Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 20, 2022 2022 WIN2F05959 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 3rd District Engineering Office
UACS No.: 300105200775000
Project ID: P00655179LZ
AS PER GAA:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate City
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Allocation: Php 7,000,000.00

AS MODIFIED:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Estimated Cost: Php 7,000,000.00
April 20, 2022 FY 2021 GAA WIN2G02781 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300106200716000
Project ID : P00561579LZ

LOCAL PROGRAM

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects

FROM :

Construction of Jao-asan Flooc Control,
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Control Mitigation :
0.00 Lineal Meter (lm)
Allocation - Php 50.00 million

TO :

Construction of Jao-asan Flood Control
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
248.00 Lineal Meter (lm)
Allocation - Php 50.00 Million
April 20, 2022 FY 2021 GAA WIN2G02754 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116204208000
Project *ID : P00562469LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road ; 0 lane Km
Allocation - Php 50.00 Milliojn

TO :

Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,182 Square meters
Allocation - Php 50.00 Million
April 20, 2022 2022 WIN2F05946 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100872000
Project ID: P00605799LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0415+515 – K0316+265, K0416+760 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 – Road Widening – 4.605 Lane km.
Allocation: Php 115,120,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0416+836 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 - Road Widening – 2.9648 Lane km.
CW2 - Construction of Drainage Structure along Road – 2977.8 Lineal meters
ROW – ROW acquisition – 29648 Square Meters
Estimated Cost: Php 115,120,000.00
April 20, 2022 2022 WIN2F06007 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100870000
Project ID: P00606446LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0401+848
Physical Target: CW1 – Road Widening – 5.192 Lane km.
Allocation: Php 136,775,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0400+614.45
Physical Target: CW1 - Road Widening – 2.7369 Lane km.
CW2 - Construction of Road Slope Protection Structure – 3086.03 Lineal meters
CW3 – Construction of Drainage Structure along Road – 2706.98 Lineal Meters
ROW Acquisition – 27369 Square Meters
Estimated Cost: Php 136,775,000.00
April 20, 2022 2022 WIN2F05998 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100871000
Project ID: P00606447LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0415+515
Physical Target: CW1 – Road Widening – 4.17 Lane km.
Allocation: Php 104,250,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0414+385
Physical Target: CW1 - Road Widening – 1.924 Lane km.
CW2 - Construction of Rode Slope Protection Structure – 2311.07 Square Meters
CW3 – Construction of Drainage Structure along Roads – 1893.6 Lineal Meters
ROW – Row Acquisition - 19240 Square Meters
Estimated Cost: Php 104,250,000.00
April 20, 2022 2022 WIN2F06183 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310109100871000
Project ID: P00609355LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+000 – K0490+232
Physical Target: CW1 - Construction of Road Slope Protection Structure – 6111.111 Square Meter
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+640 – K0490+990
Physical Target: CW1 Construction of Road Slope Protection Structure – 5274.36 Square Meter
Estimated Cost: Php 110,000,000.00
April 20, 2022 2022 WIN2F05962 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 320101107580000
Project ID: P00620320LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+219.2 – Sta. 12+972 Right Side, Sta. 12+219.2 – Sta. 13+125 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Allocation: Php 181,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+260 – Sta. 12+308 Right Side, Sta. 11+792 – Sta. 12+848 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Estimated Cost: Php 181,000,000.00
April 20, 2022 2022 WIN2F06008 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 320101107581000
Project ID: P00620321LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+817.2 – Sta. 24+638 Left Side, Sta. 23+817.2 – Sta. 24+655 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Allocation: Php 180,849,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752 – Sta. 24+575.57 Left Side, Sta. 23+806.5 – Sta. 24+357.5 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Estimated Cost: Php 180,849,000.00
April 20, 2022 2022 WIN2F05947 FY 2022 GAA RA 11639 December 29, 2021 Region V Regional Office V
UACS No.: 300105200333000
Project ID: P00655008LZ
AS PER GAA:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase III)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Allocation: Php 75,000,000.00

AS MODIFIED:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase IV)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Estimated Cost: Php 75,000,000.00
April 20, 2022 2022 WIN2F06047 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00608292LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 3.291 Lane km.
CW2 – Construction of Drainage Structure along Road – 1650 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 4000 Square Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 2.356 Lane km.
CW2 - Construction of Drainage Structure along Road – 1400 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 1210.6 Square Meters

Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2F05997 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310205100577000
Project ID: P00608293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 5050 Square Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3563.84 Square Meters
Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2E02109 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310102100853000
Project ID: P00601289MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd (S00300MN) - K1461 + 099 - K1463 + 112, K1471 + 566 - K1473 + 506.44

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 11.933 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: P 8,167,686.25/Lane Km

TO:

Surigao-Davao Coastal Rd (S00300MN) - K1461+099 - K1463+112, K1463+112 - K1463+481, K1471+566 - K1473+506.44

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.670 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: P 7,692,580.90/Lane Km
April 20, 2022 2022 WIN2E02156 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310203100535000
Project ID: P00602516MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1246 + 400 - K1247 + 525, K1250 + 878 - K1252 + 631

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 5.699 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: 17,102,123.17/Lane Km

TO:

Butuan City-Malaybalay Rd - K1246 + 428 - K1247 + 000, K1250 + 878 - K1252 + 640

Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4.660 Lane Km
CW2- 1,577.10 Square meters

Allocation:
TOTAL: P 101,000,000
CW1: P 79,919,756
CW2: P 17,545,244
EAO: P 3,535,000

