July 13, 2020 FY 2020 GAA WIN0G02950 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.480 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.266 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00
July 13, 2020 FY 2020 GAA WIN0G02957 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.154 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00
July 10, 2020 FY 2020 WIN0G02985 310204100795000 June 15, 2020 Region IX Regional Office IX
UACS No. 310204100795000
Project ID: P00401265MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Zamboanga City By-Pass Road (Culianan - Patalon Section), Package 3, Zamboanga City

CW1 - Road Widening: 9.42 lane km.
Unit Cost: P 15,269,000.00/lane km.
ROW: 687.617 sq. m.
Unit Cost: P 1,519.74/ sq.m.
EAO: P 5,034,264.80
Excess: 84,598.01
Allocation: P 150,000,000.00
July 10, 2020 FY 2020 WIN0G02978 300117207278000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117207278000
Project ID: P00443976MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Tetuan, Zamboanga City

Physical Target:
CW-1- Rehabilitation of Paved Road: 3.12 lane km
Unit Cost: P 6,346,153.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00
July 10, 2020 2020 WIN0C03912 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 019 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000

To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 000 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000


July 10, 2020 2020 WIN0C03914 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.614 Lane Km; Allocation= Php 21,305,000

To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.459 Lane Km; Allocation= Php 21,305,000
July 10, 2020 2020 WIN0C03924 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0504 + 392;
Physical Target: CW1 : 910 Square meters; Allocation= Php 20,000,000

To: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0505 + 000, K0507 + 400 – K0510 + 013;
Physical Target: CW1 : 2,860.06 Square meters; Allocation= Php 20,000,000

July 10, 2020 2020 WIN0C03906 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Constructionof Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000

To: Construction of Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 2.600 Lane Km; Allocation= Php 20,000,000

July 10, 2020 2020 WIN0C03913 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 5,000,000

To: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0.800 Lane Km; Allocation= Php 5,000,000

July 10, 2020 2020 WIN0C03923 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 0 Lane Km;
Allocation= Php 15,000,000

To: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 2.478 Lane Km; Allocation= Php 15,000,000
July 10, 2020 CY 2020 WIN0F06117 UACS No. 320101104344000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 320101104344000
Project ID.: P00421447LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 5), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 6), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN0F06117
July 10, 2020 CY 2020 WIN0F06119 UACS No. 300104213532000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300104213532000
Project ID.: P00447360LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 20,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Brgy. Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 20,000.00
WIN0F06119
July 9, 2020 CY 2020 WIN0F06177 UACS No. 300104213533000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300104213533000
Project ID.: P00447362LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Brgy. Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
WIN0F06177
July 8, 2020 2020 WIN0G02909 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200151000
Project ID: P00444711MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P69,480,000

EAO: P2,520,000

TOTAL: P72,000,000

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,364.70 sq.m

Unit Cost: P29,382 / sq.m

Allocation: P69,480,000

EAO: P2,520,000

TOTAL: P72,000,000
July 8, 2020 2020 WIN0G02937 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200153000
Project ID: P00444713MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+596 – K1195+773, Brgy. Hayanggabon, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P85,035.80M

EAO: P3,084.20M

TOTAL: P88.120M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+570 – K1195+747, Brgy. Hayanggabon, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,897.74 sq.m.

Unit Cost: P29.346T/sq.m.

Allocation: P85,035.80M

EAO: P3,084.20M

TOTAL: P88.120M
July 8, 2020 2020 WIN0G02955 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200152000
Project ID: P00444712MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1184+(-197) – K1184+045, Brgy Cabugo, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P86,811.40M

EAO: P3,148.60M

TOTAL: P89.960M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1183+947 – K1184+065, Brgy Cabugo, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,959.01 sq.m

Unit Cost: P29,338T / sq.m

Allocation: P86,811.40M

EAO: P3,148.60M

TOTAL: P89.960M
July 8, 2020 2020 WIN0G02914 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200159000
Project ID: P00444718MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P87,683.760M

EAO: P3,180.240M

TOTAL: P90.864M

TO:

Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 3,312.82 sq.m

Unit Cost: P26.468T / sq.m

Allocation: P87,683.760M

EAO: P3,180.240M

TOTAL: P90.864M
July 7, 2020 FY 2020 GAA WIN0F06161 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310102100493000
Project ID: P00401078LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation: Preventive Maintenance - Secondary Roads

FROM:
Puerto Princesa North Road,
K0019+800 - K0021+000,
K0021+082 - K0022+186,
K0027+000 - K0027+823,
K0030+123 - K0031+928,
K0033+023 - K0034+154,
K0035+900 - K0036+281,
K0036+964 - K0037+009,
K0038+068 - K0039+868,
K0050+258 - K0050+286,
K0054+326 - K0055+022
Physical Target: CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 19.794 Lane Km
Allocation: Php 29.373 Million

