April 4, 2018 |
GAA CY2018 |
WIN8F05171 |
UACS No. 310102100048000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 310102100048000
Project ID: P00200064LZ
WIN8F05171
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Ortigas Avenue, Mandaluyong City, K0011+039 – K0011+535
Physical Target: CW1-Asphalt Overlay L=1.308 lane km
Unit Cost (P’000): P7,722.00/ lane km
Allocation: P 10,100,860.00 M
EAO P 206,140.00 M
Total: P 10,307,000.00 M
As Modified
UACS No. 310102100048000
Project ID: P00200064LZ
WIN8F05171
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Ortigas Avenue, (Eastbound) Mandaluyong City, K0011+099 – K0011+535
Physical Target: CW1-Asphalt Overlay L=1.308 lane km
Unit Cost (P’000): P7,722.00/ lane km
Allocation: P 10,100,860.00 M
EAO P 206,140.00 M
Total: P 10,307,000.00 M
|
April 4, 2018 |
FY - 2018 |
WIN8F05096 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa South Rd.
K0009+491 - K0010+048,
K0010+064 - K0010+269,
K0010+285 - K0011+428,
K0011+998 - K0014+853,
K0014+871 - K0015+807
CW1: 11.844 lane km ( Road Widening )
Allocation: 200,000,000 Php
TO:
Puerto Princesa South Rd.
K0023+650 - K0025+024,
K0040+000 - K0044+846,
K0051+200 - K0053+096
CW1: 16.232 lane km ( Road Widening )
Allocation: 200,000,000Php
|
April 4, 2018 |
FY - 2018 |
WIN8F05103 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa South Rd.
K0027+495 - K0029+525,
K0037+000 - K0038+000,
K0039+668 - K0039+870,
K0045+194 - K0047+071
CW1: 9.952 lane km ( Rehabilitation of Paved Road )
Allocation: 156,046,000 Php
TO:
Puerto Princesa Road
K0045+194 - K0047+071,
K0047+147.50 - K0047+360,
K0048+471 - K0048+494,
K0050+237 - K0050+438,
K0050+725 - K0051+014,
K0051+034 - K0051+123,
K0055+091 - K0055+200,
K0055+500 - K0055+840,
K0066+180 - K0066+700,
K0066+780 - K0067+113,
K0067+638 - K0068+388,
K0070+552 - K071+026,
K0072+145 - K0072+700
CW1: 11.499 lane km ( Road Widening )
Allocation: 156,046,000 Php
|
April 4, 2018 |
FY - 2018 |
WIN8C02119 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Convergence and Special Support Program
Convergence and Special Support -Construction/Improvement
of Access Roads leading to Declared Tourism Destinations
FROM:
Access Road leading Talakaigan River Hillside,
Brgy. Cabigaan, Aborlan, Palawan
CW1: 12.40 lane km ( Construction of Gravel Road )
Allocation: 155,000,000 Php
TO:
Access Road leading Talakaigan River Hillside,
Brgy. Cabigaan, Aborlan, Palawan
CW1: 13.6831 lane km ( Construction of Gravel Road )
Allocation: 155,000,000 Php |
April 4, 2018 |
FY - 2018 |
WIN8F05097 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Road
FROM:
Tapul - Bahile Rd
K0038+955 - K0042+1237,
Chainage 000 - Chainage0126
CW1: 8.852 lane km ( Road Widening )
Allocation: 132,780,000 Php
TO:
Tapul - Bahile Road
K0038+955 - K0042+1168
CW1: 8.462 lane km ( Road Widening )
Allocation: 132,780,000 Php |
April 4, 2018 |
FY 2018 |
WIN8C02227 |
UACS No. 320102100031000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 320102100031000
Project ID: P00220534MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Disacan River (Upstream and Downstream) including Dredging, Manukan and Jose Dalman, Zamboanga del Norte
Physical Target:
CW-1-Construction of Flood Mitigation Structure: 1,078 ln.m.
Unit Cost:
P 125,286.63/ln.m.
Physical Target:
CW-2-ROW: 136.73 sq.m.
Unit Cost:
P 300/sq.m.
EAO: P 4,900,000
Allocation: P 140,000,000.00
|
April 4, 2018 |
FY - 2018 |
WIN8F05080 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads
Tertiary Roads
Parpagoha (Marigondon) - Binoog Rd.
K0025+741 - K0028+264
CW1: 5.114 lane km ( Paving of Unpaved Road )
Allocation: 122,251,000 Php
TO:
Parpagoha ( Marigondon ) - Binoog Road
K0025+741 - K0027+700
CW1: 3.982 lane km ( Paving of Unpaved Road )
Allocation: 122,251,000 Php |
April 4, 2018 |
FY - 2018 |
WIN8F05077 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
GAA 2018 Other Infrastructure (CSSP )
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
San Jose Circumferential Road leading to various beaches,
San Jose, Romblon
Cw1: 7.52 lane km ( Construction of Concrete Road )
Allocation: 167,566,000 Php
TO:
San Jose Circumferential Road leading to various beaches,
San Jose, Romblon
CW1: 7.626 lane km ( Construction of Concrete Road )
Allocation: 167,566,000 Php |
April 4, 2018 |
FY 2018 |
WIN8C02233 |
UACS No. 310204100022000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100022000
Projects ID: P00200293MN
Organizational Outcome 1: Ensure Safe and Realiable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Baliguian Coastal Road, Junction Baliguian-Kauswagan-Mamad Section, including Slope Protection, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 5.66 lane km
Unit Cost: P 51,110,559.73/lane km
Physical Target:
CW-2- ROW: 714.11 sq. m
Unit Cost: P 300/sq. m
EAO: P 10,500,000.00
Allocation: P300,000,000.00 |
April 4, 2018 |
FY - 2018 |
WIN8F05078 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM:
Tablas Circumferential Rd.
K0062+560 - K0062+960
CW1: 7,500 sq. m.
( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php
TO:
Tablas Circumferential Rd.
K0062+480 - K0062+940
CW1: 8,356.2 sq.m.
( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php |
April 4, 2018 |
FY - 2018 |
WIN8F05064 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Tablas Circumferential Rd.
K0110+258 - K0110+838,
K0112+281 - K0114+000,
K0118+656 - K0118+682,
K0118+697 - K0122+000
CW1: 11.216 lane km ( Rehabilitation of Paved Road )
Allocation: 173,918,000 Php
TO:
Tablas Circumferential rd.
K0110+258 - K0110+838,
K0112+281 - K0114+000,
K0118+656 - K0118+683,
K0118+697 - K0120+240
CW1: 7.766 lane km ( Rehabilitation of Paved Road )
Allocation: 173,918,000 Php |
April 4, 2018 |
FY - 2018 |
WIN8F05098 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Rd.
K0064+456 - K0064+635,
K0064+824 - K0066+680,
K0066+850 - K0069+060,
K0069+356 - K0071+105,
K0064+(-780) - K0064+(-319),
K0064+(-199) - K0064+325
CW1: 14.13 lane km ( Road Widening )
Allocation: 211,950,000 Php
TO:
Calapan South rd.
