINAL:
Nijaga Br. (B00594SM) along Calbayog Diversion Rd
Physical Target: Allocation:
CW1-Widening of Bridge: 228.49 Square meters P 34.300 M
EAO P 0.700 M
Total P 35.00 M
AS MODIFIED:
Nijaga Br. (B00594SM) along Calbayog Diversion Rd
Physical Target: Allocation:
CW1-Widening of Bridge: 606.27 Square meters P 34.050 M
ROW-ROW Acquisition: 23.10 Square meters P 0.250 M
EAO P 0.700 M
Total P 35.00 M |
February 26, 2024 |
FY 2023 |
|
310101100867000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310101100867000
Project ID: P00706103MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1760 + 776 - K1762 + 920
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 8.58 Lane-km
Unit Cost: ₱ 11,809,440.56 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge - Replacement of Permanent Weak Bridges
AS PER GAA/ORIGINAL:
Gandara 2 Parallel Br. along Gandara Diversion Rd
Physical Target: Allocation:
CW1-Construction of Parallel Bridge: P 96.500 M
: 1,335.60 Square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Gandara 2 Parallel Br. along Gandara Diversion Rd
Physical Target: Allocation:
CW1-Construction of Parallel Bridge: P 92.650 M
: 1,335.60 Square meters
ROW-ROW Acquisition: 572.40 Square meters P 3.850 M
EAO P 3.500 M
Total P 100.00 M
|
February 26, 2024 |
FY 2023 |
|
310104100490000 |
May 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100490000
Project ID: P00706248MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Sindangan-Liloy Rd – K1848 + 280.00 – K1848 + 856.18, K1848 + 892.92 – K1850 + 000.00, K1856 + 266.00 – K1857 + 622.25, K1857 + 640.40 – K1859 + 802.00
CW1- Reconstruction to Concrete Pavement/ 10.402 Lane Km
Unit Cost: ₱ 9,462,603.34/Lane Km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310104100491000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100491000
Project ID: P00706249MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Sindangan-Liloy Rd - K1922 + 402.00 - K1925 + 000.00, K1927 + 035.00 – K1928 + 000.00, K1926 + 337.00 – K1927 + 035.00, K1928 + 000.00 – K1928 + 297.00
CW1- Reconstruction to Concrete Pavement/ 9.116 Lane Km
Unit Cost: ₱ 10,797,498.90 /Lane Km
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00 |
February 26, 2024 |
2023 |
|
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0801 + 781 - K0801 + 847, K0802 + 880 -K0802 + 892, K0860 + 698 - K0860 + 726, K0860 + 973 - K0861 + 000, K0861 + 890 - K0862 + 000, K0868 + 900 - K0869 + 000, K0890 + 000 - K0893 + 133
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 146.584465 M
Overlay: 13.582 Lane Km
EAO P 5.316535 M
Total P 151.901 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0801+912-K0802+000,K0802+000-K0803+110,K0804+446-K0804+537,K0810+136-K0810+183,K0816+037-K0818+000,K0823+000-K0824+000,K0827+000-K0827+305,K0851+200-K0852+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 146.584465 M
Overlay: 10.896 Lane Km
EAO P 5.316535 M
Total P 151.901 M
|
February 26, 2024 |
FY 2023 |
|
310106100857000 |
May 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 310106100857000
Project ID: P00706251MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct Oroquieta Rd – K1809 + 641.65 – K1812 + 183.36, K1812 + 275.53 – K1812 + 566.29, K1813 + 569.00 - K1813 + 717.00, K0 + 446.52 – K0 + 500.00, K1815 + 000 - K1815 + 933.61, K1820 + 000.00 - K1820 + 077.00, K1820 + 088.00 - K1820 + 561.00, K1827 + 000.00 - K1827 + 234.00, K1827+ 901.00 - K1827 + 957.00
CW1- Reconstruction to Concrete Pavement/ 9.62 Lane Km
Unit Cost: ₱ 9,800,467.77 /Lane Km
EAO: ₱ 3,419,500.00
Allocation: ₱ 97,700,000.00
|
February 26, 2024 |
2023 |
WIN3F07466 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0815 + 550 - K0817 + 500, K0818 + 565 - K0819 + 000, K0820 + 044 - K0823 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Concrete P 58.944130 M
Reblocking: 12.134 Lane Km
EAO P 2.137870 M
Total P 61.082 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0819+000-K0821+800
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Concrete P 58.944130 M
Reblocking: 5.078 Lane Km
EAO P 2.137870 M
Total P 61.082 M
|
February 26, 2024 |
FY 2023 |
WIN3B01112 |
310202101312000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 310202101312000
Project ID: P00705489MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Romandier-Camp Andres-Tanduh Bato (S00022SL) - K0035 + 260- K0039 + 180
CW1- Road Widening: 7.84 lane km
Unit Cost: ₱ 21,997,797.18 /lane km
CW1 Cost: ₱ 172,462,729.94
ROW Acquisition: 1,027 sq.m.
