July 13, 2020 |
FY 2020 GAA |
WIN0G02950 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.480 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.266 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02957 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.154 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00 |
July 10, 2020 |
FY 2020 |
WIN0G02985 |
310204100795000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100795000
Project ID: P00401265MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City By-Pass Road (Culianan - Patalon Section), Package 3, Zamboanga City
CW1 - Road Widening: 9.42 lane km.
Unit Cost: P 15,269,000.00/lane km.
ROW: 687.617 sq. m.
Unit Cost: P 1,519.74/ sq.m.
EAO: P 5,034,264.80
Excess: 84,598.01
Allocation: P 150,000,000.00 |
July 10, 2020 |
FY 2020 |
WIN0G02978 |
300117207278000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117207278000
Project ID: P00443976MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Tetuan, Zamboanga City
Physical Target:
CW-1- Rehabilitation of Paved Road: 3.12 lane km
Unit Cost: P 6,346,153.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
July 10, 2020 |
2020 |
WIN0C03912 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 019 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 000 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000
|
July 10, 2020 |
2020 |
WIN0C03914 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.614 Lane Km; Allocation= Php 21,305,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.459 Lane Km; Allocation= Php 21,305,000
|
July 10, 2020 |
2020 |
WIN0C03924 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0504 + 392;
Physical Target: CW1 : 910 Square meters; Allocation= Php 20,000,000
To: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0505 + 000, K0507 + 400 – K0510 + 013;
Physical Target: CW1 : 2,860.06 Square meters; Allocation= Php 20,000,000
|
July 10, 2020 |
2020 |
WIN0C03906 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Constructionof Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000
To: Construction of Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 2.600 Lane Km; Allocation= Php 20,000,000
|
July 10, 2020 |
2020 |
WIN0C03913 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 5,000,000
To: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0.800 Lane Km; Allocation= Php 5,000,000
|
July 10, 2020 |
2020 |
WIN0C03923 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 0 Lane Km;
Allocation= Php 15,000,000
To: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 2.478 Lane Km; Allocation= Php 15,000,000
|
July 10, 2020 |
CY 2020 |
WIN0F06117 |
UACS No. 320101104344000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 320101104344000
Project ID.: P00421447LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 5), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 6), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN0F06117
|
July 10, 2020 |
CY 2020 |
WIN0F06119 |
UACS No. 300104213532000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300104213532000
Project ID.: P00447360LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 20,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Brgy. Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 20,000.00
WIN0F06119
|
July 9, 2020 |
CY 2020 |
WIN0F06177 |
UACS No. 300104213533000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300104213533000
Project ID.: P00447362LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Brgy. Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
WIN0F06177
|
July 8, 2020 |
2020 |
WIN0G02909 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200151000
Project ID: P00444711MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P69,480,000
EAO: P2,520,000
TOTAL: P72,000,000
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,364.70 sq.m
Unit Cost: P29,382 / sq.m
Allocation: P69,480,000
EAO: P2,520,000
TOTAL: P72,000,000 |
July 8, 2020 |
2020 |
WIN0G02937 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200153000
Project ID: P00444713MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+596 – K1195+773, Brgy. Hayanggabon, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P85,035.80M
EAO: P3,084.20M
TOTAL: P88.120M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+570 – K1195+747, Brgy. Hayanggabon, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,897.74 sq.m.
Unit Cost: P29.346T/sq.m.
Allocation: P85,035.80M
EAO: P3,084.20M
TOTAL: P88.120M |
July 8, 2020 |
2020 |
WIN0G02955 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200152000
Project ID: P00444712MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1184+(-197) – K1184+045, Brgy Cabugo, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P86,811.40M
EAO: P3,148.60M
TOTAL: P89.960M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1183+947 – K1184+065, Brgy Cabugo, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,959.01 sq.m
Unit Cost: P29,338T / sq.m
Allocation: P86,811.40M
EAO: P3,148.60M
TOTAL: P89.960M |
July 8, 2020 |
2020 |
WIN0G02914 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200159000
Project ID: P00444718MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P87,683.760M
EAO: P3,180.240M
TOTAL: P90.864M
TO:
Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 3,312.82 sq.m
Unit Cost: P26.468T / sq.m
Allocation: P87,683.760M
EAO: P3,180.240M
TOTAL: P90.864M |
July 7, 2020 |
FY 2020 GAA |
WIN0F06161 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310102100493000
Project ID: P00401078LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Preventive Maintenance - Secondary Roads
FROM:
Puerto Princesa North Road,
K0019+800 - K0021+000,
K0021+082 - K0022+186,
K0027+000 - K0027+823,
K0030+123 - K0031+928,
K0033+023 - K0034+154,
K0035+900 - K0036+281,
K0036+964 - K0037+009,
K0038+068 - K0039+868,
K0050+258 - K0050+286,
K0054+326 - K0055+022
Physical Target: CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 19.794 Lane Km
Allocation: Php 29.373 Million
TO:
Puerto Princesa North Road,
K0040+500 - K0041+781,
K0049+654 - K0050+341,
K0053+509 - K0054+959,
K0057+309 - K0058+768,
K0059+318 - K0059+654,
K0062+450 - K0062+480,
K0069+804 - K0070+972,
K0071+218 - K0072+863,
K0074+227 - K0075+581,
K0076+432 - K0077+923,
K0078+004 - K0080+890
Physical Target : CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 2.8935 Lane Km
Allocation: Php 29.373 Million |
July 7, 2020 |
FY 2020 GAA |
WIN0F06163 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310105100393000
Project ID: P00402571LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads
FROM:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.416 Lane Km
Allocation: Php 38.622 Million
TO:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
K0027+292 - K0027+665
Physical Target: CW1 - Reconstruction to Concrete Pavement :
3.162 Lane Km
Allocation: Php 38.622 Lane Km
|
July 7, 2020 |
FY 2020 |
WIN0G02974 |
300116203176000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116203176000
Project ID: P00443630MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road, Brgy. Panubigan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 3.480 lane km.