TO:
Puerto Princesa North Road,
K0040+500 - K0041+781,
K0049+654 - K0050+341,
K0053+509 - K0054+959,
K0057+309 - K0058+768,
K0059+318 - K0059+654,
K0062+450 - K0062+480,
K0069+804 - K0070+972,
K0071+218 - K0072+863,
K0074+227 - K0075+581,
K0076+432 - K0077+923,
K0078+004 - K0080+890
Physical Target : CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 2.8935 Lane Km
Allocation: Php 29.373 Million
July 7, 2020 FY 2020 GAA WIN0F06163 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310105100393000
Project ID: P00402571LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads

FROM:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.416 Lane Km
Allocation: Php 38.622 Million

TO:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
K0027+292 - K0027+665
Physical Target: CW1 - Reconstruction to Concrete Pavement :
3.162 Lane Km
Allocation: Php 38.622 Lane Km

July 7, 2020 FY 2020 WIN0G02974 300116203176000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300116203176000
Project ID: P00443630MN

Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Local Road, Brgy. Panubigan, Zamboanga City

Physical Target:
CW-1 - Construction of Concrete Road: 3.480 lane km.
Unit Cost: P 14,224,000.00/lane km.
EAO: P 500,000.00
Allocation: P 50,000,000.00
July 7, 2020 FY 2020 WIN0G02977 300117207277000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
'UACS No. 300117207277000
Project ID: P00443973MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Talon-talon, Zamboanga City

Physical Target:
CW-1- Rehabilitation of Paved Road: 3.3755 lane km
Unit Cost: P 5,865,000.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00
July 7, 2020 FY 2020 WIN0G02971 320101104227000 May 26, 2020 Region IX Regional Office IX
UACS No. 320101104227000
Project ID: P00420385MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+666.25 - 3+074.25), Zamboanga del Norte

CW1 - Construction of Revetment: 408.00 lm
Unit Cost: P 237,248.78/lm
ROW : 16,048.61407 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,387,912.61
Allocation: P 105,000,000.00
July 7, 2020 2020 WIN0G02913 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 310201100516000
Project ID: P00401461MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72

Type of Work: CW1 - Road Widening

Physical Target: 2.703 Lane Km

Unit Cost: P18.564558 M / Lane Km

Allocation: P50,180,000

EAO: P1,820,000

TOTAL: P52,000,000

TO:

Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72, K1163+600 - K1163+660

Type of Work: CW1 - Road Widening

Physical Target: 3.351 Lane Km

Unit Cost: P14.974634 M / Lane Km

Allocation: P50,180,000

EAO: P1,820,000

TOTAL: P52,000,000
July 7, 2020 2020 WIN0G02900 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200155000
Project ID: P00444715MN

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Kinalablaban, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P84,230,990M

EAO: P3,055,010M

TOTAL: P87.286M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,870.08 sq.m

Unit Cost: P29.348T / sq.m

Allocation: P84,230,990M

EAO: P3,055,010M

TOTAL: P87.286M
July 7, 2020 2020 WIN0G02912 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200150000
Project ID: P00444710MN

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K1197+265 – K1197+500, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P83,899.03M

EAO: P3,042.97M

TOTAL: P86.942M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K119+867 – K1196+085, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,858.88 sq.m

Unit Cost: P29.347T/sq.m

Allocation: P83,899.03M

EAO: P3,042.97M

TOTAL: P86.942M
July 7, 2020 2020 WIN0G02906 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300117207584000
Project ID: P00444340MN

Local Infrastructure Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Concreting of Road, Brgy. Campo-Pautao, Gigaquit, Surigao del Norte

Type of Work: CW1 - Construction of Concrete Road

Physical Target: -

Unit Cost: -

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000

TO:

Concreting of Road, Brgy. Campo-Pautao, Bacuag, Surigao del Norte

Type of Work: CW1 - Construction of Concrete Road

Physical Target: 2.012 Lane Km

Unit Cost: P9.840954 M/Lane Km

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000
July 7, 2020 2020 WIN0G02885 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200156000
Project ID: P00444716MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+870, Brgy. Wangke, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P87,077,740

EAO: P3,158,260

TOTAL: P90,236,000

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+868, Brgy. Wangke, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,967.66 sq.m

Unit Cost: P29,342/sq.m

Allocation: P87,077,740

EAO: P3,158,260

TOTAL: P90,236,000
July 7, 2020 2020 WIN0G02910 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300104218865000
Project ID: P00444524MN

Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities

FROM:

Construction (Completion) of Multi-Purpose Building, Bgy. Cagnoig, San Francisco, Surigao del Norte

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: -

Allocation: P1,000,000

EAO: -

TOTAL: P1,000,000

TO:

Construction (Completion) of Multi-Purpose Building, Bgy. Cagniog, Surigao City, Surigao del Norte

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: P1.0M/ Building

Allocation: P1,000,000

EAO: -

TOTAL: P1,000,000
July 3, 2020 FY 2020 GAA WIN0F06174 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310108100388000
Project ID: P00400141LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Secondary Roads

FROM:
Tablas Circumferential Road
K0040+106 - K0040+206
Physical target : CW1 - Construction of Road Slope
Protection Structure : 1,666.67 sq.m.
Allocation: Php 30.00 Million

TO:
Tablas Circumferential road
K0040+138.35 - K0040+163.96
Physical Target : CW1 - Construction of Road Slope
Protection Structure : 1,238.70 sq.m.
Allocation: Php 30.00 Million
July 3, 2020 FY 2020 GAA WIN0F06165 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206534000
Project ID: P00447543LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation/Improvement of Botilao - Ipil Road,
Sta. 0+000 - Sta. 1+000,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road :
11.096 Lane Km
Allocation: Php 98.750 Million

TO:
Rehabilitation/Improvement of Botilao - Ipit Road,
Sta. 0+000 - Sta. 5+548,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road
11.096 Lane Km
Allocation: Php 98.750 Million

July 3, 2020 FY 2020 GAA WIN0F06162 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. 310105100394000
Project ID: P00401304LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+045
Physical Target: CW1 - Reconstruction to Concrete Pavement :
1.796 Lane Km
Allocation: Php 28.736 Million

TO:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+180
Physical Target: CW1 - Reconstruction to Concrete Pavement :
2.066 Lane Km
Allocation: Php 28.736 Mllion
July 3, 2020 FY 2020 GAA WIN0F06164 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202941000
Project ID: P00447012LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 173+079 - Sta. 184+500 ), Palawan
Physical Target: CW1 - Construction of Concrete Road:
3.41 Lane Km
Allocation: Php 50.00 Million

TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 191+935.50 - Sta. 193+175.00), Palawan
Physical Target: CW1 - Construction of Gravel Road :
2.479 Lane Km
Allocation: 50.00 Million
July 2, 2020 FY 2020 GAA WIN0F6167 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202188000
Project ID: P00446499LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D, 20+000 - 25+000,
Palawan
Physical Target: CW-1 Construction of Concrete Road:
0 Lane Km
Allocation: Php 55.00 Million

TO:

Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D,
Sta. 263+461.00 - Sta. 267+035,
Palawan
Physical Target: CW-1 Construction of Gravel Road:
7.1468 Lane Km
Allocation: Php 55.00 Million
July 2, 2020 FY 2020 GAA WIN0F06168 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202207000
Project ID: P00446513LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 182+000 - Sta.188+500), Palawan
Physical Target : CW-1 Construction of Concrete Road :
3.30 Lane km
Allocation: Php 55.00 Million

TO:
Constructon of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 193+175.00 - Sta. 198+000.00), Palawan
Physical Target : CW-1 Construction of Gravel Road:
9.65 Lane Km
Allocation : Php 55.00 Million
July 2, 2020 FY 2020 GAA WIN0F06169 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310105100392000
Project ID : P00401308LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads

FROM:
Irawan - Tagburos Rd.
K0012+1046 - K0013+000,
K0012+953 - K0012+1046,
K0013+000 - K0013+785,
K0018+000 - K0018+305
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.41 Lane Km
Allocation: Php 38.490 Million

TO:
Irawan - Tagburos rd.
K0012+953 - K0013+745,
K0018+000 - K0018+415
Physical Target : CW1 - Reconstruction to Concrete Pavement:
2.55 Lane Km
Allocation : Php 38.490 million
July 2, 2020 2020 310205100341000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela
July 2, 2020 2020 310204100399000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Bypass and Diversion Roads - Bambang Bypass Road, Nueva Vizcaya
June 30, 2020 FY 2020 WIN0G02936 320101104224000 May 26, 2020 Region IX Regional Office IX
UACS No. 320101104224000
Project ID: P00420382MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of revetment, Kumalarang River, Isabela City, Basilan

CW1 - Construction of Revetment: 620.00 lm
Unit Cost: P 173,751.00/lm
ROW : 945.9768 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,770,403.13
Allocation: P 111,780,000.00
June 30, 2020 FY 2020 WIN0G02949 310102100403000 May 26, 2020 Region IX Regional Office IX
UACS No. 310102100403000
Project ID: P00400517MN

Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) -
K1924 + 204 - K1924 + 755,
K1925 + 000 - K1927 + 000,
K1929 + 477 - K1930 + 000,
K1932 + 000 - K1933 + 000,
K1935 + 092 - K1936 + 518.00,
K1936 + 548 - K1937 + 000,
K1938 + 000 - K1939 + 097,
K1939 + 1000 - K1939 + 2000,
K1939 + 3000 - K1939 + 4000


