June 13, 2018 |
2018 |
WIN8C02848 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu City District Engineering Office |
Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations F. Ramos Street leading to Basilica Minore del Sto. Nino, Magellan's Cross, Fuente Osmena, Cebu Provincial Capitol Mango, Night Entertainment Centers, Brgy. Santa Cruz, Cebu City |
June 13, 2018 |
2018 |
WIN8F05452 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Siquijor District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide -Secondary Roads, Siquijor Circumferential Rd – K0001+605 - K0001+985, K0002+105 - K0002+545, K0002+605 - K0002+826, K0004+254 - K0004+300, K0004+726 - K0004+848, K0005+783 - K0005+803, K0006+160 - K0006+522, K0009+611 - K0009+674, K00024+112 - K0024+186, K0026+682 - K0026+918, K0032+422 - K0032+544, K0052+250 - K0052+305, K0073+086 - K0073+154, K0074+378 - K0074+778 |
June 13, 2018 |
FY 2018 GAA |
WIN8C03157 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 3, Davao City
Physical Target:
CW1: 1.440 Lane Km (Construction of Asphalt Road)
CW2: 3,960 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 250,200,000.00
CW1: P 111,168,000.00 (Construction of Asphalt Road)
CW2: P 130,275,000.00 (Construction of Road Slope Protection Structure)
EAO: P 8,757,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 3, Davao City
Physical Target:
CW1: 1.367 Lane Km (Construction of Asphalt Road)
CW2: 2,937.51 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.602 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,200,000.00
CW1: P 153,291,301.51 (Construction of Asphalt Road)
CW2: P 84,213,474.44 (Construction of Road Slope Protection Structure)
CW3: P 3,938,224.05 (Construction of Gravel Road)
EAO: P 8,757,000.00
|
June 13, 2018 |
2018 |
WIN8C02945 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0021 + 000 - K0021 + 240, K0021 + 480 - K0021 + 620, K0021 + 720 - K0022 + 100 |
June 13, 2018 |
2018 |
WIN8C02944 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Secondary Roads, Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - K0003+000 - K0006+060, K0011+000 - K0012+598, K0012+861 - K0013+386.70 |
June 13, 2018 |
2018 |
WIN8C02954 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Antequera-San Isidro-Libertad (Tubigon) Rd - K0023 + 270 - K0023 + 400 |
June 13, 2018 |
2018 |
WIN8C02951 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) – K0031 + 415 - K0031 + 540, K0031 + 620 - K0031 + 740 |
June 13, 2018 |
2018 |
WIN8C02956 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Jct. (TER) Dauis-Panglao Road - K0003+(-271) - K0003+000, K0003+086 - K0003+464 |
June 13, 2018 |
2018 |
WIN8C02949 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Declared Tourism Destinations, Jct. Antequera-San Isidro-Libertad Road leading to Danao Agr-Tourism, Brgy. Danao, Antequera, Bohol |
June 13, 2018 |
2018 |
WIN8C02946 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Declared Tourism Destinations, Jct. TNR leading to Panginabuhian Demonstration Farm, incl. Bridge, Maribojoc, Bohol |
June 13, 2018 |
GAA FY 2018 |
WIN8F05598 |
UACS No. 300116200392000 |
January 1, 2018 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300116200392000
Project ID: P00240689LZ
WIN8F05598
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 60 and 61, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=4.00 lane km
Unit Cost (P’000): P4,900.00/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
As Modified
UACS No. 300116200392000
Project ID: P00240689LZ
WIN8F05598
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 60 and 61, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=1.452 lane km
Unit Cost (P’000): P13,498.62/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
|
June 13, 2018 |
2018 |
WIN8C02957 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Network Development – Off-Carriageway Improvement, Tertiary Roads, Antequera – San Isidro – Libertad (Tubigon) Rd – K0033+406 – K0034+498 |
June 13, 2018 |
2018 |
WIN8C02953 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Network Development – Off-Carriageway Improvement, Tertiary Roads, Jct. (LIR) Buenavista-Carmen-Danao-Jetafe Road, K01798+487 – K0178+567, K0178+578.60 – K0178+711, K0178+722 – K0180+056 |
June 13, 2018 |
2018 |
WIN8C02947 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Network Development – Off-Carriageway Improvement, Secondary Roads, Loay Interior Road, K0124+173 – K0125+588, K0125+617 – K0126+064 |
June 13, 2018 |
GAA FY 2018 |
WIN8F05593 |
UACS No. 310103100059000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100059000
Project ID: P00200237LZ
WIN8F05593
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