Unit Cost: P 14,224,000.00/lane km.
EAO: P 500,000.00
Allocation: P 50,000,000.00 |
July 7, 2020 |
FY 2020 |
WIN0G02977 |
300117207277000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
'UACS No. 300117207277000
Project ID: P00443973MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Talon-talon, Zamboanga City
Physical Target:
CW-1- Rehabilitation of Paved Road: 3.3755 lane km
Unit Cost: P 5,865,000.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
July 7, 2020 |
FY 2020 |
WIN0G02971 |
320101104227000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104227000
Project ID: P00420385MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+666.25 - 3+074.25), Zamboanga del Norte
CW1 - Construction of Revetment: 408.00 lm
Unit Cost: P 237,248.78/lm
ROW : 16,048.61407 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,387,912.61
Allocation: P 105,000,000.00 |
July 7, 2020 |
2020 |
WIN0G02913 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 310201100516000
Project ID: P00401461MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72
Type of Work: CW1 - Road Widening
Physical Target: 2.703 Lane Km
Unit Cost: P18.564558 M / Lane Km
Allocation: P50,180,000
EAO: P1,820,000
TOTAL: P52,000,000
TO:
Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72, K1163+600 - K1163+660
Type of Work: CW1 - Road Widening
Physical Target: 3.351 Lane Km
Unit Cost: P14.974634 M / Lane Km
Allocation: P50,180,000
EAO: P1,820,000
TOTAL: P52,000,000 |
July 7, 2020 |
2020 |
WIN0G02900 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200155000
Project ID: P00444715MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Kinalablaban, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P84,230,990M
EAO: P3,055,010M
TOTAL: P87.286M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,870.08 sq.m
Unit Cost: P29.348T / sq.m
Allocation: P84,230,990M
EAO: P3,055,010M
TOTAL: P87.286M |
July 7, 2020 |
2020 |
WIN0G02912 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200150000
Project ID: P00444710MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K1197+265 – K1197+500, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P83,899.03M
EAO: P3,042.97M
TOTAL: P86.942M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K119+867 – K1196+085, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,858.88 sq.m
Unit Cost: P29.347T/sq.m
Allocation: P83,899.03M
EAO: P3,042.97M
TOTAL: P86.942M |
July 7, 2020 |
2020 |
WIN0G02906 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117207584000
Project ID: P00444340MN
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Concreting of Road, Brgy. Campo-Pautao, Gigaquit, Surigao del Norte
Type of Work: CW1 - Construction of Concrete Road
Physical Target: -
Unit Cost: -
Allocation: P19,800,000
EAO: P200,000
TOTAL: P20,000,000
TO:
Concreting of Road, Brgy. Campo-Pautao, Bacuag, Surigao del Norte
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 2.012 Lane Km
Unit Cost: P9.840954 M/Lane Km
Allocation: P19,800,000
EAO: P200,000
TOTAL: P20,000,000 |
July 7, 2020 |
2020 |
WIN0G02885 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200156000
Project ID: P00444716MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+870, Brgy. Wangke, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P87,077,740
EAO: P3,158,260
TOTAL: P90,236,000
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+868, Brgy. Wangke, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,967.66 sq.m
Unit Cost: P29,342/sq.m
Allocation: P87,077,740
EAO: P3,158,260
TOTAL: P90,236,000 |
July 7, 2020 |
2020 |
WIN0G02910 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300104218865000
Project ID: P00444524MN
Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities
FROM:
Construction (Completion) of Multi-Purpose Building, Bgy. Cagnoig, San Francisco, Surigao del Norte
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: -
Allocation: P1,000,000
EAO: -
TOTAL: P1,000,000
TO:
Construction (Completion) of Multi-Purpose Building, Bgy. Cagniog, Surigao City, Surigao del Norte
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: P1.0M/ Building
Allocation: P1,000,000
EAO: -
TOTAL: P1,000,000 |
July 3, 2020 |
FY 2020 GAA |
WIN0F06174 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310108100388000
Project ID: P00400141LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
FROM:
Tablas Circumferential Road
K0040+106 - K0040+206
Physical target : CW1 - Construction of Road Slope
Protection Structure : 1,666.67 sq.m.