Unit Cost : ₱ 500.00 /sq.m.
ROW Cost: ₱ 513,520.06
EAO: ₱ 6,273,750
Allocation: ₱ 179,250,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01109 |
300217100183000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300217100183000
Project ID: P00735024MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Sulu Circumferential National Road, Panamao Section, Sulu
CW1- Construction of Concrete Road: 4.720 lane km
Unit Cost: ₱ 23,307,203.39 /lane km
EAO: ₱ 3,990,000.00
Allocation: ₱ 114,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310104100488000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 310104100488000
Project ID: P00707603MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation/Reconstruction Damaged Paved Roads Jct. Timbangan Romandier Road (STA.0010 + 000 - STA. 0010 + 041.82, STA. 10 + 057.21 - STA. 0013 + 000)
CW1- Reconstruction to Concrete Pavement: 5.917 lane km
Unit Cost: ₱ 17,939,834.37 /lane km
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01103 |
300217100182000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300217100182000
Project ID: P00735023MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Sulu Circumferential National Road, Kalingalan Caluang Section, Kalingalan Caluang, Sulu
CW1- Construction of Concrete Road: 4.661 lane km
Unit Cost: ₱ 23,602,231.28 /lane km
EAO: ₱ 3,990,000.00
Allocation: ₱ 114,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01086 |
310202101310000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 310202101310000
Project ID: P00705487MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Seit Tayungan-Camp Andres (S00020SL) - K0036 + 424.91 - K0038 + 120.00
CW1- Road Widening: 3.39 lane km
Unit Cost: ₱ 22,625,818.63 /lane km
CW1 Cost: ₱ 76,701,525.16
ROW Acquisition: 1,503.96 sq.m.
Unit Cost: ₱ 300.00 /sq.m.
ROW Cost: ₱ 451,189.84
EAO: ₱ 2,798,285.00
Allocation: ₱ 79,951,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01074 |
300222100117000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Tawi-Tawi District Engineering Office |
UACS No. 300222100117000
Project ID: P00732407MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Barangays Basnunuk, Tubig Dakula and Jakarta, 83 + 000.00 - Sta. 84+ 030.00, Languyan, Tawi-Tawi
CW1- Construction of Concrete Road: 2.060 lane km
Unit Cost: ₱ 23,422,320.10 /lane km
EAO: ₱ 500,000.00
EXCESS: ₱ 1,250,000.00
Allocation: ₱ 50,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300222100123000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100123000
Project ID: P00732413MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Pagsalipangan - Maimbung, Barangay Laum, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300222100125000 |
May 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100125000
Project ID: P00732415MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Maimbung - Indanan, Barangay Tabu Bato, Maimbung Sulu
CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300221102344000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300221102344000
Project ID: P00735035MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting Road at Brgy. Gulangan, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.864 lane km
Unit Cost: ₱ 11,458,333.33 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01078 |
300217100181000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300217100181000
Project ID: P00733933MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Rehabilitation of Jolo - Taglibi - Tiptipon Road, Sta. 021 + 500 - Sta. 025 + 000, Sulu
CW1- Rehabilitation of Concrete Road: 7.0 lane km
Unit Cost: ₱ 15,164,285.7 /lane km
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01063 |
310106100856000 |
March 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Tawi-Tawi District Engineering Office |
UACS No. 310106100856000
Project ID: P00706247MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sibutu-Ligayan Road - Chainage 116.16 - Chainage 2120
CW1- Rehabilitation of Paved Road: 4.008 lane km
Unit Cost: ₱ 15,794,411.18 /lane km
EAO: ₱ 2,296,000.00
Allocation: ₱ 65,600,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01094 |
300219101752000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300219101752000
Project ID: P00735025MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu
CW1- Construction of Flood Mitigation Structure: 272.0 ln.m
Unit Cost: ₱ 90,618.40 /ln.m.