Unit Cost:
CW1: P 17,150,162.23/Lane Km
CW2: P 11,125.00/Square meters
April 20, 2022 2022 WIN2E02168 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300214100093000
Project ID: P00633704MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248 + 550 - K1250 + 098, K1250 + 098 - K1251 + 000, K1251 + 542 - K1253 + 264, K1265 + 605 - K1266 + 622, K1266 + 622 - K1267 + 569, K1268 + 003 - K1270 + 110, K1273 + 043 - K1273 + 892, K1274 + 384 - K1276 + 000, K1276 + 000 - K1276 + 672, K1276 + 672 - K1276 + 994, K1277 + 678 - K1278 + 073, K1278 + 696 - K1278 + 862

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 7.649 Lane Km

Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00

Unit Cost:
CW1: P 17,662,440/Lane Km

TO:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248+550 - K1250+098, K1250+098 - K1251+000, K1251+542 - K1253+264, K1265+605 - K1266+622, K1266+622 - K1267+569, K1268+003 - K1268+613.50

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 17.847 Lane Km

Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00

Unit Cost:
CW1: P 7,569,899.70/Lane Km
April 20, 2022 2022 WIN2E02167 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310101100595000
Project ID: P00601290MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 542.18

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.533 Lane Km

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 8,084,656.51/Lane Km

TO:

Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 815.55

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 13.850 Lane Km

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 7,315,884.48/Lane Km
April 19, 2022 2022 WIN2F06099 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 1st Engineering Office
UACS No.: 300217100033000
Project ID: P00636994LZ
AS PER GAA:
CSSP : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Polangui, Albay
Physical Target: CW1 - Construction of Concrete Road – 10.03 Lane km.
Allocation: Php 99,000.00

AS MODIFIED:
OO1 : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Bacacay, Albay
Physical Target: CW1 - Reconstruction of Concrete Pavement – 10.03 Lane Km
Allocation: Php 99,000.00

Estimated Cost: Php 20,057,000.00
April 19, 2022 2022 WIN2F06160 SR2022-02-000858 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0315 + 736 - K0315 + 918;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0315 + 693 - K0315 + 930;
Physical Target: 6,188.000 Square meters;
Allocation: Php 150,000,000.000

April 19, 2022 2022 WIN2F06050 SR2022-02-001173 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0338 + 700 - K0338 + 900;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000

To: Gov. Bado Dangwa National Rd - K0338 + 753 - K0338 + 914;
Physical Target: 6,124.700 Square meters;
Allocation: Php 150,000,000.000
April 19, 2022 2022 WIN2F06011 SR2022-02-001178 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0339 + 334 - K0339 + 500;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000

To: Gov. Bado Dangwa National Rd - K0339 + 323 - K0339 + 548;
Physical Target: 6,247.200 Square meters;
Allocation: Php 150,000,000.000

April 19, 2022 2022 WIN2F06018 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310104100408000
Project ID: P00603937LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0533+000 – K0533+600
Physical Target: CW1 – Reconstruction to Concrete Pavement – 1.2 Lane km.
Allocation: Php 20,057,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0527+405 – K0527+647, K0532+624 – K0532+880, K0533+000 – K0533+600
Physical Target: CW1 - Reconstruction to Concrete Pavement – 2.196 Lane Km
Allocation: Php 20,057,000.00
April 19, 2022 2022 WIN2F06079 SR2022-02-000899 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 150;
Physical Target: 7,200.000 Square meters;
Allocation: Php 60,000,000.000

To: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 070;
Physical Target: 2,280.000 Square meters;
Allocation: Php 60,000,000.000

April 19, 2022 2022 WIN2F06018 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310104100353000
Project ID: P00603938LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0536+000 – K0537+840
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.774 Lane km.
Allocation: Php 63,079,235.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0527+647 – K0528+460, K0530+000 – K0532+000
Physical Target: CW1 - Reconstruction to Concrete Pavement – 5.626 Lane km.
Estimated Cost: Php 63,079,235.00
April 19, 2022 2022 WIN2F06127 SR2022-03-006711 March 21, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0329 + 394 - K0330 + 600, K0330 + 850 - K0336 + 400;
Physical Target: 7.538 Lane Km;
Allocation: Php 100,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0312 + 600 - K0320 + 600;
Physical Target: 15.860 Lane Km;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06188 SR2022-02-001910 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167;
Physical Target: 15.077 Lane Km;
Allocation: Php 200,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167, K0319 + (-840) - K0320 + 100;
Physical Target: 23.028 Lane Km;
Allocation: Php 200,000,000.000

April 19, 2022 2022 WIN2F06222 SR2022-03-007782 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000

To: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000

April 19, 2022 2022 WIN2F06184 SR2022-03-007619 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06210 SR2022-03-007623 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 3,055.560 Square meters;
Allocation: Php 55,000,000.000

To: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 1,830.500 Square meters;
Allocation: Php 55,000,000.000

April 19, 2022 2022 WIN2F06211 SR2022-03-007625 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 3,404.000 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06155 SR2022-03-007628 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 3,404.720 Square meters;
Allocation: Php 100,000,000.000


April 19, 2022 2022 WIN2F06216 SR2022-03-007630 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0451 + 450 - K0451 + 600;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000


April 19, 2022 2022 WIN2F06098 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310111100431000
Project ID: P00604133LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607
Physical Target: CW1 – Construction of Drainage Structure along Road – 3014 Lineal Meter.
Allocation: Php 50,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607, K0566+050 – K0566+280