Allocation: Php 30.00 Million
TO:
Tablas Circumferential road
K0040+138.35 - K0040+163.96
Physical Target : CW1 - Construction of Road Slope
Protection Structure : 1,238.70 sq.m.
Allocation: Php 30.00 Million |
July 3, 2020 |
FY 2020 GAA |
WIN0F06165 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206534000
Project ID: P00447543LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Improvement of Botilao - Ipil Road,
Sta. 0+000 - Sta. 1+000,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road :
11.096 Lane Km
Allocation: Php 98.750 Million
TO:
Rehabilitation/Improvement of Botilao - Ipit Road,
Sta. 0+000 - Sta. 5+548,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road
11.096 Lane Km
Allocation: Php 98.750 Million
|
July 3, 2020 |
FY 2020 GAA |
WIN0F06162 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 310105100394000
Project ID: P00401304LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+045
Physical Target: CW1 - Reconstruction to Concrete Pavement :
1.796 Lane Km
Allocation: Php 28.736 Million
TO:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+180
Physical Target: CW1 - Reconstruction to Concrete Pavement :
2.066 Lane Km
Allocation: Php 28.736 Mllion
|
July 3, 2020 |
FY 2020 GAA |
WIN0F06164 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202941000
Project ID: P00447012LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 173+079 - Sta. 184+500 ), Palawan
Physical Target: CW1 - Construction of Concrete Road:
3.41 Lane Km
Allocation: Php 50.00 Million
TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 191+935.50 - Sta. 193+175.00), Palawan
Physical Target: CW1 - Construction of Gravel Road :
2.479 Lane Km
Allocation: 50.00 Million |
July 2, 2020 |
FY 2020 GAA |
WIN0F6167 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202188000
Project ID: P00446499LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D, 20+000 - 25+000,
Palawan
Physical Target: CW-1 Construction of Concrete Road:
0 Lane Km
Allocation: Php 55.00 Million
TO:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D,
Sta. 263+461.00 - Sta. 267+035,
Palawan
Physical Target: CW-1 Construction of Gravel Road:
7.1468 Lane Km
Allocation: Php 55.00 Million
|
July 2, 2020 |
FY 2020 GAA |
WIN0F06168 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202207000
Project ID: P00446513LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 182+000 - Sta.188+500), Palawan
Physical Target : CW-1 Construction of Concrete Road :
3.30 Lane km
Allocation: Php 55.00 Million
TO:
Constructon of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 193+175.00 - Sta. 198+000.00), Palawan
Physical Target : CW-1 Construction of Gravel Road:
9.65 Lane Km
Allocation : Php 55.00 Million
|
July 2, 2020 |
FY 2020 GAA |
WIN0F06169 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310105100392000
Project ID : P00401308LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads
FROM:
Irawan - Tagburos Rd.
K0012+1046 - K0013+000,
K0012+953 - K0012+1046,
K0013+000 - K0013+785,
K0018+000 - K0018+305
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.41 Lane Km
Allocation: Php 38.490 Million
TO:
Irawan - Tagburos rd.
K0012+953 - K0013+745,
K0018+000 - K0018+415
Physical Target : CW1 - Reconstruction to Concrete Pavement:
2.55 Lane Km
Allocation : Php 38.490 million |
July 2, 2020 |
2020 |
310205100341000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela |
July 2, 2020 |
2020 |
310204100399000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Bypass and Diversion Roads - Bambang Bypass Road, Nueva Vizcaya |
June 30, 2020 |
FY 2020 |
WIN0G02936 |
320101104224000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104224000
Project ID: P00420382MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of revetment, Kumalarang River, Isabela City, Basilan
CW1 - Construction of Revetment: 620.00 lm
Unit Cost: P 173,751.00/lm
ROW : 945.9768 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,770,403.13
Allocation: P 111,780,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02949 |
310102100403000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 310102100403000
Project ID: P00400517MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) -
K1924 + 204 - K1924 + 755,
K1925 + 000 - K1927 + 000,
K1929 + 477 - K1930 + 000,
K1932 + 000 - K1933 + 000,
K1935 + 092 - K1936 + 518.00,
K1936 + 548 - K1937 + 000,
K1938 + 000 - K1939 + 097,
K1939 + 1000 - K1939 + 2000,
K1939 + 3000 - K1939 + 4000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 18.198 lane km.
Unit Cost: P 5,598,000.00/lane km.
EAO: P 3,566,077.29
Allocation: P 105,454,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02879 |
310205100265000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310205100265000
Project ID: P00401272MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads
Midsalip - Buboan Road, Zamboanga del Sur
CW1 - Construction of Concrete Road: 4.24 lane km.
Unit Cost: P 23,171,000.00/lane km.
ROW: 11,041.25867 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,438,711.87
Allocation: P 105,000,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02880 |
310201100481000 |
May 4, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100481000
Project ID: P00400269MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd -
K1875+940 - K1878+880.00
CW1 - Road Widening: 5.88 lane km.