CW1 Cost: ₱ 26,648,205.12
CW2- Construction of Flood Mitigation Structure: 272.0 ln.m.
Unit Cost: ₱ 86,771.30 /ln.m.
CW2 Cost: ₱ 23,601,794.88
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300222100121000 |
May 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100121000
Project ID: P00732411MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Lantong - Lagasan Asibih Access from Parang - Maimbung Road, Barangay Lantong, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.850 lane km
Unit Cost: ₱ 11,647,058.82 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300215102740000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Tawi-Tawi District Engineering Office |
UACS No. 300215102740000
Project ID: P00735020MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Banaran Island Circumferential Road, Barangay Tonggusong Banaran - Look Road, Sapa-Sapa, Tawi-Tawi
CW1- Construction of Concrete Road: 1.556 lane km
Unit Cost: ₱ 21,086,118.25 /lane km
EAO: ₱ 1,190,000.00
Allocation: ₱ 34,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01068 |
310106100855000 |
March 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Tawi-Tawi District Engineering Office |
UACS No. 310106100855000
Project ID: P00706246MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1519.29, Chainage 6123.14- Chainage 7630
CW1- Rehabilitation of Paved Road: 6.052 lane km
Unit Cost: ₱ 17,539,656.31 /lane km
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300221102350000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300221102350000
Project ID: P00735038MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Road at Brgy. Tubig Samin, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.84 lane km
Unit Cost: ₱ 11,785,714.28 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310104100489000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 310104100489000
Project ID: P00707604MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation/Reconstruction Damaged Paved Roads Jct. Timbangan Romandier Road (STA.0013 + 000 - STA. 0015 + 560.36, STA. 15+601.69 - STA. 16+000)
CW1- Reconstruction to Concrete Pavement: 5.917 lane km
Unit Cost: ₱ 17,939,834.37/lane km
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
February 25, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) - K0900 + 005 - K0900 + 719
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,355.00 Lineal meters
EAO P .920 M
Total P 46.00 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 719
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,607.00 Lineal meters
EAO P .920 M
Total P 46.00 M
|
February 25, 2024 |
2023 |
WIN3F07398 |
SR2023-03-007216 |
March 15, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(1067- K0905 +619), Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: P 40.530 M
Street Lighting: 4.705 Km
EAO P 1.470 M
Total P 42.00 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(-1067)- K0905 +619), Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: P 40.530 M
Street Lighting: 288.00 Number of Streetlights
EAO P 1.470 M
Total P 42.00 M
|
February 25, 2024 |
2023 |
WIN3F07298 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0904+017, Tacloban City
Physical Target: Allocation:
CW1-Road Safety: P 29.890 M
Street Lighting: 3.417 Km
EAO P .610 M
Total P 30.500 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0914+017, Tacloban City
Physical Target: Allocation:
CW1-Road Safety: P 29.890 M
Street Lighting: 209.00 Number of Streetlights
EAO P .610 M
Total P 30.500 M
|
February 25, 2024 |
2023 |
WIN3F07301 |
SARO-BMB-A-23-0013913 |
June 3, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-110) - K0916+568, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: P 40.376 M
Street Lighting: 4.615 Km
EAO P .824 M
Total P 41.200 M
AS MODIFIED:
Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-1000) - K0916+568, Tacloban, City
Physical Target: Allocation:
CW1-Road Safety: P 40.376 M
Street Lighting: 283.00 Number of Streetlights
EAO P .824 M
Total P 41.200 M
|
February 25, 2024 |
2023 |
WIN3F07242 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St - (S00003LT) Chainage 110 - Chainage 641, Chainage 430 - Chainage 641
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 13.230 M
Road: 742.00 Lineal meters
EAO P .270 M
Total P 13.500 M
AS MODIFIED:
Avenida Veteranos St - (S00003LT) Chainage 121 - Chainage 641, Chainage 581 - Chainage 641
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 13.230 M
Road: 580.00 Lineal meters
EAO P .270 M
Total P 13.500 M
|
February 25, 2024 |
2023 |
WIN3F07604 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities
AS PER GAA/ORIGINAL:
Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Drainage P 4.900 M
Structure: 378.761 Lineal meters
EAO P .100 M
Total P 5.00 M
AS MODIFIED:
Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Drainage Stucture P 4.900 M
along Road: 177.14 Lineal meters
EAO P .100 M
Total P 5.00 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0903 + 089 - K0903 + 969, K0904 + 093 - K0904 + 360
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 9.016 M
2.456 Lane Km
EAO P .184 M
Total P 9.200 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + (-071), K0903 + 072 - K0903 + 242, K0903 + 442 - K0903 + 696
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 9.016 M
0.968 Lane Km
EAO P .184 M
Total P 9.200 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + 089
Physical Target: Allocation:
CW1-Road Widening: P 10.780 M
0.440 Lane Km
EAO P .220 M
Total P 11.000 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-123) - K0903 + (-081), K0903 + (-081) - K0903 + 089
Physical Target: Allocation:
CW1-Road Widening P 10.780 M
0.382 Lane Km
EAO P .220 M
Total P 11.000 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0902 + 115 - K0902 + 940
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,650.00 Lineal meters
EAO P .948 M
Total P 47.400 M
AS MODIFIED:
Daang Maharlika (LT) - K0902 + 147 - K0902 + 287, K0902 + 347 - K0902 + 937
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,460 Lineal meters
EAO P .948 M
Total P 47.400 M
|
February 24, 2024 |
2023 |
WIN3F07378 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0906 + 261 - K0906 + 505, K0906 + 705 - K0907 + 030
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.871540 M
Road: 1,140 Lineal meters
EAO P .201460 M
Total P 10.073 M
AS MODIFIED:
Daang Maharlika (LT) - K0906 + 323 - K0906 + 649
Physical Target: Allocation:
CW1-Construction of Drainage Structure Along P 9.871540 M
Road: 326.00 Lineal meters
EAO P .201460 M
Total P 10.073 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0907 + 030 - K0910 + 173, K0908 + (-830) - K0910 + 472
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 29.400 M
Road: 944.00 Lineal meters
EAO P .600 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0909 + 574 - K0910 + 472
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 29.400 M
Road: 954.00 Lineal meters
EAO P .600 M
Total P 30.00 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) - K0900 + 145 - K0900 + 585
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 31.260040 M
1.760 Lane Km
EAO P .637960 M
Total P 31.898 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 880
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 31.260040 M
2.43 Lane Km
EAO P .637960 M
Total P 31.898 M
|
February 24, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0908 + (-677) - K0908 +131
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 29.400 M
Road: 808.00 Lineal meters
EAO P .600 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0908 + (-677) - K0908 +103
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 29.400 M
Road: 780.00 Lineal meters
EAO P .600 M
Total P 30.00 M
|
February 23, 2024 |
2023 |
WIN3F07319 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0912+765,K0913+002-K0913+726
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 48.020 M
Road 2,178.00 Lineal meters
EAO P 0.980 M
Total P 49.00 M
AS MODIFIED:
Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0913+700
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 48.020 M
Road 1,812.00 Lineal meters
EAO P 0.980 M
Total P 49.00 M
|
February 23, 2024 |
2023 |
WIN3F07473 |
SR2023-03-006366 |
March 3, 2023 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
OO2: Protect Lives and Properties
Flood Management _ Construction/Maintenance of Flood Mitigation Structures and Drainage System
AS PER GAA/ORIGINAL:
Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 19.300 M
Structure: 60.00 Lineal meters
EAO P 0.700 M
Total P 20.00 M
AS MODIFIED:
Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 19.300 M
Structure: 50.00 Lineal meters
