Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 4, 2018 GAA CY2018 WIN8F05171 UACS No. 310102100048000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 310102100048000
Project ID: P00200064LZ
WIN8F05171
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Ortigas Avenue, Mandaluyong City, K0011+039 – K0011+535
Physical Target: CW1-Asphalt Overlay L=1.308 lane km
Unit Cost (P’000): P7,722.00/ lane km
Allocation: P 10,100,860.00 M
EAO P 206,140.00 M
Total: P 10,307,000.00 M

As Modified
UACS No. 310102100048000
Project ID: P00200064LZ
WIN8F05171
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Ortigas Avenue, (Eastbound) Mandaluyong City, K0011+099 – K0011+535
Physical Target: CW1-Asphalt Overlay L=1.308 lane km
Unit Cost (P’000): P7,722.00/ lane km
Allocation: P 10,100,860.00 M
EAO P 206,140.00 M
Total: P 10,307,000.00 M
April 4, 2018 FY - 2018 WIN8F05096 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa South Rd.
K0009+491 - K0010+048,
K0010+064 - K0010+269,
K0010+285 - K0011+428,
K0011+998 - K0014+853,
K0014+871 - K0015+807

CW1: 11.844 lane km ( Road Widening )
Allocation: 200,000,000 Php

TO:
Puerto Princesa South Rd.
K0023+650 - K0025+024,
K0040+000 - K0044+846,
K0051+200 - K0053+096

CW1: 16.232 lane km ( Road Widening )
Allocation: 200,000,000Php

April 4, 2018 FY - 2018 WIN8F05103 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa South Rd.
K0027+495 - K0029+525,
K0037+000 - K0038+000,
K0039+668 - K0039+870,
K0045+194 - K0047+071

CW1: 9.952 lane km ( Rehabilitation of Paved Road )
Allocation: 156,046,000 Php

TO:
Puerto Princesa Road
K0045+194 - K0047+071,
K0047+147.50 - K0047+360,
K0048+471 - K0048+494,
K0050+237 - K0050+438,
K0050+725 - K0051+014,
K0051+034 - K0051+123,
K0055+091 - K0055+200,
K0055+500 - K0055+840,
K0066+180 - K0066+700,
K0066+780 - K0067+113,
K0067+638 - K0068+388,
K0070+552 - K071+026,
K0072+145 - K0072+700

CW1: 11.499 lane km ( Road Widening )
Allocation: 156,046,000 Php
April 4, 2018 FY - 2018 WIN8C02119 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Convergence and Special Support Program

Convergence and Special Support -Construction/Improvement
of Access Roads leading to Declared Tourism Destinations

FROM:
Access Road leading Talakaigan River Hillside,
Brgy. Cabigaan, Aborlan, Palawan

CW1: 12.40 lane km ( Construction of Gravel Road )
Allocation: 155,000,000 Php

TO:
Access Road leading Talakaigan River Hillside,
Brgy. Cabigaan, Aborlan, Palawan

CW1: 13.6831 lane km ( Construction of Gravel Road )
Allocation: 155,000,000 Php
April 4, 2018 FY - 2018 WIN8F05097 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Road

FROM:
Tapul - Bahile Rd
K0038+955 - K0042+1237,
Chainage 000 - Chainage0126

CW1: 8.852 lane km ( Road Widening )
Allocation: 132,780,000 Php

TO:
Tapul - Bahile Road
K0038+955 - K0042+1168

CW1: 8.462 lane km ( Road Widening )
Allocation: 132,780,000 Php
April 4, 2018 FY 2018 WIN8C02227 UACS No. 320102100031000 March 21, 2018 Region IX Regional Office IX
UACS No. 320102100031000
Project ID: P00220534MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Disacan River (Upstream and Downstream) including Dredging, Manukan and Jose Dalman, Zamboanga del Norte

Physical Target:
CW-1-Construction of Flood Mitigation Structure: 1,078 ln.m.
Unit Cost:
P 125,286.63/ln.m.
Physical Target:
CW-2-ROW: 136.73 sq.m.
Unit Cost:
P 300/sq.m.
EAO: P 4,900,000
Allocation: P 140,000,000.00
April 4, 2018 FY - 2018 WIN8F05080 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Roads
Tertiary Roads

Parpagoha (Marigondon) - Binoog Rd.
K0025+741 - K0028+264

CW1: 5.114 lane km ( Paving of Unpaved Road )
Allocation: 122,251,000 Php

TO:
Parpagoha ( Marigondon ) - Binoog Road
K0025+741 - K0027+700

CW1: 3.982 lane km ( Paving of Unpaved Road )
Allocation: 122,251,000 Php
April 4, 2018 FY - 2018 WIN8F05077 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
GAA 2018 Other Infrastructure (CSSP )

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
San Jose Circumferential Road leading to various beaches,
San Jose, Romblon

Cw1: 7.52 lane km ( Construction of Concrete Road )
Allocation: 167,566,000 Php

TO:
San Jose Circumferential Road leading to various beaches,
San Jose, Romblon

CW1: 7.626 lane km ( Construction of Concrete Road )
Allocation: 167,566,000 Php
April 4, 2018 FY 2018 WIN8C02233 UACS No. 310204100022000 March 21, 2018 Region IX Regional Office IX
UACS No. 310204100022000
Projects ID: P00200293MN
Organizational Outcome 1: Ensure Safe and Realiable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Baliguian Coastal Road, Junction Baliguian-Kauswagan-Mamad Section, including Slope Protection, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 5.66 lane km
Unit Cost: P 51,110,559.73/lane km
Physical Target:
CW-2- ROW: 714.11 sq. m
Unit Cost: P 300/sq. m
EAO: P 10,500,000.00
Allocation: P300,000,000.00
April 4, 2018 FY - 2018 WIN8F05078 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM:
Tablas Circumferential Rd.
K0062+560 - K0062+960

CW1: 7,500 sq. m.
( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php

TO:
Tablas Circumferential Rd.
K0062+480 - K0062+940

CW1: 8,356.2 sq.m.
( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php
April 4, 2018 FY - 2018 WIN8F05064 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Tablas Circumferential Rd.
K0110+258 - K0110+838,
K0112+281 - K0114+000,
K0118+656 - K0118+682,
K0118+697 - K0122+000

CW1: 11.216 lane km ( Rehabilitation of Paved Road )
Allocation: 173,918,000 Php

TO:
Tablas Circumferential rd.
K0110+258 - K0110+838,
K0112+281 - K0114+000,
K0118+656 - K0118+683,
K0118+697 - K0120+240

CW1: 7.766 lane km ( Rehabilitation of Paved Road )
Allocation: 173,918,000 Php
April 4, 2018 FY - 2018 WIN8F05098 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Calapan South Rd.
K0064+456 - K0064+635,
K0064+824 - K0066+680,
K0066+850 - K0069+060,
K0069+356 - K0071+105,
K0064+(-780) - K0064+(-319),
K0064+(-199) - K0064+325

CW1: 14.13 lane km ( Road Widening )
Allocation: 211,950,000 Php

TO:
Calapan South rd.
K0064+(-780) - K0064+(-320),
K0064+(-200) - K0064+328,
K0064+456 - K0064+638,
K0034+822 - K0066+680,
K0066+868 - K0069+053,
K0069+356 - K0071+160,
K0071+273 - K0072+128,
K0072+241 - K0072+445,
K0072+628 - K0073+687,
K0073+794 - K0074+640