Unit Cost: P 18,864,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,882,356.94
Excess: P 48,159.06
Allocation: P 124,855,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02941 |
310106100523000 |
June 9, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100523000
Project ID: P00400621MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog - Polanco - Piñan - Jct. Oroquieta Rd -
K1827+969.80 - K1828+687
CW1 - Reconstruction from Pave to Concrete: 1.4164 lane km.
Unit Cost: P 7,887,600.00/lane km.
EAO: P 228,000.00
Allocation: P 11,400,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02945 |
310105100468000 |
June 8, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310105100468000
Project ID: P00400626MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Rizal - Dakak - Dapitan Coastal Loop Rd
K1840+557 - K1840+905,
K1843+674 - K1843+995,
K1844+828 - K1844+903,
K1845+419 - K1845+518,
K1846+107 - K1846+195.40
CW1 - Reconstruction from Pave to Concrete: 1.8628 lane km.
Unit Cost: P 17,869,160.00/lane km.
ROW: 1,500.00 sq.m.
Unit Cost: P 689.00/sq.m
EAO: P 679,320.00
Allocation: P 35,000,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02934 |
310111100241000 |
June 9, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310111100241000
Project ID: P00400398MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Jct. Polo - Dapitan Park Natl Rd
K1825+(-260) - K1825+180
K1826+172 - K1827+300
CW1 - Construction of Drainage Structure along Road: 1.572 lm.
Unit Cost: P 10,145,370.00/lm
ROW: 400.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 325,480.00
Allocation: P 16,674,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02939 |
310106100524000 |
June 8, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100524000
Project ID: P00400624MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Piñan - Mutia Rd
K1817+916 - K1818+000,
K1818+928 - K1819+178,
K1822+572 - K1823+194.60,
K1826+807 - K1826+901
CW1 - Reconstruction from Paved to Concrete: 2.0992 lane km.
Unit Cost: P 11,341,520.00/lane km.
ROW: 466.00 sq.m.
Unit Cost: P 100.00/sq.m
EAO: P 485,880.00
Allocation: P 24,760,000.00 |
June 29, 2020 |
2020 |
WIN0C03858 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0067+571 - K0067+653 |
June 24, 2020 |
FY 2020 GAA |
WIN0F06118 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206532000
Project ID: P00449344LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation of Bolo - Pulang lupa road,
Sta. 1+076 - Sta. 2+076,
Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
50831 lane km
Allocation: Php 80.00 Million
TO:
Rehabilitation of Bolo - Pulang Lupa Road,
Sta. 1+076 - Sta. 3+991.5
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.831 lane km
Allocation: Php 80.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06113 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200147000
Project ID: P00449205LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0146+(-187.00) - K0150+465.00
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay: 0 Lane Km
Allocation: Php 55.00 Million
TO:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - punta Baja
K0146+(-187.00) - K0147+414.00
Palawan
Physical Target: CW1 - Preventive maintenance of Road:
Asphalt Overlay : 3.292 Lane Km
Allocation: Php 55.00 Million |
June 24, 2020 |
FY 2020 GAA |
WIN0F06092 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200255000
Project ID: P00449274LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road : Asphalt Overlay -
PPSr Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0142+730.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 2.069 Lane Km
Allocation : Php 40.00 Million
TO:
Preventive Maintenance of Road ; Asphalt Overlay -
PPSR Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0139+568.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 2.138 Lane Km
Allocation: Php 40.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06087 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310203100272000
Project ID: P00402592LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM:
Coron - Busuanga Rd
K0005+124 - K0008+029,
k0008+469 - k0008+755,
k0013+582 - k0013+896,
k0013+950 - k0014+100
Physical Target: CW1 - Road Widening : 7.388 Lane Km
Allocation: php 107.478 Million
TO:
Coron - Busuanga Rd
K0005+124 - K0007+919,
K0008+489 - K0009+577.50
Physical target: CW1 - Road Widening : 7.827 Lane Km
Allocation: Php 107.478 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06088 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100481000
Project ID: P00400415LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0149+308 - K0152+625
Physical Target : CW1 - Road Widening - 6.758 Lane Km
Allocation: Php 125.00 Million
TO:
Puerto Princesa North Rd
K0149+308 - K0152+765
Physical Target : CW1 - Road Widening - 7.038 Lane Km
Allocation: Php 125.00 Million |
June 24, 2020 |
FY 2020 GAA |
WIN0F06091 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310305100942000
Project ID: P00402596LZ
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridge
FROM:
Widening of Permanent Bridge - Dayandante Bridge I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 235.161 sq.m.
Allocation: Php 25.00 Million
TO:
Widening of Permanent Bridge - Dayandante I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 207.800 sq.m.
Allocation: Php 25.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06004 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200251000
Project ID: P00449270LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0181+630.00,
K0182+000.00 - K0183+506.00,
Palawan
Physical Target : Preventive Maintenance of Road -
Asphalt overlay : 0 Lane Km
Allocation: Php 50.00 Million
TO:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong,
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0176+1482.00,
Palawan
Physical Target : Preventive Maintenance of Road :
Asphalt Overlay - 2.716 Lane Km
Allocation : Php 50.00 Million |
June 23, 2020 |
FY 2020 GAA |
WIN0F06121 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200113000
Project ID: P00449187LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0036+400 to K0036+900
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,022.00 sq.m.