Physical Target: CW1 - Construction of Drainage Structure along Road – 1699 Lineal Meter.
Estimated Cost: Php 50,000,000.00
April 19, 2022 2022 WIN2F05990 FY 2022 GAA RA 11639 December 30, 2022 Region V Camarines Norte District Engineering Office
UACS No.: 300221101271000
Project ID: P00640381LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbitayan Maliit, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Allocation: Php 25,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbirayan Munti, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Estimated Cost: Php 25,000,000.00
April 19, 2022 2022 WIN2F06078 SR2022-03-007635 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06187 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310102100958000
Project ID: P00603952LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0468+310
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.258 Lane km.
Allocation: Php 40,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0467+476.20
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 4.6504 Lane km.
Estimated Cost: Php 40,000,000.00
April 19, 2022 2022 WIN2F06173 SR2022-03-007638 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06165 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310103100964000
Project ID: P00603955LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0449+000 – K0451+000
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 4.198 Lane km.
Allocation: Php 27,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0448+986.90 – K0450+714.50
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.4892 Lane km.
Estimated Cost: Php 27,000,000.00
April 19, 2022 2022 WIN2F05950 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310112100320000
Project ID: P00604140LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0442+690
Physical Target: CW1 – Construction of Drainage Structure along Road – 3370 Lineal Meters.
Allocation: Php 37,657,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0441+748
Physical Target: CW1 - Construction of Drainage Structure along Road – 1496 Lineal Meters.
Estimated Cost: Php 37,657,000.00
April 19, 2022 2022 WIN2F06147 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310209100368000
Project ID: P00606415LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-235) – K0438+600
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 3340 Square Meters.
Allocation: Php 25,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-015) – K0438+583
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 2392 Square Meters.
Estimated Cost: Php 25,000,000.00
April 19, 2022 2022 WIN2F06175 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 264.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 167.600 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06129 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 430.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 172.400 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06088 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 612.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F05987 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310103100807000
Project ID: P00610156LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0474+679
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 11.732 Lane km.
Allocation: Php 98,950,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0473+615
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 8.7289 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 98,950,000.00
April 19, 2022 2022 WIN2F06174 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 458.310 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06093 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 320101107527000
Project ID: P00621520LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Fundado (Fundado Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 391 Lineal Meters
Allocation: Php 70,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Barobaybay (Barobaybay Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 391 Lineal Meters
Estimated Cost: Php 70,000,000.00
April 19, 2022 2022 WIN2F06219 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 414.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F05973 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 300225100473000
Project ID: P00632964LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose to Caditaan Creek, Barangay Pawili, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Allocation: Php 5,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose Creek, Barangay San Jose, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Estimated Cost: Php 5,000,000.00
April 19, 2022 2022 WIN2F06161 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 470.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06162 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 300225100476000
Project ID: P00640581LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcay, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcang, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Estimated Cost: Php 30,000,000.00
April 19, 2022 2022 WIN2F06182 GAA 2022 January 2, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 810 - Sta. 1 + 310, Calanasan, Apayao;
Physical Target: 500.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Sta. Filomena Flood Control Structure, Sta. 0+ 440 - Sta. 1+ 400, Calanasan, Apayao;
Physical Target: 960.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06077 GAA 2022 January 2, 2022 Cordillera Administrative Region Baguio City District Engineering Office
From: Sto Tomas-Mt Cabuyo Rd – K0252 + 291 – K0253 + 049;
Physical Target: 491.000 Lineal meters;
Allocation: Php 25,000,000.000

To: Sto Tomas-Mt Cabuyo Rd – K0252 + 160 – K0253 + 049;
Physical Target: 622.000 Lineal meters;
Allocation: Php 25,000,000.000

April 19, 2022 2022 WIN2F06070 SARO-BMB-A-22-0002928 March 21, 2022 Cordillera Administrative Region Baguio City District Engineering Office
From: Construction of Road located at Purok 4, Monticello, Barangay Camp 7,Baguio City;
Physical Target: 0.500 Lane Km;
Allocation: Php 5,000,000.000

To: Construction of Road located at Purok 2, Monticello, Barangay Camp 7;
Physical Target: 0.275 Lane Km;
Allocation: Php 5,000,000.000

April 19, 2022 2022 WIN2F06012 SR2022-03-007744 March 23, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Shilan-Beckel Rd - K0261+892 - K0262+890, K0264+908 - K0265+943;
Physical Target: 3.878 Lane Km;
Allocation: Php 66,000,000.000

To: Shilan-Beckel Rd - K0262+056 - K0262+284.5, K0262+355.5 - K0262+780, K0264+925 - K0265+943;
Physical Target: 3.326 Lane Km;
Allocation: Php 66,000,000.000


April 19, 2022 2022 WIN2F06051 SR2022-03-007745 March 23, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0261+000;
Physical Target: 3.520 Lane Km;
Allocation: Php 93,400,000.000

To: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0260+690, K0260+735 - K0261+000;
Physical Target: 3.430 Lane Km;
Allocation: Php 93,400,000.000

April 19, 2022 2022 WIN2F06132 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Baguio-Bauang Rd - K0284+500 - K0284+507, K0290+410 - K0290+420, K0291+170 - K0291+270;
Physical Target: 766.800 Square Meters;
Allocation: Php 14,100,000.000

To: Baguio-Bauang Rd - K0291+164 - K0291+290;
Physical Target: 1,044.000 Square Meters;
Allocation: Php 14,100,000.000

