April 20, 2022 |
2022 |
WIN2F05959 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 3rd District Engineering Office |
UACS No.: 300105200775000
Project ID: P00655179LZ
AS PER GAA:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate City
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Allocation: Php 7,000,000.00
AS MODIFIED:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Estimated Cost: Php 7,000,000.00
|
April 20, 2022 |
FY 2021 GAA |
WIN2G02781 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200716000
Project ID : P00561579LZ
LOCAL PROGRAM
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Jao-asan Flooc Control,
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Control Mitigation :
0.00 Lineal Meter (lm)
Allocation - Php 50.00 million
TO :
Construction of Jao-asan Flood Control
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
248.00 Lineal Meter (lm)
Allocation - Php 50.00 Million |
April 20, 2022 |
FY 2021 GAA |
WIN2G02754 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204208000
Project *ID : P00562469LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road ; 0 lane Km
Allocation - Php 50.00 Milliojn
TO :
Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,182 Square meters
Allocation - Php 50.00 Million
|
April 20, 2022 |
2022 |
WIN2F05946 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100872000
Project ID: P00605799LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0415+515 – K0316+265, K0416+760 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 – Road Widening – 4.605 Lane km.
Allocation: Php 115,120,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0416+836 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 - Road Widening – 2.9648 Lane km.
CW2 - Construction of Drainage Structure along Road – 2977.8 Lineal meters
ROW – ROW acquisition – 29648 Square Meters
Estimated Cost: Php 115,120,000.00
|
April 20, 2022 |
2022 |
WIN2F06007 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100870000
Project ID: P00606446LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0401+848
Physical Target: CW1 – Road Widening – 5.192 Lane km.
Allocation: Php 136,775,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0400+614.45
Physical Target: CW1 - Road Widening – 2.7369 Lane km.
CW2 - Construction of Road Slope Protection Structure – 3086.03 Lineal meters
CW3 – Construction of Drainage Structure along Road – 2706.98 Lineal Meters
ROW Acquisition – 27369 Square Meters
Estimated Cost: Php 136,775,000.00
|
April 20, 2022 |
2022 |
WIN2F05998 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100871000
Project ID: P00606447LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0415+515
Physical Target: CW1 – Road Widening – 4.17 Lane km.
Allocation: Php 104,250,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0414+385
Physical Target: CW1 - Road Widening – 1.924 Lane km.
CW2 - Construction of Rode Slope Protection Structure – 2311.07 Square Meters
CW3 – Construction of Drainage Structure along Roads – 1893.6 Lineal Meters
ROW – Row Acquisition - 19240 Square Meters
Estimated Cost: Php 104,250,000.00
|
April 20, 2022 |
2022 |
WIN2F06183 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310109100871000
Project ID: P00609355LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+000 – K0490+232
Physical Target: CW1 - Construction of Road Slope Protection Structure – 6111.111 Square Meter
Allocation: Php 110,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+640 – K0490+990
Physical Target: CW1 Construction of Road Slope Protection Structure – 5274.36 Square Meter
Estimated Cost: Php 110,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05962 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107580000
Project ID: P00620320LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+219.2 – Sta. 12+972 Right Side, Sta. 12+219.2 – Sta. 13+125 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Allocation: Php 181,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+260 – Sta. 12+308 Right Side, Sta. 11+792 – Sta. 12+848 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Estimated Cost: Php 181,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06008 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107581000
Project ID: P00620321LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+817.2 – Sta. 24+638 Left Side, Sta. 23+817.2 – Sta. 24+655 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Allocation: Php 180,849,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752 – Sta. 24+575.57 Left Side, Sta. 23+806.5 – Sta. 24+357.5 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Estimated Cost: Php 180,849,000.00
|
April 20, 2022 |
2022 |
WIN2F05947 |
FY 2022 GAA RA 11639 |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300105200333000
Project ID: P00655008LZ
AS PER GAA:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase III)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Allocation: Php 75,000,000.00
AS MODIFIED:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase IV)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Estimated Cost: Php 75,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06047 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310205100576000
Project ID: P00608292LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 3.291 Lane km.
CW2 – Construction of Drainage Structure along Road – 1650 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 4000 Square Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 2.356 Lane km.