Allocation: PHP 97.00 Million
TO:
Calapan North Road (S00008MR),
K0036+180 to K0036+302.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,344.00 sq.m.
Allocation: Php 97.00 Million |
June 23, 2020 |
FY 2020 GAA |
WIN0F6120 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200114000
Project ID: P00449188LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0037+300 to K0037+800
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,094.00 sq.m.
Allocation: Php 98.00 Million
TO:
Calapan North Road (S00008MR),
K0037+300 to K0037+473.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,367.00 sq.m.
Allocation: Php 98.00 Million
|
June 23, 2020 |
FY 2020 |
WIN0G02875 |
310204100796000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS NO. 310204100796000
Project ID: P00401537MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, (West Coast Section), Zamboanga City
CW1 - Construction of Concrete Road: 4.427 lane km.
Unit Cost: P 32,032,437.79/lane km.
ROW: 1,973.684211 sq.m.
Unit Cost: P 1,520.00/sq. m.
EAO: P 4,963,478.85
Excess: P 222,839.59
Allocation: P 150,000,000.00 |
June 23, 2020 |
FY 2020 |
WIN0G02867 |
310201100480000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100480000
Project ID: P00400265MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1871 + 300.00 - K1871 + 420.00,
K1871 + 540.00 - K1871 + 800.00,
K1872 + 020.00 - K1872 + 460.00,
K1873 + 580.00 - K1875 + 940.00,
CW1 - Road Widening: 6.36 lane km.
Unit Cost: P 16,710,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,719,730.03
Excess: P 2,269.19
Allocation: P 120,000,000.00 |
June 23, 2020 |
FY 2020 |
WIN0G02866 |
300204100421000 |
May 4, 2020 |
Region IX |
Regional Office IX |
UACS No. 300204100421000
Project ID: P00431549MN
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Bobonao, Ilaya - Burgos - Tamion - Diwa-an Road in support to copra industry, Dapitan CIty, Zamboanga del Norte
CW1 - Construction of Concrete Road: 7.618 lane km.
Unit Cost: P 15,315,000.00/lane km.
EAO: P 4,083,698.19
Excess: P 239,210.77
Allocation: P 121,000,000.00 |
June 23, 2020 |
2020 |
WIN0G02853 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 310305101185000
P00401049MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent
Bridges
FROM:
Pongtod Br. (Parallel Br.) along Daang Maharlika (Surigao-Agusan Sect)
Type of Work: Widening of Bridge
Physical Target: 381.6 Lane Km
Unit Cost: P102,725.37 / Lane Km
Allocation: P39,200,000
EAO: P800,000
TOTAL: P40,000,000
TO:
Pongtod Br. (B00862MN) along Daang Maharlika (Surigao-Agusan Sect)
Type of Work: Widening of Bridge
Physical Target: 407.36 Lane Km
Unit Cost: P96,229.38 / Lane Km
Allocation: P39,200,000
EAO: P800,000
TOTAL: P40,000,000 |
June 23, 2020 |
20202 |
WIN0G02905 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. 300116203361000
P00443753MN
LOCAL PROGRAM - Local Roads and Bridges - Local Roads Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Consruction of By-pass Road, Brgy. Pag-Antayan, Cantillan, Surigao del Sur
Type of Work: Construction of Concrete Road
Physical Target: 0 Lane Km
Unit Cost:
Allocation: P39,200,000
EAO: P800,000
TOTAL: P40,000,000
TO:
Consruction of By-pass Road, Brgy. Pag-Antayan, Cantillan, Surigao del Sur
Type of Work: Construction of Concrete Road
Physical Target: 1.647 Lane Km
Unit Cost: P23.80085M / Lane Km
Allocation: P39,200,000
EAO: P800,000
TOTAL: P40,000,000 |
June 23, 2020 |
FY 2020 |
WIN0G02868 |
310205100264000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 310205100264000
Project ID: P00401271MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads
Labangan - Midsalip Road, Zamboanga del Sur
CW1 - Construction of Concrete Road: 5.12 lane km.
Unit Cost: P 19,344,000.00/lane km.
ROW: 8,299.706833 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,466,524.71
Allocation: P 105,000,000.00 |
June 23, 2020 |
FY 2020 |
WIN0G02872 |
310204100798000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100798000
Project ID: P00401263MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road, Zamboanga City
CW1 - Road Widening: 5.51 lane km.
Unit Cost: P 23,672,140.84/lane km.
ROW: 50,000 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,565,172.36
Excess: 1,331.61
Allocation: P 150,000,000.00 |
June 23, 2020 |
FY 2020 |
WIN0G02876 |
310203100286000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310203100286000
Project ID: P00400307MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Dumalinao - Margosatubig Rd
K1681 + 086 - K1684 + 254.54,
K1684 + 674.11 - K1685 + 232.57
CW1 - Road Widening: 7.454 lane km.
Unit Cost: P 14,097,818.28/lane km.
