Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 18, 2022 2022 WIN2C03508 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0762 + 000 - K0763 + 092

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 39.200 M
: 2.200 Lane Km

EAO P 0.800 M

Total P 40.00 M

AS MODIFIED:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0762 + 000 - K0763 + 092

Physical Target: Allocation:


CW1-Reconstruction to Concrete Pavement P 39.200 M
: 1.723 Lane Km

EAO P 0.800 M

Total P 40.00 M
April 18, 2022 2022 WIN2C03489 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0770 + 259 - K0770 + 315

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 6.531700 M
Structure: 336 Square meters
EAO P 0.133300 M

Total P 6.665 M

AS MODIFIED:

Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0770 + 259 - K0770 + 315

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 5.57929580 M
Structure: 267.40 Square meters

CW2-Road Widening: 0.04683 Lane Km P 0.952404200 M


EAO P 0.133300 M

Total P 6.665 M
April 18, 2022 2022 WIN2F06071 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sta. Rosa - Fort Magsaysay Rd - K0110+147.40 - K0110+320.30, K0110+370.50 - K0110+393.00, K0110+456.00 - K0110+460.50, K0110+518.50 - K0110+613.50, K0110+867.50 - K0110+918.10, K0111+080.50 - K0111+103.60
April 18, 2022 2022 WIN2C03455 SARO-BMB-A-22-0003147 March 23, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation-Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Rizal Avenida Ext Rd - K0905 + (-066) - K0905 + 619

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 17.0912 M
Asphalt Overlay: 3.204 Lane Km

EAO P 0.3488 M

Total P 17.440 M

AS MODIFIED:

Rizal Avenida Ext Rd - K0905 + (-066) - K0905 + 613

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 17.0912 M
Asphalt Overlay: 1.984 Lane Km

EAO P 0.3488 M

Total P 17.440 M
April 18, 2022 2022 WIN2F06090 FY 2022 GAA December 30, 2021 Region III Zambales 2nd District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Olongapo - Bugallon Rd - K0152+712 - K0153+370
April 18, 2022 2022 WIN2C03461 SARO-BMB-A-22-0003147 March 23, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation-Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Caibaan Rd - K0915 + 195 - K0915 + 1044

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.70 Lane Km

EAO P 0.21678 M

Total P 10.839 M

AS MODIFIED:

Caibaan Rd - K0915 + 121 - K0915 + 1044

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.846 Lane Km

EAO P 0.21678 M

Total P 10.839 M
April 18, 2022 2022 WIN2E02161 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 320102105123000
Project ID: P00620299MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+150.00, Rosario, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 90.000 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 326,666.67/Lineal meters

TO:

Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 – Sta. 0+090.00, Rosario, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 90.000 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 326,666.67/Lineal meters
April 18, 2022 2022 WIN2C03463 SARO-BMB-A-22-0003147 March 23, 2022 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0903 + 056 - K0903 + 264, K0903 + 278 - K0903 + 319

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 6.29062 M
Asphalt Overlay : 0.747 Lane Km

EAO P 0.12838 M

Total P 6.419 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0903 + 041 - K0903 + 259, K0903 + 283 - K0903 + 319

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 6.29062 M
Asphalt Overlay : 1.016 Lane Km

EAO P 0.12838 M

Total P 6.419 M
April 12, 2022 2022 310103100792000 GAA FY 2022 January 3, 2022 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads - Jct Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax - K0391+000 - K0392+434, K0395+000 - K0395+072, K0399+000 - K0399+316
April 12, 2022 FY 2021 GAA WIN2G02759 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No .: 300106200715000
Project ID : P00561578LZ

LOCAL PROGRAM

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM :

Construction of Cabulutan Flood Control,
Cabulutan, San Agustin, Romblon
Physical Target : CW1 - Construction of Flood Control Mitigation
Structure : 0 Lineal Meter (lm)
Allocation : Php 50.00 Million

TO :

Construction of Cabulutan Flood Control,
Cabulutan, San Agustin, Romblon
Physical Target - CW1 - Construction of Flood Control
Mitigation Structure : 258 Lineal Meter (lm)
Allocation - Php 50.00 Million
April 12, 2022 FY 2021 GAA WIN2G02777 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116204209000
Project ID : P00562470LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of Various
Infrastructures including Local Projects

FROM :
Construction/Rehabilitation of Punta (National Road Junction) -
Ilaya - Ayog-og - Kabaliwan Road, Bachawan,,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0 lane km
Allocation - Php 50.00 Million

TO :