CW2 - Construction of Drainage Structure along Road – 1400 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 1210.6 Square Meters
Estimated Cost: Php 100,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05997 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310205100577000
Project ID: P00608293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 5050 Square Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3563.84 Square Meters
Estimated Cost: Php 100,000,000.00
|
April 20, 2022 |
2022 |
WIN2E02109 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310102100853000
Project ID: P00601289MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Surigao-Davao Coastal Rd (S00300MN) - K1461 + 099 - K1463 + 112, K1471 + 566 - K1473 + 506.44
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 11.933 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: P 8,167,686.25/Lane Km
TO:
Surigao-Davao Coastal Rd (S00300MN) - K1461+099 - K1463+112, K1463+112 - K1463+481, K1471+566 - K1473+506.44
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.670 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: P 7,692,580.90/Lane Km |
April 20, 2022 |
2022 |
WIN2E02156 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310203100535000
Project ID: P00602516MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1246 + 400 - K1247 + 525, K1250 + 878 - K1252 + 631
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 5.699 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: 17,102,123.17/Lane Km
TO:
Butuan City-Malaybalay Rd - K1246 + 428 - K1247 + 000, K1250 + 878 - K1252 + 640
Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4.660 Lane Km
CW2- 1,577.10 Square meters
Allocation:
TOTAL: P 101,000,000
CW1: P 79,919,756
CW2: P 17,545,244
EAO: P 3,535,000
Unit Cost:
CW1: P 17,150,162.23/Lane Km
CW2: P 11,125.00/Square meters
|
April 20, 2022 |
2022 |
WIN2E02168 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300214100093000
Project ID: P00633704MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248 + 550 - K1250 + 098, K1250 + 098 - K1251 + 000, K1251 + 542 - K1253 + 264, K1265 + 605 - K1266 + 622, K1266 + 622 - K1267 + 569, K1268 + 003 - K1270 + 110, K1273 + 043 - K1273 + 892, K1274 + 384 - K1276 + 000, K1276 + 000 - K1276 + 672, K1276 + 672 - K1276 + 994, K1277 + 678 - K1278 + 073, K1278 + 696 - K1278 + 862
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 7.649 Lane Km
Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00
Unit Cost:
CW1: P 17,662,440/Lane Km
TO:
Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248+550 - K1250+098, K1250+098 - K1251+000, K1251+542 - K1253+264, K1265+605 - K1266+622, K1266+622 - K1267+569, K1268+003 - K1268+613.50
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 17.847 Lane Km
Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00
Unit Cost:
CW1: P 7,569,899.70/Lane Km
|
April 20, 2022 |
2022 |
WIN2E02167 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310101100595000
Project ID: P00601290MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 542.18
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.533 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 8,084,656.51/Lane Km
TO:
Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 815.55
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 13.850 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 7,315,884.48/Lane Km |
April 19, 2022 |
2022 |
WIN2F06099 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 1st Engineering Office |
UACS No.: 300217100033000
Project ID: P00636994LZ
AS PER GAA:
CSSP : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Polangui, Albay
Physical Target: CW1 - Construction of Concrete Road – 10.03 Lane km.
Allocation: Php 99,000.00
AS MODIFIED:
OO1 : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Bacacay, Albay
Physical Target: CW1 - Reconstruction of Concrete Pavement – 10.03 Lane Km
Allocation: Php 99,000.00
Estimated Cost: Php 20,057,000.00
|
April 19, 2022 |
2022 |
WIN2F06160 |
SR2022-02-000858 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0315 + 736 - K0315 + 918;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000
To: Cong. Andres Acop Cosalan Rd - K0315 + 693 - K0315 + 930;
Physical Target: 6,188.000 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06050 |
SR2022-02-001173 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0338 + 700 - K0338 + 900;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000
To: Gov. Bado Dangwa National Rd - K0338 + 753 - K0338 + 914;
Physical Target: 6,124.700 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06011 |
SR2022-02-001178 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0339 + 334 - K0339 + 500;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000
To: Gov. Bado Dangwa National Rd - K0339 + 323 - K0339 + 548;
Physical Target: 6,247.200 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06018 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310104100408000
Project ID: P00603937LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0533+000 – K0533+600
Physical Target: CW1 – Reconstruction to Concrete Pavement – 1.2 Lane km.
Allocation: Php 20,057,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0527+405 – K0527+647, K0532+624 – K0532+880, K0533+000 – K0533+600
Physical Target: CW1 - Reconstruction to Concrete Pavement – 2.196 Lane Km
Allocation: Php 20,057,000.00
|
April 19, 2022 |
2022 |
WIN2F06079 |
SR2022-02-000899 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 150;
Physical Target: 7,200.000 Square meters;
Allocation: Php 60,000,000.000
To: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 070;
Physical Target: 2,280.000 Square meters;
Allocation: Php 60,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06018 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310104100353000
Project ID: P00603938LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0536+000 – K0537+840
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.774 Lane km.
Allocation: Php 63,079,235.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0527+647 – K0528+460, K0530+000 – K0532+000
Physical Target: CW1 - Reconstruction to Concrete Pavement – 5.626 Lane km.
Estimated Cost: Php 63,079,235.00
|
April 19, 2022 |
2022 |
WIN2F06127 |
SR2022-03-006711 |
March 21, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0329 + 394 - K0330 + 600, K0330 + 850 - K0336 + 400;
Physical Target: 7.538 Lane Km;
Allocation: Php 100,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0312 + 600 - K0320 + 600;
Physical Target: 15.860 Lane Km;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06188 |
SR2022-02-001910 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167;
Physical Target: 15.077 Lane Km;
Allocation: Php 200,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167, K0319 + (-840) - K0320 + 100;
Physical Target: 23.028 Lane Km;
Allocation: Php 200,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06222 |
SR2022-03-007782 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000
To: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06184 |
SR2022-03-007619 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06210 |
SR2022-03-007623 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 3,055.560 Square meters;
Allocation: Php 55,000,000.000
To: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 1,830.500 Square meters;
Allocation: Php 55,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06211 |
SR2022-03-007625 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 3,404.000 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06155 |
SR2022-03-007628 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 3,404.720 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06216 |
SR2022-03-007630 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 450 - K0451 + 600;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06098 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310111100431000
Project ID: P00604133LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607
Physical Target: CW1 – Construction of Drainage Structure along Road – 3014 Lineal Meter.
Allocation: Php 50,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607, K0566+050 – K0566+280
Physical Target: CW1 - Construction of Drainage Structure along Road – 1699 Lineal Meter.