MVO Road Network – (S05574LZ) Chainage 0 – Chainage 109
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay L = 0.218 lane km
Unit Cost (P’000): P 5,273.12/ lane km
Allocation (‘000): P 1,149.54
EAO (‘000) P 23.46
Total (‘000): P 1,173.00
As Modified
UACS No. 310103100059000
Project ID: P00200237LZ
WIN8F05593
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
MVO Road Network – (S05572LZ) Chainage 0 – Chainage 175; (S05575LZ) Chainage 0 – Chainage 109
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay L = 0.323 lane km
Unit Cost (P’000): P 3,558.95/ lane km
Allocation (‘000): P 1,149.54
EAO (‘000) P 23.46
Total (‘000): P 1,173.00
|
June 13, 2018 |
2018 |
WIN8C02948 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Taming to Villa Anunciado Road leading to Highland Tourism, Brgy. Taming, Danao, Bohol |
June 13, 2018 |
GAA FY 2018 |
WIN8F05594 |
UACS No. 310103100060000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100060000
Project ID: P00200238LZ
WIN8F05594
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
NIA South Rd – (S05148LZ) Chainage 0 – Chainage 245
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay L=0.98 lane km
EAO (‘000) – P 105.40
Unit Cost (P’000): P5,270.00/ linear meter
Allocation (‘000): P 5,164.60
Total (‘000): P 5,270.00
As Modified
UACS No. 310103100060000
Project ID: P00200238LZ
WIN8F05594
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
NIA South Rd – (S05148LZ) Chainage 0 – Chainage 206
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay L=0.82 lane km
EAO (‘000) – P 105.40
Unit Cost (P’000): P6,298.29/ linear meter
Allocation (‘000): P 5,164.60
Total (‘000): P 5,270.00
|
June 13, 2018 |
2018 |
WIN8C02958 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Access Road leading to Tontunan Highland, Brgy. Tontunan, Clarin, Bohol |
June 13, 2018 |
2018 |
WIN8C02950 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Taming Barangay Road leading to Grand Canyon View of Danao Adventure Park, Brgy. Taming, Danao, Bohol |
June 13, 2018 |
2018 |
WIN8C02959 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports, Access Road leading to U-og Fishport, Inabanga, Bohol |
June 13, 2018 |
GAA FY 2018 |
WIN8F05596 |
UACS No. 300116200223000 |
January 1, 2018 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 300116200223000
Project ID: P00240375LZ
WIN8F05596
Local – Local Roads and Bridges – Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Road including Drainage System of Japanese Cemetary Road and Burma St., NBP Road, Barangay Poblacion, Muntinlupa City
Physical Target: CW1 – Construction of concrete road 4.0 lane km
EAO – P 400,000.40
Unit Cost (P’000): P4,900.00/ lane km
Allocation (‘000): P 19,600.00
Total : P 20,000,000.00
As Modified
UACS No. 300116200223000
Project ID: P00240375LZ
WIN8F05596
Local – Local Roads and Bridges – Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Road including Drainage System of Japanese Cemetary Road and Burma St., NBP Road, Barangay Poblacion, Muntinlupa City
Physical Target: CW1 – Construction of concrete road 2.0 lane km
EAO – P 400,000.40
Unit Cost (P’000): P9,800.00/ lane km
Allocation (‘000): P 19,600.00
Total : P 20,000,000.00
|
June 13, 2018 |
2018 |
WIN8C02955 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Network Development – Off-Carriageway Improvement, Secondary Roads, Tagbilaran North Road (Tagbilaran-Jetafe Sect) - K0059 + 000 - K0059 + 199, K0076 + 941 - K0077 + 382, K0077 + 382 - K0077 + 505, K0078 + 367 - K0078 + 470, K0078 + 813.50 - K0079 + 439, K0079 + 781 - K0080 + 346 |
June 13, 2018 |
2018 |
WIN8C02952 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Asset Preservation- Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Secondary Roads, Construction of Road Slope Protection Structure-Loay Interior Rd- K0139 + 365 - K0139 + 765 |
June 13, 2018 |
2018 |
WIN8F05491 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Organizational Outcome 1: Ensure and Reliable National Road System - Asset Preservation- Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary Roads, Construction of Road Slope Protection Structure along Jct. (LIR) Buenavista-Carmen-Danao-Jetafe Road K0192 + 300 - K0192 + 400, K0198 + 283 - K0198 + 350, K0199 + 250 - K0199 +300, K0199 + 485 - K0199 + 565, K0199 + 709 - K0199 + 750, K0199 + 820 - K0199 + 850, K0199 + 870 - K0199 + 1211, Buenavista and Getafe, Bohol |
June 13, 2018 |
FY 2018 GAA |
WIN8C03131 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 4, incl. Bridge and ROW Davao City
Physical Target:
CW1: 1.987 Lane Km (Construction of Asphalt Road)
CW2: 5,464.80 sq. m. (Construction of Road Slope Protection Structure)
CW3: 410.130 sq.m. (Construction of Concrete Bridge)
ROW: 10,000 sq.m.