CW1 - Preventive Maintenance of Road: Asphalt Overlay: 18.198 lane km.
Unit Cost: P 5,598,000.00/lane km.
EAO: P 3,566,077.29
Allocation: P 105,454,000.00
June 30, 2020 FY 2020 WIN0G02879 310205100265000 May 13, 2020 Region IX Regional Office IX
UACS No. 310205100265000
Project ID: P00401272MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Midsalip - Buboan Road, Zamboanga del Sur

CW1 - Construction of Concrete Road: 4.24 lane km.
Unit Cost: P 23,171,000.00/lane km.
ROW: 11,041.25867 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,438,711.87
Allocation: P 105,000,000.00
June 30, 2020 FY 2020 WIN0G02880 310201100481000 May 4, 2020 Region IX Regional Office IX
UACS No. 310201100481000
Project ID: P00400269MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd -
K1875+940 - K1878+880.00

CW1 - Road Widening: 5.88 lane km.
Unit Cost: P 18,864,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,882,356.94
Excess: P 48,159.06
Allocation: P 124,855,000.00
June 30, 2020 FY 2020 WIN0G02941 310106100523000 June 9, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100523000
Project ID: P00400621MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Dipolog - Polanco - Piñan - Jct. Oroquieta Rd -
K1827+969.80 - K1828+687

CW1 - Reconstruction from Pave to Concrete: 1.4164 lane km.
Unit Cost: P 7,887,600.00/lane km.
EAO: P 228,000.00
Allocation: P 11,400,000.00
June 30, 2020 FY 2020 WIN0G02945 310105100468000 June 8, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310105100468000
Project ID: P00400626MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Rizal - Dakak - Dapitan Coastal Loop Rd
K1840+557 - K1840+905,
K1843+674 - K1843+995,
K1844+828 - K1844+903,
K1845+419 - K1845+518,
K1846+107 - K1846+195.40

CW1 - Reconstruction from Pave to Concrete: 1.8628 lane km.
Unit Cost: P 17,869,160.00/lane km.
ROW: 1,500.00 sq.m.
Unit Cost: P 689.00/sq.m
EAO: P 679,320.00
Allocation: P 35,000,000.00
June 30, 2020 FY 2020 WIN0G02934 310111100241000 June 9, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310111100241000
Project ID: P00400398MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Jct. Polo - Dapitan Park Natl Rd
K1825+(-260) - K1825+180
K1826+172 - K1827+300

CW1 - Construction of Drainage Structure along Road: 1.572 lm.
Unit Cost: P 10,145,370.00/lm
ROW: 400.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 325,480.00
Allocation: P 16,674,000.00
June 30, 2020 FY 2020 WIN0G02939 310106100524000 June 8, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100524000
Project ID: P00400624MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Piñan - Mutia Rd
K1817+916 - K1818+000,
K1818+928 - K1819+178,
K1822+572 - K1823+194.60,
K1826+807 - K1826+901

CW1 - Reconstruction from Paved to Concrete: 2.0992 lane km.
Unit Cost: P 11,341,520.00/lane km.
ROW: 466.00 sq.m.
Unit Cost: P 100.00/sq.m
EAO: P 485,880.00
Allocation: P 24,760,000.00
June 29, 2020 2020 WIN0C03858 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0067+571 - K0067+653
June 24, 2020 FY 2020 GAA WIN0F06118 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206532000
Project ID: P00449344LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation of Bolo - Pulang lupa road,
Sta. 1+076 - Sta. 2+076,
Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
50831 lane km
Allocation: Php 80.00 Million

TO:
Rehabilitation of Bolo - Pulang Lupa Road,
Sta. 1+076 - Sta. 3+991.5
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.831 lane km
Allocation: Php 80.00 Million

June 24, 2020 FY 2020 GAA WIN0F06113 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200147000
Project ID: P00449205LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0146+(-187.00) - K0150+465.00
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay: 0 Lane Km
Allocation: Php 55.00 Million

TO:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - punta Baja
K0146+(-187.00) - K0147+414.00
Palawan
Physical Target: CW1 - Preventive maintenance of Road:
Asphalt Overlay : 3.292 Lane Km
Allocation: Php 55.00 Million
June 24, 2020 FY 2020 GAA WIN0F06092 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200255000
Project ID: P00449274LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road : Asphalt Overlay -
PPSr Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0142+730.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 2.069 Lane Km
Allocation : Php 40.00 Million