K0064+(-780) - K0064+(-320),
K0064+(-200) - K0064+328,
K0064+456 - K0064+638,
K0034+822 - K0066+680,
K0066+868 - K0069+053,
K0069+356 - K0071+160,
K0071+273 - K0072+128,
K0072+241 - K0072+445,
K0072+628 - K0073+687,
K0073+794 - K0074+640
CW1: 20.072 lane km ( Road Widening )
Allocation: 211,950,000 Php |
April 4, 2018 |
FY 2018 |
WIN8C02130 |
UACS No. 310204100129000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100129000
Project ID: P00200298MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Ipil Circumferential Road: Veterans-Tiayon-Don Andres Section (Phase IV), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.13 lane km
Unit Cost: P 27,241,715.38/lane km
Physical Target:
CW-2- ROW: 16,666.67 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,250,000.00
Allocation: P 150,000,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02129 |
UACS No. 310201100136000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100136000
Project ID: P00200585MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Ipil - Liloy - Sindangan Road
K2002+400.00 - K2002+643.00,
K2003+737.00 - K2004+439.00,
K2004+474.00 - K2008+501.29,
K2011+758.15 - K2011+838.15
Physical Target:
CW-1-Road Widening: 9.96663 lane km.
Unit Cost: P 14,021,790.72/lane km.
Physical Target:
CW-2-Reconstruction from Paved to Concrete: 1.24772 lane km.
Unit Cost: P 11,601,160.52/lane km.
Physical Target:
CW-3-ROW: 16,666.67 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,775,000
Allocation: P 165,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02209 |
UACS No. 300204100039000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 300204100039000
Project ID: P00230012MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Jct. National Highway - Brgy. Morob, in support of Bamboo Craft, Leon T. Postigo, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 10.82 lane km
Unit Cost: P 11,066,376.66/lane km
Physical Target:
CW-2- ROW: 2,849.78 sq. m
Unit Cost: P 300/sq. m
EAO: 4,375,000.00
Allocation: 125,000,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02128 |
UACS No. 310201100121000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100121000
Project ID: P00200582MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog - Sindangan - Liloy Road
K1873+862 - K1875+233,
K1875+377 - K1877+534,
K1881+560 - K1884+449.95,
K1884+449.95 - K1885+210
Physical Target:
CW-1- Road Widening: 14.36 lane km.
Unit Cost: P 13,432,660.49/lane km.
Physical Target:
CW-2- ROW: 356.65 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000
Allocation: P 200,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02131 |
UACS No. 310201100118000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100118000
Project ID: P00200579MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Dipolog - Oroquieta National Road including ROW
K1810+975.00 - K1812+937.00,
K1813+102.00 - K1814+400.00,
K1814+400.00 - K1817+700.00
Physical Target:
CW-1- Road Widening: 13.12 lane km.
Unit Cost: P 14,703,929.65/lane km.
Physical Target:
CW-2- ROW: 281.48 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000
Allocation: P 200,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02136 |
UACS No. 310205100156000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310205100156000
Project ID: P00200475MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
Sindangan-Bayog-Lakewood Road (Talinga-Dagohoy-Tinaplan-Titik), Zamboanga del Norte
Physical Target:
CW-1- Paving of Unpaved Road: 3.14 lane km
Unit Cost: P 46,097,617.17/lane km
Physical Target:
CW-2- ROW: 11.61 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,250,000.00
Allocation: P 150,000,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02127 |
UACS No. 31020110013500 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 31020110013500
Project ID: P00200584MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Ipil - Liloy - Sindangan Road
K1999+866.00 - K2002+400.00,
K2008+517.00 - K2011+206.00
Physical Target:
CW-1-Road Widening-Primary Road: 10.45 lane km.
Unit Cost: P 13,373,205.74/lane km.
Physical Target:
CW-2-ROW: 16,666.67 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000
Allocation: P 150,000,000
|
April 4, 2018 |
FY 2018 |
WIN8C02208 |
UACS No. 310201100119000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100119000
Project ID: P00200580MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Dipolog - Punta - Dansullan - Sergio Osmeña, Zamboanga del Norte including ROW
K1855+877.00 - K1862+900.00
Physical Target:
CW-1- Road Widening: 13.84 lane km.
Unit Cost: P 13,211,834.73/lane km.
Physical Target:
CW-2-ROW Acquisition: 33,827.36 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000.00
Allocation: P 200,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02215 |
UACS No. 320101100197000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 320101100197000
Project ID: P00221250MN
Organizational Outcome 2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Tutua-Polo Section including RROW along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 690.0 ln.m
Unit Cost: P 150,539.78/ln.m
Pysical Target:
CW-2- ROW: P 7,591.85 sq. m
Unit Cost: P 300/sq. m
EAO: 3,850,000.00
Allocation: P 110,000,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02232 |
UACS No. 310201100147000 |
March 1, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100147000
Project ID: P00200590MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Road
K1758+296.00 - K1759+182.00,
K1759+335.00 - K1760+071.00,
K1760+222.00 - K1763+300.00
Physical Target:
CW-1-Road Widening-Primary Road: 9.40 lane km.
Unit Cost: P 14,642,625.03/lane km.
Physical Target:
CW-2-ROW: 23,697.75 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000.00
Allocation: P 150,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02210 |
UACS No. 310108100042000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310108100042000
Project ID: P00200215MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Road
K1836+820 - K1836+860,
K1856+520 - K1856+600,
K1864+460 - K1864+520,
K1864+695 - K1864+723
Physical Target:
CW-1- Construction of Road Slope Protection: 8,206.36 sq. m
Unit Cost: P 17,116.37/sq.m
Physical Target:
CW-2- ROW: 1,423.13 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,110,000.00
Allocation: P 146,000,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02133 |
UACS No. 310201100148000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100148000
Project ID: P00200591MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Road
K1763+300.00 - K1763+489.00,
K1763+631.00 - K1766+037.00,
K1766+165.00 - K1768+196.12,
K1768+196.12 - K1768+700.00
Physical Target:
CW-1-Road Widening: 10.26 lane km.
Unit Cost: P 13,999,557.61/lane km.