CW1: 20.072 lane km ( Road Widening )
Allocation: 211,950,000 Php
April 4, 2018 FY 2018 WIN8C02130 UACS No. 310204100129000 March 15, 2018 Region IX Regional Office IX
UACS No. 310204100129000
Project ID: P00200298MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Ipil Circumferential Road: Veterans-Tiayon-Don Andres Section (Phase IV), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.13 lane km
Unit Cost: P 27,241,715.38/lane km
Physical Target:
CW-2- ROW: 16,666.67 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,250,000.00
Allocation: P 150,000,000.00
April 4, 2018 FY 2018 WIN8C02129 UACS No. 310201100136000 March 15, 2018 Region IX Regional Office IX
UACS No. 310201100136000
Project ID: P00200585MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Ipil - Liloy - Sindangan Road
K2002+400.00 - K2002+643.00,
K2003+737.00 - K2004+439.00,
K2004+474.00 - K2008+501.29,
K2011+758.15 - K2011+838.15

Physical Target:
CW-1-Road Widening: 9.96663 lane km.
Unit Cost: P 14,021,790.72/lane km.
Physical Target:
CW-2-Reconstruction from Paved to Concrete: 1.24772 lane km.
Unit Cost: P 11,601,160.52/lane km.
Physical Target:
CW-3-ROW: 16,666.67 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,775,000
Allocation: P 165,000,000
April 4, 2018 FY 2018 WIN8C02209 UACS No. 300204100039000 March 21, 2018 Region IX Regional Office IX
UACS No. 300204100039000
Project ID: P00230012MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Jct. National Highway - Brgy. Morob, in support of Bamboo Craft, Leon T. Postigo, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 10.82 lane km
Unit Cost: P 11,066,376.66/lane km
Physical Target:
CW-2- ROW: 2,849.78 sq. m
Unit Cost: P 300/sq. m
EAO: 4,375,000.00
Allocation: 125,000,000.00
April 4, 2018 FY 2018 WIN8C02128 UACS No. 310201100121000 March 15, 2018 Region IX Regional Office IX
UACS No. 310201100121000
Project ID: P00200582MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog - Sindangan - Liloy Road
K1873+862 - K1875+233,
K1875+377 - K1877+534,
K1881+560 - K1884+449.95,
K1884+449.95 - K1885+210

Physical Target:
CW-1- Road Widening: 14.36 lane km.
Unit Cost: P 13,432,660.49/lane km.
Physical Target:
CW-2- ROW: 356.65 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000
Allocation: P 200,000,000
April 4, 2018 FY 2018 WIN8C02131 UACS No. 310201100118000 March 15, 2018 Region IX Regional Office IX
UACS No. 310201100118000
Project ID: P00200579MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Dipolog - Oroquieta National Road including ROW
K1810+975.00 - K1812+937.00,
K1813+102.00 - K1814+400.00,
K1814+400.00 - K1817+700.00

Physical Target:
CW-1- Road Widening: 13.12 lane km.
Unit Cost: P 14,703,929.65/lane km.
Physical Target:
CW-2- ROW: 281.48 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000
Allocation: P 200,000,000
April 4, 2018 FY 2018 WIN8C02136 UACS No. 310205100156000 March 15, 2018 Region IX Regional Office IX
UACS No. 310205100156000
Project ID: P00200475MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
Sindangan-Bayog-Lakewood Road (Talinga-Dagohoy-Tinaplan-Titik), Zamboanga del Norte
Physical Target:
CW-1- Paving of Unpaved Road: 3.14 lane km
Unit Cost: P 46,097,617.17/lane km
Physical Target:
CW-2- ROW: 11.61 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,250,000.00
Allocation: P 150,000,000.00
April 4, 2018 FY 2018 WIN8C02127 UACS No. 31020110013500 March 15, 2018 Region IX Regional Office IX
UACS No. 31020110013500
Project ID: P00200584MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Ipil - Liloy - Sindangan Road
K1999+866.00 - K2002+400.00,
K2008+517.00 - K2011+206.00

Physical Target:
CW-1-Road Widening-Primary Road: 10.45 lane km.
Unit Cost: P 13,373,205.74/lane km.
Physical Target:
CW-2-ROW: 16,666.67 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000
Allocation: P 150,000,000
April 4, 2018 FY 2018 WIN8C02208 UACS No. 310201100119000 March 21, 2018 Region IX Regional Office IX
UACS No. 310201100119000
Project ID: P00200580MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Dipolog - Punta - Dansullan - Sergio Osmeña, Zamboanga del Norte including ROW
K1855+877.00 - K1862+900.00

Physical Target:
CW-1- Road Widening: 13.84 lane km.
Unit Cost: P 13,211,834.73/lane km.
Physical Target:
CW-2-ROW Acquisition: 33,827.36 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 7,000,000.00
Allocation: P 200,000,000
April 4, 2018 FY 2018 WIN8C02215 UACS No. 320101100197000 March 21, 2018 Region IX Regional Office IX
UACS No. 320101100197000
Project ID: P00221250MN
Organizational Outcome 2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Tutua-Polo Section including RROW along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 690.0 ln.m
Unit Cost: P 150,539.78/ln.m
Pysical Target:
CW-2- ROW: P 7,591.85 sq. m
Unit Cost: P 300/sq. m
EAO: 3,850,000.00
Allocation: P 110,000,000.00
April 4, 2018 FY 2018 WIN8C02232 UACS No. 310201100147000 March 1, 2018 Region IX Regional Office IX
UACS No. 310201100147000
Project ID: P00200590MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Lanao - Pagadian - Zamboanga City Road
K1758+296.00 - K1759+182.00,
K1759+335.00 - K1760+071.00,
K1760+222.00 - K1763+300.00

Physical Target:
CW-1-Road Widening-Primary Road: 9.40 lane km.
Unit Cost: P 14,642,625.03/lane km.
Physical Target:
CW-2-ROW: 23,697.75 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000.00
Allocation: P 150,000,000
April 4, 2018 FY 2018 WIN8C02210 UACS No. 310108100042000 March 21, 2018 Region IX Regional Office IX
UACS No. 310108100042000
Project ID: P00200215MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Road
K1836+820 - K1836+860,
K1856+520 - K1856+600,
K1864+460 - K1864+520,
K1864+695 - K1864+723
Physical Target:
CW-1- Construction of Road Slope Protection: 8,206.36 sq. m
Unit Cost: P 17,116.37/sq.m
Physical Target:
CW-2- ROW: 1,423.13 sq. m
Unit Cost: P 300/sq. m
EAO: P 5,110,000.00
Allocation: P 146,000,000.00
April 4, 2018 FY 2018 WIN8C02133 UACS No. 310201100148000 March 15, 2018 Region IX Regional Office IX
UACS No. 310201100148000
Project ID: P00200591MN
OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Primary Roads

Lanao - Pagadian - Zamboanga City Road
K1763+300.00 - K1763+489.00,
K1763+631.00 - K1766+037.00,
K1766+165.00 - K1768+196.12,
K1768+196.12 - K1768+700.00