Estimated Cost: Php 50,000,000.00
|
April 19, 2022 |
2022 |
WIN2F05990 |
FY 2022 GAA RA 11639 |
December 30, 2022 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300221101271000
Project ID: P00640381LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbitayan Maliit, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Allocation: Php 25,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbirayan Munti, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Estimated Cost: Php 25,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06078 |
SR2022-03-007635 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06187 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310102100958000
Project ID: P00603952LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0468+310
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.258 Lane km.
Allocation: Php 40,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0467+476.20
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 4.6504 Lane km.
Estimated Cost: Php 40,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06173 |
SR2022-03-007638 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06165 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310103100964000
Project ID: P00603955LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0449+000 – K0451+000
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 4.198 Lane km.
Allocation: Php 27,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0448+986.90 – K0450+714.50
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.4892 Lane km.
Estimated Cost: Php 27,000,000.00
|
April 19, 2022 |
2022 |
WIN2F05950 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100320000
Project ID: P00604140LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0442+690
Physical Target: CW1 – Construction of Drainage Structure along Road – 3370 Lineal Meters.
Allocation: Php 37,657,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0441+748
Physical Target: CW1 - Construction of Drainage Structure along Road – 1496 Lineal Meters.
Estimated Cost: Php 37,657,000.00
|
April 19, 2022 |
2022 |
WIN2F06147 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310209100368000
Project ID: P00606415LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-235) – K0438+600
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 3340 Square Meters.
Allocation: Php 25,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-015) – K0438+583
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 2392 Square Meters.
Estimated Cost: Php 25,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06175 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 264.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 167.600 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06129 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 430.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 172.400 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06088 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 612.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F05987 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310103100807000
Project ID: P00610156LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0474+679
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 11.732 Lane km.
Allocation: Php 98,950,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0473+615
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 8.7289 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 98,950,000.00
|
April 19, 2022 |
2022 |
WIN2F06174 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 458.310 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06093 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 320101107527000
Project ID: P00621520LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Fundado (Fundado Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 391 Lineal Meters
Allocation: Php 70,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Barobaybay (Barobaybay Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 391 Lineal Meters
Estimated Cost: Php 70,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06219 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 414.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F05973 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300225100473000
Project ID: P00632964LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose to Caditaan Creek, Barangay Pawili, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Allocation: Php 5,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose Creek, Barangay San Jose, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Estimated Cost: Php 5,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06161 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 470.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06162 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300225100476000
Project ID: P00640581LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcay, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Allocation: Php 30,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcang, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Estimated Cost: Php 30,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06182 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 810 - Sta. 1 + 310, Calanasan, Apayao;
Physical Target: 500.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Sta. Filomena Flood Control Structure, Sta. 0+ 440 - Sta. 1+ 400, Calanasan, Apayao;
Physical Target: 960.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06077 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Sto Tomas-Mt Cabuyo Rd – K0252 + 291 – K0253 + 049;
Physical Target: 491.000 Lineal meters;
Allocation: Php 25,000,000.000
To: Sto Tomas-Mt Cabuyo Rd – K0252 + 160 – K0253 + 049;
Physical Target: 622.000 Lineal meters;
Allocation: Php 25,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06070 |
SARO-BMB-A-22-0002928 |
March 21, 2022 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Construction of Road located at Purok 4, Monticello, Barangay Camp 7,Baguio City;
Physical Target: 0.500 Lane Km;
Allocation: Php 5,000,000.000
To: Construction of Road located at Purok 2, Monticello, Barangay Camp 7;
Physical Target: 0.275 Lane Km;
Allocation: Php 5,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06012 |
SR2022-03-007744 |
March 23, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Shilan-Beckel Rd - K0261+892 - K0262+890, K0264+908 - K0265+943;
Physical Target: 3.878 Lane Km;
Allocation: Php 66,000,000.000