Physical Target:
CW-2-ROW: 3,715.13 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000
Allocation: P 150,000,000 |
April 4, 2018 |
FY 2018 |
WIN8C02221 |
UACS No. 310211100019000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310211100019000
Project ID: P00200842MN
Organizational Outcome 1: Ensure safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1849+601.00 - K1852+010.19,
K1854+026.00 - K1854+860.00
Physical Target:
CW-1- Paving of Unpaved Road: 6.49 lane km
Unit Cost: P 16,094,809.14/lane km
Physical Target:
CW-2- ROW: 1,660.30 sq.m
Unit Cost: P 300/sq. m
EAO: P 3,806,600.00
Allocation: P 108,760,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02132 |
UACS No. 310104100020000 |
March 15, 2018 |
Region IX |
Regional Office IX |
UACS No. 310104100020000
Project ID: P00201339MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Dipolog-Sindangan-Liloy Road
K1895+000 - K1899+000.00
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 8.00 lane km
Unit Cost: P 11,056,512.44/lane km
Physical Target:
CW-2- ROW: 50,021.72 sq. m
Unit Cost: P 300/sq. m
EAO: P 3,752,385.00
Allocation: P 107,211,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02234 |
UACS No. 310105100040000 |
March 21, 2018 |
Region IX |
Regional Office IX |
UACS No. 310105100040000
Project ID: P00200115MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Road
Sta. 1820+000.00 - Sta. 1820+938.26,
Sta. 1841+984.00 - Sta. 1842+993.53,
Sta. 1856+984.00 - Sta. 1859+430.00
Physical Target:
CW-1- Paving of Unpaved Road: 8.79 lane km
Unit Cost: P 17,889,214.94/lane km
Physical Target:
CW-2- ROW: 3,604.50 sq.m
Unit Cost: P 300/sq.m
EAO: P 5,742,450.00
Allocation: P 164,070,000.00 |
April 4, 2018 |
2018 |
WIN8G01841 |
WIN8G01841 |
March 12, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Missing Links/ New Roads - Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road) incl. ROW and Slope Protection, Sablan, Benguet; Physical Target:ROW : 7,500 Square meters; CW1 : 4.32 Lane Km; CW2 : 6,670 Square meters; Allocation = Php150,000,000
To: Construction of Missing Links/ New Roads - Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road) incl. ROW and Slope Protection, Sablan, Benguet; Physical Target:ROW : 7,500 Square meters ; CW1 : 4.32 Lane Km; CW2 : 6,597 Square meters; Allocation = Php150,000,000
|
April 4, 2018 |
2018 |
WIN8G01818 |
WIN8G01818 |
March 12, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Missing Links/ New Roads - Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road) incl. ROW and Bridge, Tuba, Benguet; Physical Target:ROW : 7,500 Square meters; CW1 : 1,159 Square meters; Allocation = Php150,000,000
To: Construction of Missing Links/ New Roads - Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road) incl. ROW and Bridge, Tuba, Benguet; Physical Target:ROW : 1,500 Square meters; CW1 : 1,159.11 Square meters; Allocation = Php150,000,000
|
April 4, 2018 |
2018 |
WIN8G01838 |
WIN8G01838 |
March 12, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Missing Links/ New Roads - Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Apayao; Physical Target:7.87 Lane km; Allocation = Php100,000,000
To: Construction of Missing Links/ New Roads - Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Apayao; Physical Target:7.00 Lane km; Allocation = Php100,000,000
|
April 4, 2018 |
2018 |
WIN8G01820 |
WIN8G01820 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000
To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province; Physical Target:1.576 Lane KM; Allocation = Php25,000,000
|
April 4, 2018 |
2018 |
WIN8G01819 |
WIN8G01819 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Dantay-Sagada Rd – K0385+510-K0385+560, K0388+606-K0388+729; Physical Target:0.346 Lane KM; Allocation = Php 5,000,000
To: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Dantay-Sagada Rd – K0388+606-K0388+729; Physical Target:0.246 Lane KM; Allocation = Php5,000,000
|
April 4, 2018 |
2018 |
WIN8G01773 |
WIN8G01773 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Water System, Barangay Bontoc III, Mountain Province; Physical Target:1.00 Water Supply System; Allocation = Php 2,500,000
To: Construction of Water System, Barangay Bontoc Ili, Mountain Province; Physical Target:1 Water Supply System; Allocation = Php2,500,000
|
April 4, 2018 |
2018 |
WIN8G01831 |
WIN8G01831 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Poblacion, Sagada-Aguid Road in support of Coffee, Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000
To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Poblacion, Sagada-Aguid Road in support of Coffee, Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province; Physical Target:1.136 Lane KM; Allocation = Php25,000,000
|
April 4, 2018 |
2018 |
WIN8G01821 |
WIN8G01821 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000
To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province; Physical Target:1.780 Lane KM; Allocation = Php25,000,000
|
April 4, 2018 |
FY 2018 |
WIN8C02235 |
UACS No. 300204100030000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300204100030000
Project ID: P00230008MN
Convergence and Special Support Program
Construction/Improvement of Access Roads Leading to trades, Industries and Economic Zones
Road Concreting - Buenavista Barangay Road in Support of Corn and Vegetables Production at Barangay Buenavista, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1- Construction of Road: 3.666 lane km
Unit Cost: P 17,109,929.07/lane km
EAO: P 2,275,000.00
Allocation: P 65,000,000.00 |
April 4, 2018 |
2018 |
WIN8G01778 |
WIN8G01778 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000
To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province; Physical Target:1.852 Lane KM; Allocation = Php25,000,000
|
April 4, 2018 |
2018 |
WIN8G01774 |
WIN8G01774 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000
To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province; Physical Target:1.804 Lane KM; Allocation = Php25,000,000
|
April 4, 2018 |
2018 |
WIN8G01839 |
WIN8G01839 |
March 12, 2018 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Mt Province-N Vizcaya Rd – K0367+225-K0367+298, K0383+871-K0383+983; Physical Target:0.258 Lane KM; Allocation = Php 5,550,000
To: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Mt Province-N Vizcaya Rd – K0367+188-K0367+316, K0383+871-K0383+983; Physical Target:0.480 Lane KM; Allocation = Php5,550,000
|
April 4, 2018 |
FY 2018 |
WIN8C02225 |
UACS No. 300204100076000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300204100076000
Project ID: P00230036MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Tinindugan Barangay Road in Support of Corn and Vegetables Production at Tinindugan, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 3.946 lane km
Unit Cost: P 18,958,117.08/lane km
EAO: P 2,713,270.00
Allocation: P 77,522,000.00 |
April 4, 2018 |
FY 2018 |
WIN8C02213 |
UACS No. 310305100437000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310305100437000
Project ID: P00201124MN
OO1: Ensure Safe and Reliable National Road System
Bridge Program - Widening of Permanent Bridges
Nipaan Br. (B00414MN) along Dipolog-Polanco-Piñan-Jct. Oroquieta Rd
Physical Target:
CW-1- Widening of Bridge: 151.11 sq. m
Unit Cost: P 72,741.71/sq. m
Physical Target:
ROW: 153 sq. m
Unit Cost: P 1,496.73/sq. m
EAO: P 229,000.00
Allocation: P 11,450,000.00 |
April 4, 2018 |
2018 |
WIN8G01833 |
WIN8G01833 |
March 15, 2018 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Concrete Road - Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet; Physical Target:3.342 Lane Km.; Allocation = Php 58,485,000
To: Construction of Concrete Road - Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet; Physical Target:2.780 Lane Km.; Allocation = Php58,485,000
|
April 4, 2018 |
FY 2018 |
WIN8C02212 |
UACS No. 310106100208000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100208000
Project ID: P00201347MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct. Oroquieta Rd
K1828+919 - K1830+079
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 2.320 lane km
Unit Cost: P 14,543,586.21/lane km
Physical Target:
ROW: 468.63 sq. m
Unit Cost: P 1,499.99/sq. m
EAO: P 702,940.00
Allocation: P 35,147,000.00 |
April 4, 2018 |
2018 |
WIN8G01875 |
WIN8G01875 |
March 14, 2018 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Road Slope Protection Structure - Kennon Rd - K0233+576 - K0234+028; Physical Target:5,000.00 Square meters; Allocation = Php 50,000,000
To: Construction of Road Slope Protection Structure - Kennon Rd - K0233+904 - K0234+000; Physical Target:2,760.00 Square meters; Allocation = Php50,000,000
|
April 4, 2018 |
FY 2018 |
WIN8C02222 |
UACS No. 320101100198000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101100198000
Project ID: P00221251MN
OO2: Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure (Revetment) along Dipolog River, Dapdap Bridge, Labrador Section including RROW along Polanco-Macleodes National Road, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 273.20 l.m.