Construction/Rehabilitation of Punta (National Road Junction) -
Ilaya - Ayog-og - Kabaliwan Road, Bachawan,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,591 square meter
Allocation - Php 50.00 million
April 12, 2022 2022 WIN2F05935 FY 2022 GAA December 30, 2021 Region III Pampanga 3rd District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Arayat - Magalang - Mabalacat Rd - K0107+705 - K0108+000
April 12, 2022 2022 WIN2F05929 FY 2022 GAA December 30, 2021 Region III Pampanga 3rd District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Friendship Circum Rd (West Circum Rd) - K0085+500 - K0086+164
April 12, 2022 FY 2022 WIN2C03511 UACS No. 310103100826000 February 24, 2022 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103100826000
Project ID.: P00603511LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Daang Maharlika (LZ) – (S03286LZ) Chainage 0 – Chainage 142
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay = 0.456 lane km
Unit Cost = P 7,833,553/lane km
Allocation = P 3,572,100
EAO = P 72,900
Total = P 3,645,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Daang Maharlika (LZ) – (S03286LZ) Chainage 30 – Chainage 134
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking = 0.312 lane km
Unit Cost = P 11,449,039/lane km
Allocation = P 3,572,100
EAO = P 72,900
Total = P 3,645,000
WIN2C03511
April 12, 2022 FY 2022 WIN2C03510 UACS No. 310102100855000 February 24, 2022 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310102100855000
Project ID.: P00603508LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
PPTA Rd – K0029+(-078) – K0029+(-109.57)
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay=5.295 lane km
Unit Cost = P 7,755,396/lane km
Allocation = P 5,390,000
EAO = P 110,000
Total = P 5,500,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
PPTA Rd – K0029+(119.60) – K0029+(-078)
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay=5.295 lane km
Unit Cost = P 13,645,570/lane km
Allocation = P 5,390,000
EAO = P 110,000
Total = P 5,500,000
WIN2C03510
April 12, 2022 2022 WIN2F06163 FY 2022 GAA December 30, 2021 Region III Pampanga 3rd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village, Sapang Balen Riverwall, Sta. (-0+120) to Sta. (-0+370), Mabalacat City, Pampanga

April 12, 2022 FY 2022 WIN2C03494 UACS No. 310101100599000 February 24, 2022 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310101100599000
Project ID.: P00603513LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Quirino Avenue – K0012+(-479)-K0013+293
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay=5.295 lane km
Unit Cost = P 7,754,123/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Quirino Avenue – K0013+(-242)-K0013+802.14
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay=3.132 lane km
Unit Cost = P 13,109,221/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000
WIN2C03494
April 12, 2022 2022 WIN2F06170 FY 2022 GAA December 30, 2021 Region III Pampanga 3rd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Slope Protection along Sapangbato River, Sta. 1+149 to Sta. 1+649, Barangay Margot, Angeles City, Pampanga

April 12, 2022 FY 2022 WIN2G02711 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100979000
Project ID : P00606274LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Puerto Princesa North Road
K0131 + 870 - K0132 +552,
K0132 + 592 - K0133 + 456,
K0140 + (-676) - K0140 + (-551),
K0140 + 000 - K0141 + 100,
K0042 + 472 - K0142 + 825
Physical Target - CW1 - Road Widening : 6.274 Lane Km
Allocation - Php 110.640 Million

TO :

Road Widening - Puerto Princesa North Road
K0131 + 870 - K0132 + 432,
K0132 + 712 - K0133 + 456,
K0140 +(-676) - K0140 + 478
Physical Target - CW1 - Road Widening : 4.934 Lane Km
Allocation - Php 110.640 Million


April 12, 2022 FY 2022 WIN2G02684 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100988000
Project ID : P00606285LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0108 + 960 - K0109 + 427 ,
K0109 + 449 - K0110 + 327,
K0114 + 000 - K0115 + 390,
K0115 + 421 - K0116 + 431
Physical Target - CW1 - Road Widening ; 7.534 Lane Km
Allocation - Php 110.00 Million

TO :

Puerto Princesa South Road
K0108 + 960 - K0109 + 423,
K0109 + 453 - K0110 + 323,
K0114 + 000 - K0115 + 386,
K0115 + 425 - K0116 + 431
April 12, 2022 FY 2022 WIN2G02697 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100977000
Project ID : P00606272LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM ;

Puerto Princesa North Road
K0120 + 000 - K0123 + 245,
K0127 + 000 - K0128 + 000
Physical Target - CW1 - Road Widening : 8.508 Lane Km
Allocation - Php 127.620 Million

TO :