Physical Target:
CW-1-Road Widening: 10.26 lane km.
Unit Cost: P 13,999,557.61/lane km.
Physical Target:
CW-2-ROW: 3,715.13 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 5,250,000
Allocation: P 150,000,000
April 4, 2018 FY 2018 WIN8C02221 UACS No. 310211100019000 March 21, 2018 Region IX Regional Office IX
UACS No. 310211100019000
Project ID: P00200842MN
Organizational Outcome 1: Ensure safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1849+601.00 - K1852+010.19,
K1854+026.00 - K1854+860.00
Physical Target:
CW-1- Paving of Unpaved Road: 6.49 lane km
Unit Cost: P 16,094,809.14/lane km
Physical Target:
CW-2- ROW: 1,660.30 sq.m
Unit Cost: P 300/sq. m
EAO: P 3,806,600.00
Allocation: P 108,760,000.00
April 4, 2018 FY 2018 WIN8C02132 UACS No. 310104100020000 March 15, 2018 Region IX Regional Office IX
UACS No. 310104100020000
Project ID: P00201339MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Dipolog-Sindangan-Liloy Road
K1895+000 - K1899+000.00
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 8.00 lane km
Unit Cost: P 11,056,512.44/lane km
Physical Target:
CW-2- ROW: 50,021.72 sq. m
Unit Cost: P 300/sq. m
EAO: P 3,752,385.00
Allocation: P 107,211,000.00
April 4, 2018 FY 2018 WIN8C02234 UACS No. 310105100040000 March 21, 2018 Region IX Regional Office IX
UACS No. 310105100040000
Project ID: P00200115MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Road
Sta. 1820+000.00 - Sta. 1820+938.26,
Sta. 1841+984.00 - Sta. 1842+993.53,
Sta. 1856+984.00 - Sta. 1859+430.00
Physical Target:
CW-1- Paving of Unpaved Road: 8.79 lane km
Unit Cost: P 17,889,214.94/lane km
Physical Target:
CW-2- ROW: 3,604.50 sq.m
Unit Cost: P 300/sq.m
EAO: P 5,742,450.00
Allocation: P 164,070,000.00
April 4, 2018 2018 WIN8G01841 WIN8G01841 March 12, 2018 Cordillera Administrative Region CAR - Regional Office
From: Construction of Missing Links/ New Roads - Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road) incl. ROW and Slope Protection, Sablan, Benguet; Physical Target:ROW : 7,500 Square meters; CW1 : 4.32 Lane Km; CW2 : 6,670 Square meters; Allocation = Php150,000,000

To: Construction of Missing Links/ New Roads - Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road) incl. ROW and Slope Protection, Sablan, Benguet; Physical Target:ROW : 7,500 Square meters ; CW1 : 4.32 Lane Km; CW2 : 6,597 Square meters; Allocation = Php150,000,000
April 4, 2018 2018 WIN8G01818 WIN8G01818 March 12, 2018 Cordillera Administrative Region CAR - Regional Office
From: Construction of Missing Links/ New Roads - Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road) incl. ROW and Bridge, Tuba, Benguet; Physical Target:ROW : 7,500 Square meters; CW1 : 1,159 Square meters; Allocation = Php150,000,000

To: Construction of Missing Links/ New Roads - Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road) incl. ROW and Bridge, Tuba, Benguet; Physical Target:ROW : 1,500 Square meters; CW1 : 1,159.11 Square meters; Allocation = Php150,000,000
April 4, 2018 2018 WIN8G01838 WIN8G01838 March 12, 2018 Cordillera Administrative Region CAR - Regional Office
From: Construction of Missing Links/ New Roads - Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Apayao; Physical Target:7.87 Lane km; Allocation = Php100,000,000

To: Construction of Missing Links/ New Roads - Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Apayao; Physical Target:7.00 Lane km; Allocation = Php100,000,000
April 4, 2018 2018 WIN8G01820 WIN8G01820 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000

To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province; Physical Target:1.576 Lane KM; Allocation = Php25,000,000
April 4, 2018 2018 WIN8G01819 WIN8G01819 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Dantay-Sagada Rd – K0385+510-K0385+560, K0388+606-K0388+729; Physical Target:0.346 Lane KM; Allocation = Php 5,000,000

To: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Dantay-Sagada Rd – K0388+606-K0388+729; Physical Target:0.246 Lane KM; Allocation = Php5,000,000
April 4, 2018 2018 WIN8G01773 WIN8G01773 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Water System, Barangay Bontoc III, Mountain Province; Physical Target:1.00 Water Supply System; Allocation = Php 2,500,000

To: Construction of Water System, Barangay Bontoc Ili, Mountain Province; Physical Target:1 Water Supply System; Allocation = Php2,500,000
April 4, 2018 2018 WIN8G01831 WIN8G01831 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Poblacion, Sagada-Aguid Road in support of Coffee, Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000

To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Poblacion, Sagada-Aguid Road in support of Coffee, Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province; Physical Target:1.136 Lane KM; Allocation = Php25,000,000
April 4, 2018 2018 WIN8G01821 WIN8G01821 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000

To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province; Physical Target:1.780 Lane KM; Allocation = Php25,000,000
April 4, 2018 FY 2018 WIN8C02235 UACS No. 300204100030000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300204100030000
Project ID: P00230008MN
Convergence and Special Support Program
Construction/Improvement of Access Roads Leading to trades, Industries and Economic Zones
Road Concreting - Buenavista Barangay Road in Support of Corn and Vegetables Production at Barangay Buenavista, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1- Construction of Road: 3.666 lane km
Unit Cost: P 17,109,929.07/lane km
EAO: P 2,275,000.00
Allocation: P 65,000,000.00
April 4, 2018 2018 WIN8G01778 WIN8G01778 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000

To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province; Physical Target:1.852 Lane KM; Allocation = Php25,000,000
April 4, 2018 2018 WIN8G01774 WIN8G01774 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province; Physical Target:2.00 Lane KM; Allocation = Php 25,000,000

To: Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province; Physical Target:1.804 Lane KM; Allocation = Php25,000,000
April 4, 2018 2018 WIN8G01839 WIN8G01839 March 12, 2018 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Mt Province-N Vizcaya Rd – K0367+225-K0367+298, K0383+871-K0383+983; Physical Target:0.258 Lane KM; Allocation = Php 5,550,000

To: Asset Preservation Program – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road, Mt Province-N Vizcaya Rd – K0367+188-K0367+316, K0383+871-K0383+983; Physical Target:0.480 Lane KM; Allocation = Php5,550,000
April 4, 2018 FY 2018 WIN8C02225 UACS No. 300204100076000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300204100076000
Project ID: P00230036MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Tinindugan Barangay Road in Support of Corn and Vegetables Production at Tinindugan, Sergio Osmeña, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 3.946 lane km
Unit Cost: P 18,958,117.08/lane km
EAO: P 2,713,270.00
Allocation: P 77,522,000.00
April 4, 2018 FY 2018 WIN8C02213 UACS No. 310305100437000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310305100437000
Project ID: P00201124MN
OO1: Ensure Safe and Reliable National Road System
Bridge Program - Widening of Permanent Bridges
Nipaan Br. (B00414MN) along Dipolog-Polanco-Piñan-Jct. Oroquieta Rd
Physical Target:
CW-1- Widening of Bridge: 151.11 sq. m
Unit Cost: P 72,741.71/sq. m
Physical Target:
ROW: 153 sq. m
Unit Cost: P 1,496.73/sq. m
EAO: P 229,000.00
Allocation: P 11,450,000.00
April 4, 2018 2018 WIN8G01833 WIN8G01833 March 15, 2018 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Concrete Road - Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet; Physical Target:3.342 Lane Km.; Allocation = Php 58,485,000