April 19, 2022 2022 WIN2F06208 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Gov. Bado Dangwa National Rd - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0315+618 - K0315+668, K0316+503 - K0316+528;
Physical Target: 1,480.000 Square meters;
Allocation: Php 35,000,000.000

To: Gov. Bado Dangwa National Rd - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0316+175 - K0316+207, K0316+503 - K0316+528, K0317+693 - K0317+723;
Physical Target: 1185 Square meters;
Allocation: Php 35,000,000.000

April 19, 2022 2022 WIN2F06149 SR2022-03-007590 March 23, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Cong. Andres Acop Cosalan Rd - K0343+400 - K0343+430, K0345+200 - K0345+230,K0348+100 - K0348+150, K0348+740 - K0348+769, K0348+769 - K0348+880, K0349+960 - K0350+000, K0351+300 - K0351+400, K0351+870 - K0351+900, K0352+400 - K0352+500, K0356+396 - K0356+513, K0356+456 - K0356+496;
Physical Target: 6,782.000 Square meters; Allocation: Php 66,120,000.000

To: Cong. Andres Acop Cosalan Rd - K0343+400 - K0343+429, K0345+199 - K0345+218, K0348+738 - K0348+801, K0356+396 - K0356+542;
Physical Target: 3900.9 Square meters;
Allocation: Php 66,120,000.000

April 19, 2022 2022 WIN2F06128 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Balbalan-Pinukpuk Rd - K0499 + 2929 - K0499 + 3171, K0509 + 051 - K0509 + 496, K0515 + 270 - K0515 + 400 ;
Physical Target: 1.634 Lane Km;
Allocation: Php 14,011,000.000

To: Balbalan-Pinukpuk Rd - K0499 + 3215 - K0499 + 3294, K0509 + 051 - K0509 + 496, K0515 + 270 - K0515 + 400 ;
Physical Target: 1.208 Lane Km;
Allocation: Php 14,011,000.000

April 19, 2022 2022 WIN2E02135 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310201101057000
Project ID: P00602490MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1330 + 669 - K1330 + 802, K1330 + 984 - K1331 + 075, K1331 + 640 - K1331 + 759, K1331 + 774 - K1331 + 845, K1333 + 935 - K1334 + 135, K1334 + 157 - K1334 + 320

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 1.554 Lane Km

Allocation:
TOTAL: P 31,080,000
CW1: P 30,458,400
EAO: P 621,600

Unit Cost:
CW1: P 19,600,000/Lane Km

TO:

Daang Maharlika (Agusan-Davao Section) - K1330+669 – K1330+802, K1330+989 – K1331+075, K1331+640 – K1331+754, K1331+779 – K1331+845, K1333+935 – K1334+058, K1334+237 – K1334+320, K1341+230 – K1341+536

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 1.736 Lane Km

Allocation:
TOTAL: P 31,080,000
CW1: P 30,458,400
EAO: P 621,600

Unit Cost:
CW1: P 17,545,161.29/Lane Km
April 19, 2022 2022 WIN2F06220 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Bulanao-Paracelis Rd - K0504 + 200 - K0504 + 439, K0513 + 230 - K0513 + 321; Physical Target: 0.660 Lane Km;
Allocation: Php 5,660,000.000

To: Bulanao-Paracelis Rd - K0504 + 236 - K0504 + 540, K0513 + 230 - K0513 + 321;
Physical Target: 0.759 Lane Km;
Allocation: Php 5,660,000.000

April 19, 2022 2022 WIN2F06212 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 865 - K0472 + 907, K0473 + 999 - K0474 + 066, K0476 + 1120 - K0476 + 1145, K0480 + 840 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 608 - K0487 + 641 ;
Physical Target: 6,732.000 Square meters;
Allocation: Php 44,500,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0472 + 262 - K0472 + 307, K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 726 - K0472 + 752, K0472 + 860 - K0472 + 907, K0476 + 1114 - K0476 + 1145, K0477 + 297 - K0477 + 329, K0480 + 839 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 501 - K0487 + 547, K0487 + 608 - K0487 + 641, K0492 + 276 - K0492 + 306, K0493 + 741 - K0493 + 830;
Physical Target: 3,728.000 Square meters;
Allocation: Php 44,500,000.000

April 19, 2022 2022 WIN2F06213 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 1048 - K0528 + 1064, K0531 + 483 - K0531 + 515, K0532 + 696 - K0532 + 714 ;
Physical Target: 508.000 Square meters;
Allocation: Php 6,500,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 1048 - K0528 + 1064, K0531 + 474 - K0531 + 515, K0532 + 691 - K0532 + 714 ;
Physical Target: 562.000 Square meters;
Allocation: Php 6,500,000.000

April 19, 2022 2022 WIN2F05907 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 310102100959000
Project ID: P00603957LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-467) – K0499+073
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 3.162 Lane km.
Allocation: Php 20,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-467) – K0499+077
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.17 Lane km.
Estimated Cost: Php 20,000,000.00
April 19, 2022 2022 WIN2F06218 SR2022-02-001829 DTD February 4, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan Pinukpuk-Abbut - K0488 + 945 - K0498 + 469 ;
Physical Target: 6.524 Km;
Allocation: Php 97,503,000.000

To: Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan Pinukpuk-Abbut - K0488 + 945 - K0495 + 358 (Cagaluan-Calanan Section), K0496 + (-700) - K0498 + 469 (Calanan-Pinukpuk Section) ;
Physical Target: 9.656 Km;
Allocation: Php 97,503,000.000