Puerto Princesa North Road
K0120 + 000 - K0123 + 280
Physical Target - CW1 - Road Widening ; 6.574 Lane Km
Allocation - Php 127.620 Million
April 12, 2022 FY 2022 WIN2G02678 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100981000
Project ID : P00606277LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road
K0155 + 000 - K0157 + 294,
K0157 + 469 - K0158 + 000
Physical Target - CW1 - Road Widening : 7.766 Lane Km
Allocation - Php 121.740 Million

TO :

Puerto Princesa North Road
K0155 + 000 - K0157 + 294,
K0157 + 469 - K0157 + 959
Physical Target - CW1 - Road Widening : 6.15 Lane Km
Allocation - Php 121.740 million
April 12, 2022 FY 2022 WIN2G02676 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100975000
Project ID : P00606289LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Puerto Princesa North Road
K0040 + 925 - K0043 + 688
Physical Target - CW1 - Road Widening ; 5.518 Lane
Allocation - Php 115.00 Million

TO :

Road Widening - Puerto Princesa North Road
K0041 + 161 - K043 + 605
Physical Target - CW1 - Road Widening : 4.878 Lane Km
Allocation - Php 115.00 Million
April 11, 2022 2022 WIN2E02042 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310201101053000
Project ID: P00602485MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 579 - K1264 + 796, K1267 + 938 - K1268 + 000

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.572 Lane Km

Allocation:
TOTAL: P 12,500,000
CW1: P 12,250,000
EAO: P 250,000

Unit Cost:
CW1: P 21,416,083.92/Lane Km

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 579 - K1264 + 860

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.562 Lane Km

Allocation:
TOTAL: P 12,500,000
CW1: P 12,250,000
EAO: P 250,000

Unit Cost:
CW1: P 21,797,153.02/Lane Km
April 11, 2022 2022 310202101081000 GAA FY 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit-Mission Road K0571+(-10.79) - K0571+772
April 11, 2022 2022 310202101082000 GAA FY 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit-Mission Road K0587+000 - K0587+589.5
April 11, 2022 2022 300220100509000 GAA FY 2022 January 3, 2022 Region II Quirino District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/Facilities to Support Social Services - Construction (Completion) of Multi-Purpose Building, San Pascual, Diffun, Quirino
April 11, 2022 2022 310208100413000 GAA FY 2022 January 3, 2022 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry - Jct Dumabato) - K0324+536 - K0324+630
April 8, 2022 2022 WIN2F06167 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Improvement of Road, Bonga-Menor - Malamig - Liciada, Bustos, Bulacan
April 8, 2022 2022 WIN2F06112 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Rehabilitation / Reconstruction / Upgrading along Manila North Road - K0028+500 - K0029+000, K0029+200 - K0029+700
April 8, 2022 2022 WIN2F06014 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Improvement of Road, Old Poblacion Bustos Road, Poblacion, Bustos, Bulacan
April 8, 2022 2022 WIN2F05999 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structures along Bocaue River, Sta. K003+593.60 - Sta. K003+850, Bunlo, Bocaue, Bulacan
April 8, 2022 2022 WIN2F05899 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structure along Guiguinto River, (Sta. 1+036 to Sta. 1+338), Brgy. Daungan, Guiguinto, Bulacan
April 8, 2022 2022 WIN2F05896 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Improvement of Major River System and Creek with Flood Control Structure along Barangay San Jose, Paombong, Bulacan
April 8, 2022 2022 WIN2C03449 GAA FY 2022 January 2, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Borongan-Guiuan Rd -K0951 + 000 - K0953 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 4.050 Lane Km

EAO P 0.480 M

Total P 24.00 M

AS MODIFIED:

Borongan-Guiuan Rd - K0951 + 000 - K0953 + 000, K0997 + 000 - K0998 + 230

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 2.3634 Lane Km

EAO P 0.480 M

Total P 24.00 M
April 8, 2022 2022 WIN2C03474 SR2022-02-000287 February 3, 2022 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1092 + 397 - K1095 + 000

Physical Target: Allocation:

CW1-Road Widening: 5.054 Lane Km P 115.800 M

EAO P 4.200 M

Total P 120.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1090 + 580 - K1092 + 362, K1092 + 397 - K1095 + 000


Physical Target: Allocation:

CW1-Road Widening: 5.532 Lane Km P 95.489872 M

CW2- Preventive Maintenance of Road: P 20.310128 M
Asphalt Overlay: 2.346 Lane Km

EAO P 4.200 M

Total P 120.00 M
April 8, 2022 2022 WIN2C03471 SR2022-03-008947 March 23, 2022 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Inter-Provl Rd - K0909 + 460 - K0910 + 067