Allocation:
TOTAL: P 500,276,000.00
CW1: P 153,411,840.00 (Construction of Asphalt Road)
CW2: P 179,779,500.00 (Construction of Road Slope Protection Structure)
CW3: P 53,075,000.00 (Construction of Concrete Bridge)
ROW: P 96,500,000.00
EAO: P 17,509,660.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 4, incl. Bridge and ROW Davao City
Physical Target:
CW1: 1.548 Lane Km (Construction of Asphalt Road)
CW2: 3,818.90 sq. m. (Construction of Road Slope Protection Structure)
CW3: 323.40 sq.m. (Construction of Concrete Bridge)
CW4: 0.480 Lane Km (Construction of Gravel Road)
ROW: 10,000 sq.m.
Allocation:
TOTAL: P 500,276,000.00
CW1: P 211,706,288.00 (Construction of Asphalt Road)
CW2: P 125,040,475.00 (Construction of Road Slope Protection Structure)
CW3: P 45,884,089.00 (Construction of Concrete Bridge)
CW4: P 3,635,488.00 (Construction of Gravel Road)
ROW: P 96,500,000.00
EAO: P 17,509,660.00
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03144 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 7, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.728 Lane Km (Construction of Asphalt Road)
CW2: 1,864.50 sq. m. (Construction of Road Slope Protection Structure)
CW3: 410.13 sq.m. (Construction of Concrete Bridge)
ROW: 20,000 sq.m.
Allocation:
TOTAL: P 572,899,000.00
CW1: P 210,601,600.00 (Construction of Asphalt Road)
CW2: P 96,170,935.00 (Construction of Road Slope Protection Structure)
CW3: P 20,051,465.00 (Construction of Concrete Bridge)
ROW: P 193,000,000.00
EAO: P 20,051,465.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 7, incl. ROW Davao City
Physical Target:
CW1: 1.084 Lane Km (Construction of Asphalt Road)
CW2: 5,242.766 sq. m. (Construction of Road Slope Protection Structure)
CW3: 2.72 Lane Km (Construction of Concrete Road)
CW4: 260 Lineal Meter (Construction of Revetment)
ROW: 20,000 sq.m.
Allocation:
TOTAL: P 572,899,000.00
CW1: P 131,226,580.49 (Construction of Asphalt Road)
CW2: P 107,560,661.15 (Construction of Road Slope Protection Structure)
CW3: P 76,923,830.74 (Construction of Concrete Bridge)
CW4: P 44,136,462.62 (Construction of Gravel Road)
ROW: P 193,000,000.00
EAO: P 20,051,465.00
|
June 13, 2018 |
FY 2018 |
WIN8G02314 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Manila North Rd - K0130 + 829.20 - K0134 + 183.00 |
June 13, 2018 |
FY 2018 |
WIN8G02325 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Galintuja Road, Brgy. Galintuja, Ma. Aurora, Aurora |
June 13, 2018 |
FY 2018 |
WIN8G02329 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Barangay Sapang Kawayan to Brgy. Buenavista, Dipaculao, Aurora |
June 13, 2018 |
FY 2018 |
WIN8G02323 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Brgy. Road, Brgy. Dibet, Casiguran, Aurora |
June 13, 2018 |
FY 2018 |
WIN8G02319 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures – Multi-purpose / Facilities - Construction of a Multi-purpose Building (Covered Court), Brgy. Calabgan, Casiguran, Aurora |
June 13, 2018 |
FY 2018 GAA |
WIN8C03162 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Matiao-Magsaysay Coastal Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 1.094 Lane Km (Construction of Asphalt Road)
CW2: 4,925 sq. m. (Construction of Road Slope Protection Structure)
ROW: 8,248.605 sq.m.
Allocation:
TOTAL: P 245,000,000.00
CW1: P 67,560,615.00 (Construction of Asphalt Road)
CW2: P 156,025,060.00 (Construction of Road Slope Protection Structure)
ROW: P 12,839,325.00
EAO: P 8,575,000.00
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Matiao-Magsaysay Coastal Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 1.44 Lane Km (Construction of Gravel Road)
CW2: 2,795 sq. m. (Construction of Road Slope Protection Structure)
ROW: 8,248.605 sq.m.