Unit Cost: P 210,560.03/l.m.
Physical Target:
ROW: 200 sq.m
Unit Cost: P 1,500.00/sq. m
Physical Target:
Soil Exploration:1 Borehole
Unit Cost: P75,000/borehole
EAO: P 2,100,000.00
Allocation: P 60,000,000.00
|
April 4, 2018 |
FY 2018 |
WIN8C02237 |
UACS No. 320101102160000 |
March 21, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102160000
Project ID: P00220565MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, De Venta Perla, (Polanco Side) including RROW, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 140.40 l.m.
Unit Cost: P 204,594.02/l.m.
Physical Target:
ROW: 400 sq.m
Unit Cost: P 1,500.00/sq.m
Physical Target:
Soil Exploration: 1 borehole
Unit Cost: P 75,000/borehole
EAO: P600,000.00
Allocation: P 30,000,000.00 |
April 3, 2018 |
2018 |
WIN8F05173 |
UACS No. 310102100045000 |
January 1, 2018 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 3101022100045000
Project ID: P00200061LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
PPTA Road K0025+510 – K0027+-050, K0027+000 – K0028+545
As Modified
UACS No. 3101022100045000
Project ID: P00200061LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
PPTA Road K0025+510 – K0026+110.40, K0027+(-050.70) – K0028+545
|
April 3, 2018 |
2018 |
WIN8F05172 |
UACS No. 310103100038000 |
January 1, 2018 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 31010310003800
Project ID: P00200196LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
Daang Maharlika (LZ) (S03288LZ) Chainage 30 – Chainage 225
As Modified
UACS No. 31010310003800
Project ID: P00200196LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
Daang Maharlika (LZ) (S03288LZ) Chainage 30 – Chainage 225.40
|
April 3, 2018 |
FY - 2018 |
WIN8C02118 |
FY - 2018 GAA DPWH Infra Program |
December 22, 2017 |
Region IV-B |
NCR - Regional Office |
001: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Tertiary Roads
FROM:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0267+210 - K0272+519
CW1: 10.904 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
TO:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0267+242 - K0271+180
CW1: 8.100 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php |
April 3, 2018 |
FY - 2018 |
WIN8F05099 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Road -
Secondary Roads
FROM:
Palawan Circum. Rd.
K0232+764 - K0232+900,
K0233+090 - K0236+121,
K0236+388 - K0236+655,
K0211+625 - K0212+089,
K0212+257 - K0212+1026,
K0215+036 - K0215+230
CW1: 10.00 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
TO:
Palawan Circum. Rd.
K0232+764 - K0232+900,
K0233+090 - K0236+098,
K0236+417 - K0236+694,
K0211+625 - K0212+089,
K0212+257 - K0212+312
CW1: 8.138 lane km ( Paving of unpaved Road )
Allocation: 150,000,000 Php |
April 3, 2018 |
FY - 2018 |
WIN8F05076 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Secondary Roads
FROM:
Palawan Circum. Rd.
K0236+665 - K0241+524
CW1: 10.00 lane km ( Paving of Unpaved Roads )
Allocation: 150,000,000 Php
TO:
Palawan Circum. Rd.
K0236+665 - K0241+283
CW1: 9.518 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 |
April 3, 2018 |
FY - 2018 |
WIN8F05067 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Secondary Roads
FROM:
Quezon - Punta Baja Rd
K0189+429 -K0192+309,
K0192+358 - K0193+049,
K0162+014 - K0162+471,
K0167+591 - K0168+282
CW1: 10.00 lane km (Paving of Unpaved Road )
Allocation: 150,000,000 Php
TO:
Quezon - Punta Baja Rd.
K0162+014 - K0162+433,
K0167+591 - K0168+233,
K0189+429 - K0192+309
CW1: 8.342 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php |
April 3, 2018 |
FY - 2018 |
WIN8F05074 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Secondary Roads
FROM:
Quezon - Punta Baja Rd.
K0198+344 - K0201+377,
K0202+506 - K0203+063,
K0170+892 - K0171+216
CW1: 8.358 lane km ( Paving of Unpaved Road )
Allocation: 125,364,000 Php
TO:
Quezon - Punta Baja Rd.
K0170+892 - K0171+216,
K0198+344 - K0200+627
CW1: 5.55 lane km ( Paving of Unpaved Road )
Allocation: 125,364,000 Php |
April 3, 2018 |
GAA CY2018 |
WIN8F05180 |
UACS No. 320101100377000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Pinagkabalian River (Sta. 2+339 to Sta. 2+199), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 144 lm Unit Cost: P 340,277.78/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M
As Modified
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Pinagkabalian River (Sta. 2+340 to Sta. 2+226), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 114 lm, Unit Cost: P 423,394.74/lm
Allocation: P 48.267 M
EAO P 1 M
Excess P 0.733 M
Total: P 50 M
|
April 3, 2018 |
GAA CY2018 |
WIN8F05178 |
UACS No. 320101100231000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100231000
Project ID: P00221395LZ-CW1
WIN8F05178
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 2+454 to 2+929), from Women’s Hospital to Valenzuela, Boundary, Malabon City
Physical Target: CW1-Construction of Revetment: 475 lm
Unit Cost: P 152,368.42/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M
As Modified
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 2+454 to 2+901.5), from Women’s Hospital to Valenzuela, Boundary, Malabon City
Physical Target: CW1-Construction of Revetment: 447 lm
Unit Cost: P 164,243.85/lm
Allocation: P 73.417 M
EAO P 1.50 M
Excess 0.083 M
Total: P 75 M
|
April 3, 2018 |
GAA CY2018 |
WIN8F05179 |
UACS No. 320101100376000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100376000
Project ID: P00221399LZ-CW1
WIN8F05179
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River (Sta. 4+900 to Sta. 5+190), from Acacia Pumping Station to Philippine National Railway (PNR), Brgy. Tinajeros, Malabon City
Physical Target: CW1-Construction of Revetment: 290 lm
Unit Cost: P 168,965.52/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M
As Modified
UACS No. 320101100376000
Project ID: P00221399LZ-CW1
WIN8F05179
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River (Sta. 4+885.6 to Sta. 5+175.6), from Acacia Pumping Station to Philippine National Railway (PNR), Brgy. Tinajeros, Malabon City
Physical Target: CW1-Construction of Revetment: 290 lm
Unit Cost: P 168,955.17/lm
Allocation: P 48.997 M
EAO P 1 M
Excess P 0.003 M
Total: P 50 M
|
April 3, 2018 |
GAA CY2018 |
WIN8F05176 |
UACS No. 320101100371000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100371000
Project ID: P00221394LZ
WIN8F05176
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 1+611 to Sta. 1+927), from Santulan Bridge (Upstream), Malabon City
Physical Target: CW1-Construction of Revetment: 311 lm
Unit Cost: P 157,556.27/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M
As Modified
UACS No. 320101100371000
Project ID: P00221394LZ
WIN8F05176
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 1+611 to Sta. 1+903), from Santulan Bridge (Upstream), Malabon City
Physical Target: CW1-Construction of Revetment: 292 lm
Unit Cost: P 167,421.23/lm
Allocation: P 48.887 M
EAO P 1 M
Excess P 0.113 M
Total: P 50 M
|
April 3, 2018 |
GAA CY2018 |
WIN8F05183 |
UACS No. 320101100232000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100232000
Project ID: P00221397LZ
WIN8F05183
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River along Malabon-Tullahan River (Sta. 1+043 to Sta. 1+517), Brgy. Tañong, Malabon City
Physical Target: CW1-Construction of Revetment: 477 lm
Unit Cost: P 151,729.56/lm
Allocation: P 72.735 M
EAO P 2.625 M
Total: P 75 M
As Modified
UACS No. 320101100232000
Project ID: P00221397LZ
WIN8F05183
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River along Malabon-Tullahan River (Sta. 1+043 to Sta. 1+527), Brgy. Tañong, Malabon City
Physical Target: CW1-Construction of Revetment: 484 lm
Unit Cost: P 151,431.82/lm
Allocation: P 73.293 M
EAO P 1.50 M
Excess P 0.207 M
Total: P 75 M
|
April 3, 2018 |
FY - 2018 |
WIN8F05081 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Road -
Secondary Roads
FROM:
Quezon - Punta Baja Rd.