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.56 square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Leyte-Samar Inter-Provl Rd - K0909 + 460 - K0911 + 140

Physical Target: Allocation:

CW1-Road Widening: 3.438 Lane Km P 41.474214 M

CW2-Construction of Road Slope Protection P 55.025786 M
Structure: 6,154.49 square meters

EAO P 3.500 M

Total P 100.00 M
April 8, 2022 2022 WIN2C03451 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Allen-Catarman Rd - K0718 + 226 - K0718 + 866

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 10.84762 M
Asphalt Overlay : 1.28 Lane Km

EAO P 0.22138 M

Total P 11.069 M

AS MODIFIED:

Allen-Catarman Rd - K0709 + 250 - K0710 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 10.84762 M
Asphalt Overlay : 1.50 Lane Km

EAO P 0.22138 M

Total P 11.069 M
April 8, 2022 2022 WIN2C03452 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Catarman Div Rd 2 - K0746 + 500 - K0747 + 187

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 5.50368 M
along Road: 1,404 Lineal meters

EAO P 0.11232 M

Total P 5.616 M

AS MODIFIED:

Catarman Div Rd 2 - K0746 + 258.19 - K0746 + 588

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 5.50368 M
along Road: 329.81 Lineal meters

EAO P 0.11232 M

Total P 5.616 M
April 8, 2022 2022 WIN2C03453 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0682 + 110 - K0682 + 125, K0682 + 145 - K0682 + 160, K0682 + 217 - K0682 + 246

Physical Target: Allocation:

CW1-Road Widening: 0.118 Lane Km P 6.46114 M

EAO P 0.13186 M

Total P 6.593 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0680 + (-737.60) - K0680 + (-610), K0682 + 113.70 - K0682 + 126.50, K0682 + 149.70 - K0682 + 164

Physical Target: Allocation:

CW1-Road Widening: 0.2644 Lane Km P 6.46114 M

EAO P 0.13186 M

Total P 6.593 M
April 8, 2022 2022 WIN2C03448 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance along Allen-Catarman Rd - K0715 + 300 - K0716 + 997, K0717 + 140 - K0717 + 478, K0719 + 693 - K0721 + 000, K0722 + 604 - K0722 + 756, K0725 + 500 - K0727 + 000, K0737 + 000 - K0737 + 751

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 40.530 M
Concrete Reblocking : 3.21 Lane Km

EAO P 1.470 M

Total P 42.00 M

AS MODIFIED:

Preventive Maintenance along Allen-Catarman Rd - K0714 + 000 - K0714 + 118, K0715 + 300 - K0716 + 997, K0717 + 140 - K0717 + 478, K0741 + 300 - K0741 + 630

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 40.530 M
Asphalt Overlay : 4.9877 Lane Km

EAO P 1.470 M

Total P 42.00 M
April 8, 2022 2022 WIN2F05895 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation of Road including Drainage, Duhat, Bocaue, Bulacan
April 8, 2022 2022 WIN2C03476 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Palo-Carigara-Ormoc Rd - K0988 + 060 - K0989 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 1.930 Lane Km

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Palo-Carigara-Ormoc Rd - K0988 + 060 - K0988 + 826

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 1.532 Lane Km

EAO P 0.300 M

Total P 15.00 M
April 8, 2022 2022 WIN2C03487 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation-Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1127 + 000 - K1127 + 378, K1127 + 396.10 - K1128 + 231

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 9.800 M
along Road: 1,216.90 Lineal meters

EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Palompon – Isabel – Merida – Ormoc Rd., K1127+267 – K1127+378, K1127+396.10 – K1128+231

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 9.800 M
along Road: 950.00 Lineal meters

EAO P 0.200 M

Total P 10.00 M
April 8, 2022 2022 WIN2F05919 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Improvement of Major River System and Creek with Flood Control Structure along Barangay Canalete, Malolos, Bulacan
April 8, 2022 2022 WIN2F05894 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Improvement of Major River System and Creek with Flood Control Structure along Barangay Balubad, Bulakan, Bulacan
April 8, 2022 2022 WIN2F05925 FY 2022 GAA December 30, 2021 Region III Bulacan 1st District Engineering Office
Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction / Improvement of Bulihan - Longos Creek, Malolos City
April 8, 2022 2022 WIN2C03468 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1116 + 100 - K1116 + 150, K1117 + 000 - K1117 + 252, K1120 + 360 - K1120 + 500, K1121 + 250 - K1121 + 380, K1122 + 600 - K1122 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 4,198 square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Merida-Lundag-Puting Bato-Consolacion-Isabel Rd –
K1117+(-330) – K1117+035, K1119+000 – K1119+320, K1120+350 – K1120+500, K1121+220 – K1121+360, K1122+480 – K1122+550


Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 6,120 square meters

EAO P 1.00 M

Total P 50.00 M
April 7, 2022 2022 WIN2E02036 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310201100950000
Project ID: P00602484MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1186 + 783 - K1187 + 056, K1187 + 224 - K1188 + 791, K1203 + 577 - K1203 + 894

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 4.314 Lane Km

Allocation:
TOTAL: P 83,029,000
CW1: P 80,122,985
EAO: P 2,906,015

Unit Cost:
CW1: P 18,572,782.80/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1186 + 783 - K1187 + 056, K1187 + 224 - K1188 + 748, K1203 + 577 - K1203 + 894

Type of Work:
CW1- Road Widening
ROW- ROW Acquisition

Physical Target:
CW1- 4.228 Lane Km
ROW-63,420 Square meters

Allocation:
TOTAL: P 83,029,000
CW1: P 76,262,985
ROW: P 3,860,000
EAO: P 2,906,015

Unit Cost:
CW1: P 18,037,602.89/Lane Km
ROW: P 60.86408/Square meters
April 7, 2022 2022 WIN2E02039 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310203100534000
Project ID: P00602487MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads

FROM:

Buenavista-Bunaguit Rd - K1257 + 554 - K1259 + 000

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 2.998 Lane Km

Allocation:
TOTAL: P 59,000,000
CW1: P 56,935,000
EAO: P 2,065,000

Unit Cost:
CW1: P 18,990,994.00/Lane Km

TO:

Buenavista-Bunaguit Rd - K1257 + 000 - K1259 + 000

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 4.106 Lane Km

Allocation:
TOTAL: P 59,000,000
CW1: P 56,935,000
EAO: P 2,065,000

Unit Cost:
CW1: P 13,866,293.23/Lane Km
April 7, 2022 2022 WIN2E02043 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310207100233000
Project ID: P00602489MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1193 + 111 - K1193 + 573

Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders

Physical Target:
CW1- 1,154.250 Square meters

Allocation:
TOTAL: P 10,042,000
CW1: P 9,841,160
EAO: P 200,840

Unit Cost:
CW1: P 8,526.021223/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1193 + 000 - K1193 + 573

Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders

Physical Target:
CW1- 2,438.410 Square meters

Allocation:
TOTAL: P 10,042,000
CW1: P 9,841,160
EAO: P 200,840

Unit Cost:
CW1: P 4,035.892242/Square meters
April 7, 2022 FY 2022 WINC03507 UACS No. 300214100102000 February 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300214100102000
Project ID.: P00635862LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A.11239
Rehabilitation/Upgrading along Kaybiga Road – K0019+(-328) – K0020+754, Caloocan City
Physical Target: CW1 – Rehabilitation of Concrete Road = 0.450 lane km
Unit Cost = P 49,000,000/lane km
Allocation = P 22,050,000
EAO = P 450,000
Total = P 22,500,000

As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A.11239
Rehabilitation/Upgrading along Kaybiga Road – K0019+(-328) – K0019+353, Caloocan City
Physical Target: CW1 – Rehabilitation of Concrete Road = 0.746 lane km
Unit Cost = P 22,557,641/lane km
Allocation = P 22,050,000
EAO = P 450,000
Total = P 22,500,000
WINC03507
April 7, 2022 FY 2022 WINC03496 UACS No. 300215100835000 February 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215100835000
Project ID.: P00636875LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the
National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Lawang Batoto Punturin Bypass Road, Barangay Lawang Bato, Valenzuela City
Physical Target: CW1 – Construction of Concrete Road = 0.480 lane km
Unit Cost = P 25,520,833/lane km
Allocation = P 12,250,000
EAO = P 250,000
Total = P 12,500,000

As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the
National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Lawang Bato to Punturin Bypass Road, Barangay Lawang Bato, Valenzuela City
Physical Target: CW1 – Construction of Concrete Road = 0.480 lane km
Unit Cost = P 25,520,833/lane km
Allocation = P 12,250,000
EAO = P 250,000
Total = P 12,500,000
WINC03496
April 7, 2022 FY 2022 WINC03506 UACS No. 300214100100000 February 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300214100100000
Project ID.: P00635860LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Rehabilitation/Upgrading along Gen. T. De Leon St., K0015+000 – K0016+585, Valenzuela City
Physical Target: CW1 – Rehabilitation of Concrete Road = 1.074 lane km
Unit Cost = P 13,869,646/lane km
Allocation = P 14,896,000
EAO = P 304,000
Total = P 15,200,000