To: Shilan-Beckel Rd - K0262+056 - K0262+284.5, K0262+355.5 - K0262+780, K0264+925 - K0265+943;
Physical Target: 3.326 Lane Km;
Allocation: Php 66,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06051 |
SR2022-03-007745 |
March 23, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0261+000;
Physical Target: 3.520 Lane Km;
Allocation: Php 93,400,000.000
To: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0260+690, K0260+735 - K0261+000;
Physical Target: 3.430 Lane Km;
Allocation: Php 93,400,000.000
|
April 19, 2022 |
2022 |
WIN2F06132 |
SARO-BMB-A-22-0002929 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Bauang Rd - K0284+500 - K0284+507, K0290+410 - K0290+420, K0291+170 - K0291+270;
Physical Target: 766.800 Square Meters;
Allocation: Php 14,100,000.000
To: Baguio-Bauang Rd - K0291+164 - K0291+290;
Physical Target: 1,044.000 Square Meters;
Allocation: Php 14,100,000.000
|
April 19, 2022 |
2022 |
WIN2F06208 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Gov. Bado Dangwa National Rd - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0315+618 - K0315+668, K0316+503 - K0316+528;
Physical Target: 1,480.000 Square meters;
Allocation: Php 35,000,000.000
To: Gov. Bado Dangwa National Rd - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0316+175 - K0316+207, K0316+503 - K0316+528, K0317+693 - K0317+723;
Physical Target: 1185 Square meters;
Allocation: Php 35,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06149 |
SR2022-03-007590 |
March 23, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Cong. Andres Acop Cosalan Rd - K0343+400 - K0343+430, K0345+200 - K0345+230,K0348+100 - K0348+150, K0348+740 - K0348+769, K0348+769 - K0348+880, K0349+960 - K0350+000, K0351+300 - K0351+400, K0351+870 - K0351+900, K0352+400 - K0352+500, K0356+396 - K0356+513, K0356+456 - K0356+496;
Physical Target: 6,782.000 Square meters; Allocation: Php 66,120,000.000
To: Cong. Andres Acop Cosalan Rd - K0343+400 - K0343+429, K0345+199 - K0345+218, K0348+738 - K0348+801, K0356+396 - K0356+542;
Physical Target: 3900.9 Square meters;
Allocation: Php 66,120,000.000
|
April 19, 2022 |
2022 |
WIN2F06128 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Balbalan-Pinukpuk Rd - K0499 + 2929 - K0499 + 3171, K0509 + 051 - K0509 + 496, K0515 + 270 - K0515 + 400 ;
Physical Target: 1.634 Lane Km;
Allocation: Php 14,011,000.000
To: Balbalan-Pinukpuk Rd - K0499 + 3215 - K0499 + 3294, K0509 + 051 - K0509 + 496, K0515 + 270 - K0515 + 400 ;
Physical Target: 1.208 Lane Km;
Allocation: Php 14,011,000.000
|
April 19, 2022 |
2022 |
WIN2E02135 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310201101057000
Project ID: P00602490MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1330 + 669 - K1330 + 802, K1330 + 984 - K1331 + 075, K1331 + 640 - K1331 + 759, K1331 + 774 - K1331 + 845, K1333 + 935 - K1334 + 135, K1334 + 157 - K1334 + 320
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.554 Lane Km
Allocation:
TOTAL: P 31,080,000
CW1: P 30,458,400
EAO: P 621,600
Unit Cost:
CW1: P 19,600,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Section) - K1330+669 – K1330+802, K1330+989 – K1331+075, K1331+640 – K1331+754, K1331+779 – K1331+845, K1333+935 – K1334+058, K1334+237 – K1334+320, K1341+230 – K1341+536
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.736 Lane Km
Allocation:
TOTAL: P 31,080,000
CW1: P 30,458,400
EAO: P 621,600
Unit Cost:
CW1: P 17,545,161.29/Lane Km
|
April 19, 2022 |
2022 |
WIN2F06220 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Bulanao-Paracelis Rd - K0504 + 200 - K0504 + 439, K0513 + 230 - K0513 + 321; Physical Target: 0.660 Lane Km;
Allocation: Php 5,660,000.000
To: Bulanao-Paracelis Rd - K0504 + 236 - K0504 + 540, K0513 + 230 - K0513 + 321;
Physical Target: 0.759 Lane Km;
Allocation: Php 5,660,000.000
|
April 19, 2022 |
2022 |
WIN2F06212 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 865 - K0472 + 907, K0473 + 999 - K0474 + 066, K0476 + 1120 - K0476 + 1145, K0480 + 840 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 608 - K0487 + 641 ;
Physical Target: 6,732.000 Square meters;
Allocation: Php 44,500,000.000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0472 + 262 - K0472 + 307, K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 726 - K0472 + 752, K0472 + 860 - K0472 + 907, K0476 + 1114 - K0476 + 1145, K0477 + 297 - K0477 + 329, K0480 + 839 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 501 - K0487 + 547, K0487 + 608 - K0487 + 641, K0492 + 276 - K0492 + 306, K0493 + 741 - K0493 + 830;
Physical Target: 3,728.000 Square meters;
Allocation: Php 44,500,000.000
|
April 19, 2022 |
2022 |
WIN2F06213 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 1048 - K0528 + 1064, K0531 + 483 - K0531 + 515, K0532 + 696 - K0532 + 714 ;
Physical Target: 508.000 Square meters;
Allocation: Php 6,500,000.000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 1048 - K0528 + 1064, K0531 + 474 - K0531 + 515, K0532 + 691 - K0532 + 714 ;
Physical Target: 562.000 Square meters;
Allocation: Php 6,500,000.000
|
April 19, 2022 |
2022 |
WIN2F05907 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310102100959000
Project ID: P00603957LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-467) – K0499+073
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 3.162 Lane km.
Allocation: Php 20,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-467) – K0499+077
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.17 Lane km.
Estimated Cost: Php 20,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06218 |
SR2022-02-001829 DTD |
February 4, 2022 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan Pinukpuk-Abbut - K0488 + 945 - K0498 + 469 ;
Physical Target: 6.524 Km;
Allocation: Php 97,503,000.000
To: Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan Pinukpuk-Abbut - K0488 + 945 - K0495 + 358 (Cagaluan-Calanan Section), K0496 + (-700) - K0498 + 469 (Calanan-Pinukpuk Section) ;
Physical Target: 9.656 Km;
Allocation: Php 97,503,000.000
|
April 19, 2022 |
2022 |
WIN2F06081 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310209100369000
Project ID: P00606417LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Goa-Digdigon-Sn Isidro Road- K0497+561 – K0498+648
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 4412 Square Meters.
Allocation: Php 13,893,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Goa-Digdigon-Sn Isidro Road- K0494+778 – K0494+904, K0500+278 – K0500+407, K0502+461 – K0502+1000, K0503+024 – K0503+073
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 3372 Square Meters.