Allocation:
TOTAL: P 245,000,000.00
CW1: P 91,254,138.41 (Construction of Asphalt Road)
CW2: P 132,331,536.62 (Construction of Road Slope Protection Structure)
ROW: P 12,839,325.00
EAO: P 8,575,000.00
|
June 13, 2018 |
FY 2018 |
WIN8G02322 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Brgy. Dianed, Dipaculao, Aurora |
June 13, 2018 |
FY 2018 |
WIN8G02388 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of a Flood Control, Barangay Bazal, Ma. Aurora, Aurora |
June 13, 2018 |
FY 2018 GAA |
WIN8C03173 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road (section 1), Package C, incl. ROW, Compostela Valley
Physical Target:
CW1: 7.688 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 189,140,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 7,000,000.00
TO: OO1: Ensure Safe Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road (section 1), Package C, incl. ROW, Compostela Valley
Physical Target:
CW1: 4.851 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 189,140,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 7,000,000.00
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03196 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood
Mitigation Structures and Drainage Systems
Construction of Revetment at Tarago Creek, Barangay Poblacion, Maragusan, Compostela Valley
Physical Target:
CW-1 - 400 Lineal meter (Construction of Revetment)
CW-2 - 8,250 Cubic meters (Channelization)
ROW - 1,714 Square meters (ROW Acquisition)
ALLOCATION:
Total: P 50,000,000.00
CW-1 - P 38,710,000.00
CW-2 - P 9,996,000.00
ROW - P 294,000.00
EAO - P 1,000,000.00
TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood
Mitigation Structures and Drainage Systems
Construction of Revetment at Tarago Creek, Barangay Poblacion, Maragusan, Compostela Valley
Physical Target:
CW-1 - 1,159.646 Lineal meter (Construction of Revetment)
CW-2 - 26,864 Cubic meters (Channelization)
CW-3 - 146.4 Square meters (Construction of Concrete Bridge)
ROW - 1,714 Square meters (ROW Acquisition)
ALLOCATION:
Total: P 50,000,000.00
CW-1 - P 32,362,973.00
CW-2 - P 3,815,309.00
CW-3 - P 12,527,718.00
ROW - P 294,000.00
EAO - P 1,000,000.00
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03165 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
Modification:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
Widening of Road at Jct. Davao City Diversion Road – Langub Road – Magtuod Road incl. Drainage Structures and ROW, Davao City
Physical Target:
CW1: 12.320 Lane Km (Road Widening)
ROW: 862,400.00 Square Meters
Allocation:
TOTAL: P 327,712.00
CW1: P 208,054.00 (Road Widening)
ROW: P 108,188.08
EAO: P 11,469.92
TO: OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
Widening of Road at Jct. Davao City Diversion Road – Langub Road – Magtuod Road incl. Drainage Structures and ROW, Davao City
Physical Target:
CW1: 7.642 Lane Km (Road Widening)
CW2: 4,309.53 Square Meters (Construction of Road Slope Protection)
ROW: 862,400.00 Square Meters
Allocation:
TOTAL: P 327,712.00
CW1: P 146,717.08253 (Road Widening)
CW2: P 61,336.91747 (Construction of Road Slope Protection)
ROW: P 108,188.08
EAO: P 11,469.92
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03129 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
Modification:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening – Secondary Roads
Widening of Road at Jct. Davao City Diversion Road – Magtuod Road – Matina Blao incl. Drainage Structures and ROW, Davao City
Physical Target:
CW1: 6.608 Lane Km (Road Widening)
ROW: 46,259.60 Square Meters
Allocation:
TOTAL: P 346,947.00
CW1: P 111,601.285 (Road Widening)
ROW: P 223,202.57
EAO: P 12,143.145
TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening – Secondary Roads
Widening of Road at Jct. Davao City Diversion Road – Magtuod Road – Matina Biao incl. Drainage Structures and ROW, Davao City
Physical Target:
CW1: 3.790 Lane Km (Road Widening)
ROW: 46,259.60 Square Meters
Allocation:
TOTAL: P 346,947.00
CW1: P 111,601.285 (Road Widening)
ROW: P 223,202.57
EAO: P 12,143.145
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03156 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
Modification:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
Jct. Davao City Diversion Road (Matina Pangi Section) – Latina Pangi Road – Sitio Toril Jct. Catalunan Grande Road including ROW, Davao City
Physical Target:
CW1: 7.984 Lane Km (Reconstruction from Paved to Concrete)
CW2: 0.222 Lane Km (Construction of Concrete Road)
CW3: 381.60 Square Meters (Construction of Concrete Bridge)
CW4: 200.34 Square Meters (Construction of Concrete Bridge)
ROW: 41,030.00 Square Meters
Allocation:
TOTAL: P 315,840.00
CW1: P 145,189.075 (Reconstruction from Paved to Concrete).