April 19, 2022 2022 WIN2F06081 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 310209100369000
Project ID: P00606417LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Goa-Digdigon-Sn Isidro Road- K0497+561 – K0498+648
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 4412 Square Meters.
Allocation: Php 13,893,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Goa-Digdigon-Sn Isidro Road- K0494+778 – K0494+904, K0500+278 – K0500+407, K0502+461 – K0502+1000, K0503+024 – K0503+073
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 3372 Square Meters.
Estimated Cost: Php 13,893,000.00
April 19, 2022 2022 WIN2F05943 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0477 + 000 - K0477 + 857;
Physical Target: 1.714 Lane Km;
Allocation: Php 8,042,000.000

To: Kalinga-Abra Rd - K0477 + 202 - K0477 + 857;
Physical Target: 1.310 Lane Km;
Allocation: Php 8,042,000.000

April 19, 2022 2022 WIN2F05944 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0446 + 684 - K0447 + 255;
Physical Target: 1.128 Lane Km;
Allocation: Php 5,797,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0446 + 684 - K0447 + 192;
Physical Target: 1.002 Lane Km;
Allocation: Php 5,797,000.000

April 19, 2022 2022 WIN2F05985 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 310202101142000
Project ID: P00606420LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-817) – K0498+(-802)
Physical Target: CW1 – Road Widening – 0.03 Lane km.
Allocation: Php 15,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-817) – K0498+(-547)
Physical Target: CW1 - Road Widening – 0.54 Lane km
Estimated Cost: Php 15,000,000.00
April 19, 2022 2022 WIN2F06157 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 426 - K0476 + 655, K0476 + 878 - K0476 + 1440, K0476 + 1675 - K0476 + 2879;
Physical Target: 1.995 Lane Km;
Allocation: Php 44,918,000.000

To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 426 - K0476 + 655, K0476 + 878 - K0476 + 1440, K0476 + 1675 - K0476 + 1881.5;
Physical Target: 1.995 Lane Km;
Allocation: Php 44,918,000.000

April 19, 2022 2022 WIN2F05967 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 320101107575000
Project ID: P00620313LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Improvement of Flood Control Structure along Balangao River, Sta. 0+532 – Sta. 0+865 (upstream), Sta. 0+616 – Sta. 0+984 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1214 Lineal Meters
Allocation: Php 85,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Improvement of Flood Control Structure along Balangao River, Sta. 0+532 – Sta. 0+865 (upstream), Sta. 0+616 – Sta. 0+890 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1214 Lineal Meters
Estimated Cost: Php 85,000,000.00
April 19, 2022 2022 WIN2F06215 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0465 + 124 - K0465 + 225, K0471 + 000 - K0471 + 120, K0471 + 152 - K0471 + 216, K0474 + 1000 - K0474 + 1043, K0479 + 508 - K0479 + 544, K0479 + 566 - K0479 + 588, K0480 + 365 - K0480 + 423, K0480 + 786 - K0480 + 842, K0499 + 915 - K0499 + 981, K0503 + 1198 - K0503 + 1266, K0503 + 1412 - K0503 + 1448, K0506 + 830 - K0506 + 850, K0509 + 420 - K0509 + 452, K0516 + 550 - K0516 + 570, K0517 + 295 - K0517 + 309, K0523 + 277 - K0523 + 322;
Physical Target: 2,324.480 Square Meters;
Allocation: Php 41,840,000.000

To: Kalinga-Abra Rd - K0464+ 622 - K0464 + 677, K0465 + 124 - K0465 + 225, K0471 + 000 - K0471 + 120, K0471 + 152 - K0471 + 216, K0474 + 1000 - K0474 + 1043, K0479 + 508 - K0479 + 544, K0479 + 566 - K0479 + 588, K0480 + 786 - K0480 + 842, K0503 + 1198 - K0503 + 1266, K0503 + 1412 - K0503 + 1448, K0506 + 830 - K0506 + 850, K0509 + 420 - K0509 + 452, K0516 + 550 - K0516 + 570, K0517 + 295 - K0517 + 309, K0523 + 277 - K0523 + 322;
Physical Target: 3,520.000 Square Meters;
Allocation: Php 41,840,000.000

April 19, 2022 2022 WIN2F05966 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 320101107577000
Project ID: P00620315LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Rangas River, Sta. 0+053 – Sta. 1+903.5 (downstream-Left Side), Sta. 0+034 – Sta. 0+903.5 (downstream-Right Side), Matacla, Goa, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1720 Lineal Meters.
Allocation: Php 81,004,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Rangas River, Sta. 0+053 – Sta. 0+903.5 (downstream-Left Side), Sta. 0+034 – Sta. 0+903.5 (downstream-Right Side), Matacla, Goa, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1720 Lineal Meters.