To: Construction of Concrete Road - Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet; Physical Target:2.780 Lane Km.; Allocation = Php58,485,000
April 4, 2018 FY 2018 WIN8C02212 UACS No. 310106100208000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100208000
Project ID: P00201347MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct. Oroquieta Rd
K1828+919 - K1830+079
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 2.320 lane km
Unit Cost: P 14,543,586.21/lane km
Physical Target:
ROW: 468.63 sq. m
Unit Cost: P 1,499.99/sq. m
EAO: P 702,940.00
Allocation: P 35,147,000.00
April 4, 2018 2018 WIN8G01875 WIN8G01875 March 14, 2018 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Road Slope Protection Structure - Kennon Rd - K0233+576 - K0234+028; Physical Target:5,000.00 Square meters; Allocation = Php 50,000,000

To: Construction of Road Slope Protection Structure - Kennon Rd - K0233+904 - K0234+000; Physical Target:2,760.00 Square meters; Allocation = Php50,000,000
April 4, 2018 FY 2018 WIN8C02222 UACS No. 320101100198000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 320101100198000
Project ID: P00221251MN
OO2: Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure (Revetment) along Dipolog River, Dapdap Bridge, Labrador Section including RROW along Polanco-Macleodes National Road, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 273.20 l.m.
Unit Cost: P 210,560.03/l.m.
Physical Target:
ROW: 200 sq.m
Unit Cost: P 1,500.00/sq. m
Physical Target:
Soil Exploration:1 Borehole
Unit Cost: P75,000/borehole
EAO: P 2,100,000.00
Allocation: P 60,000,000.00
April 4, 2018 FY 2018 WIN8C02237 UACS No. 320101102160000 March 21, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 320101102160000
Project ID: P00220565MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, De Venta Perla, (Polanco Side) including RROW, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 140.40 l.m.
Unit Cost: P 204,594.02/l.m.
Physical Target:
ROW: 400 sq.m
Unit Cost: P 1,500.00/sq.m
Physical Target:
Soil Exploration: 1 borehole
Unit Cost: P 75,000/borehole
EAO: P600,000.00
Allocation: P 30,000,000.00
April 3, 2018 2018 WIN8F05173 UACS No. 310102100045000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 3101022100045000
Project ID: P00200061LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
PPTA Road K0025+510 – K0027+-050, K0027+000 – K0028+545

As Modified
UACS No. 3101022100045000
Project ID: P00200061LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
PPTA Road K0025+510 – K0026+110.40, K0027+(-050.70) – K0028+545
April 3, 2018 2018 WIN8F05172 UACS No. 310103100038000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 31010310003800
Project ID: P00200196LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
Daang Maharlika (LZ) (S03288LZ) Chainage 30 – Chainage 225

As Modified
UACS No. 31010310003800
Project ID: P00200196LZ
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Road
Daang Maharlika (LZ) (S03288LZ) Chainage 30 – Chainage 225.40
April 3, 2018 FY - 2018 WIN8C02118 FY - 2018 GAA DPWH Infra Program December 22, 2017 Region IV-B NCR - Regional Office
001: Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Roads -
Tertiary Roads

FROM:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0267+210 - K0272+519

CW1: 10.904 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php

TO:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0267+242 - K0271+180

CW1: 8.100 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
April 3, 2018 FY - 2018 WIN8F05099 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Road -
Secondary Roads

FROM:
Palawan Circum. Rd.
K0232+764 - K0232+900,
K0233+090 - K0236+121,
K0236+388 - K0236+655,
K0211+625 - K0212+089,
K0212+257 - K0212+1026,
K0215+036 - K0215+230

CW1: 10.00 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php

TO:

Palawan Circum. Rd.
K0232+764 - K0232+900,
K0233+090 - K0236+098,
K0236+417 - K0236+694,
K0211+625 - K0212+089,
K0212+257 - K0212+312

CW1: 8.138 lane km ( Paving of unpaved Road )
Allocation: 150,000,000 Php
April 3, 2018 FY - 2018 WIN8F05076 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Roads -
Secondary Roads

FROM:
Palawan Circum. Rd.
K0236+665 - K0241+524

CW1: 10.00 lane km ( Paving of Unpaved Roads )
Allocation: 150,000,000 Php

TO:
Palawan Circum. Rd.
K0236+665 - K0241+283

CW1: 9.518 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000
April 3, 2018 FY - 2018 WIN8F05067 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Roads -
Secondary Roads

FROM:
Quezon - Punta Baja Rd
K0189+429 -K0192+309,
K0192+358 - K0193+049,
K0162+014 - K0162+471,
K0167+591 - K0168+282

CW1: 10.00 lane km (Paving of Unpaved Road )
Allocation: 150,000,000 Php

TO:
Quezon - Punta Baja Rd.
K0162+014 - K0162+433,
K0167+591 - K0168+233,
K0189+429 - K0192+309

CW1: 8.342 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
April 3, 2018 FY - 2018 WIN8F05074 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Roads -
Secondary Roads

FROM:
Quezon - Punta Baja Rd.
K0198+344 - K0201+377,
K0202+506 - K0203+063,
K0170+892 - K0171+216

CW1: 8.358 lane km ( Paving of Unpaved Road )
Allocation: 125,364,000 Php

TO:
Quezon - Punta Baja Rd.
K0170+892 - K0171+216,
K0198+344 - K0200+627

CW1: 5.55 lane km ( Paving of Unpaved Road )
Allocation: 125,364,000 Php
April 3, 2018 GAA CY2018 WIN8F05180 UACS No. 320101100377000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Pinagkabalian River (Sta. 2+339 to Sta. 2+199), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 144 lm Unit Cost: P 340,277.78/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M

As Modified
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Pinagkabalian River (Sta. 2+340 to Sta. 2+226), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 114 lm, Unit Cost: P 423,394.74/lm
Allocation: P 48.267 M
EAO P 1 M
Excess P 0.733 M
Total: P 50 M
April 3, 2018 GAA CY2018 WIN8F05178 UACS No. 320101100231000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100231000
Project ID: P00221395LZ-CW1
WIN8F05178
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 2+454 to 2+929), from Women’s Hospital to Valenzuela, Boundary, Malabon City
Physical Target: CW1-Construction of Revetment: 475 lm
Unit Cost: P 152,368.42/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M

As Modified
UACS No. 320101100377000
Project ID: P00221400LZ-CW1
WIN8F05180
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 2+454 to 2+901.5), from Women’s Hospital to Valenzuela, Boundary, Malabon City
Physical Target: CW1-Construction of Revetment: 447 lm
Unit Cost: P 164,243.85/lm
Allocation: P 73.417 M
EAO P 1.50 M
Excess 0.083 M
Total: P 75 M
April 3, 2018 GAA CY2018 WIN8F05179 UACS No. 320101100376000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100376000
Project ID: P00221399LZ-CW1
WIN8F05179
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River (Sta. 4+900 to Sta. 5+190), from Acacia Pumping Station to Philippine National Railway (PNR), Brgy. Tinajeros, Malabon City
Physical Target: CW1-Construction of Revetment: 290 lm
Unit Cost: P 168,965.52/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M

As Modified
UACS No. 320101100376000
Project ID: P00221399LZ-CW1
WIN8F05179
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River (Sta. 4+885.6 to Sta. 5+175.6), from Acacia Pumping Station to Philippine National Railway (PNR), Brgy. Tinajeros, Malabon City
Physical Target: CW1-Construction of Revetment: 290 lm
Unit Cost: P 168,955.17/lm
Allocation: P 48.997 M
EAO P 1 M
Excess P 0.003 M
Total: P 50 M
April 3, 2018 GAA CY2018 WIN8F05176 UACS No. 320101100371000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100371000
Project ID: P00221394LZ
WIN8F05176
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 1+611 to Sta. 1+927), from Santulan Bridge (Upstream), Malabon City
Physical Target: CW1-Construction of Revetment: 311 lm
Unit Cost: P 157,556.27/lm
Allocation: P 49 M
EAO P 1 M
Total: P 50 M