CW2: P3,749.025 (Construction of Concrete Road)
CW3: P 30,880.00 (Construction of Concrete Bridge)
CW4: P 16,212.00 (Construction of Concrete Bridge)
ROW: P 108,755.50
EAO: P 11,054.40
TO: OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
Jct. Davao City Diversion Road (Matina Pangi Section) – Matina Pangi Road – Sitio Toril Jct. Catalunan Grande Road including ROW, Davao City
Physical Target:
CW1: 4.152 Lane Km (Reconstruction from Paved to Concrete)
CW2: 674.40 Square Meters (Replacement of Bridge)
CW3: 505.80 Square Meters (Replacement of Bridge)
ROW: 41,030.00 Square Meters
Allocation:
TOTAL: P 315,840.00
CW1: P 108,456.06008 (Reconstruction from Paved to Concrete)
CW2: P 47,410.32258 (Replacement of Bridge)
CW3: P 40,163.71734 (Replacement of Bridge)
ROW: P 108,755.50
EAO: P 11,054.40
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03164 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
Modification:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak Compostela Valley), Package 1, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Square Meters
Allocation:
TOTAL: P 300,000.00
CW1: P 280,351.80 (Construction of Concrete Road)
ROW: P 9,148.20
EAO: P 10,500.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak Compostela Valley), Package 1, incl. ROW, Davao del Norte
Physical Target:
CW1: 7.3361 Lane Km (Construction of Concrete Road)
CW2: 381.60 Square Meters (Construction of Concrete Bridge)
CW3: 429.30 Square Meters (Construction of Concrete Bridge)
ROW: 96,840.00 Square Meters
Allocation:
TOTAL: P 300,000.00
CW1: P 205,021.17011 (Construction of Concrete Road)
CW2: P 33,542.94959 (Construction of Concrete Bridge)
CW3: P 41,787.68030 (Construction of Concrete Bridge)
ROW: P 9,148.20
EAO: P 10,500.00
|
June 13, 2018 |
FY 2018 GAA |
WIN8C03192 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM:OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling / Construction of Revetment along Matiao River
(Bucana), Brgy. Matiao, Pantukan, Compostela Valley
Physical Target:
CW-1 - 1,300 Lineal meters (Construction of Revetment)
CW-2 - 730 Cubic Meters (Channelization)
ROW - 1,143 Square meters (ROW Acquisition)
ALLOCATION:
Total: P 35,000,000.00
CW-1 - P 22,606,268.00 (Construction of Revetment)
CW-2 - P 11,497,732.00 (Channelization)
ROW - P 196,000.00
EAO - P 700,000.00
TO:OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation
Structures and Drainage Systems
Rechanneling / Construction of Revetment along Matiao River
(Bucana), Brgy. Matiao, Pantukan, Compostela Valley
Physical Target:
CW-1 - 208.959 Lineal meters (Construction of Revetment)
ROW - 1,143 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1 - P 34,104,000.00 (Construction of Revetment)
ROW - P 196,000.00
EAO - P 700,000.00 |
June 12, 2018 |
FY 2018 |
WIN8G02353 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Calzadang Bayu, Porac, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02355 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. San Basilio, Zone 3, Santa Rita, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02356 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Brgy. San Roque Arbol, Lubao, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02366 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Zone 5, Lourdes, Lubao, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02367 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Road leading to Nabuclod Eco Park (Pabanlag Section), Floridablanca, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02368 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
41. Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Sto. Domingo – Dau Road, Purok 3, Sto. Domingo, Lubao, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02369 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Sepung Bulaon, Porac, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02370 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement – Tertiary Rd – Sn Antonio – Floridablanca Rd, K0081+(-950) – K0081+(-885), K0081+(-869) – K0081+(-136), K0085+700 – K0086+930, K0089+136 – K0089+871 |
June 12, 2018 |
FY 2018 |
WIN8G02377 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 5 to Purok 6, Brgy. Santiago, Lubao, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02378 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement – Tertiary Rd – Lubao Diversion Rd, K0084+882 – K0084+083, K0084+112.45 – K0085+238 |
June 12, 2018 |
FY 2018 |
WIN8G02379 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Slope Protection and Rehabilitation of Dike along Western Megadike, Sta. 0+000 to Sta. 0+194.70, Sta. 4+047 to Sta. 5+397, Sta. 7+086 to Sta. 9+261, Sta. Rita – Porac, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02380 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Upgrading of Road, Barangay Bancal, Guagua, Pampanga |
June 12, 2018 |
FY 2018 |
WIN8G02320 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 2nd District Engineering Office |
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Rehabilitation / Reconstruction / Improvement of Igay – Montalban Road, San Jose Del Monte City, Bulacan |
June 11, 2018 |
FY 2018 |
WIN8G02092 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300202100013000
Project ID: P00230383LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports – Jct. Nalayahan-Homestead Road leading to Siruma Port, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 3.002 lane-km
Unit Cost: CW1 – Php 28.93M /lane-km
Estimated Cost: Php 90.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02076 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300117201372000
Project ID: P00258798LZ
Local Program – Local Infrastructure Program – Local Roads and Bridges – Local Roads –
Construction of Road, Brgy. Bantugan/San Vicente, Presentacion/San Jose, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 0.356 lane-km
Unit Cost: CW1 – Php 5.56M /lane-km
Estimated Cost: Php 2.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01728 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100041000
Project ID: P00200739LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Goa-Digdigon-San Isidro Road - K0492+633 - K0492+875, K0494+248 - K0495+352, K0495+368 - K0495+613.50
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,605.70 lm.