TO:
Preventive Maintenance of Road ; Asphalt Overlay -
PPSR Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0139+568.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 2.138 Lane Km
Allocation: Php 40.00 Million
June 24, 2020 FY 2020 GAA WIN0F06087 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310203100272000
Project ID: P00402592LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM:
Coron - Busuanga Rd
K0005+124 - K0008+029,
k0008+469 - k0008+755,
k0013+582 - k0013+896,
k0013+950 - k0014+100
Physical Target: CW1 - Road Widening : 7.388 Lane Km
Allocation: php 107.478 Million

TO:
Coron - Busuanga Rd
K0005+124 - K0007+919,
K0008+489 - K0009+577.50
Physical target: CW1 - Road Widening : 7.827 Lane Km
Allocation: Php 107.478 Million

June 24, 2020 FY 2020 GAA WIN0F06088 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100481000
Project ID: P00400415LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd
K0149+308 - K0152+625
Physical Target : CW1 - Road Widening - 6.758 Lane Km
Allocation: Php 125.00 Million

TO:
Puerto Princesa North Rd
K0149+308 - K0152+765
Physical Target : CW1 - Road Widening - 7.038 Lane Km
Allocation: Php 125.00 Million
June 24, 2020 FY 2020 GAA WIN0F06091 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310305100942000
Project ID: P00402596LZ

OO1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridge

FROM:
Widening of Permanent Bridge - Dayandante Bridge I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 235.161 sq.m.
Allocation: Php 25.00 Million

TO:
Widening of Permanent Bridge - Dayandante I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 207.800 sq.m.
Allocation: Php 25.00 Million
June 24, 2020 FY 2020 GAA WIN0F06004 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200251000
Project ID: P00449270LZ

LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0181+630.00,
K0182+000.00 - K0183+506.00,
Palawan
Physical Target : Preventive Maintenance of Road -
Asphalt overlay : 0 Lane Km
Allocation: Php 50.00 Million

TO:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong,
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0176+1482.00,
Palawan
Physical Target : Preventive Maintenance of Road :
Asphalt Overlay - 2.716 Lane Km
Allocation : Php 50.00 Million
June 23, 2020 FY 2020 GAA WIN0F06121 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200113000
Project ID: P00449187LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0036+400 to K0036+900
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,022.00 sq.m.
Allocation: PHP 97.00 Million

TO:
Calapan North Road (S00008MR),
K0036+180 to K0036+302.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,344.00 sq.m.
Allocation: Php 97.00 Million
June 23, 2020 FY 2020 GAA WIN0F6120 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200114000
Project ID: P00449188LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0037+300 to K0037+800
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,094.00 sq.m.
Allocation: Php 98.00 Million

TO:
Calapan North Road (S00008MR),
K0037+300 to K0037+473.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,367.00 sq.m.
Allocation: Php 98.00 Million


June 23, 2020 FY 2020 WIN0G02875 310204100796000 April 29, 2020 Region IX Regional Office IX
UACS NO. 310204100796000
Project ID: P00401537MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section), Zamboanga City

CW1 - Construction of Concrete Road: 4.427 lane km.
Unit Cost: P 32,032,437.79/lane km.
ROW: 1,973.684211 sq.m.
Unit Cost: P 1,520.00/sq. m.
EAO: P 4,963,478.85
Excess: P 222,839.59
Allocation: P 150,000,000.00
June 23, 2020 FY 2020 WIN0G02867 310201100480000 May 11, 2020 Region IX Regional Office IX
UACS No. 310201100480000
Project ID: P00400265MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City - Zamboanga City Rd
K1871 + 300.00 - K1871 + 420.00,
K1871 + 540.00 - K1871 + 800.00,
K1872 + 020.00 - K1872 + 460.00,
K1873 + 580.00 - K1875 + 940.00,

CW1 - Road Widening: 6.36 lane km.
Unit Cost: P 16,710,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,719,730.03
Excess: P 2,269.19
Allocation: P 120,000,000.00
June 23, 2020 FY 2020 WIN0G02866 300204100421000 May 4, 2020 Region IX Regional Office IX
UACS No. 300204100421000
Project ID: P00431549MN

CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Sitio Bobonao, Ilaya - Burgos - Tamion - Diwa-an Road in support to copra industry, Dapitan CIty, Zamboanga del Norte

CW1 - Construction of Concrete Road: 7.618 lane km.
Unit Cost: P 15,315,000.00/lane km.
EAO: P 4,083,698.19
Excess: P 239,210.77
Allocation: P 121,000,000.00
June 23, 2020 2020 WIN0G02853 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 310305101185000
P00401049MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent
Bridges

FROM:

Pongtod Br. (Parallel Br.) along Daang Maharlika (Surigao-Agusan Sect)

Type of Work: Widening of Bridge

Physical Target: 381.6 Lane Km

Unit Cost: P102,725.37 / Lane Km

Allocation: P39,200,000

EAO: P800,000

TOTAL: P40,000,000

TO:

Pongtod Br. (B00862MN) along Daang Maharlika (Surigao-Agusan Sect)

Type of Work: Widening of Bridge

Physical Target: 407.36 Lane Km

Unit Cost: P96,229.38 / Lane Km

Allocation: P39,200,000

EAO: P800,000

TOTAL: P40,000,000
June 23, 2020 20202 WIN0G02905 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 300116203361000
P00443753MN

LOCAL PROGRAM - Local Roads and Bridges - Local Roads Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Consruction of By-pass Road, Brgy. Pag-Antayan, Cantillan, Surigao del Sur

Type of Work: Construction of Concrete Road

Physical Target: 0 Lane Km

Unit Cost:

Allocation: P39,200,000

EAO: P800,000

TOTAL: P40,000,000

TO:

Consruction of By-pass Road, Brgy. Pag-Antayan, Cantillan, Surigao del Sur

Type of Work: Construction of Concrete Road

Physical Target: 1.647 Lane Km

Unit Cost: P23.80085M / Lane Km

Allocation: P39,200,000

EAO: P800,000

TOTAL: P40,000,000
June 23, 2020 FY 2020 WIN0G02868 310205100264000 May 6, 2020 Region IX Regional Office IX
UACS No. 310205100264000
Project ID: P00401271MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Labangan - Midsalip Road, Zamboanga del Sur

CW1 - Construction of Concrete Road: 5.12 lane km.
Unit Cost: P 19,344,000.00/lane km.
ROW: 8,299.706833 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,466,524.71
Allocation: P 105,000,000.00
June 23, 2020 FY 2020 WIN0G02872 310204100798000 April 29, 2020 Region IX Regional Office IX
UACS No. 310204100798000
Project ID: P00401263MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Zamboanga City Diversion Road, Zamboanga City

CW1 - Road Widening: 5.51 lane km.
Unit Cost: P 23,672,140.84/lane km.
ROW: 50,000 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,565,172.36
Excess: 1,331.61
Allocation: P 150,000,000.00
June 23, 2020 FY 2020 WIN0G02876 310203100286000 April 29, 2020 Region IX Regional Office IX
UACS No. 310203100286000
Project ID: P00400307MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct Dumalinao - Margosatubig Rd
K1681 + 086 - K1684 + 254.54,
K1684 + 674.11 - K1685 + 232.57

CW1 - Road Widening: 7.454 lane km.
Unit Cost: P 14,097,818.28/lane km.
ROW: 4,122.9424 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,677,979.80
Allocation: P 110,000,000.00
June 23, 2020 FY 2020 GAA WIN0F06114 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200115000
Project ID: P00449189LZ

LOCAL PROGRAM

National Roads and Bridges - Natonal Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0039+500 to K0040+000
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,077.00 sq.m.
Allocation: Php 98.00 Million

TO:
Calapan North Road (S00008MR),
KJ0039+700 to K0039+869.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,400.00 sq.m.
Allocation: Php 98.00 Million
June 23, 2020 FY 2020 GAA WIn0F06115 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200116000
Project ID: P00449190LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0043+600 to K0043+950
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 3,949.00 sq.m.
Allocation: Php 95.00 Million

TO:
Calapan North Road (S00008MR),
K0043+625 to K0043+800.40
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,264.00 sq.m.
Allocation: Php 95.00 Million
June 23, 2020 2020 WIN0G02902 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 300107200971000
P00444695MN

LOCAL PROGRAM - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

FROM:

Construction of Seawall, Brgy. San Pedro, Cantilan, Surigao del Sur

Type of Work: Construction of Flood Mitigation Structure

Physical Target: 0 Lineal meters

Unit Cost:

Allocation: P49,500,000

EAO: P500,000

TOTAL: P50,000,000

TO:

Construction of Seawall, Brgy. San Pedro, Cantilan, Surigao del Sur

Type of Work: Construction of Flood Mitigation Structure

Physical Target: 191.600 Lineal meters

Unit Cost: P258,350 / Lineal meters

Allocation: P49,500,000

EAO: P500,000

TOTAL: P50,000,000
June 23, 2020 2020 WIN0G02903 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 300107200971000
P00400007MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1269 + 219 - K1269 + 246, K1270 + 218 - K1270 + 253, K1341 + 289 - K1341 + 320

Type of Work: Construction of Road Slope Protection Structure

Physical Target: 1906.500 Square meters

Unit Cost: P14,907 / Square meters

Allocation: P28,420,000

EAO: P580,000

TOTAL: P 29,000,000

TO:

Surigao-Davao Coastal Rd - K1269 + 219 - K1269 + 246, K1270 + 250 - K1270 + 300, K1341 + 289 - K1341 + 320