Estimated Cost: Php 13,893,000.00
|
April 19, 2022 |
2022 |
WIN2F05943 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga-Abra Rd - K0477 + 000 - K0477 + 857;
Physical Target: 1.714 Lane Km;
Allocation: Php 8,042,000.000
To: Kalinga-Abra Rd - K0477 + 202 - K0477 + 857;
Physical Target: 1.310 Lane Km;
Allocation: Php 8,042,000.000
|
April 19, 2022 |
2022 |
WIN2F05944 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0446 + 684 - K0447 + 255;
Physical Target: 1.128 Lane Km;
Allocation: Php 5,797,000.000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0446 + 684 - K0447 + 192;
Physical Target: 1.002 Lane Km;
Allocation: Php 5,797,000.000
|
April 19, 2022 |
2022 |
WIN2F05985 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310202101142000
Project ID: P00606420LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-817) – K0498+(-802)
Physical Target: CW1 – Road Widening – 0.03 Lane km.
Allocation: Php 15,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads - Lagonoy-Presentacion Rd – K0498+(-817) – K0498+(-547)
Physical Target: CW1 - Road Widening – 0.54 Lane km
Estimated Cost: Php 15,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06157 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 426 - K0476 + 655, K0476 + 878 - K0476 + 1440, K0476 + 1675 - K0476 + 2879;
Physical Target: 1.995 Lane Km;
Allocation: Php 44,918,000.000
To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 426 - K0476 + 655, K0476 + 878 - K0476 + 1440, K0476 + 1675 - K0476 + 1881.5;
Physical Target: 1.995 Lane Km;
Allocation: Php 44,918,000.000
|
April 19, 2022 |
2022 |
WIN2F05967 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 320101107575000
Project ID: P00620313LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Improvement of Flood Control Structure along Balangao River, Sta. 0+532 – Sta. 0+865 (upstream), Sta. 0+616 – Sta. 0+984 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1214 Lineal Meters
Allocation: Php 85,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Improvement of Flood Control Structure along Balangao River, Sta. 0+532 – Sta. 0+865 (upstream), Sta. 0+616 – Sta. 0+890 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1214 Lineal Meters
Estimated Cost: Php 85,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06215 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga-Abra Rd - K0465 + 124 - K0465 + 225, K0471 + 000 - K0471 + 120, K0471 + 152 - K0471 + 216, K0474 + 1000 - K0474 + 1043, K0479 + 508 - K0479 + 544, K0479 + 566 - K0479 + 588, K0480 + 365 - K0480 + 423, K0480 + 786 - K0480 + 842, K0499 + 915 - K0499 + 981, K0503 + 1198 - K0503 + 1266, K0503 + 1412 - K0503 + 1448, K0506 + 830 - K0506 + 850, K0509 + 420 - K0509 + 452, K0516 + 550 - K0516 + 570, K0517 + 295 - K0517 + 309, K0523 + 277 - K0523 + 322;
Physical Target: 2,324.480 Square Meters;
Allocation: Php 41,840,000.000
To: Kalinga-Abra Rd - K0464+ 622 - K0464 + 677, K0465 + 124 - K0465 + 225, K0471 + 000 - K0471 + 120, K0471 + 152 - K0471 + 216, K0474 + 1000 - K0474 + 1043, K0479 + 508 - K0479 + 544, K0479 + 566 - K0479 + 588, K0480 + 786 - K0480 + 842, K0503 + 1198 - K0503 + 1266, K0503 + 1412 - K0503 + 1448, K0506 + 830 - K0506 + 850, K0509 + 420 - K0509 + 452, K0516 + 550 - K0516 + 570, K0517 + 295 - K0517 + 309, K0523 + 277 - K0523 + 322;
Physical Target: 3,520.000 Square Meters;
Allocation: Php 41,840,000.000
|
April 19, 2022 |
2022 |
WIN2F05966 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 320101107577000
Project ID: P00620315LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Rangas River, Sta. 0+053 – Sta. 1+903.5 (downstream-Left Side), Sta. 0+034 – Sta. 0+903.5 (downstream-Right Side), Matacla, Goa, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1720 Lineal Meters.
Allocation: Php 81,004,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Rangas River, Sta. 0+053 – Sta. 0+903.5 (downstream-Left Side), Sta. 0+034 – Sta. 0+903.5 (downstream-Right Side), Matacla, Goa, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1720 Lineal Meters.
Estimated Cost: Php 81,004,000.00
|
April 19, 2022 |
2022 |
WIN2F06096 |
SR20222-02-001855 |
February 4, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K0522 + 389 - K0526 + 511, Balbalan, Kalinga;
Physical Target: 6.356 Km;
Allocation: Php 95,000,000.000
To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K0479 + 490 - K0526 + 511, Balbalan, Kalinga;
Physical Target: 15.143 Km;
Allocation: Php 95,000,000.000
|
April 19, 2022 |
2022 |
WIN2F05969 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 320101107578000
Project ID: P00620316LZ
AS PER GAA:
OO2 : Protect Lives and Properties - Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Sagpon River, Sta. 0+555 – Sta. 1+542.5 (downstream), Tigaon, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 2175.50 Lineal Meters.