As Modified
UACS No. 320101100371000
Project ID: P00221394LZ
WIN8F05176
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing of Riverwall along Santulan River (Sta. 1+611 to Sta. 1+903), from Santulan Bridge (Upstream), Malabon City
Physical Target: CW1-Construction of Revetment: 292 lm
Unit Cost: P 167,421.23/lm
Allocation: P 48.887 M
EAO P 1 M
Excess P 0.113 M
Total: P 50 M
April 3, 2018 GAA CY2018 WIN8F05183 UACS No. 320101100232000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100232000
Project ID: P00221397LZ
WIN8F05183
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River along Malabon-Tullahan River (Sta. 1+043 to Sta. 1+517), Brgy. Tañong, Malabon City
Physical Target: CW1-Construction of Revetment: 477 lm
Unit Cost: P 151,729.56/lm
Allocation: P 72.735 M
EAO P 2.625 M
Total: P 75 M

As Modified
UACS No. 320101100232000
Project ID: P00221397LZ
WIN8F05183
Organizational Outcome 2: Protect Lives and Properties
Construction/Sealing/Improvement of Riverwall along Malabon-Tullahan River along Malabon-Tullahan River (Sta. 1+043 to Sta. 1+527), Brgy. Tañong, Malabon City
Physical Target: CW1-Construction of Revetment: 484 lm
Unit Cost: P 151,431.82/lm
Allocation: P 73.293 M
EAO P 1.50 M
Excess P 0.207 M
Total: P 75 M
April 3, 2018 FY - 2018 WIN8F05081 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Paving of Unpaved Road -
Secondary Roads

FROM:
Quezon - Punta Baja Rd.
K0193+049 - K0196+320,
K0196+457 - K0196+976,
K0197+352 - K0198+344

CW1: 10.00 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php

TO:
Quezon - Punta Baja rd.
K0193+049 - K0196+320,
K0196+457 - K0196+976,
K0197+352 - K0197+580

CW1: 8.33 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
April 3, 2018 FY - 2018 WIN8F05079 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd
K0014+000 - K0015+433,
K0015+448.20 + K0022+000

CW1: 15.962 lane km ( Road Widening )
Allocation: 242,802,000 Php

TO:
Puerto Princesa North Rd
K0014+000 - K0015+373,
K0015+508 - K0020+433

CW1: 12.57 lane km ( Road Widening )
Allocation: 242,802,000
April 3, 2018 GAA CY2018 WIN8F05182 UACS No. 320101100146000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100146000
Project ID: P00222433LZ-CW1
WIN8F05182
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+989 to Sta. 1+779), (Phase 2), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 344,642.86/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M

As Modified
UACS No. 320101100146000
Project ID: P00222433LZ-CW1
WIN8F05182
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 2+048 to Sta. 1+870), (Phase 2), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 410,662.92/lm
Allocation: P 73.098 M
EAO P 1.50 M
Excess 0.402 M
Total: P 75 M
April 3, 2018 FY - 2018 WIN8F05075 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
GAA 2018 Other Infrastructure ( CSSP )

Convergence and Special Support Program
- Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
NRJ leading to Tabon Cave, Palawan

CW1: 7.394 lane km ( Construction of Gravel Road )
Allocation: 110,903,000 Php

TO:
NRJ leading to Tabon Cave, Palawan

CW1: 3.735 lane km ( Construction of Gravel Road )
Allocation: 110,903,00 Php
April 3, 2018 FY - 2018 WIN8F05069 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd.
K0022+000 - K0023+449,
K0023+496 - K0023+596,
K0023+651 - K0025+134,
K0025+150 - K0027+255,
K0027+274 - K0028+000

CW1: 11.744 lane km ( Road Widening )
Allocation: 200,000,000 Php

TO:
Puerto Princesa North Rd
K0021+320 - K0023+389,
K0023+711 - K0025+074,
K0025+210 - K0027+195,
K0027+334 - K0028+000

CW1: 12.184 lane km ( Road Widening )
Allocation: 200,000,000 Php
April 3, 2018 GAA CY2018 WIN8F05181 UACS No. 320101100145000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100145000
Project ID: P00222434LZ-CW1
WIN8F05181
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+779 to Sta. 1+569), (Phase 3), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 210 lm
Unit Cost: P 344,642.86/lm
Allocation: P 72.375 M
EAO P 2.625 M
Total: P 75 M

As Modified
UACS No. 320101100145000
Project ID: P00222434LZ-CW1
WIN8F05181
Organizational Outcome 2: Protect Lives and Properties
Construction of Riverwall and Road Dike (Sta. 1+870 to Sta. 1+691.2), (Phase 3), Brgy. Dampalit, Malabon City
Physical Target: CW1-Construction of Revetment: 178.8 lm
Unit Cost: P 410,620.80/lm
Allocation: P 73.419 M
EAO P 1.50 M
Excess 0.081 M
Total: P 75 M
April 3, 2018 FY - 2018 WIN8F05100 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
GAA 2018 Other Infrastructure ( CSSP )

Convergence and Special Support Program
- Construction/Improvement of Access Road leading to
Declared Tourism destinations

FROM:
Bacungan - Simpucan - Bagumbayan - Napsan Road,
Puerto Princesa City, Palawan

CW1: 9.257 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php

TO:
Bacungan - Simpucan - Bagumbayan - Napsan Road,
Puerto Princesa City, Palawan