Unit Cost: CW1 – Php 14.67T/lm.
Estimated Cost: Php 39.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01728 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100042000
Project ID: P00200740LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads –Tertiary Roads – Jct Digdigon (Goa)-Tinambac Rd – K0496+(-449) – K0496+074, K0502+813 – K0503+122, K0503+529 – K0503+832, K0504+611 – K0504+727, K0504+758 – K0504+826, K0505+000 – K0505+358
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,319.00 lm.
Unit Cost: CW1 – Php 13.10/lm.
Estimated Cost: Php 31.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310105100036000
Project ID: P00200499LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads – Presentacion-Maligaya Rd – K0535+400 – K0535+700, K0535+927 – K0536+000, K0537+135 – K0537+205, K0537+380 – K0537+463.70, K0537+576 – K0537+974, K0542+408 – K0542+601, K0543+378 – K0543+477, K0543+803 – K0544+049, K0544+284.30 – K0544+434
Physical Target - CW1 – Rehabilitation of Paved Road/ 2.8226 lane-km
Unit Cost: CW1 – Php 22.37M /lane-km
Estimated Cost: Php 65.427M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01992 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310106100146000
Project ID: P00200638LZ
OO1: Ensure Safe and Reliable National Road System – sset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads – Tigaon-Goa-San Jose-Guijalo via San Vicente Rd – K0550+1002 – K0551+335
Physical Target - CW1 – Rehabilitation of Paved Road/ 0.4618 lane-km
Unit Cost: CW1 – Php 26.86M /lane-km
Estimated Cost: Php 12.659 M
(As Modified
|
June 11, 2018 |
FY - 2018 |
WIN8F05509 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Local Roads and Bridges - Local Roads
FROM:
Repair/rehabilitation of Bucana Hanging Bridge,
Taytay, Palawan
CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php
TO:
CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php |
June 11, 2018 |
FY 2018 |
WIN8G01846 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100199000
Project ID: P00202638LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Managnag (Tigaon-Goa-San Jose-Lagonoy-Guihalo via San Vicente Road) – Himanag Road, Lagonoy, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.0 lane-km
CW2 – Construction of Concrete Road/ 1.50 lane-km
Unit Cost: CW1 – Php 13.475M /lane-km
CW2 – Php 14.700M /lane-km
Estimated Cost: Php 50.0 M
(As Modified)
|
June 11, 2018 |
2018 |
300116200524000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
LOCAL Program: Local – National Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Alicia-Angadanan-San Guillermo-Cauayan City, Naguilian Road, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G01781 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100198000
Project ID: P00201160LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Calabanga – Tinambac Road (Tinambac Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.26 lane-km
Unit Cost: CW1 – Php 21.681M /lane-km
Estimated Cost: Php 50.0 M
(As Modified) |
June 11, 2018 |
FY - 2018 |
WIN8F05482 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
El Nido - jct. New Ibajay leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan
CW1: 2.000 lane km ( Construction of Concrete Road )
Allocation: 25,000,000 Php
TO:
El Nido - Jct. New Ibajay Road leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan
CW1: 1.560 lane km ( Construction of Concrete Road )
Allocation: 25,000,00 Php
|
June 11, 2018 |
FY 2018 |
WIN8G02089 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310204100154000
Project ID: P00202636LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Jct. Nato-Sabang Coastal Road (Sagñay-Tigaon Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.4632 lane-km
Unit Cost: CW1 – Php 39.18M /lane-km
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100007000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Bypass Road, incl. ROW and Slope Protection, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G02011 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100102000
Project ID: P00202634LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lagonoy-Caramoan Road, incl. ROW, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.40 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 38.90M /lane-km
ROW Acquisition – Php 52.43/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01729 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100103000
Project ID: P00202635LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lalud-Garchitorena Road, incl. ROW and Bridge, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 6.11776 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 13.812M /lane-km
ROW Acquisition – Php 200.00/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100330000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Cauayan City - Cabatuan Diversion Road, incl. ROW, Isabela |
June 11, 2018 |
2018 |
310204100329000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, incl. ROW, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G02315 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Apalit – Macabebe – Masantol Rd, K0055+(-680) – K0055+(-200), K0057+106 – K0057+484, K0057+566 – K0057+642, K0057+642 – K0057+696, K0058+067 – K0058+411, K0062+062 – K0063+250 |