EAO P 0.700 M
Total P 20.00 M
|
February 23, 2024 |
2023 |
WIN3F07464 |
SR2023-03-006352 |
March 3, 2023 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage System
AS PER GAA/ORIGINAL:
Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 196.00 Lineal meters
EAO P 1.750 M
Total P 50.00 M
|
February 23, 2024 |
2023 |
WIN3F07383 |
SR2023-03-006355 |
March 3, 2023 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Flood Management-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 255.00 Lineal meters
EAO P 1.750 M
Total P 50.00 M
|
February 23, 2024 |
2023 |
|
SR2023-01-003513 |
January 31, 2023 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Construction (Completion) of Multi-Purpose Building, Barangay Samoje, San Juan, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Construction (Completion) of Multi-Purpose Building, Barangay Somoje, San Juan, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building
EAO P 0.02 M
Total P 2.00 M
|
February 23, 2024 |
2023 |
WIN3F07317 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT)-K0904+365-K0904+940
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 23.211300 M
along Road: 1,150.00 Lineal meters
EAO P 0.473700 M
Total P 23.685 M
AS MODIFIED:
Daang Maharlika (LT)-K0904+343-K0904+612,K0904+617-K0904+689
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 23.211300 M
along Road: 682.00 Lineal meters
EAO P 0.473700 M
Total P 23.685 M
|
February 23, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0898 + (-122) - K0898 + 462
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 12.152 M
along Road: 584 Lineal meters
EAO P 0.248 M
Total P 12.400 M
AS MODIFIED:
Daang Maharlika (LT) - K0899 + 299 - K0899+654
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 12.152 M
along Road: 355 Lineal meters
EAO P 0.248 M
Total P 12.400 M
|
February 22, 2024 |
2023 |
WIN3F07036 |
SR2023-12-015070 |
December 15, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters
EAO P 3.675 M
Total P 105.00 M
AS MODIFIED:
Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927+(348)-K0927+(-310)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters
EAO P 3.675 M
Total P 105.00 M
|
February 22, 2024 |
2023 |
WIN3F07450 |
SR2023-09-013365 |
September 15, 2023 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Basey-Maydolong, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 193.00 M
: 14.502 Lane Km
EAO P 7.00 M
Total P 200.00 M
AS MODIFIED:
Construction of Road, Basey-Maydolong, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 144.92696675 M
: 2.72 Lane Km
CW1-Construction of Drainage Structure P 48.07303325 M
along Road: 2,240.00 Lineal meters
EAO P 7.00 M
Total P 200.00 M
|
February 22, 2024 |
2023 |
WIN3F07742 |
SR2023-03-006194 |
March 2, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening- Secondary Roads
AS PER GAA/ORIGINAL:
JCT Buenavista-Borongan City Road, Eastern Samar
Physical Target: Allocation:
CW1-Road Widening: 3.333 Lane Km P 48.250 M
EAO P 1.750M
Total P 50.00 M
AS MODIFIED:
JCT Buenavista-Borongan City Road, Eastern Samar- K1013+000 - K1014+573
Physical Target: Allocation:
CW1-Road Widening: 3.174 Lane Km P 48.250 M
EAO P 1.750M
Total P 50.00 M
|
February 22, 2024 |
2023 |
WIN3F07376 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1044 + 972 - K1045 + 160, K1045 + 860 - K1046 + 445
Physical Target: Allocation:
CW1-Road Widening ; 1.39 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Biliran Circumferential Rd - K1044 + 972 - K1045 + 145, K1045 + 860 - K1046 + 445
Physical Target: Allocation:
CW1-Road Widening ;0.738 Lane Km P 12.306892 M
CW2-Construction of Drainage Structure P 4.405137 M
: 680.00 Lineal meters
CW3-Construction of Road Slope Protection P 2.887971 M
Structure: 38.670 Square meters
EAO P 0.400 M
Total P 20.00 M
|
February 22, 2024 |
2023 |
WIN3F07664 |
SARO-BMB-A-23-0013838 |
March 6, 2023 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL:
Palo West Bypass Road, Leyte
Physical Target: Allocation:
CW1-Widening of Bridge: 146.40 Square meters P 77.200 M
EAO P 2.800 M
Total P 80.00 M
AS MODIFIED:
Palo West Bypass Road, Leyte
Physical Target: Allocation:
CW1-Widening of Bridge: 209.88 Square meters P 38.99531136 M
CW2-Road Widening: 0.69 Lane Km P 38.20468864 M
EAO P 2.800 M
Total P 80.00 M
|
February 22, 2024 |
2023 |
WIN3F07465 |
SR2023-03-006370 |