ROW: 4,122.9424 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,677,979.80
Allocation: P 110,000,000.00 |
June 23, 2020 |
FY 2020 GAA |
WIN0F06114 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200115000
Project ID: P00449189LZ
LOCAL PROGRAM
National Roads and Bridges - Natonal Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0039+500 to K0040+000
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,077.00 sq.m.
Allocation: Php 98.00 Million
TO:
Calapan North Road (S00008MR),
KJ0039+700 to K0039+869.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,400.00 sq.m.
Allocation: Php 98.00 Million
|
June 23, 2020 |
FY 2020 GAA |
WIn0F06115 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200116000
Project ID: P00449190LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0043+600 to K0043+950
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 3,949.00 sq.m.
Allocation: Php 95.00 Million
TO:
Calapan North Road (S00008MR),
K0043+625 to K0043+800.40
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,264.00 sq.m.
Allocation: Php 95.00 Million |
June 23, 2020 |
2020 |
WIN0G02902 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. 300107200971000
P00444695MN
LOCAL PROGRAM - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
FROM:
Construction of Seawall, Brgy. San Pedro, Cantilan, Surigao del Sur
Type of Work: Construction of Flood Mitigation Structure
Physical Target: 0 Lineal meters
Unit Cost:
Allocation: P49,500,000
EAO: P500,000
TOTAL: P50,000,000
TO:
Construction of Seawall, Brgy. San Pedro, Cantilan, Surigao del Sur
Type of Work: Construction of Flood Mitigation Structure
Physical Target: 191.600 Lineal meters
Unit Cost: P258,350 / Lineal meters
Allocation: P49,500,000
EAO: P500,000
TOTAL: P50,000,000 |
June 23, 2020 |
2020 |
WIN0G02903 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. 300107200971000
P00400007MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1269 + 219 - K1269 + 246, K1270 + 218 - K1270 + 253, K1341 + 289 - K1341 + 320
Type of Work: Construction of Road Slope Protection Structure
Physical Target: 1906.500 Square meters
Unit Cost: P14,907 / Square meters
Allocation: P28,420,000
EAO: P580,000
TOTAL: P 29,000,000
TO:
Surigao-Davao Coastal Rd - K1269 + 219 - K1269 + 246, K1270 + 250 - K1270 + 300, K1341 + 289 - K1341 + 320
Type of Work: Construction of Road Slope Protection Structure
Physical Target: 2,001.13 Square meters
Unit Cost: P14,202 / Square meters
Allocation: P28,420,000
EAO: P580,000
TOTAL: P 29,000,000 |
June 23, 2020 |
2020 |
WIN0G02908 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. 310202100562000
P00400134MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1213 + 000 - K1215 + 401
Type of Work: Road Widening
Physical Target: 4.802 Lane Km
Unit Cost: P16,304,000 / Lane Km
Allocation: P78,294,310
EAO: P2,839,690
TOTAL: P81,134,000
TO:
Surigao-Davao Coastal Rd - K1213 + 396 - K1215 + 396
Type of Work: Road Widening
Physical Target: 4.00 Lane Km
Unit Cost: P19,573,000 / Lane Km
Allocation: P78,294,310
EAO: P2,839,690
TOTAL: P81,134,000 |
June 23, 2020 |
2020 |
WIN0C03845 |
FY 2020 GAA (RA11465) |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 4+291.60 - Sta. 4+612.60 (Left Side), Olongapo City |
June 23, 2020 |
2020 |
WIN0C03837 |
FY 2020 GAA (RA 11465) |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Nueva Ecija-Aurora Rd - K0211 + 427 - K0211 + 786 |
June 23, 2020 |
FY 2020 |
WIN0G02889 |
310211100057000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310211100057000
Project ID: P00400477MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Rd (Sibuco-Sirawai Section) - (S01166MN)
Chainage 10675 - Chainage 10904.88;
Chainage 11072.5 - Chainage 11800,
Chainage 11980 - Chainage 12210
CW1 - Paving of Unpaved Roads: 2.355 lane km.
Unit Cost: P 61,311,000.00/lane km.
ROW: 1,860.5005 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 5,053,589.13
Allocation: P 150,000,000.00 |
June 23, 2020 |
FY 2020 GAA |
WIN0F06108 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200117000
Project ID: P00449191LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0057+800 to K0058+300
Physical Target : CW1 - Construction of Road Slope
Protection Structure - 4,080.00 sq.m.
Allocation: Php 98.00 Million
TO:
Calapan North Road (S00008MR),
K0057+800 to K0057+941.80
Physical Target : CW1 - Construction of Road Slope
Protection Structure - 4,356.00 sq.m.