As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Rehabilitation/Upgrading along Gen. T. De Leon St., K0016+059 – K0016+539, Valenzuela City
Physical Target: CW1 – Rehabilitation of Concrete Road = 1.074 lane km
Unit Cost = P 13,869,646/lane km
Allocation = P 14,896,000
EAO = P 304,000
Total = P 15,200,000
WINC03506
April 7, 2022 FY 2022 WIN2F6002 UACS No. 300226100232000 February 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300226100232000
Project ID.: P00633104LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP)-Multi-Purpose Buildings/Facilities to support Social Services
Rehabilitation of Multi-Purpose Building, Sitero Franciso High School, Barangay Marulas, Valenzuela City
Physical Target: CW1 – Rehabilitation/Major Repair of Multi-Purpose Building = 1 Bldg.
Unit Cost (000) = P 3,960/no. of bldg.
Allocation (000) = P 3,960.00
EAO (000) = P 40.00
Total (000) = P 3,645,000

As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP)-Multi-Purpose Buildings/Facilities to support Social Services
Rehabilitation of Multi-Purpose Building, Sitero Franciso High School, Barangay Ugong, Valenzuela City
Physical Target: CW1 – Rehabilitation/Major Repair of Multi-Purpose Building = 1 Bldg.
Unit Cost (000) = P 3,960/no. of bldg.
Allocation (000) = P 3,960.00
EAO (000) = P 40.00
Total (000) = P 3,645,000
WIN2F6002
April 7, 2022 FY 2022 WINC03514 UACS No. 300219100446000 February 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300219100446000
Project ID.: P00637045LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting
Public Infrastructure/Facilities
Construction of Flood Control Wall along Bisi-Mabolo, Brgy. Mabolo, Valenzuela City
Physical Target: CW1 – Construction of Flood Mitigation Structure = 212.00 lane km
Unit Cost = P 69,339.62/lane km
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000

As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting
Public Infrastructure/Facilities
Construction of Flood Control Wall along Bisig-Mabolo, Brgy. Mabolo, Valenzuela City
Physical Target: CW1 – Construction of Flood Mitigation Structure = 212.00 lane km
Unit Cost = P 69,339.62/lane km
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WINC03514
April 7, 2022 FY 2022 WIN2C03504 UACS No. 310106100691000 February 10, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310106100691000
Project ID.: P00603570LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Aurora Avenue – (S02355LZ) Chainage 832 – Chainage 895
Physical Target: CW1 – Reconstruction of Concrete Pavement=0.252 lane km
Unit Cost = P 38,888,889/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000

As Modified
OO1: Ensure Safe and Reliable National Road, System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Aurora Avenue – (S02355LZ) Chainage 000.0 – Chainage 76.0, Chainage 832.0 – Chainage 895.0
Physical Target: CW1 – Reconstruction of Concrete Pavement=0.834 lane km
Unit Cost = P 11,750,560/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
WIN2C03504
April 7, 2022 FY 2022 WIN2C03513 UACS No. 300221100150000 February 8, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300221100150000
Project ID.: P00631920LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 – Rehabilitation of Concrete Road=2.359 lane km
Unit Cost = P 14,688,427/lane km
Allocation = P 34,650,000
EAO = P 350,000
Total = P 35,000,000

As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 – Rehabilitation of Concrete Road=2.359 lane km
Unit Cost = P 14,688,427/lane km
Allocation = P 34,650,000
EAO = P 350,000
Total = P 35,000,000
WIN2C03513
April 6, 2022 2022 WIN2F05892 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Concepcion - La Paz Rd - K0134+000 - K0134+345, K0135+366 - K0135+889

April 6, 2022 2022 WIN2F05893 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Rehabilitation of Dike along Parua River, Sta. 6+675 to Sta. 7+119 (Brgy. San Francisco Section Left Bank), Concepcion, Tarlac
April 5, 2022 FY 2022 WIN2C03472 UACS No. 300226100254000 February 8, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300226100254000
Project ID.: P00633123LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 1.0 bldg.
Unit Cost = P 39,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000

As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 6.0 bldg.
Unit Cost = P 6,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
WIN2C03472
April 5, 2022 FY 2022 WIN2C03472 UACS No. 300226100254000 February 8, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300226100254000
Project ID.: P00633123LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 1.0 bldg.
Unit Cost = P 39,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000