Allocation: Php 85,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties - Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement of Flood Control Structure along Sagpon River, Sta. 0+480 – Sta. 0+784.50 bothside ( upstream), Sta. 0+525 – Sta. 0+707 (L/S), Sta. 0+743 – Sta. 0+799 (L/S), Sta. 0+555 – Sta. 0+643 (R/S), Sta. 0+682.50 – Sta. 0+799 (R/S), Sta. 2+055 – Sta. 2+617 bothside (downstream), Tigaon, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 2175.50 Lineal Meters.
Estimated Cost: Php 85,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06123 |
SR20222-02-001860 |
February 4, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0447 + 000 - K0469 + 916;
Physical Target: 6.423 Km;
Allocation: Php 96,000,000.000
To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0435 + 405 - K0469 + 898;
Physical Target: 14.070 Km;
Allocation: Php 96,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06114 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd - K0479 + 624 - K0487 + 144;
Physical Target: 3.345 Km;
Allocation: Php 50,000,000.000
To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd - K0480 + (-376) - K0494 + 644;
Physical Target: 11.337 Km;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06190 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 300218100030000
Project ID: P00630916LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Coastal Roads/ Causeway of Environmental Protection/ Conservation – Construction of Bypass/ Diversion Road along Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.144 Lane km.
Allocation: Php 75,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Coastal Roads/ Causeway of Environmental Protection/ Conservation – Construction of Bypass/ Diversion Road along Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.114 Lane km.
Estimated Cost: Php 75,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06095 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459 + 917- K0469+483, Lubuagan and Pasil, Kalinga;
Physical Target: 3.345 Km;
Allocation: Php 50,000,000.000
To: Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459 +(-610) - K0472+120, Lubuagan and Pasil, Kalinga;
Physical Target: 7.354 Km;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2E02132 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320102105124000
Project ID: P00620300MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 - Sta. 0+295.00, Loreto, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 115 Lineal meters
Allocation:
TOTAL: P 34,455,000
CW1: P 33,765,900
EAO: P 689,100
Unit Cost:
CW1: P 293,616.52/ Lineal meters
TO:
Construction of River Bank Protection along Ihawan River Phase III, Sta. 0+095.00 – Sta. 0+210.00, Loreto, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 115 Lineal meters
Allocation:
TOTAL: P 34,455,000
CW1: P 33,765,900
EAO: P 689,100
Unit Cost:
CW1: P 293,616.52/ Lineal meters
|
April 19, 2022 |
2022 |
WIN2F06083 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 300219101007000
Project ID: P00631424LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 756 Lineal Meters.
Allocation: Php 30,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 214 Lineal Meters.
Estimated Cost: Php 30,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06097 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 423 - K0472 + 495;
Physical Target: 900.000 Square Meters;
Allocation: Php 9,890,000.000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 350 - K0472 + 495;
Physical Target: 585.000 Square Meters;
Allocation: Php 9,890,000.000
|
April 19, 2022 |
2022 |
WIN2F06159 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis- Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1830;
Physical Target: 1.000 Lane Km;
Allocation: Php 22,000,000.000
To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1340;
Physical Target: 1.020 Lane Km;
Allocation: Php 22,000,000.000
|
April 19, 2022 |
2022 |
WIN2E02131 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310104100452000
Project ID: P00601283MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) (S00391MN) - K1274 + 800 - K1275 + 157
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 1.444 Lane Km
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 10,180,055.40/Lane Km
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) (S00391MN) - K1274 + 800 - K1275 + 480
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 1.368 Lane Km
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 10,745,614.04/Lane Km
|
April 19, 2022 |
2022 |
WIN2F06158 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0469 + 420 - K0469 + 520, K0478 + 390 - K0478 + 440, K0479 + 540 - K0479 + 580, K0479 + 620 - K0479 + 660;
Physical Target: 2575.200 Square Meters;
Allocation: Php 34,316,000.000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0469 + 420 - K0469 + 520, K0470 + 000 - K0470 + 040, K0471 + 000 - K0471 + 070, K0478 + 390 - K0478 + 440, K0479 + 540 - K0479 + 580, K0479 + 620 - K0479 + 665;
Physical Target: 2,210.000 Square Meters;
Allocation: Php 34,316,000.000
|
April 19, 2022 |
2022 |
WIN2F06221 |
SARO-BMB-A-22-0002944 RCUD |