CW1: 16.528 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php
April 3, 2018 2018 310207100014000 GAA FY2018 January 1, 2018 Region II Isabela 2nd District Engineering Office
Network Development Program: Off-Carriageway Improvement-- Primary Roads: Santiago-Tuguegarao Rd - K0392 + 500 - K0392 + 560, K0392 + 670 - K0392 + 730, K0392 + 880 - K0392 + 950
April 3, 2018 2018 310209100039000 GAA FY2018 January 1, 2018 Region II Isabela 2nd District Engineering Office
Network Development Program: Off-Carriageway Improvement-Tertiary Roads-Ilagan-Delfin Albano-Mallig Rd - K0438 + 375 - K0440 + 638
April 3, 2018 2018 310102100076000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program: Preventive Maintenance-Secondary Roads-Aparri Airport Rd - K0583 + -714.20 - K0583 + 589
April 3, 2018 2018 310102100077000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System: Asset Preservation Program:Preventive Maintenance - Secondary Roads- Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0570 + 745 - K0575 + 584.10
April 2, 2018 FY 2018 GAA WIN8C02220 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1727+572 - K1729+770
Physical Target:
CW1: 4.124 Lane Km (Road Widening)
ROW: 19,792.20 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,262,675.00 (Road Widening)
ROW: P 487,325.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1727+572 - K1729+270
Physical Target:
CW1: 3.17566 Lane Km (Road Widening)
ROW: 19,792.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,262,675.00 (Road Widening)
ROW: P 487,325.00
EAO: P 5,250,000.00
April 2, 2018 FY 2018 GAA WIN8C02223 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1729+770 - K1732+220
Physical Target:
CW1: 4.960 Lane Km (Road Widening)
ROW: 23,808.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,183,545.00 (Road Widening)
ROW: P 566,455.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW -
K1729+270 - K1731+360
Physical Target:
CW1: 4.2626 Lane Km (Road Widening)
ROW: 23,808.00 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,183,545.00 (Road Widening)
ROW: P 566,455.00
EAO: P 5,250,000.00
April 2, 2018 FY 2018 GAA WIN8C02219 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Jct Matti (along Davao-Cot. Road) - Jct Aurora (along Digos-Makar Road) Bypass Road, incl. ROW, Davao del Sur
Physical Target:
CW1: 3,186.40 sq.m. (Additional Lane Width)
CW2: 2.100 Lane Km (Construction of Concrete Road)
CW3: 1.336 Lane Km (Road Widening)
ROW: 57,921.478 sq.m.
Allocation:
TOTAL: P 114,583,000.00
CW1: P 25,331,250.00 (Additional Lane Width)
CW2: P 30,748,760.00 (Construction of Concrete Road)
CW3: P 30,290,385.00 (Road Widening)
ROW: P 24,202,200.00
EAO: P 4,010,405.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Jct Matti (along Davao-Cot. Road) - Jct Aurora (along Digos-Makar Road) Bypass Road, incl. ROW, Davao del Sur
Physical Target:
CW1: 1,803.290 sq.m. (Additional Lane Width)
CW2: 2.122 Lane Km (Construction of Concrete Road)
CW3: 3.363 Lane Km (Road Widening)
CW4: 0.675 Lane Km (Rehabilitation of Paved Road)
ROW: 57,921.478 sq.m.
Allocation:
TOTAL: P 114,583,000.00
CW1: P 12,685,346.50 (Additional Lane Width)
CW2: P 22,617,411.94 (Construction of Concrete Road)
CW3: P 44,160,481.15 (Road Widening)
CW4: P 6,907,155.41 (Rehabilitation of Paved Road)
ROW: P 24,202,200.00
EAO: P 4,010,405.00
April 2, 2018 FY - 2018 WIN8F05082 FY - 2018 ( GAA ) DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Mindoro West Coastal Road
K0322+600 - K0324+000,
K0229+833 - K0230+675,
K0229+(-871) - K0229+631,
K0229+757 - K0229+833

CW1: 7.792 lane km (Road Widening)
Allocation: 128,452,000 Php (Total)
123,956,180 Php (Road)
4,495,820 Php (EAO)
TO:
Mindoro West Coastal Road
K0229+(-871) - K0229+631,
K0229+757 - K0229+833,
K0229+833 - K0231+415,
K0322+600 - K0324+000

CW1: 9.248 lane km (Road Widening)
Allocation: 128,452,000 Php (Total)
123,956,180 (Road)
4,495,820 (EAO)
April 2, 2018 FY - 2018 WIN8F05102 FY - 2018 ( GAA ) DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridges

FROM:
Caramay Bridge ( B00205PW) along Puerto Princesa North Road

CW1: 979.567 sq. meters (Widening of Bridge)
Allocation: 130,000,000 Php

TO:
Caramay Bridge (B00205PW) along Puerto Princesa North Road

CW1: 935.616 sq. meters (Widening of Bridge)
Allocation: 130,000,000 Php
April 2, 2018 FY 2018 GAA WIN8C02251 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1499+132 - K1500+172, K1500+372 - K1502+786
Physical Target:
CW1: 20.376 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overaly)
EAO: P 7,000,000.00

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1499+132 - K1500+172, K1500+372 - K1502+580
Physical Target:
CW1: 19.508 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overaly)
EAO: P 7,000,000.00
April 2, 2018 FY 2018 GAA WIN8C02250 FY 2018 GAA RA 10964 January 1, 2017 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1502+786 - K1503+000, K1503+632 - K1504+588, K1504+599 - K1506+743
Physical Target:
CW1: 20.408 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overlay)
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Preventive Maintenance - Secondary Roads
Davao City Div Road -
K1502+580 - K1503+000, K1503+632 - K1504+588, K1504+599 - K1506+680
Physical Target
CW1: 20.087 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Asphalt Overlay)
EAO: P 7,000,000.00
April 2, 2018 FY - 2018 WIN8F05104 GAA FY - 2018 DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:
El Nido - Jct. New Ibahay Rd.
K0299+525 - K0299+675,
K0300+240 - K0300+260,
K0300+600 - K0300+733,
K0300+900 - K0301+097,
K0301+677 - K0301+827,
K0302+301 - K0302+721

CW1: 16,170 sq. meters ( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php

TO:
El Nido - Jct. New Ibahay Rd
K0299+525 - K0299+675,
K0300+640 - K0300+709.2,
K0300+900 - K0301+074,
K0301+367 - K0301+477,
K0301+677 - K0301+827,
K0302+380 - K0302+720

CW1: 8,824.07 sq. meters ( Construction of Road Slope Protection Structure )
Allocation: 150,000,000 Php
April 2, 2018 FY - 2018 WIN8F05101 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM:
Palawan Circumferential Road (Latud - Canipaan Section)
Package A, Palawan

CW1: 33 lane km ( Construction of Gravel Road )
Allocation: 150,000,000 Php

TO:
Palawan Circumferential Road (Latud - Canipaan Section)
Package A, Palawan

CW1: 20.96 lane km ( Construction of Gravel Road )
Allocation: 150,000,000 Php
April 2, 2018 FY - 2018 WIN8F05065 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001: Ensure Safe and reliable National Road System

Network Development - Paving of Unpaved Roads -
Tertiary Road

FROM:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0258+983 - K0259+001,
K0259+043 - K0259+093,
K0263+216 - K0267+210

CW1: 8.53 lane km ( Paving of Unpaved Road)
Allocation: 150,000,000 Php

TO:
Palawan Circum. Rd ( Panalingaan - Tagbita - Latud )
K0258+983 - K0258+1001,
K0259+043 - K0259+093,
K0263+216 - K0267+242

CW1: 8.53 lane km ( Paving of Unpaved Road )
Allocation: 150,000,000 Php
April 2, 2018 2018 WIN8G01776 WIN8G01776 March 23, 2018 Cordillera Administrative Region CAR - Regional Office
From: Off-Carriageway Improvement - Primary Roads - Kennon Rd - K0216 + 270 - K0216 + 814, K0227 + 000 - K0227 + 068, K0227 + 079 - K0227 + 744, K0234 + 000 - K0235 + 000, K0233+576 - K0233+655; Physical Target: CW1 : 8,415 Square meters, CW2 : 3,035 Square meters; Allocation = Php122,011,000

To: Off-Carriageway Improvement - Primary Roads: Kennon Rd - K0216 + 270 - K0216 + 814, K0217 + 532 - K0217 + 650, K0227 + 000 - K0227 + 068, K0227 + 079 - K0227 + 744, K0234 + 000 - K0235 + 000, K0233+576 - K0233+677; Physical Target: CW1 : 8,531 Square meters, CW2 : 3,282.52 Square meters; Allocation = Php122,011,000
April 2, 2018 2018 WIN8G01775 WIN8G01775 March 23, 2018 Cordillera Administrative Region CAR - Regional Office
From: Construction of Missing Links/ New Roads - Taloy Norte Jct. - San Pascual Brgy. Hall Jct. (Section 7 of BLISTT Outer Ring Circumferential Road) incl. ROW, Bridge and Slope Protection, Tuba, Benguet; Physical Target:ROW : 7,500 Square meters, CW1 : 4.984 Lane Km, CW2 : 2.486 Lane Km, CW3 : 5,033 Square meters, CW4 : 443.60 Square meters; Allocation = Php150,000,000