March 3, 2023 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
OO2; Protect Lives and Properties
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 48.250 M
Structure: 120 Lineal meters
EAO P 1.750 M
Total P 50.00 M
|
February 22, 2024 |
2023 |
WIN3F07241 |
SR2023-09-013268 |
September 7, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT)-K0898+482-K0898+706,K0900+202-K0900+372,K0900+965-K0901+908,K0903+883-K0905+416,K0905+472-K0906+630
Physical Target: Allocation:
CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 16.488 Lane Km
EAO P 4.305 M
Total P 123.00 M
AS MODIFIED:
Daang Maharlika (LT)-K0901+247-K0901+908, K0904+103-K0905+416, K0905+472-K0906+569
Physical Target: Allocation:
CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 12.688 Lane Km
EAO P 4.305 M
Total P 123.00 M |
February 22, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd-K0915+(-908)-K0915+(-319)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 2.594 Lane Km
EAO P 0.303820 M
Total P 15.191 M
AS MODIFIED:
Tacloban-Baybay South Rd-K0915+(-894)-K0915+(-439)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 1.820 Lane Km
EAO P 0.303820 M
Total P 15.191 M
|
February 22, 2024 |
2023 |
WIN3F07243 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Justice Romualdez St - (S00005LT) Chainage 85-Chainage 872
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 1.574 Lane KM
EAO P 0.184340 M
Total P 9.217 M
AS MODIFIED:
Justice Romualdez St - (S00005LT) Chainage 005-Chainage 256
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 0.662 Lane KM
EAO P 0.184340 M
Total P 9.217 M |
February 22, 2024 |
2023 |
WIN3F07196 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Sn Jose-Candahug Rd-K0913+(-956)-K0914+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 4.802 Lane Km
EAO P 0.562420 M
Total P 28.121 M
AS MODIFIED:
Sn Jose-Candahug Rd-K0913+(-586)-K0914+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 3.912 Lane Km
EAO P 0.562420 M
Total P 28.121 M
|
February 22, 2024 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0900+005,K0900+585-K0901+000,K0901+184-K0901+199,K0902+358-K0903+056
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 5.710 Lane Km
EAO P 0.672060 M
Total P 33.603 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0899+992
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 1.748 Lane Km
EAO P 0.672060 M
Total P 33.603 M
|
February 21, 2024 |
FY 2023 GAA |
WIN3E02958 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
CW2: 200 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 12,851,303.69 (Construction of Concrete Road)
CW2: P 1,848,696.31 (Construction of Drainage Structure along Road)
EAO: P 300,000.00 |
February 21, 2024 |
FY 2023 GAA |
P00734160MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.221 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.418 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00 |
February 21, 2024 |
FY 2023 GAA |
P00734279MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 5.086 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
February 21, 2024 |
FY 2023 GAA |
P00734285MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00 |
February 21, 2024 |
FY 2023 GAA |
P00705977MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1474+327 - K1474+422, K1474+889 - K1473+042,
K1472+1000 - K1473+078, K1473+545 - K1473+640
Physical Target:
CW1: 426.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476+580 - K1476+988
Physical Target:
CW1: 408.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00 |
February 15, 2024 |
2023 |
WIN3F07742 |
SR2023-03-006194 |
March 2, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
JCT Buenavista - Borongan City Road, Eastern Samar
Physical Target: Allocation:
CW1-Road Widening: 3.333 Lane Km P 48.250 M
EAO P 1.750 M
Total P 50.00 M
AS MODIFIED:
JCT Buenavista - Borongan City Road, Eastern Samar - K1013 + 000 - K1014 + 573
Physical Target: Allocation:
CW1-Road Widening: 3.174 Lane Km P 48.250 M
EAO P 1.750 M
Total P 50.00 M
|
February 15, 2024 |
2023 |
WIN3F07036 |
SR2023-12-015070 |
December 5, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters
EAO P 3.675 M
Total P 105.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927 +(-348)-K0927+(-310)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters
EAO P 3.675 M
Total P 105.00 M |