March 11, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0442 + 058 - K0442 + 072, K0443 + 190 - K0443 + 207, K0443 + 425 - K0443 + 451, K0445 + 105 - K0445 + 135, K0446 + 055 - K0446 + 090, K0446 + 307 - K0446 + 335, K0446 + 390 - K0446 + 415, K0446 + 438 - K0446 + 450, K0446 + 490 - K0446 + 528, K0446 + 545 - K0446 + 560, K0447 + 040 - K0447 + 057, K0447 + 382 - K0447 + 417;
Physical Target: 2,581.000 Square Meters;
Allocation: Php 26,098,000.000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0442 + 058 - K0442 + 072, K0443 + 190 - K0443 + 207, K0443 + 425 - K0443 + 451, K0445 + 105 - K0445 + 135, K0446 + 055 - K0446 + 090, K0446 + 307 - K0446 + 335, K0446 + 390 - K0446 + 415, K0446 + 438 - K0446 + 450, K0446 + 490 - K0446 + 528, K0446 + 545 - K0446 + 560, K0447 + 040 - K0447 + 057, K0447 + 382 - K0447 + 417, K0453 + 883 – K0454 + 000;
Physical Target: 2,530.000 Square Meters;
Allocation: Php 26,098,000.000
|
April 19, 2022 |
2022 |
WIN2F06180 |
SARO-BMB-A-22-0002944 RCUD |
March 11, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Drainage System, Sta. 134 + 009 - Sta. 134 + 509, Butac, Natonin, Mountain Province;
Physical Target: 839.000 Lineal Meters;
Allocation: Php 35,000,000.000
To: Construction of Drainage System, Sta. 134 + 009 - Sta. 134 + 607, Butac, Natonin, Mountain Province;
Physical Target: 839.000 Lineal Meters;
Allocation: Php 35,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06111 |
SR2022-03-007729 |
March 23, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Banaue-Hungduan-Benguet Bdry Rd - K0391 + 125 - K0391 + 249, K0383 + 010 - K0383 + 080, K0392 +(-047) - K0392 + (-017) , K0392 + 950 - K0392+974, K0393 + 000 - K0393 + 030;
Physical Target: 6,794.000 Square Meters;
Allocation: Php 67,940,000.000
To: Banaue-Hungduan-Benguet Bdry Rd - K0358+674 - K0358+704, K0375+190 - K0375+240, K0381+702 - K0381+717, K0383+010 - K0383+100, K0386+469 - K0386+492, K0391+125 - K0391+249, K0392+609 - K0392+650, K0392+950 - K0392+982, K0393+000 - K0393+040;
Physical Target: 4,110.820 Square Meters;
Allocation: Php 67,940,000.000
|
April 19, 2022 |
2022 |
WIN2F06104 |
SARO-BMB-A-22-0002937 |
March 21, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0304 + 477 - K0304 + 498, K0305 + 800 - K0305 + 900, K0322 + 687 - K0322 + 707, K0332 + 199 - K0332 + 221 , K0332 + 305 - K0332 + 328;
Physical Target: 3,424.800 Square Meters;
Allocation: Php 45,000,000.000
To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0304 + 477 - K0304 + 498, K0305 + 800 -K0305 + 900, K0320+517 - K0320+545, K0320+910 - K0320+935, K0322 + 687- K0322 + 707, K0332 + 199 - K0332 + 221, K0332+ 305 - K0332 + 328;
Physical Target: 2,855.560 Square Meters;
Allocation: Php 45,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06131 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0298 + 450 - K0298 + 884, K0323 + 300 - K0323 + 357, K0325 + 769 - K0325 + 919, K0326 + 000 - K0326 + 104, K0326 + 169 - K0326 + 419, K0326 + 552 - K0326 + 765, K0326 + 812 - K0326 + 930, K0326 + 970 - K0327 + 092, K0327 + 167 - K0327 + 178, K0327 + 306 - K0327 + 428, K0327 + 465 - K0327 + 720, K0327 + 764 - K0327 + 835, K0327 + 927 - K0328 + 100, K0328 + 385 - K0328 + 963, K0330 + 963 - K0331 + 490;
Physical Target: 7,020.500 Square Meters;
Allocation: Php 20,000,000.000
To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0298 + 450 - K0298 + 884, K0323 + 300 - K0323 + 357, K0325 + 769 - K0325 + 919, K0326 + 000 - K0326 + 104, K0326 + 169 - K0326 + 419, K0326 + 552 - K0326 + 765, K0326 + 812 - K0326 + 930, K0326 + 970 - K0327 + 092, K0327 + 167 - K0327 + 178, K0327 + 306 - K0327 + 428, K0327 + 465 - K0327 + 720, K0327 + 764 - K0327 + 835, K0327 + 927 - K0328 + 100, K0328 + 385 - K0328 + 963, K0330 + 963 - K0331 + 490, K0331 + 613 - K0332 + 231, K0332 + 231 - K0332 + 516, K0332 + 516 - K0332 + 642, K0332 + 642 - K0332 + 943, K0332 + 943-K0333 + 315, K0333 + 315 - K0334 + 000 ;
Physical Target: 6,943.400 Square Meters;
Allocation: Php 20,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06103 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Kiangan-Tinoc-Buguias Rd - K0315+(-147) - K0315 647, K0315+717 - K0316+433, K0316+495 - K0316+679, K0316+722 - K0317+426, K0317+455 - K0317+566, K0317+617 - K0318+191, K0320+027 - K0320+520, K0320+537 - K0321+265, K0321+292 - K0321+310, K0321+311 - K0321+343;
Physical Target: 8,860.500 Square Meters;
Allocation: Php 25,253,000.000
To: Kiangan-Tinoc-Buguias Rd - K0315+ (-147)-K0315+647, K0315+717-K0316+433, K0316+495-K0316+679, K0316+722-K0317+426, K0317+455-K0317+566, K0317+617-K0318+191, K0320+027-K0320+228 ;
Physical Target: 5,899.570 Square Meters;
Allocation: Php 25,253,000.000
|
April 19, 2022 |
FY 2022 |
WIN2C03517 |
UACS No. 300214100098000 |
March 7, 2022 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 300214100098000
Project ID.: P00635858LZ
Special Road Fund – Motor Vehicle User Charge (MVUC)
Preventive Maintenance along Zapote-Alabang Y-Length – K0023+(-615) – K0023+(-417.78)
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking = 0.942 Lane Km
Unit Cost = P 12,873.16/lane km
Allocation = P 12,126,520.00
EAO = P 247,480
Total = P 12,374,000.00
As Modified
Special Road Fund – Motor Vehicle User Charge (MVUC)
Preventive Maintenance along Zapote-Alabang - K0023+(-615) – K0023+(-426.53)