Type of Work: Construction of Road Slope Protection Structure

Physical Target: 2,001.13 Square meters

Unit Cost: P14,202 / Square meters

Allocation: P28,420,000

EAO: P580,000

TOTAL: P 29,000,000
June 23, 2020 2020 WIN0G02908 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 310202100562000
P00400134MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1213 + 000 - K1215 + 401

Type of Work: Road Widening

Physical Target: 4.802 Lane Km

Unit Cost: P16,304,000 / Lane Km

Allocation: P78,294,310

EAO: P2,839,690

TOTAL: P81,134,000

TO:

Surigao-Davao Coastal Rd - K1213 + 396 - K1215 + 396

Type of Work: Road Widening

Physical Target: 4.00 Lane Km

Unit Cost: P19,573,000 / Lane Km

Allocation: P78,294,310

EAO: P2,839,690

TOTAL: P81,134,000
June 23, 2020 2020 WIN0C03845 FY 2020 GAA (RA11465) January 7, 2020 Region III Zambales 2nd District Engineering Office
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Mitigation Structures and Drainage System of Sta. Rita River, Sta. 4+291.60 - Sta. 4+612.60 (Left Side), Olongapo City
June 23, 2020 2020 WIN0C03837 FY 2020 GAA (RA 11465) January 7, 2020 Region III Aurora District Engineering Office
Asset Preservation Program
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

Nueva Ecija-Aurora Rd - K0211 + 427 - K0211 + 786
June 23, 2020 FY 2020 WIN0G02889 310211100057000 May 13, 2020 Region IX Regional Office IX
UACS No. 310211100057000
Project ID: P00400477MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads

Zamboanga West Coastal Rd (Sibuco-Sirawai Section) - (S01166MN)
Chainage 10675 - Chainage 10904.88;
Chainage 11072.5 - Chainage 11800,
Chainage 11980 - Chainage 12210

CW1 - Paving of Unpaved Roads: 2.355 lane km.
Unit Cost: P 61,311,000.00/lane km.
ROW: 1,860.5005 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 5,053,589.13
Allocation: P 150,000,000.00
June 23, 2020 FY 2020 GAA WIN0F06108 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200117000
Project ID: P00449191LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0057+800 to K0058+300
Physical Target : CW1 - Construction of Road Slope
Protection Structure - 4,080.00 sq.m.
Allocation: Php 98.00 Million

TO:
Calapan North Road (S00008MR),
K0057+800 to K0057+941.80
Physical Target : CW1 - Construction of Road Slope
Protection Structure - 4,356.00 sq.m.
Allocation: Php 98.00 Million
June 22, 2020 2020 WIN0C03828 FY 2020 GAA January 7, 2020 Region III Bulacan 1st District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Mitigation Facilities along Labangan Channel, Iba O'Este, Calumpit, Bulacan (Sta. 01+500 - Sta. 02+280, Sta. 02+508 - Sta. 02+645.20)
June 22, 2020 2020 WIN0C03829 FY 2020 GAA January 7, 2020 Region III Bulacan 1st District Engineering Office
Network Development - Off-Carriageway Improvement - Primary Roads

Daang Maharlika (LZ) - K0041+102 - K0037+506
June 22, 2020 2020 WIN0C03830 FY 2020 GAA January 7, 2020 Region III Pampanga 3rd District Engineering Office
Network Development - Road Widening - Primary Roads

Manila North Rd - K0087+701 - K0088+340, K0088+860 - K0089+200, K0089+854 - K0090+104, K0090+118 - K0090+470
June 22, 2020 2020 WIN0C03817 GAA 2020 May 7, 2020 Cordillera Administrative Region CAR - Regional Office
From: Claveria-Calanasan-Kabugao Rd - K0703 + 274 - K0704 + 363, K0704 + 910 - K0706 + 564;
Physical Target: CW1 : 5.58 Lane Km; Allocation= Php 111,600,000

To: Claveria-Calanasan-Kabugao Rd - K0703 + 100 - K0704 + 260, K0704 + 910 - K0706 + 564; Physical Target: CW1 : 5.58 Lane Km; Allocation= Php 111,600,000
June 22, 2020 FY 2020 WIN0G02919 310201100598000 March 10, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310201100598000
Project ID: P00400161MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao- Pagadian - Zamboanga City Rd
K1750 + 268 - K1750 + 420,
K1750 + 520 - K1750 + 780,
K1751 + 736 - K1752 + 000,
K1753 + 000 - K1753 + 420,

CW1 - Road Widening: 2.192 lane km.
Unit Cost: P 13,412,409.00/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00
June 22, 2020 2020 WIN0C03791 FY 2020 GAA January 7, 2020 Region III Zambales 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program

Construction of Health Care Center, Tabacuhan, Sta. Rita, Olongapo City, Zambales