June 11, 2018 |
FY 2018 |
WIN8G02318 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Sapang Boracan, Gugu Creek and Macabacle Creek, Bacolor, Pampanga |
June 11, 2018 |
FY 2018 |
WIN8G02316 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Local Program – Flood Control and Drainage – Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Dredging / Excavation with Slope Protection at Aling Nena Creek (Sta. 0+000 – Sta. 0+440, Sta. 0+452 – Sta. 1+180), Mexico, Pampanga |
June 11, 2018 |
FY 2018 |
WIN8G02321 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Sn Antonio – Floridablanca Rd, K0089+140 – K0089+690 |
June 11, 2018 |
2018 |
WIN8G02250 |
WIN8G02250 |
April 17, 2018 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:10.00 Lane-Km; Allocation = Php 100,000,000
To: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:5.714 Lane-Km; Allocation = Php100,000,000
|
June 11, 2018 |
FY 2018 |
WIN8G02330 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Improvement of Road Connectivity to APFD Road, Lubao Diversion Road, Lubao, Pampanga |
June 11, 2018 |
2018 |
310204100023000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Bambang Bypass Road, including ROW, Nueva Vizcaya |
June 11, 2018 |
2018 |
310202100024000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Road
Cabagan-Sta. Maria Road
K0450+000 - K0450+540, K0454+274.50 - K0454+882.65, K0448+(-700) - K0448+(-441.65), K0448+(-736.67) - K0448+(-441.65), K0448+(-441.65) - K0450+000 |
June 11, 2018 |
FY 2018 |
WIN8G02301 |
FY 2018 GAA R.A. 10964 |
December 29, 2016 |
Region V |
Regional Office V |
UACS No.: 310204100100000
Project ID: P00201071LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Daraga Albay Diversion Road, Albay
Physical Target - CW1 - Road Widening/ 13.50 lane-km
Unit Cost: CW1 – Php 17.87M /lane-km
Estimated Cost: Php 250.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02246 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310205100145000
Project ID: P00201157LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Poblacion Morocborocan-Guinahadap Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.48 lane-km
CW2 - Construction of Road Slope Protection Structure/ 7,046.38 sq.m
Unit Cost: CW1 – Php 31.18M /lane-km
CW2 – Php 2.72T/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02248 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310104100035000
Project ID: P00200416LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Rolando A Andaya Highway – K0338+000 – K0339+533, K0339+569 – K0340+668
Physical Target - CW1 - Reconstruction from Paved to Concrete/ 5.788 lane-km
Unit Cost: CW1 – Php 13.97 M /lane-km
Estimated Cost: Php 83.819 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02251 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310205100151000
Project ID: P00201158LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – San Fernando-San Jacinto Monreal Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 5.578 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,242 lm.
Unit Cost: CW1 – Php 20.81 M /lane-km
CW2 – Php 5.47 T/lm.
Estimated Cost: Php 150.0 M
(As Modified) |
June 11, 2018 |
FY 2018 |
WIN8G02303 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310203100061000
Project ID: P00201467LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Tertiary Roads – Sipocot-Cabusao Rd – K0395+200 – K0398+100
Physical Target - CW1 – Road Widening/ 5.7070 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,835 lm.
Unit Cost: CW1 – Php 17.53 M /lane-km
CW2 – Php 11.66 M/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100036000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Bayombong-Solano Bypass Road, incl. ROW, Nueva Vizcaya |
June 11, 2018 |
FY 2018 |
WIN8G02247 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100294000
Project ID: P00223244LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Cadacan River, Sto. Domingo Section Sta. 28+889.33 - Sta.29+365, Sta. 29+370 - Sta. 29+621.18, Sta. 29+709.67 - Sta.29+862.29, rightside, Irosin, Sorsogon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 879.47 lm
Unit Cost: CW1 – Php 109.73 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
|
June 11, 2018 |
FY 2018 |
WIN8G02302 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100295000
Project ID: P00223245LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Casini Section, Sta. 22+067 - Sta.22+146, Sta.22+067 - Sta.358.70, Sta.22+155.31 - Sta.22+439.89, Sta.24+595.18 - Sta.24+795, Sta.24+700 - Sta.24+780, Sta.24+822 - Sta.24+918, Irosin, Sorsgon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 1,031.10 lm
Unit Cost: CW1 – Php 93.59 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
|
June 11, 2018 |
FY 2018 |
WIN8G02311 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100334000
Project ID: P00223284LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta.0+217.00 - Sta.0+574.05, Sta.0+596 - Sta.0+835.40, Sta.0+217 - Sta.0+573.58, Sta.0+606 - Sta.0+932.68, Sitio Buco, Buyo, Manito, Albay
Physical Target - CW1- Construction of Dike/ 1,279.71 lm.