Allocation: Php 98.00 Million
|
June 22, 2020 |
2020 |
WIN0C03828 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Mitigation Facilities along Labangan Channel, Iba O'Este, Calumpit, Bulacan (Sta. 01+500 - Sta. 02+280, Sta. 02+508 - Sta. 02+645.20) |
June 22, 2020 |
2020 |
WIN0C03829 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0041+102 - K0037+506 |
June 22, 2020 |
2020 |
WIN0C03830 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 3rd District Engineering Office |
Network Development - Road Widening - Primary Roads
Manila North Rd - K0087+701 - K0088+340, K0088+860 - K0089+200, K0089+854 - K0090+104, K0090+118 - K0090+470 |
June 22, 2020 |
2020 |
WIN0C03817 |
GAA 2020 |
May 7, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Claveria-Calanasan-Kabugao Rd - K0703 + 274 - K0704 + 363, K0704 + 910 - K0706 + 564;
Physical Target: CW1 : 5.58 Lane Km; Allocation= Php 111,600,000
To: Claveria-Calanasan-Kabugao Rd - K0703 + 100 - K0704 + 260, K0704 + 910 - K0706 + 564; Physical Target: CW1 : 5.58 Lane Km; Allocation= Php 111,600,000
|
June 22, 2020 |
FY 2020 |
WIN0G02919 |
310201100598000 |
March 10, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310201100598000
Project ID: P00400161MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Lanao- Pagadian - Zamboanga City Rd
K1750 + 268 - K1750 + 420,
K1750 + 520 - K1750 + 780,
K1751 + 736 - K1752 + 000,
K1753 + 000 - K1753 + 420,
CW1 - Road Widening: 2.192 lane km.
Unit Cost: P 13,412,409.00/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00
|
June 22, 2020 |
2020 |
WIN0C03791 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Construction of Health Care Center, Tabacuhan, Sta. Rita, Olongapo City, Zambales
|
June 22, 2020 |
FY 2020 |
WIN0G02890 |
320101104228000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104228000
Project ID: P00420386MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Extension of Flood Control Structure along Siocon River (Upstream) 0+743.50 to 1+241.50, Siocon, Zamboanga del Norte
CW1 - Construction of Flood Mitigation Structure: 498.00 lm
Unit Cost: P 201,282.84/lm
ROW: 842.620333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,508,359.89
Allocation: P 104,000,000.00
|
June 22, 2020 |
FY 2020 |
WIN0G02892 |
310204100791000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100791000
Project ID: P00401261MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Buenavista-Bolong Bypass Road, Package 1, Zamboanga City
CW1 - Construction of Concrete Road: 1.76 lane km.
Unit Cost: P 75,191,185.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,631,777.00
Excess: 31,737.30
Allocation: P 147,000,000.00 |
June 22, 2020 |
FY 2020 |
WIN0G02886 |
310201100478000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100478000
Project ID: P00400317MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1690 + 900 - K1691 + 689,
K1691 + 828 - K1694 + 734,
K1694 + 883 - K1696 + 180
CW1 - Road Widening: 9.984 lane km.
Unit Cost: P 14,404,041.04/lane km.
ROW: 3,855.687433 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 5,033,348.10
Allocation: P 150,000,000.00
|
June 22, 2020 |
FY 2020 |
WIN0G02887 |
310201100473000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100473000
Project ID: P00400314MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Sindangan-Liloy Rd
K1913 + 420 - K1916 + 000
CW1 - Road Widening: 5.160 lane km.
Unit Cost: P 18,655,829.47/lane km.
ROW: 34,555.5904 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,369,242.80
Allocation: P 110,000,000.00 |
June 22, 2020 |
FY 2020 |
WIN0G02884 |
310201100470000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100470000
Project ID: P00400311MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd
K1845 + 833.38 - K1849 + 200.00
CW1 - Road Widening: 6.733 lane km.
Unit Cost: P 17,831,964.13/lane km.
ROW: 14,867.31337 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,202,191.51
Allocation: P 128,725,000.00 |
June 22, 2020 |
FY 2020 |
WIN0G02911 |
310106100386000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310106100386000
Project ID: P00400622MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct Oroquieta Rd
K1812+610 - K1813+060,
K1813+961 - K1814+642,
K1814+652 - K1815+000,
K1820+561 - K1824+736,
K1827+234 - K1827+644
CW1 - Reconstruction to Concrete Pavement: 12.128 lane km.
Unit Cost: P 9,936,325.907/lane km.