To: Construction of Missing Links/ New Roads - Taloy Norte Jct. - San Pascual Brgy. Hall Jct. (Section 7 of BLISTT Outer Ring Circumferential Road) incl. ROW, Bridge and Slope Protection, Tuba, Benguet; Physical Target:ROW : 1,500 Square meters, CW1 : 1.7299 Lane Km, CW2 : 2.4731 Lane Km, CW3 : 4,968 Square meters, CW4 : 443.61 Square meters; Allocation = Php150,000,000
March 28, 2018 FY 2018 GAA WIN8C02247 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-Mawab Road, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.612 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 233,530,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-Mawab Road, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.05346 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 233,530,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 8,750,000.00
March 28, 2018 2018 WIN8C02262 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads

FROM:
Surigao – Davao Coastal Rd – K1209+731.5 – K1209+998.6
Project ID No. – P00200252MN
Physical Target – 8,013 Sq.m (Road Slope)
Allocation - Php 150M (Total)
- Php 144.75M (Road Slope)
- Php 5.25M (EAO)

TO:
Surigao – Davao Coastal Rd – K1209+640 – K1210+000
Project ID No. – P00200252MN
Physical Target – 8,013 Sq.m (Road Slope)
Allocation - Php 150M (Total)
- Php 144.75M (Road Slope)
- Php 5.25M (EAO)
March 28, 2018 2018 WIN8C02256 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Network Development - Road Widening – Primary Roads

FROM:
Daang Maharlika (Surigao – Agusan Sect) – K1131 + 500 – K1132+000, K1136+000 – K1136+127, K1136+176 – K1136+300, K1139+330 – K1141+778, K1145+850 – K1146+100, K1146+140 – K1146+390, K1146+450 – K1147+052, K1148+000 – K1148+700
Project ID No. – P00200690MN
Physical Target – 9.966 lane km (Roads)
Allocation - Php 167,355,000.00 (Total)
- Php 161,497,575.00 (Roads)
- Php 5,857,425.00 (EAO)

TO:
Daang Maharlika (Surigao – Agusan Section) (S00339MN)– K1131+500 -K1132+000, K1136+000 – K1136+127, K1136+176 – K1136+300, K1139+330 - K1139+447, K1139+447 – K1141+778, K1148+000 – K1148+700
Project ID No. – P00200690MN
Physical Target – 7.798 lane km (Roads)
Allocation - Php 167,355,000.00 (Total)
- Php 161,497,575.00 (Roads)
- Php 5,857,425.00 (EAO)
March 28, 2018 2018 WIN8C02252 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Network Development - Road Widening – Primary Roads

FROM:
Butuan City – Cagayan de Oro City – Iligan City Road (Agusan – Misamis Or Rd) – K1266+140 – K1268+852, K1268+876 – K1269+122, K1272+000 – K1272+753, K1272+767 – K1273+214
Project ID No. – P00200685MN
Physical Target – 8.312 lane km
Allocation - Php 168,219,000.00 (Total)
- Php 162,331,335.00 (Roads)
- Php 5,887,665.00 (EAO)

TO:
Butuan City – Cagayan de Oro City – Iligan City Road (Agusan – Misamis Or Rd) – K1264+540 – K1267+930
Project ID No. – P00200685MN
Physical Target – 6.760 lane km
Allocation - Php 168,219,000.00 (Total)
- Php 162,331,335.00 (Roads)
- Php 5,887,665.00 (EAO)
March 28, 2018 2018 WIN8C02254 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Network Development - Construction of Bypass and Diversion Roads

FROM:
Cantilan – Madrid Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. – P00200450MN
Physical Target – 4.572 lane km (Roads)
- 30,000 Sq.M (ROW)
Allocation - Php 130,000,000.00 (Total)
- Php 105,350,000.00 (Concrete Road)
- Php 20,100,000.00 (ROW)
- Php 4,550,000.00 (EAO)

TO:
Cantilan – Madrid Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. – P00200450MN
Physical Target – 3.126 lane km (Roads)
- 30,000 Sq.M (ROW)
Allocation - Php 130,000,000.00 (Total)
- Php 105,350,000.00 (Concrete Road)
- Php 20,100,000.00 (ROW)
- Php 4,550,000.00 (EAO)

March 28, 2018 2018 WIN8C02261 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Asset Preservation - Preventive Maintenance – Primary Roads

FROM:
Butuan City – Cagayan de Oro – Iligan (Agusan – Misamis Oriental), Butuan City
Project ID No. – P00201565MN
Physical Target – 10.20 Lane Km (Road)
Allocation - Php 150,000,000.00 (Total)
- Php 144,750,000.00 (Road)
- Php 5,250,000.00 (EAO)

TO:
Butuan City – Cagayan de Oro – Iligan (Agusan – Misamis Oriental), Butuan City
Project ID No. – P00201565MN
Physical Target – 8.239 Lane Km (Road)
Allocation - Php 150,000,000.00 (Total)
- Php 144,750,000.00 (Road)
- Php 5,250,000.00 (EAO)
March 28, 2018 2018 WIN8C02255 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Network Development - Road Widening –Secondary Roads

FROM:
Surigao – Davao Coastal Rd – K1428+660 – K1431+365, K1434+910 – K1437+057, K1442+672 - K1443+659, K1434+900 - K1437+057, K1457+096- K1457+654
Project ID No. – P00201585MN
Physical Target – 17.108 Lane Km (Road)
Allocation - Php 250,000,000.00 (Total)
- Php 241,250,000.00 (Road)
- Php 8,750,000.00 (EAO)

TO:
Surigao – Davao Coastal Rd – K1428+660 – K1431+365, K1434+910 – K1437+057, K1442+714 – K1443+044, K1443+073 – K1443+659, K1457+096 – K1457+654
Project ID No. – P00201585MN
Physical Target – 12.652 Lane Km (Road)
Allocation - Php 250,000,000.00 (Total)
- Php 241,250,000.00 (Road)
- Php 8,750,000.00 (EAO)
March 28, 2018 2018 WIN8C02253 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads

FROM:
Jct Osmeña – Pilar Rd – K0019 +216 – K0019+514, K0019+565 – K0020+000
Project ID No. – P00200286MN
Physical Target – 9,690 Sq.m (Road Slope)
Allocation - Php 176,400,000.00 (Total)
- Php 170,226,000.00 (Road Slope)
- Php 6,174,000.00 (EAO)

TO:
Jct Osmeña – Pilar Rd – K0019 +216 – K0019+460, K0019+565 – K0019+615
Project ID No. – P00200286MN
Physical Target – 9,423 Sq.m (Road Slope)
Allocation - Php 176,400,000.00 (Total)
- Php 170,226,000.00 (Road Slope)
- Php 6,174,000.00 (EAO)
March 28, 2018 2018 WIN8C02257 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:
NJR Bah-Bah-Talacogon Rd - (S00460MN) K1294 + (-300) - K1294 + (-280), K1294 + (-300) - K1294 + (-240), K1294 + 058 - K1294 + 120, K1294 + 240 - K1294 + 254, K1294 + 280 - K1294 + 340, K1294 + 460 - K1294 + 500 , (S00469MN) K1311 + (-600) - K1311 + (-566.8)
Physical Target: 3,294.40 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)