K0193+049 - K0196+320,
K0196+457 - K0196+976,
K0197+352 - K0198+344
CW1: 10.00 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
TO:
Quezon - Punta Baja rd.
K0193+049 - K0196+320,
K0196+457 - K0196+976,
K0197+352 - K0197+580
CW1: 8.33 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php |
April 3, 2018 |
FY - 2018 |
WIN8F05079 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0014+000 - K0015+433,
K0015+448.20 + K0022+000
CW1: 15.962 lane km ( Road Widening )
Allocation: 242,802,000 Php
TO:
Puerto Princesa North Rd
K0014+000 - K0015+373,
K0015+508 - K0020+433
CW1: 12.57 lane km ( Road Widening )
Allocation: 242,802,000 |
April 3, 2018 |
GAA CY2018 |
WIN8F05182 |
UACS No. 320101100146000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100146000
Project ID: P00222433LZ-CW1
WIN8F05182
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+989 to Sta. 1+779), (Phase 2), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 344,642.86/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M
As Modified
UACS No. 320101100146000
Project ID: P00222433LZ-CW1
WIN8F05182
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 2+048 to Sta. 1+870), (Phase 2), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 410,662.92/lm
Allocation: P 73.098 M
EAO P 1.50 M
Excess 0.402 M
Total: P 75 M
|
April 3, 2018 |
FY - 2018 |
WIN8F05075 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
GAA 2018 Other Infrastructure ( CSSP )
Convergence and Special Support Program
- Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
NRJ leading to Tabon Cave, Palawan
CW1: 7.394 lane km ( Construction of Gravel Road )
Allocation: 110,903,000 Php
TO:
NRJ leading to Tabon Cave, Palawan
CW1: 3.735 lane km ( Construction of Gravel Road )
Allocation: 110,903,00 Php |
April 3, 2018 |
FY - 2018 |
WIN8F05069 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd.
K0022+000 - K0023+449,
K0023+496 - K0023+596,
K0023+651 - K0025+134,
K0025+150 - K0027+255,
K0027+274 - K0028+000
CW1: 11.744 lane km ( Road Widening )
Allocation: 200,000,000 Php
TO:
Puerto Princesa North Rd
K0021+320 - K0023+389,
K0023+711 - K0025+074,
K0025+210 - K0027+195,
K0027+334 - K0028+000
CW1: 12.184 lane km ( Road Widening )
Allocation: 200,000,000 Php |
April 3, 2018 |
GAA CY2018 |
WIN8F05181 |
UACS No. 320101100145000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100145000
Project ID: P00222434LZ-CW1
WIN8F05181
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+779 to Sta. 1+569), (Phase 3), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 344,642.86/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M
As Modified
UACS No. 320101100145000
Project ID: P00222434LZ-CW1
WIN8F05181
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+870 to Sta. 1+691.2), (Phase 3), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 178.8 lm
Unit Cost: P 410,620.80/lm
Allocation: P 73.419 M
EAO P 1.50 M
Excess 0.081 M
Total: P 75 M
|
April 3, 2018 |
FY - 2018 |
WIN8F05100 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
GAA 2018 Other Infrastructure ( CSSP )
Convergence and Special Support Program
- Construction/Improvement of Access Road leading to
Declared Tourism destinations
FROM:
Bacungan - Simpucan - Bagumbayan - Napsan Road,
Puerto Princesa City, Palawan
CW1: 9.257 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php
TO:
Bacungan - Simpucan - Bagumbayan - Napsan Road,
Puerto Princesa City, Palawan
CW1: 16.528 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php |
April 3, 2018 |
2018 |
310207100014000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 2nd District Engineering Office |
Network Development Program: Off-Carriageway Improvement-- Primary Roads: Santiago-Tuguegarao Rd - K0392 + 500 - K0392 + 560, K0392 + 670 - K0392 + 730, K0392 + 880 - K0392 + 950 |
April 3, 2018 |
2018 |
310209100039000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 2nd District Engineering Office |
Network Development Program: Off-Carriageway Improvement-Tertiary Roads-Ilagan-Delfin Albano-Mallig Rd - K0438 + 375 - K0440 + 638 |
April 3, 2018 |
2018 |
310102100076000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program: Preventive Maintenance-Secondary Roads-Aparri Airport Rd - K0583 + -714.20 - K0583 + 589 |
April 3, 2018 |
2018 |
310102100077000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program:Preventive Maintenance - Secondary Roads- Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0570 + 745 - K0575 + 584.10 |
April 2, 2018 |
FY 2018 GAA |
WIN8C02220 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1727+572 - K1729+770
Physical Target:
CW1: 4.124 Lane Km (Road Widening)
ROW: 19,792.20 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,262,675.00 (Road Widening)
ROW: P 487,325.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1727+572 - K1729+270
Physical Target:
CW1: 3.17566 Lane Km (Road Widening)
ROW: 19,792.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,262,675.00 (Road Widening)
ROW: P 487,325.00
EAO: P 5,250,000.00 |
April 2, 2018 |
FY 2018 GAA |
WIN8C02223 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1729+770 - K1732+220
Physical Target:
CW1: 4.960 Lane Km (Road Widening)
ROW: 23,808.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,183,545.00 (Road Widening)
ROW: P 566,455.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1729+270 - K1731+360
Physical Target:
CW1: 4.2626 Lane Km (Road Widening)
ROW: 23,808.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,183,545.00 (Road Widening)
ROW: P 566,455.00
EAO: P 5,250,000.00 |
April 2, 2018 |
FY 2018 GAA |
WIN8C02219 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Jct Matti (along Davao-Cot. Road) - Jct Aurora (along Digos-Makar Road) Bypass Road, incl. ROW, Davao del Sur
Physical Target:
CW1: 3,186.40 sq.m. (Additional Lane Width)
CW2: 2.100 Lane Km (Construction of Concrete Road)
CW3: 1.336 Lane Km (Road Widening)
ROW: 57,921.478 sq.m.