As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 6.0 bldg.
Unit Cost = P 6,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
WIN2C03472
April 5, 2022 2022 310201100862000 GAA FY 2022 January 3, 2022 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0373+(-387.25) - K0374+170
April 5, 2022 2022 3002191000043000 GAA FY 2022 January 3, 2022 Region II Regional Office II
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Catotoran Norte Flood Structure, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan
April 5, 2022 2022 310101100545000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Manila North Rd - K0615+000 - K0617+198
April 5, 2022 2022 310101100546000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0625+000 - K0628+061
April 5, 2022 2022 310101100547000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K640+1007 - K0644+019
April 5, 2022 2022 310101100621000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0647+000 - K0648+565
April 5, 2022 2022 310101100622000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0664+020 - K0664+455
April 5, 2022 2022 310102100904000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Calog-Pudtol Rd - K0666+065 - K0667+387
April 5, 2022 2022 310104100387000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0679+272 - K0679+762
April 5, 2022 2022 310107100370000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Manila North Rd - K0600+560 - K0600+830
April 5, 2022 2022 310209100331000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - K0717+027 - K0720+028
April 5, 2022 FY 2021 WIN2C03450 UACS No. 320101106435000 January 31, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101106435000
Project ID.: P00525801LZ
OO2: Protect Lives and Properties Against Major Flood
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control River Wall along Polo River, Tagalag, Valenzuela City
Physical Target: CW1 - Rehabilitation/ Major of Flood Control Structure – 0.000 Lineal Meters
Unit Cost = -
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000

As Modified
OO2: Protect Lives and Properties Against Major Flood
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control River Wall along Polo River, Tagalag, Valenzuela City
Physical Target: CW1 - Rehabilitation/ Major of Flood Control Structure – 70.000 Lineal Meters
Unit Cost = P 210,000.00/Lineal Meter
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WIN2C03450
April 5, 2022 2022 310212100216000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 13758 - Chainage 14860, Chainage 14949 - Chainage 15159
April 5, 2022 FY 2022 WIN2C03495 UACS No. 300215100901000 March 9, 2022 National Capital Region South Manila District Engineering Office
As per GAA/Original
UACS No. 300215100901000
Project ID.: P00630332LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Access Roads and/or Bridges from
the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road including Drainage Improvement of Zone 931, Pandacan, Manila
Physical Target: CW1 – Construction of Concrete Road – 2.810 lane km
Unit Cost = P 10,462,634/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000

As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Access Roads and/or Bridges from
the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road including Drainage Improvement of Zone 91, Pandacan, Manila
Physical Target: CW1 – Construction of Concrete Road – 2.810 lane km
Unit Cost = P 10,462,634/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03495
April 5, 2022 2022 310201100965000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0662+069 - K0663+000
April 5, 2022 2022 310201100966000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0650+927 - K0651+000, K0655+579 - K0655+728, K0655+751 - K0656+938, K0656+961 - K0657+000
April 5, 2022 2022 320102104913000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Pata Flood Control Structure along Pata River (Sta. 0+000 - Sta. 0+120), Pata, Claveria, Cagayan
April 5, 2022 2022 320102104910000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Langgangan Flood Control along Langgangan River, Sta. 0+000 - Sta. 0+418 (Section 1), Sta. 0+000 - Sta. 0+025 (Section 2), Sta. 0+000 - Sta. 0+132 (Section 3), Sta. Praxedes, Cagayan
April 5, 2022 2022 320102104522000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Canayun-Sirit-Dana-Ili Flood Control Along Abulug River (Sta. 13+300 - Sta. 13+580) Left Side, Abulug, Cagayan
April 5, 2022 2022 320102104909000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Dugo Flood Control along Abulug River (Sta. 10+310 - Sta. 10+600 R/S), Abulug, Cagayan
April 5, 2022 2022 320102104910000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Simayung Flood Control along Abulug River, Sta. 7+241 - Sta. 7+416 Section 1, Sta. 7+416 - Sta. 7+466 Section 2, Abulug, Cagayan
April 5, 2022 2022 320102104912000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Masi Flood Control Structure along Pamplona River (Sta. 0+000 - Sta. 0+250), Pamplona, Cagayan
April 5, 2022 2022 310212100217000 GAA FY 2022 January 3, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads - (S00656LZ) Chainage 500 - Chainage 1865
April 2, 2022 2022 WIN2F05909 SR2022-02-000068 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 1495, K0336 + 000 - K0342 + 222;
Physical Target: 50.530 Lane Km;
Allocation: Php 300,000,000

To: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 381;
Physical Target: 35.902 Lane Km;
Allocation: Php 300,000,000

April 2, 2022 2022 WIN2F05909 SR2022-02-000068 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 1495, K0336 + 000 - K0342 + 222;
Physical Target: 50.530 Lane Km;
Allocation: Php 300,000,000