Estimated Cost: Php 81,004,000.00
April 19, 2022 2022 WIN2F06096 SR20222-02-001855 February 4, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K0522 + 389 - K0526 + 511, Balbalan, Kalinga;
Physical Target: 6.356 Km;
Allocation: Php 95,000,000.000

To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K0479 + 490 - K0526 + 511, Balbalan, Kalinga;
Physical Target: 15.143 Km;
Allocation: Php 95,000,000.000

April 19, 2022 2022 WIN2F05969 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 320101107578000
Project ID: P00620316LZ
AS PER GAA:
OO2 : Protect Lives and Properties - Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Sagpon River, Sta. 0+555 – Sta. 1+542.5 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 2175.50 Lineal Meters.
Allocation: Php 85,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties - Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Sagpon River, Sta. 0+480 – Sta. 0+784.50 bothside ( upstream), Sta. 0+525 – Sta. 0+707 (L/S), Sta. 0+743 – Sta. 0+799 (L/S), Sta. 0+555 – Sta. 0+643 (R/S), Sta. 0+682.50 – Sta. 0+799 (R/S), Sta. 2+055 – Sta. 2+617 bothside (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 2175.50 Lineal Meters.
Estimated Cost: Php 85,000,000.00
April 19, 2022 2022 WIN2F06123 SR20222-02-001860 February 4, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0447 + 000 - K0469 + 916;
Physical Target: 6.423 Km;
Allocation: Php 96,000,000.000

To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0435 + 405 - K0469 + 898;
Physical Target: 14.070 Km;
Allocation: Php 96,000,000.000
April 19, 2022 2022 WIN2F06114 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd - K0479 + 624 - K0487 + 144;
Physical Target: 3.345 Km;
Allocation: Php 50,000,000.000

To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd - K0480 + (-376) - K0494 + 644;
Physical Target: 11.337 Km;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06190 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 300218100030000
Project ID: P00630916LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Coastal Roads/ Causeway of Environmental Protection/ Conservation – Construction of Bypass/ Diversion Road along Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.144 Lane km.
Allocation: Php 75,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Coastal Roads/ Causeway of Environmental Protection/ Conservation – Construction of Bypass/ Diversion Road along Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.114 Lane km.
Estimated Cost: Php 75,000,000.00
April 19, 2022 2022 WIN2F06095 GAA 2022 January 2, 2022 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459 + 917- K0469+483, Lubuagan and Pasil, Kalinga;
Physical Target: 3.345 Km;
Allocation: Php 50,000,000.000

To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459 +(-610) - K0472+120, Lubuagan and Pasil, Kalinga;
Physical Target: 7.354 Km;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2E02132 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 320102105124000
Project ID: P00620300MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 - Sta. 0+295.00, Loreto, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 115 Lineal meters

Allocation:
TOTAL: P 34,455,000
CW1: P 33,765,900
EAO: P 689,100

Unit Cost:
CW1: P 293,616.52/ Lineal meters

TO:

Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 – Sta. 0+210.00, Loreto, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 115 Lineal meters

Allocation:
TOTAL: P 34,455,000
CW1: P 33,765,900
EAO: P 689,100

Unit Cost:
CW1: P 293,616.52/ Lineal meters
April 19, 2022 2022 WIN2F06083 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 4th District Engineering Office
UACS No.: 300219101007000
Project ID: P00631424LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 756 Lineal Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 214 Lineal Meters.
Estimated Cost: Php 30,000,000.00
April 19, 2022 2022 WIN2F06097 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 423 - K0472 + 495;
Physical Target: 900.000 Square Meters;
Allocation: Php 9,890,000.000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 350 - K0472 + 495;
Physical Target: 585.000 Square Meters;
Allocation: Php 9,890,000.000

April 19, 2022 2022 WIN2F06159 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis- Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1830;
Physical Target: 1.000 Lane Km;
Allocation: Php 22,000,000.000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1340;
Physical Target: 1.020 Lane Km;
Allocation: Php 22,000,000.000

April 19, 2022 2022 WIN2E02131 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310104100452000
Project ID: P00601283MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) (S00391MN) - K1274 + 800 - K1275 + 157

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.444 Lane Km

Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000

Unit Cost:
CW1: P 10,180,055.40/Lane Km

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) (S00391MN) - K1274 + 800 - K1275 + 480

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.368 Lane Km

Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000

Unit Cost:
CW1: P 10,745,614.04/Lane Km
April 19, 2022 2022 WIN2F06158 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0469 + 420 - K0469 + 520, K0478 + 390 - K0478 + 440, K0479 + 540 - K0479 + 580, K0479 + 620 - K0479 + 660;
Physical Target: 2575.200 Square Meters;
Allocation: Php 34,316,000.000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0469 + 420 - K0469 + 520, K0470 + 000 - K0470 + 040, K0471 + 000 - K0471 + 070, K0478 + 390 - K0478 + 440, K0479 + 540 - K0479 + 580, K0479 + 620 - K0479 + 665;
Physical Target: 2,210.000 Square Meters;
Allocation: Php 34,316,000.000


April 19, 2022 2022 WIN2F06221 SARO-BMB-A-22-0002944 RCUD March 11, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0442 + 058 - K0442 + 072, K0443 + 190 - K0443 + 207, K0443 + 425 - K0443 + 451, K0445 + 105 - K0445 + 135, K0446 + 055 - K0446 + 090, K0446 + 307 - K0446 + 335, K0446 + 390 - K0446 + 415, K0446 + 438 - K0446 + 450, K0446 + 490 - K0446 + 528, K0446 + 545 - K0446 + 560, K0447 + 040 - K0447 + 057, K0447 + 382 - K0447 + 417;
Physical Target: 2,581.000 Square Meters;
Allocation: Php 26,098,000.000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0442 + 058 - K0442 + 072, K0443 + 190 - K0443 + 207, K0443 + 425 - K0443 + 451, K0445 + 105 - K0445 + 135, K0446 + 055 - K0446 + 090, K0446 + 307 - K0446 + 335, K0446 + 390 - K0446 + 415, K0446 + 438 - K0446 + 450, K0446 + 490 - K0446 + 528, K0446 + 545 - K0446 + 560, K0447 + 040 - K0447 + 057, K0447 + 382 - K0447 + 417, K0453 + 883 – K0454 + 000;
Physical Target: 2,530.000 Square Meters;
Allocation: Php 26,098,000.000