Allocation:
TOTAL: P 114,583,000.00
CW1: P 25,331,250.00 (Additional Lane Width)
CW2: P 30,748,760.00 (Construction of Concrete Road)
CW3: P 30,290,385.00 (Road Widening)
ROW: P 24,202,200.00
EAO: P 4,010,405.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Jct Matti (along Davao-Cot. Road) - Jct Aurora (along Digos-Makar Road) Bypass Road, incl. ROW, Davao del Sur
Physical Target:
CW1: 1,803.290 sq.m. (Additional Lane Width)
CW2: 2.122 Lane Km (Construction of Concrete Road)
CW3: 3.363 Lane Km (Road Widening)
CW4: 0.675 Lane Km (Rehabilitation of Paved Road)
ROW: 57,921.478 sq.m.
Allocation:
TOTAL: P 114,583,000.00
CW1: P 12,685,346.50 (Additional Lane Width)
CW2: P 22,617,411.94 (Construction of Concrete Road)
CW3: P 44,160,481.15 (Road Widening)
CW4: P 6,907,155.41 (Rehabilitation of Paved Road)
ROW: P 24,202,200.00
EAO: P 4,010,405.00 |
April 2, 2018 |
FY - 2018 |
WIN8F05082 |
FY - 2018 ( GAA ) DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Mindoro West Coastal Road
K0322+600 - K0324+000,
K0229+833 - K0230+675,
K0229+(-871) - K0229+631,
K0229+757 - K0229+833
CW1: 7.792 lane km (Road Widening)
Allocation: 128,452,000 Php (Total)
123,956,180 Php (Road)
4,495,820 Php (EAO)
TO:
Mindoro West Coastal Road
K0229+(-871) - K0229+631,
K0229+757 - K0229+833,
K0229+833 - K0231+415,
K0322+600 - K0324+000
CW1: 9.248 lane km (Road Widening)
Allocation: 128,452,000 Php (Total)
123,956,180 (Road)
4,495,820 (EAO) |
April 2, 2018 |
FY - 2018 |
WIN8F05102 |
FY - 2018 ( GAA ) DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
FROM:
Caramay Bridge ( B00205PW) along Puerto Princesa North Road
CW1: 979.567 sq. meters (Widening of Bridge)
Allocation: 130,000,000 Php
TO:
Caramay Bridge (B00205PW) along Puerto Princesa North Road
CW1: 935.616 sq. meters (Widening of Bridge)
Allocation: 130,000,000 Php |
April 2, 2018 |
FY 2018 GAA |
WIN8C02251 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1499+132 - K1500+172, K1500+372 - K1502+786
Physical Target:
CW1: 20.376 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overaly)
EAO: P 7,000,000.00
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1499+132 - K1500+172, K1500+372 - K1502+580
Physical Target:
CW1: 19.508 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overaly)
EAO: P 7,000,000.00 |
April 2, 2018 |
FY 2018 GAA |
WIN8C02250 |
FY 2018 GAA RA 10964 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1502+786 - K1503+000, K1503+632 - K1504+588, K1504+599 - K1506+743
Physical Target:
CW1: 20.408 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overlay)
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1502+580 - K1503+000, K1503+632 - K1504+588, K1504+599 - K1506+680
Physical Target
CW1: 20.087 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overlay)
EAO: P 7,000,000.00 |
April 2, 2018 |
FY - 2018 |
WIN8F05104 |
GAA FY - 2018 DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
El Nido - Jct. New Ibahay Rd.
K0299+525 - K0299+675,
K0300+240 - K0300+260,
K0300+600 - K0300+733,
K0300+900 - K0301+097,
K0301+677 - K0301+827,
K0302+301 - K0302+721
CW1: 16,170 sq. meters ( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php
TO:
El Nido - Jct. New Ibahay Rd
K0299+525 - K0299+675,
K0300+640 - K0300+709.2,
K0300+900 - K0301+074,
K0301+367 - K0301+477,
K0301+677 - K0301+827,
K0302+380 - K0302+720
CW1: 8,824.07 sq. meters ( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php |
April 2, 2018 |
FY - 2018 |
WIN8F05101 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM:
Palawan Circumferential Road (Latud - Canipaan Section)
Package A, Palawan
CW1: 33 lane km ( Construction of Gravel Road )
Allocation: 150,000,000 Php
TO:
Palawan Circumferential Road (Latud - Canipaan Section)
Package A, Palawan
CW1: 20.96 lane km ( Construction of Gravel Road )
Allocation: 150,000,000 Php |
April 2, 2018 |
FY - 2018 |
WIN8F05065 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001: Ensure Safe and reliable National Road System
Network Development - Paving of Unpaved Roads -
Tertiary Road
FROM:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0258+983 - K0259+001,
K0259+043 - K0259+093,
K0263+216 - K0267+210
CW1: 8.53 lane km ( Paving of Unpaved Road)
Allocation: 150,000,000 Php
TO:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0258+983 - K0258+1001,
K0259+043 - K0259+093,
K0263+216 - K0267+242
CW1: 8.53 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php |
April 2, 2018 |
2018 |
WIN8G01776 |
WIN8G01776 |
March 23, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Off-Carriageway Improvement - Primary Roads - Kennon Rd - K0216 + 270 - K0216 + 814, K0227 + 000 - K0227 + 068, K0227 + 079 - K0227 + 744, K0234 + 000 - K0235 + 000, K0233+576 - K0233+655; Physical Target: CW1 : 8,415 Square meters, CW2 : 3,035 Square meters; Allocation = Php122,011,000
To: Off-Carriageway Improvement - Primary Roads: Kennon Rd - K0216 + 270 - K0216 + 814, K0217 + 532 - K0217 + 650, K0227 + 000 - K0227 + 068, K0227 + 079 - K0227 + 744, K0234 + 000 - K0235 + 000, K0233+576 - K0233+677; Physical Target: CW1 : 8,531 Square meters, CW2 : 3,282.52 Square meters; Allocation = Php122,011,000
|
April 2, 2018 |
2018 |
WIN8G01775 |
WIN8G01775 |
March 23, 2018 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Missing Links/ New Roads - Taloy Norte Jct. - San Pascual Brgy. Hall Jct. (Section 7 of BLISTT Outer Ring Circumferential Road) incl. ROW, Bridge and Slope Protection, Tuba, Benguet; Physical Target:ROW : 7,500 Square meters, CW1 : 4.984 Lane Km, CW2 : 2.486 Lane Km, CW3 : 5,033 Square meters, CW4 : 443.60 Square meters; Allocation = Php150,000,000
To: Construction of Missing Links/ New Roads - Taloy Norte Jct. - San Pascual Brgy. Hall Jct. (Section 7 of BLISTT Outer Ring Circumferential Road) incl. ROW, Bridge and Slope Protection, Tuba, Benguet; Physical Target:ROW : 1,500 Square meters, CW1 : 1.7299 Lane Km, CW2 : 2.4731 Lane Km, CW3 : 4,968 Square meters, CW4 : 443.61 Square meters; Allocation = Php150,000,000
|
March 28, 2018 |
FY 2018 GAA |
WIN8C02247 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-Mawab Road, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.612 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 233,530,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-Mawab Road, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.05346 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 233,530,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 8,750,000.00 |
March 28, 2018 |
2018 |
WIN8C02262 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
FROM:
Surigao – Davao Coastal Rd – K1209+731.5 – K1209+998.6
Project ID No. – P00200252MN
Physical Target – 8,013 Sq.m (Road Slope)
Allocation - Php 150M (Total)