EAO: P 4,217,771.62
Excess: 274,467.70
Allocation: P 125,000,000.00
|
June 22, 2020 |
FY 2020 |
WIN0G02878 |
320101104217000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104217000
Project ID: P00420375MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Kabasalan River (Phase II), (Downstream) 0+058.50 - 0+241.00 (LS) 0+058.50 - 0+241.00 (RS) (Upstream) 0+058.50 - 0+241.00 (LS) 0+058.50 - 0+241.00 (RS), Canacan, Kabasalan, Zamboanga Sibugay
CW1 - Construction of Flood Mitigation Structure: 730.500 lm
Unit Cost: P 136,203.69/lm
EAO: P 3,482,387.89
Excess: P 20,815.37
Allocation: P 103,000,000.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0F06122 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310105100401000
Project ID: P00401316LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads
FROM:
Tablas Circumferential Rd
K0124+620 - K0124+884,
K0128+943 - K0129+080
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.818 Lane Km
Allocation: Php 11.478 Million
TO:
Tablas Cirfumferential Rd,
K0124+620 - K0124+884,
K0128+943 - K0129+058
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.774 Lane Km
Allocation: Php 11.478 Million |
June 19, 2020 |
FY 2020 GAA |
WIN0F06111 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202926000
Project ID: P00446985LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads - Construction/Repair/
Rehabilitation/Improvement of
Various Infrastructure including
Local Projects
FROM;
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse
and Landslide along San Jose - Port Banton Road Section,
K0012+950 - K0013+100,
Palawan
Physical Target : CW1 - Construction of Road Slope Protection
Structure: 2,240.00 square meters
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse
and Landslide along San Jose - Port Barton Road Section,
K0013+060 - K0013+122.50
Physical Target: CW1 - Construction of Road Slope Protection
Structure: 1,716.86 square meters
Allocation: Php 40.00 Million
|
June 19, 2020 |
FY 2020 GAA |
WIN0F06112 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206533000
Project ID: P00447541LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Improvement of Sibuyao - Sabong Road,
Sta 0+000 - Sta 1+000,
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.078 lane km
Allocation: Php 73.50 Million
TO:
Rehabilittion/Improvement of Sibuyao - Sabang Road,
Sta. 0+000 - Sta. 2+539,
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.078 lane km
Allocation: Php 73.50 Million |
June 19, 2020 |
FY 2020 GAA |
WIN0F06116 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200112000
Project ID: P0049186LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects
FROM:
Calapan North Road (S00008MR),
K0024+300 - K0024+700
Physical Target: CW1 - Construction of Road Slope Protection
Structure : 3,957.00 square meters
allocation: Php 95.00 Million
TO:
Calapan North Road (S00008MR),
K0024+375 - K0024+556.10
Physical Target: CW1 - Construction of Road Slope Protection
Structure : 4,254.00 square meters
Allocation: Php 95.00 Million |
June 19, 2020 |
2020 |
WIN0C03836 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0071+000 - K0071+636, K0072+056 - K0072+474 |
June 19, 2020 |
2020 |
WIN0C03840 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0069+412 - k0069+750 |
June 19, 2020 |
2020 |
WIN0C03841 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Avenue - K0070+(-046) - K0070+109 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02849 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
JP Cabaguio Ave -
K1507+(-896) - K1507+770
Physical Target:
CW1: 7.718 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 106,150,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
JP Cabaguio Ave -
K1507+(-876) - K1507+549
Physical Target:
CW1: 5.704 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 106,150,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02917 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1525+252 - K1525+828
Physical Target:
CW1: 1,152.00 lm (Construction of Drainage Structure along Road)
ROW: 12,130.80 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 24,500,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1525+080.84 - K1525+810.84
Physical Target:
CW1: 1,460.00 lm (Construction of Drainage Structure along Road)
ROW: 12,130.80 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 24,500,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 500,000.00 |
June 19, 2020 |
2020 |
WIN0C03846 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Sn Fernando - Lubao Rd - K0068+556 - K0068+653 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02921 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1472+(-005) - K1472+380, K1472+405 - K1473+367
Physical Target:
CW1: 2.726 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,447,000.00
CW1: P 31,798,060.00 (Road Widening)
EAO: P 648,940.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1472+(-005) - K1472+380, K1472+405 - K1472+695
Physical Target:
CW1: 2.230 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,447,000.00
CW1: P 31,798,060.00 (Road Widening)
EAO: P 648,940.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02916 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) -
K1474+091 - K1477+665, K1478+355 - K1479+500
Physical Target:
CW1: 26,594.40 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 82,964,000.00
CW1: P 80,060,230.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,903,740.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) -
K1477+405 - K1477+665, K1478+355 - K1478+615
Physical Target:
CW1: 20,914.80 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 82,964,000.00
CW1: P 80,060,230.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,903,740.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02838 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+600 - K1770+200, K1771+000 - K1772+530
Physical Target:
CW1: 4.400 lane km (Road Widening)
Allocation:
TOTAL: P 53,928,000.00
CW1: P 52,040,520.00 (Road Widening)
EAO: P 1,887,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+600 - K1770+200, K1771+000 - K1771+820
Physical Target:
CW1: 2.840 lane km (Road Widening)
Allocation:
TOTAL: P 53,928,000.00
CW1: P 52,040,520.00 (Road Widening)
EAO: P 1,887,480.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02922 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1713+357 - K1714+230, K1717+000 - K1718+500,
K1759+000 - K1759+500
Physical Target:
CW1: 7,492.00 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 16,894,000.00
CW1: P 16,556,120.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 337,880.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1713+354 - K1714+000, K1714+000 - K1714+176,
K1714+322 - K1714+573
Physical Target:
CW1: 5,105.46 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 16,894,000.00
CW1: P 16,556,120.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 337,880.00 |
June 19, 2020 |
FY 2020 GAA |
WIN0G02915 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1721+622 - K1721+942
Physical Target:
CW1: 1,810.240 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Road Slope Protection Structure)
EAO: P 140,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1721+754 - K1721+951.60
Physical Target:
CW1: 861.536 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Road Slope Protection Structure)
EAO: P 140,000.00 |