April 19, 2022 2022 WIN2F06180 SARO-BMB-A-22-0002944 RCUD March 11, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Drainage System, Sta. 134 + 009 - Sta. 134 + 509, Butac, Natonin, Mountain Province;
Physical Target: 839.000 Lineal Meters;
Allocation: Php 35,000,000.000

To: Construction of Drainage System, Sta. 134 + 009 - Sta. 134 + 607, Butac, Natonin, Mountain Province;
Physical Target: 839.000 Lineal Meters;
Allocation: Php 35,000,000.000

April 19, 2022 2022 WIN2F06111 SR2022-03-007729 March 23, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Banaue-Hungduan-Benguet Bdry Rd - K0391 + 125 - K0391 + 249, K0383 + 010 - K0383 + 080, K0392 +(-047) - K0392 + (-017) , K0392 + 950 - K0392+974, K0393 + 000 - K0393 + 030;
Physical Target: 6,794.000 Square Meters;
Allocation: Php 67,940,000.000

To: Banaue-Hungduan-Benguet Bdry Rd - K0358+674 - K0358+704, K0375+190 - K0375+240, K0381+702 - K0381+717, K0383+010 - K0383+100, K0386+469 - K0386+492, K0391+125 - K0391+249, K0392+609 - K0392+650, K0392+950 - K0392+982, K0393+000 - K0393+040;
Physical Target: 4,110.820 Square Meters;
Allocation: Php 67,940,000.000

April 19, 2022 2022 WIN2F06104 SARO-BMB-A-22-0002937 March 21, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0304 + 477 - K0304 + 498, K0305 + 800 - K0305 + 900, K0322 + 687 - K0322 + 707, K0332 + 199 - K0332 + 221 , K0332 + 305 - K0332 + 328;
Physical Target: 3,424.800 Square Meters;
Allocation: Php 45,000,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0304 + 477 - K0304 + 498, K0305 + 800 -K0305 + 900, K0320+517 - K0320+545, K0320+910 - K0320+935, K0322 + 687- K0322 + 707, K0332 + 199 - K0332 + 221, K0332+ 305 - K0332 + 328;
Physical Target: 2,855.560 Square Meters;
Allocation: Php 45,000,000.000

April 19, 2022 2022 WIN2F06131 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0298 + 450 - K0298 + 884, K0323 + 300 - K0323 + 357, K0325 + 769 - K0325 + 919, K0326 + 000 - K0326 + 104, K0326 + 169 - K0326 + 419, K0326 + 552 - K0326 + 765, K0326 + 812 - K0326 + 930, K0326 + 970 - K0327 + 092, K0327 + 167 - K0327 + 178, K0327 + 306 - K0327 + 428, K0327 + 465 - K0327 + 720, K0327 + 764 - K0327 + 835, K0327 + 927 - K0328 + 100, K0328 + 385 - K0328 + 963, K0330 + 963 - K0331 + 490;
Physical Target: 7,020.500 Square Meters;
Allocation: Php 20,000,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0298 + 450 - K0298 + 884, K0323 + 300 - K0323 + 357, K0325 + 769 - K0325 + 919, K0326 + 000 - K0326 + 104, K0326 + 169 - K0326 + 419, K0326 + 552 - K0326 + 765, K0326 + 812 - K0326 + 930, K0326 + 970 - K0327 + 092, K0327 + 167 - K0327 + 178, K0327 + 306 - K0327 + 428, K0327 + 465 - K0327 + 720, K0327 + 764 - K0327 + 835, K0327 + 927 - K0328 + 100, K0328 + 385 - K0328 + 963, K0330 + 963 - K0331 + 490, K0331 + 613 - K0332 + 231, K0332 + 231 - K0332 + 516, K0332 + 516 - K0332 + 642, K0332 + 642 - K0332 + 943, K0332 + 943-K0333 + 315, K0333 + 315 - K0334 + 000 ;
Physical Target: 6,943.400 Square Meters;
Allocation: Php 20,000,000.000

April 19, 2022 2022 WIN2F06103 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Kiangan-Tinoc-Buguias Rd - K0315+(-147) - K0315 647, K0315+717 - K0316+433, K0316+495 - K0316+679, K0316+722 - K0317+426, K0317+455 - K0317+566, K0317+617 - K0318+191, K0320+027 - K0320+520, K0320+537 - K0321+265, K0321+292 - K0321+310, K0321+311 - K0321+343;
Physical Target: 8,860.500 Square Meters;
Allocation: Php 25,253,000.000

To: Kiangan-Tinoc-Buguias Rd - K0315+ (-147)-K0315+647, K0315+717-K0316+433, K0316+495-K0316+679, K0316+722-K0317+426, K0317+455-K0317+566, K0317+617-K0318+191, K0320+027-K0320+228 ;
Physical Target: 5,899.570 Square Meters;
Allocation: Php 25,253,000.000


April 19, 2022 FY 2022 WIN2C03517 UACS No. 300214100098000 March 7, 2022 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 300214100098000
Project ID.: P00635858LZ
Special Road Fund – Motor Vehicle User Charge (MVUC)
Preventive Maintenance along Zapote-Alabang Y-Length – K0023+(-615) – K0023+(-417.78)
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking = 0.942 Lane Km
Unit Cost = P 12,873.16/lane km
Allocation = P 12,126,520.00
EAO = P 247,480
Total = P 12,374,000.00