- Php 144.75M (Road Slope)
- Php 5.25M (EAO)
TO:
Surigao – Davao Coastal Rd – K1209+640 – K1210+000
Project ID No. – P00200252MN
Physical Target – 8,013 Sq.m (Road Slope)
Allocation - Php 150M (Total)
- Php 144.75M (Road Slope)
- Php 5.25M (EAO) |
March 28, 2018 |
2018 |
WIN8C02256 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Road Widening – Primary Roads
FROM:
Daang Maharlika (Surigao – Agusan Sect) – K1131 + 500 – K1132+000, K1136+000 – K1136+127, K1136+176 – K1136+300, K1139+330 – K1141+778, K1145+850 – K1146+100, K1146+140 – K1146+390, K1146+450 – K1147+052, K1148+000 – K1148+700
Project ID No. – P00200690MN
Physical Target – 9.966 lane km (Roads)
Allocation - Php 167,355,000.00 (Total)
- Php 161,497,575.00 (Roads)
- Php 5,857,425.00 (EAO)
TO:
Daang Maharlika (Surigao – Agusan Section) (S00339MN)– K1131+500 -K1132+000, K1136+000 – K1136+127, K1136+176 – K1136+300, K1139+330 - K1139+447, K1139+447 – K1141+778, K1148+000 – K1148+700
Project ID No. – P00200690MN
Physical Target – 7.798 lane km (Roads)
Allocation - Php 167,355,000.00 (Total)
- Php 161,497,575.00 (Roads)
- Php 5,857,425.00 (EAO)
|
March 28, 2018 |
2018 |
WIN8C02252 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Road Widening – Primary Roads
FROM:
Butuan City – Cagayan de Oro City – Iligan City Road (Agusan – Misamis Or Rd) – K1266+140 – K1268+852, K1268+876 – K1269+122, K1272+000 – K1272+753, K1272+767 – K1273+214
Project ID No. – P00200685MN
Physical Target – 8.312 lane km
Allocation - Php 168,219,000.00 (Total)
- Php 162,331,335.00 (Roads)
- Php 5,887,665.00 (EAO)
TO:
Butuan City – Cagayan de Oro City – Iligan City Road (Agusan – Misamis Or Rd) – K1264+540 – K1267+930
Project ID No. – P00200685MN
Physical Target – 6.760 lane km
Allocation - Php 168,219,000.00 (Total)
- Php 162,331,335.00 (Roads)
- Php 5,887,665.00 (EAO) |
March 28, 2018 |
2018 |
WIN8C02254 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Construction of Bypass and Diversion Roads
FROM:
Cantilan – Madrid Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. – P00200450MN
Physical Target – 4.572 lane km (Roads)
- 30,000 Sq.M (ROW)
Allocation - Php 130,000,000.00 (Total)
- Php 105,350,000.00 (Concrete Road)
- Php 20,100,000.00 (ROW)
- Php 4,550,000.00 (EAO)
TO:
Cantilan – Madrid Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. – P00200450MN
Physical Target – 3.126 lane km (Roads)
- 30,000 Sq.M (ROW)
Allocation - Php 130,000,000.00 (Total)
- Php 105,350,000.00 (Concrete Road)
- Php 20,100,000.00 (ROW)
- Php 4,550,000.00 (EAO)
|
March 28, 2018 |
2018 |
WIN8C02261 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Asset Preservation - Preventive Maintenance – Primary Roads
FROM:
Butuan City – Cagayan de Oro – Iligan (Agusan – Misamis Oriental), Butuan City
Project ID No. – P00201565MN
Physical Target – 10.20 Lane Km (Road)
Allocation - Php 150,000,000.00 (Total)
- Php 144,750,000.00 (Road)
- Php 5,250,000.00 (EAO)
TO:
Butuan City – Cagayan de Oro – Iligan (Agusan – Misamis Oriental), Butuan City
Project ID No. – P00201565MN
Physical Target – 8.239 Lane Km (Road)
Allocation - Php 150,000,000.00 (Total)
- Php 144,750,000.00 (Road)
- Php 5,250,000.00 (EAO) |
March 28, 2018 |
2018 |
WIN8C02255 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Network Development - Road Widening –Secondary Roads
FROM:
Surigao – Davao Coastal Rd – K1428+660 – K1431+365, K1434+910 – K1437+057, K1442+672 - K1443+659, K1434+900 - K1437+057, K1457+096- K1457+654
Project ID No. – P00201585MN
Physical Target – 17.108 Lane Km (Road)
Allocation - Php 250,000,000.00 (Total)
- Php 241,250,000.00 (Road)
- Php 8,750,000.00 (EAO)
TO:
Surigao – Davao Coastal Rd – K1428+660 – K1431+365, K1434+910 – K1437+057, K1442+714 – K1443+044, K1443+073 – K1443+659, K1457+096 – K1457+654
Project ID No. – P00201585MN
Physical Target – 12.652 Lane Km (Road)
Allocation - Php 250,000,000.00 (Total)
- Php 241,250,000.00 (Road)
- Php 8,750,000.00 (EAO) |
March 28, 2018 |
2018 |
WIN8C02253 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Regional Office XIII |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
FROM:
Jct Osmeña – Pilar Rd – K0019 +216 – K0019+514, K0019+565 – K0020+000
Project ID No. – P00200286MN
Physical Target – 9,690 Sq.m (Road Slope)
Allocation - Php 176,400,000.00 (Total)
- Php 170,226,000.00 (Road Slope)
- Php 6,174,000.00 (EAO)
TO:
Jct Osmeña – Pilar Rd – K0019 +216 – K0019+460, K0019+565 – K0019+615
Project ID No. – P00200286MN
Physical Target – 9,423 Sq.m (Road Slope)
Allocation - Php 176,400,000.00 (Total)
- Php 170,226,000.00 (Road Slope)
- Php 6,174,000.00 (EAO) |
March 28, 2018 |
2018 |
WIN8C02257 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - (S00460MN) K1294 + (-300) - K1294 + (-280), K1294 + (-300) - K1294 + (-240), K1294 + 058 - K1294 + 120, K1294 + 240 - K1294 + 254, K1294 + 280 - K1294 + 340, K1294 + 460 - K1294 + 500 , (S00469MN) K1311 + (-600) - K1311 + (-566.8)
Physical Target: 3,294.40 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
TO:
NRJ Bahbah-Talacogon Road – K1294+460.00-K1294+500.00, K1294+601.50-K1294+623.10, K1294+674.70-K1294+697.50, K1294+909.80-K1294+932.20,
K1311+(-600.00)-K1311+(-570.00)
Physical Target: 2,052.00 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
|
March 28, 2018 |
2018 |
WIN8C02257 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - (S00460MN) K1294 + (-300) - K1294 + (-280), K1294 + (-300) - K1294 + (-240), K1294 + 058 - K1294 + 120, K1294 + 240 - K1294 + 254, K1294 + 280 - K1294 + 340, K1294 + 460 - K1294 + 500 , (S00469MN) K1311 + (-600) - K1311 + (-566.8)
Physical Target: 3,294.40 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
TO:
NRJ Bahbah-Talacogon Road – K1294+460.00-K1294+500.00, K1294+601.50-K1294+623.10, K1294+674.70-K1294+697.50, K1294+909.80-K1294+932.20,
K1311+(-600.00)-K1311+(-570.00)
Physical Target: 2,052.00 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
|
March 28, 2018 |
2018 |
WIN8C02259 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd –
K1350+990-K1350+1030, K1351+050-K1351+113, K1351+090-K1351+100
Physical Target: 1,811.790 square meters (Road Slope)
Amount : Php 20,000,000.00 (Total)
: Php 19,600,000.00 (Road Slope)
: Php 400,000.00 (EAO)
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd –
K1350+990.00 - K1350+1030, K1351+050.00 - K1351+112.80, K1351+090.00 - K1351+112.80
Physical Target: 1,884.00 square meters (Road Slope)
Amount : Php 20,000,000.00 (Total)
: Php 19,600,000.00 (Road Slope)
: Php 400,000.00 (EAO)
|
March 28, 2018 |
FY 2018 GAA |
WIN8C02245 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd incl. ROW -
K1472+822 - K1477+000, K1477+320 - K1478+008
Physical Target:
CW1: 9.732 Lane Km (Road Widening)
ROW: 50,119.80 sq.m.