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking = 0.942 Lane Km
Unit Cost = P 12,873.16/lane km
Allocation = P 12,126,520.00
EAO = P 247,480
Total = P 12,374,000.00
WIN2C03517
|
April 19, 2022 |
FY 2022 |
WIN2C03518 |
UACS No. 300214100097000 |
March 7, 2022 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 300214100097000
Project ID.: P00635857LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Quirino Avenue – K0012+(-479) – K0013+230
Physical Target: CW1 Preventive Maintenance of Road: Concrete Reblocking = 3.690 lane km
Unit Cost = P 11,126,851/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000
As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Quirino Avenue – K0012+(-479) – K0013+(-242)
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay = 3.690 lane km
Unit Cost = P 11,126,851/lane km
Allocation = P 41,058,080
EAO = P 837,920
Total = P 41,896,000
WIN2C03518
|
April 18, 2022 |
2022 |
WIN2C03470 |
GAA FY 2022 |
January 18, 2022 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development-Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Palompon-Isabel-Merida-Ormoc Rd - K1130 + 903 - K1131 + 458
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving P 8.82098 M
of Shoulders: 1,501.920 Square meters
EAO P 0.18002 M
Total P 9.001 M
AS MODIFIED:
Palompon-Isabel-Merida-Omoc Road, K1130+903 – K1131+854
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving P 8.82098 M
of Shoulders: 2,824.75 Square meters
EAO P 0.18002 M
Total P 9.001 M
|
April 18, 2022 |
2022 |
WIN2C03488 |
GAA FY 2022 |
January 18, 2022 |
Region VIII |
Leyte 4th District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1026 + 000 - K1028 + 277
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 29.400 M
Asphalt Overlay: 3.002 Lane Km
EAO P 0.600 M
Total P 30.00 M
AS MODIFIED:
Preventive Maintenance along Ormoc-Baybay-Southern Leyte Bdry Rd - K1026 + 000 - K1027+ 671
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 29.400 M
Asphalt Overlay: 3.002 Lane Km
EAO P 0.600 M
Total P 30.00 M |
April 18, 2022 |
2022 |
WIN2C03473 |
SARO-BMB-A-22-0002731 |
March 17, 2022 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (San Isidro-San Juanico Bridge), K0620+200-K0860+450
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.400 M
: 1.827 Lane Km
EAO P 0.600 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (San Isidro-San Juanico Br)-K0860+200-K0860+450
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.400 M
: 1.00 Lane Km
EAO P 0.600 M
Total P 30.00 M
|
April 18, 2022 |
2022 |
WIN2C03475 |
SARO-BMB-A-22-0002731 |
March 17, 2022 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0910 + 000 - K0910 + 464, K0910 + 499 - K0911 + 000, K0923 + 000 - K0923 + 205, K0924 + 791 - K0925 + 000, K0926 + 000 - K0926 + 313
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.352 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0909 + 000 - K0910 + 100, K0910 + 800 - K0911 + 000, K0911 + 830 - K0912 + 193
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.352 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
April 18, 2022 |
2022 |
WIN2C03478 |
SARO-BMB-A-22-0002731 |
March 17, 2022 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0933 + 000 - K0933 + 169, K0937 + 900 - K0938 + 000, K0938 + 000 - K0938 + 429, K0940 + 000 - K0941 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.302 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd - K0912+193 - K0912 + 530, K0916+900 - K0917+000, K0917+500 - K0917 + 743, K0917+757 – K0917+800, K0918+400-K0918+550, K0920+1360,K0920+1420,K0920+1550-K0920+1800,K0921+050-K0921+200,K0924+791-K0925+032,K0926+000-K0926+093
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.302 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
April 18, 2022 |
2022 |
WIN2C03466 |
SARO-BMB-A-22-0002731 |
March 17, 2022 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0947 + 211 - K0948 + 000, K0948 + 000 - K0949 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.280 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd – K0927+700-K0927+734, K0927+758-K0928+524, K0930+800-K0931+100, K0933+000-K0933+175, K0941+400-K0941+560, K0948+210-K0948+307, K0948+700-K0948+900
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 49.00 M
: 3.280 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
April 18, 2022 |
2022 |
WIN2C03499 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Poblacion-Barangay Cabacungan Rd - K0699 + 176 - K0699 + 188, K0700 + 615 - K0700 + 680, K0704 + 750 - K0704 + 890
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 7.73416 M
0.434 Lane Km
EAO P 0.15784 M
Total P 7.892 M
AS MODIFIED:
Poblacion-Barangay Cabacungan Rd - K0699 + 176 - K0699 + 188, K0700 + 615 - K0700 + 680, K0704 + 750 - K0704 + 890
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 4.05822757 M
0.1263 Lane Km
CW2-Road Widening: 0.146 Lane Km P 3.67593243 M
EAO P 0.15784 M
Total P 7.892 M
|
April 18, 2022 |
2022 |
WIN2F05961 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Repair/Rehabilitation/Improvement along Daang Maharlika (LZ) - K0104+171 - K0104+252.60, K0104+313.70 - K0104+322.80, K0104+446.90 -K0104+491.90, K0104+653 - K0104+671.50, K0104+752.70 - K0104+819.70, K0104+909.27 - K0104+1045, K0105+000 - K0105+319.40 |