As Modified
Special Road Fund – Motor Vehicle User Charge (MVUC)
Preventive Maintenance along Zapote-Alabang - K0023+(-615) – K0023+(-426.53)
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking = 0.942 Lane Km
Unit Cost = P 12,873.16/lane km
Allocation = P 12,126,520.00
EAO = P 247,480
Total = P 12,374,000.00
WIN2C03517
April 19, 2022 FY 2022 WIN2C03518 UACS No. 300214100097000 March 7, 2022 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 300214100097000
Project ID.: P00635857LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Quirino Avenue – K0012+(-479) – K0013+230
Physical Target: CW1 Preventive Maintenance of Road: Concrete Reblocking = 3.690 lane km
Unit Cost = P 11,126,851/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000

As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Quirino Avenue – K0012+(-479) – K0013+(-242)
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay = 3.690 lane km
Unit Cost = P 11,126,851/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000
WIN2C03518
April 18, 2022 2022 WIN2C03470 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development-Off-Carriageway Improvement - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1130 + 903 - K1131 + 458

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Paving P 8.82098 M
of Shoulders: 1,501.920 Square meters

EAO P 0.18002 M

Total P 9.001 M

AS MODIFIED:

Palompon-Isabel-Merida-Omoc Road, K1130+903 – K1131+854


Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Paving P 8.82098 M
of Shoulders: 2,824.75 Square meters

EAO P 0.18002 M

Total P 9.001 M
April 18, 2022 2022 WIN2C03488 GAA FY 2022 January 18, 2022 Region VIII Leyte 4th District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1026 + 000 - K1028 + 277

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 29.400 M
Asphalt Overlay: 3.002 Lane Km

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1026 + 000 - K1027+ 671

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 29.400 M
Asphalt Overlay: 3.002 Lane Km

EAO P 0.600 M

Total P 30.00 M
April 18, 2022 2022 WIN2C03473 SARO-BMB-A-22-0002731 March 17, 2022 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:

Daang Maharlika (San Isidro-San Juanico Bridge), K0620+200-K0860+450

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 29.400 M
: 1.827 Lane Km

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (San Isidro-San Juanico Br)-K0860+200-K0860+450

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 29.400 M
: 1.00 Lane Km

EAO P 0.600 M

Total P 30.00 M
April 18, 2022 2022 WIN2C03475 SARO-BMB-A-22-0002731 March 17, 2022 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0910 + 000 - K0910 + 464, K0910 + 499 - K0911 + 000, K0923 + 000 - K0923 + 205, K0924 + 791 - K0925 + 000, K0926 + 000 - K0926 + 313

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.352 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0909 + 000 - K0910 + 100, K0910 + 800 - K0911 + 000, K0911 + 830 - K0912 + 193

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.352 Lane Km

EAO P 1.00 M

Total P 50.00 M
April 18, 2022 2022 WIN2C03478 SARO-BMB-A-22-0002731 March 17, 2022 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0933 + 000 - K0933 + 169, K0937 + 900 - K0938 + 000, K0938 + 000 - K0938 + 429, K0940 + 000 - K0941 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.302 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0912+193 - K0912 + 530, K0916+900 - K0917+000, K0917+500 - K0917 + 743, K0917+757 – K0917+800, K0918+400-K0918+550, K0920+1360,K0920+1420,K0920+1550-K0920+1800,K0921+050-K0921+200,K0924+791-K0925+032,K0926+000-K0926+093

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.302 Lane Km

EAO P 1.00 M

Total P 50.00 M
April 18, 2022 2022 WIN2C03466 SARO-BMB-A-22-0002731 March 17, 2022 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0947 + 211 - K0948 + 000, K0948 + 000 - K0949 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.280 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd – K0927+700-K0927+734, K0927+758-K0928+524, K0930+800-K0931+100, K0933+000-K0933+175, K0941+400-K0941+560, K0948+210-K0948+307, K0948+700-K0948+900

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.280 Lane Km

EAO P 1.00 M

Total P 50.00 M
April 18, 2022 2022 WIN2C03499 GAA FY 2022 January 3, 2022 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Poblacion-Barangay Cabacungan Rd - K0699 + 176 - K0699 + 188, K0700 + 615 - K0700 + 680, K0704 + 750 - K0704 + 890

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 7.73416 M
0.434 Lane Km

EAO P 0.15784 M

Total P 7.892 M

AS MODIFIED:

Poblacion-Barangay Cabacungan Rd - K0699 + 176 - K0699 + 188, K0700 + 615 - K0700 + 680, K0704 + 750 - K0704 + 890

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 4.05822757 M
0.1263 Lane Km

CW2-Road Widening: 0.146 Lane Km P 3.67593243 M

EAO P 0.15784 M

Total P 7.892 M
April 18, 2022 2022 WIN2F05961 FY 2022 GAA November 30, 2021 Region III Nueva Ecija 2nd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Repair/Rehabilitation/Improvement along Daang Maharlika (LZ) - K0104+171 - K0104+252.60, K0104+313.70 - K0104+322.80, K0104+446.90 -K0104+491.90, K0104+653 - K0104+671.50, K0104+752.70 - K0104+819.70, K0104+909.27 - K0104+1045, K0105+000 - K0105+319.40