Allocation:
TOTAL: P 182,290,000.00
CW1: P 171,393,650.00 (Road Widening)
ROW: P 4,516,200.00
EAO: P 6,380,150.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd incl. ROW -
K1472+822 - K1477+000, K1477+320 - K1478+857
Physical Target:
CW1: 11.418 Lane Km (Road Widening)
ROW: 50,119.80 sq.m.
Allocation:
TOTAL: P 182,290,000.00
CW1: P 171,393,650.00 (Road Widening)
ROW: P 4,516,200.00
EAO: P 6,380,150.00 |
March 28, 2018 |
2018 |
WIN8C02260 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures
FROM:
Construction of Barangay Hall, Brgy. Pananay-an, San Francisco, Surigao del Norte
Physical Target: - 1 Number of Bldg
Allocation: - Php 2,500,000.00 (Total)
- Php 2,475,000.00 (Building)
- Php 25,000.00 (EAO)
TO:
Construction of Barangay Hall, Brgy. Pananay-an, Placer, Surigao del Norte
Physical Target: - 1 Number of Bldg
Allocation: - Php 2,500,000.00 (Total)
- Php 2,475,000.00 (Building)
- Php 25,000.00 (EAO)
|
March 28, 2018 |
2018 |
WIN8C02258 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Protect Lives and Properties Against Major Floods - Flood Management Program
FROM:
Construction of Flood Control Structure along the River Banks of Lahi, Sico-sico and Camam-onan, Surigao del Norte
Physical Target: - 400 lineal meters (Flood Control)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000.00 (Flood Control)
- Php 1,000,000.00 (EAO)
TO:
Construction of Flood Control Structure along the River Banks of Lahi, Sico-sico and Camam-onan, Surigao del Norte
Physical Target: - 484 lineal meters (Flood Control)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000.00 (Flood Control)
- Php 1,000,000.00 (EAO) |
March 28, 2018 |
FY 2018 GAA |
WIN8C02240 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Baganga Diversion Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 4.960 Lane Km (Construction of Gravel Road)
ROW: 52,666.667 sq.m.
Allocation:
TOTAL: P 115,000,000.00
CW1: P 95,728,000.00 (Construction of Gravel Road)
ROW: P 15,247,000.00
EAO: P 4,025,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Baganga Diversion Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 10.338 Lane Km (Construction of Gravel Road)
ROW: 52,666.667 sq.m.
Allocation:
TOTAL: P 115,000,000.00
CW1: P 95,728,000.00 (Construction of Gravel Road)
ROW: P 15,247,000.00
EAO: P 4,025,000.00
|
March 28, 2018 |
FY 2018 GAA |
WIN8C02241 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Montevista (Jct. Mayaon)-Laak Diversion Rd, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Montevista (Jct. Mayaon)-Laak Diversion Rd, incl. ROW, Compostela Valley
Physical Target:
CW1: 10.51846 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
|
March 28, 2018 |
FY 2018 GAA |
WIN8C02246 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect.) incl. ROW -
K1544+047 - K1548+320
Physical Target:
CW1: 8.598 Lane Km (Road Widening)
ROW: 36,973.078 sq.m.
Allocation:
TOTAL: P 188,214,000.00
CW1: P 170,097,655.00 (Road Widening)
ROW: P 11,528,855.00
EAO: P 6,587,490.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect.) incl. ROW -
K1544+047 - K1548+320
Physical Target:
CW1: 8.544 Lane Km (Road Widening)
ROW: 36,973.078 sq.m.
Allocation:
TOTAL: P 188,214,000.00
CW1: P 170,097,655.00 (Road Widening)
ROW: P 11,528,855.00
EAO: P 6,587,490.00 |
March 28, 2018 |
FY 2018 GAA |
WIN8C02244 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Davao Or Side) incl. ROW -
K1522+404 - K1556+873
Physical Target:
CW1: 8.676 Lane Km (Construction of Concrete Road)
ROW: 34,714.286 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 125,585,100.00 (Construction of Concrete Road)
ROW: P 4,689,900.00
EAO: P 4,725,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Davao Or Side) incl. ROW -
K1522+404 - K1556+873
Physical Target:
CW1: 8.933 Lane Km (Const. of Concrete Road)
ROW: 34,714.286 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 125,585,100.00 (Construction of Concrete Road)
ROW: P 4,689,900.00
EAO: P 4,725,000.00 |
March 28, 2018 |
FY 2018 GAA |
WIN8C02243 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1447+040 - K1450+134
Physical Target:
CW1: 6.160 Lane Km (Road Widening)
ROW: 41,888.00 sq.m.
Allocation:
TOTAL: P 294,076,000.00
CW1: P 206,583,340.00 (Road Widening)
ROW: P 77,200,000.00
EAO: P 10,292,660.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1446+000 - K1450+134
Physical Target:
CW1: 8.260 Lane Km (Road Widening)
ROW: 41,888.00 sq.m.
Allocation:
TOTAL: P 294,076,000.00
CW1: P 206,583,340.00 (Road Widening)
ROW: P 77,200,000.00
EAO: P 10,292,660.00 |