Unit Cost: CW1 - Php 75.41 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02308 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100335000
Project ID: P00223285LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta. 0+340 – Sta.0+944, Sta.0+967.59 - Sta.1+258, Sta.0+660 - Sta.0+944 Cawayan, Manito, Albay
Physical Target - CW1 - Construction of Dike/ 1,178.41 lm
Unit Cost: CW1 - Php 81.89 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02249 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100329000
Project ID: P00223279LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Buyo River Flood Control Dike, Sta.1+420 – Sta.1+771.11, Sta.1+460 – Sta.1+852.55, Sta.2+114 – Sta.2+200, Sta.2+200 – Sta.2+370, Buyo, Manito, Albay
Physical Target - CW1 – Construction of Dike/ 999.66 lm
Unit Cost: CW1 – Php 96.53 T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
WIN8G02139 |
WIN8G02139 |
April 12, 2018 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 110 - K0608 + 135; Physical Target:1,185 Square meters; Allocation = Php 12,000,000
To: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 090 - K0608 + 146.40; Physical Target:1,185 Square meters; Allocation = Php 12,000,000
|
June 11, 2018 |
2018 |
WIN8C03045 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
Convergence and Special Support Program -Construction/Improvement of Access Roads leading to Declared Tourism Destination
FROM:
NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte
Type of Work: Construction of Concrete Road
Physical Target: 1.714 Lane Km
Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)
TO:
NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte
Type of Work: Construction of Concrete Road
Physical Target: 2.7416 Lane Km
Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)
|
June 9, 2018 |
FY 2018 |
WIN8G02375 |
SR2018-01-000919 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads
Daang Maharlika (LZ), K0169+112.96 - K0169+210, K0169+330 - K0169+390, K0169+470 - K0169+490, K0169+730 - K0169+931.43, K0202+091 - K0204+130, K0204+175 - K0205+100, K0205+200 - K0206+174, K0206+249 - K0206+448, K0206+468 - K0206+887
|
June 8, 2018 |
FY 2018 |
WIN8C03110 |
UACS No. 300116201166000 |
June 4, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201166000
Project ID: P00258448MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Access Road Leading to Veterans - Lumbia - Timalang, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.6 Lane km
Unit Cost: P 8,750,000.00/ Lane km
EAO: P 1.0 M
Allocation: P 50 M
|
June 8, 2018 |
FY 2018 |
WIN8C03066 |
UACS No. 300203100524000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300203100524000
Project ID: P00230342MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Busay Falls, Doña Josefa, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.47804 Lane km
Unit Cost: P 16,576,006.06/ Lane km
EAO: P 0.50 M
Allocation: P 25 M |
June 8, 2018 |
FY 2018 |
WIN8C03067 |
UACS No. 300203100525000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300203100525000
Project ID: P00230343MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Looc-Labuan Beach, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.23 Lane km
Unit Cost: P 19,918,699.19/ Lane km
EAO: P 0.50 M
Allocation: P 25 M |
June 8, 2018 |
FY 2018 |
WIN8C03063 |
UACS No. 300116201169000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201169000
Project ID: P00258449MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Upgrading/ Concrete Paving of Access Road leading to Provincial Capitol, Ipil Heights, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.09537 Lane km
Unit Cost: P 9,616,573.48/ Lane km
EAO: P 1.0 M
Allocation: P 50M |
June 8, 2018 |
FY 2018 |
WIN8C03080 |
UACS No. 310101100110000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310101100110000
Projects ID: P00200006MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Ipil-Liloy- Sindangan Rd
K1998+677.00 - K1998+690.50
K1998+714.00 - K1998+723.00
K1998+768.00 - K1998+817.50
K1998+822.00 - K1998+858.00
K1998+916.50 - K1998+934.50
K1998+943.50 - K1998+979.50
K1998+984.00 - K1998+997.50
K1999+004.50 - K1999+103.50
Physical Target:
CW-1- Concrete Reblocking: 0.45 Lane km
Unit Cost: P 9,819,600/lane km
EAO: P 0.09018 M
Allocation: P 4.509M |