TO:
NRJ Bahbah-Talacogon Road – K1294+460.00-K1294+500.00, K1294+601.50-K1294+623.10, K1294+674.70-K1294+697.50, K1294+909.80-K1294+932.20,
K1311+(-600.00)-K1311+(-570.00)
Physical Target: 2,052.00 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
March 28, 2018 2018 WIN8C02257 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:
NJR Bah-Bah-Talacogon Rd - (S00460MN) K1294 + (-300) - K1294 + (-280), K1294 + (-300) - K1294 + (-240), K1294 + 058 - K1294 + 120, K1294 + 240 - K1294 + 254, K1294 + 280 - K1294 + 340, K1294 + 460 - K1294 + 500 , (S00469MN) K1311 + (-600) - K1311 + (-566.8)
Physical Target: 3,294.40 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)

TO:
NRJ Bahbah-Talacogon Road – K1294+460.00-K1294+500.00, K1294+601.50-K1294+623.10, K1294+674.70-K1294+697.50, K1294+909.80-K1294+932.20,
K1311+(-600.00)-K1311+(-570.00)
Physical Target: 2,052.00 square meters (Road Slope)
Amount : Php 34,000,000.00 (Total)
:Php 32,810,000.00 (Road Slope)
:Php 1,190,000.00 (EAO)
March 28, 2018 2018 WIN8C02259 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd –
K1350+990-K1350+1030, K1351+050-K1351+113, K1351+090-K1351+100
Physical Target: 1,811.790 square meters (Road Slope)
Amount : Php 20,000,000.00 (Total)
: Php 19,600,000.00 (Road Slope)
: Php 400,000.00 (EAO)

TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd –
K1350+990.00 - K1350+1030, K1351+050.00 - K1351+112.80, K1351+090.00 - K1351+112.80
Physical Target: 1,884.00 square meters (Road Slope)
Amount : Php 20,000,000.00 (Total)
: Php 19,600,000.00 (Road Slope)
: Php 400,000.00 (EAO)
March 28, 2018 FY 2018 GAA WIN8C02245 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd incl. ROW -
K1472+822 - K1477+000, K1477+320 - K1478+008
Physical Target:
CW1: 9.732 Lane Km (Road Widening)
ROW: 50,119.80 sq.m.
Allocation:
TOTAL: P 182,290,000.00
CW1: P 171,393,650.00 (Road Widening)
ROW: P 4,516,200.00
EAO: P 6,380,150.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd incl. ROW -
K1472+822 - K1477+000, K1477+320 - K1478+857
Physical Target:
CW1: 11.418 Lane Km (Road Widening)
ROW: 50,119.80 sq.m.
Allocation:
TOTAL: P 182,290,000.00
CW1: P 171,393,650.00 (Road Widening)
ROW: P 4,516,200.00
EAO: P 6,380,150.00
March 28, 2018 2018 WIN8C02260 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures

FROM:
Construction of Barangay Hall, Brgy. Pananay-an, San Francisco, Surigao del Norte
Physical Target: - 1 Number of Bldg
Allocation: - Php 2,500,000.00 (Total)
- Php 2,475,000.00 (Building)
- Php 25,000.00 (EAO)

TO:
Construction of Barangay Hall, Brgy. Pananay-an, Placer, Surigao del Norte
Physical Target: - 1 Number of Bldg
Allocation: - Php 2,500,000.00 (Total)
- Php 2,475,000.00 (Building)
- Php 25,000.00 (EAO)
March 28, 2018 2018 WIN8C02258 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 1st District Engineering Office
Protect Lives and Properties Against Major Floods - Flood Management Program

FROM:
Construction of Flood Control Structure along the River Banks of Lahi, Sico-sico and Camam-onan, Surigao del Norte
Physical Target: - 400 lineal meters (Flood Control)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000.00 (Flood Control)
- Php 1,000,000.00 (EAO)

TO:
Construction of Flood Control Structure along the River Banks of Lahi, Sico-sico and Camam-onan, Surigao del Norte
Physical Target: - 484 lineal meters (Flood Control)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000.00 (Flood Control)
- Php 1,000,000.00 (EAO)
March 28, 2018 FY 2018 GAA WIN8C02240 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Baganga Diversion Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 4.960 Lane Km (Construction of Gravel Road)
ROW: 52,666.667 sq.m.
Allocation:
TOTAL: P 115,000,000.00
CW1: P 95,728,000.00 (Construction of Gravel Road)
ROW: P 15,247,000.00
EAO: P 4,025,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Baganga Diversion Road, incl. ROW, Davao Oriental
Physical Target:
CW1: 10.338 Lane Km (Construction of Gravel Road)
ROW: 52,666.667 sq.m.
Allocation:
TOTAL: P 115,000,000.00
CW1: P 95,728,000.00 (Construction of Gravel Road)
ROW: P 15,247,000.00
EAO: P 4,025,000.00
March 28, 2018 FY 2018 GAA WIN8C02241 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Montevista (Jct. Mayaon)-Laak Diversion Rd, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Construction of Bypass and Diversion Roads
Montevista (Jct. Mayaon)-Laak Diversion Rd, incl. ROW, Compostela Valley
Physical Target:
CW1: 10.51846 Lane Km (Construction of Concrete Road)
ROW: 81,632.563 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 185,280,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
March 28, 2018 FY 2018 GAA WIN8C02246 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect.) incl. ROW -
K1544+047 - K1548+320
Physical Target:
CW1: 8.598 Lane Km (Road Widening)
ROW: 36,973.078 sq.m.
Allocation:
TOTAL: P 188,214,000.00
CW1: P 170,097,655.00 (Road Widening)
ROW: P 11,528,855.00
EAO: P 6,587,490.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect.) incl. ROW -
K1544+047 - K1548+320
Physical Target:
CW1: 8.544 Lane Km (Road Widening)
ROW: 36,973.078 sq.m.
Allocation:
TOTAL: P 188,214,000.00
CW1: P 170,097,655.00 (Road Widening)
ROW: P 11,528,855.00
EAO: P 6,587,490.00
March 28, 2018 FY 2018 GAA WIN8C02244 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Davao Or Side) incl. ROW -
K1522+404 - K1556+873
Physical Target:
CW1: 8.676 Lane Km (Construction of Concrete Road)
ROW: 34,714.286 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 125,585,100.00 (Construction of Concrete Road)
ROW: P 4,689,900.00
EAO: P 4,725,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Secondary Roads
Compostela-Cateel Rd (Davao Or Side) incl. ROW -
K1522+404 - K1556+873
Physical Target:
CW1: 8.933 Lane Km (Const. of Concrete Road)
ROW: 34,714.286 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 125,585,100.00 (Construction of Concrete Road)
ROW: P 4,689,900.00
EAO: P 4,725,000.00
March 28, 2018 FY 2018 GAA WIN8C02243 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1447+040 - K1450+134
Physical Target:
CW1: 6.160 Lane Km (Road Widening)
ROW: 41,888.00 sq.m.
Allocation:
TOTAL: P 294,076,000.00
CW1: P 206,583,340.00 (Road Widening)
ROW: P 77,200,000.00
EAO: P 10,292,660.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1446+000 - K1450+134
Physical Target:
CW1: 8.260 Lane Km (Road Widening)
ROW: 41,888.00 sq.m.
Allocation:
TOTAL: P 294,076,000.00
CW1: P 206,583,340.00 (Road Widening)
ROW: P 77,200,000.00
EAO: P 10,292,660.00