To: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 381;
Physical Target: 35.902 Lane Km;
Allocation: Php 300,000,000

April 2, 2022 2022 WIN2F05904 SR2022-03-007586 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0302 + 320 - K0302 + 415;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000


To: Benguet-Nueva Vizcaya Rd - K0293+ 245 - K0293 + 308;
Physical Target: 4,774.000 Square meters;
Allocation: Php 120,000,000
April 2, 2022 2022 WIN2F05902 SR2022-02-001190 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 286 - K0271 + 413;
Physical Target: 8333.330 Square meters;
Allocation: Php 150,000,000

To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 216 - K0271 + 466;
Physical Target: 6,434.000 Square meters;
Allocation: Php 150,000,000

April 2, 2022 2022 WIN2F05898 SR2022-02-001197 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 889 - K0272 + 050, K0272 + 393 - K0272 + 458;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000

To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 875 - K0272 + 045, K0272 + 400 - K0272 + 455;
Physical Target: 6,341.000 Square meters;
Allocation: Php 150,000,000

April 2, 2022 2022 WIN2F05905 SR2022-02-001865 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0254 + (-586) - K0260 + 000;
Physical Target: 9.800 Lane Km;
Allocation: Php 130,000,000

To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0253 + (-586) - K0262 + 000;
Physical Target: 19.232 Lane Km;
Allocation: Php 130,000,000

April 2, 2022 2022 WIN2F05941 SR2022-02-001889 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Itogon Rd - K0254 + (-651) - K0258 + 595, K0261 + 000 - K0268 + 055;
Physical Target: 15.831 Lane Km;
Allocation: Php 210,000,000

To: Preventive Maintenance (Asphalt Overlay) along Baguio-Itogon Rd - K0254 + (-651) - K0258 + 595, K0261 + 000 - K0264+768;
Physical Target: 17.948 Lane Km;
Allocation: Php 210,000,000

April 2, 2022 2022 WIN2F05934 SR2022-02-001142 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0338 + 150 - K0338 + 300;
Physical Target: 8333.330 Square meters;
Allocation: Php 150,000,000

To: Gov. Bado Dangwa National Rd - K0338 + 038 - K0338 + 151, K0338 + 220 - K0338 + 250;
Physical Target: 6166.000 Square meters;
Allocation: Php 150,000,000

April 2, 2022 2022 WIN2F05913 SR2022-02-001927 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance along Baguio-Bontoc Rd - K0281 + 195 - K0288 + 827;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 11.308 Lane Km;
Allocation: Php 150,000,000.000

To: Preventive Maintenance along Baguio-Bontoc Rd - K0273 + 500 - K0281 + 438;
Type of Work: Preventive
Maintenance of Road: Asphalt Overlay;
Physical Target: 15.940 Lane Km;
Allocation: Php 150,000,000.000

April 2, 2022 2022 WIN2F05914 SR2022-02-001930 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance along Baguio-Bontoc Rd - K0288 + 827 - K0299 + 730, K0299 + 750 - K0300 + 636;
Physical Target: 16.584 Lane Km;
Allocation: Php 220,000,000

To: Preventive Maintenance along Baguio-Bontoc Rd - K0294 + 969 - K0299 + 760, K0299 + 820 - K0307 + 205;
Physical Target: 24.096 Lane Km;
Allocation: Php 220,000,000

April 2, 2022 2022 WIN2F05915 SR2022-02-001933 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance along Gov. Bado Dangwa National Rd - K0346 + 000 - K0351 + 256, K0328 + (-085) - K0335 + 000;
Physical Target: 16.584 Lane Km;
Allocation: Php 220,000,000

To: Preventive Maintenance along Gov. Bado Dangwa National Rd - (S00377LZ) K0328 + (-085) - K0329 + 420, (S00376LZ) K0320 + 100 - K0331 + 000;
Physical Target: 24.852 Lane Km;
Allocation: Php 220,000,000

March 30, 2022 2022 WIN2F05881 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Rehabilitation of Existing Dike along Binabakod River, Paludpud Section, D/S of Check Gate, La Paz, Tarlac
March 30, 2022 2022 WIN2F05880 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Dike along O'Donnell River (Brgy. Maruglu Section, Sta. 2+603 to Sta. 3+137 Right Bank), Capas, Tarlac
March 30, 2022 2022 WIN2F05835 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Convergence and Special Support Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac
March 30, 2022 2022 WIN2F05873 FY 2022 GAA December 30, 2021 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Concepcion - La Paz Rd - K0120+915 - K0121+108, K0121+108 - K0121+570, K0122+710 - K0123+013, K0132+117 - K0132+363