June 22, 2020 FY 2020 WIN0G02890 320101104228000 May 11, 2020 Region IX Regional Office IX
UACS No. 320101104228000
Project ID: P00420386MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Extension of Flood Control Structure along Siocon River (Upstream) 0+743.50 to 1+241.50, Siocon, Zamboanga del Norte

CW1 - Construction of Flood Mitigation Structure: 498.00 lm
Unit Cost: P 201,282.84/lm
ROW: 842.620333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,508,359.89
Allocation: P 104,000,000.00
June 22, 2020 FY 2020 WIN0G02892 310204100791000 May 6, 2020 Region IX Regional Office IX
UACS No. 310204100791000
Project ID: P00401261MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Buenavista-Bolong Bypass Road, Package 1, Zamboanga City

CW1 - Construction of Concrete Road: 1.76 lane km.
Unit Cost: P 75,191,185.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,631,777.00
Excess: 31,737.30
Allocation: P 147,000,000.00
June 22, 2020 FY 2020 WIN0G02886 310201100478000 May 6, 2020 Region IX Regional Office IX
UACS No. 310201100478000
Project ID: P00400317MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City - Zamboanga City Rd
K1690 + 900 - K1691 + 689,
K1691 + 828 - K1694 + 734,
K1694 + 883 - K1696 + 180

CW1 - Road Widening: 9.984 lane km.
Unit Cost: P 14,404,041.04/lane km.
ROW: 3,855.687433 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 5,033,348.10
Allocation: P 150,000,000.00
June 22, 2020 FY 2020 WIN0G02887 310201100473000 May 13, 2020 Region IX Regional Office IX
UACS No. 310201100473000
Project ID: P00400314MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd
K1913 + 420 - K1916 + 000

CW1 - Road Widening: 5.160 lane km.
Unit Cost: P 18,655,829.47/lane km.
ROW: 34,555.5904 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,369,242.80
Allocation: P 110,000,000.00
June 22, 2020 FY 2020 WIN0G02884 310201100470000 May 11, 2020 Region IX Regional Office IX
UACS No. 310201100470000
Project ID: P00400311MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd
K1845 + 833.38 - K1849 + 200.00

CW1 - Road Widening: 6.733 lane km.
Unit Cost: P 17,831,964.13/lane km.
ROW: 14,867.31337 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,202,191.51
Allocation: P 128,725,000.00
June 22, 2020 FY 2020 WIN0G02911 310106100386000 May 11, 2020 Region IX Regional Office IX
UACS No. 310106100386000
Project ID: P00400622MN

Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Dipolog-Polanco-Piñan-Jct Oroquieta Rd
K1812+610 - K1813+060,
K1813+961 - K1814+642,
K1814+652 - K1815+000,
K1820+561 - K1824+736,
K1827+234 - K1827+644


CW1 - Reconstruction to Concrete Pavement: 12.128 lane km.
Unit Cost: P 9,936,325.907/lane km.
EAO: P 4,217,771.62
Excess: 274,467.70
Allocation: P 125,000,000.00
June 22, 2020 FY 2020 WIN0G02878 320101104217000 May 11, 2020 Region IX Regional Office IX
UACS No. 320101104217000
Project ID: P00420375MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Kabasalan River (Phase II), (Downstream) 0+058.50 - 0+241.00 (LS) 0+058.50 - 0+241.00 (RS) (Upstream) 0+058.50 - 0+241.00 (LS) 0+058.50 - 0+241.00 (RS), Canacan, Kabasalan, Zamboanga Sibugay

CW1 - Construction of Flood Mitigation Structure: 730.500 lm
Unit Cost: P 136,203.69/lm
EAO: P 3,482,387.89
Excess: P 20,815.37
Allocation: P 103,000,000.00
June 19, 2020 FY 2020 GAA WIN0F06122 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310105100401000
Project ID: P00401316LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads

FROM:
Tablas Circumferential Rd
K0124+620 - K0124+884,
K0128+943 - K0129+080
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.818 Lane Km
Allocation: Php 11.478 Million

TO:
Tablas Cirfumferential Rd,
K0124+620 - K0124+884,
K0128+943 - K0129+058
Physical Target: CW1 - Reconstruction to Concrete Pavement:
0.774 Lane Km
Allocation: Php 11.478 Million
June 19, 2020 FY 2020 GAA WIN0F06111 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202926000
Project ID: P00446985LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads - Construction/Repair/
Rehabilitation/Improvement of
Various Infrastructure including
Local Projects

FROM;
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse
and Landslide along San Jose - Port Banton Road Section,
K0012+950 - K0013+100,
Palawan
Physical Target : CW1 - Construction of Road Slope Protection
Structure: 2,240.00 square meters
Allocation: Php 40.00 Million

TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse
and Landslide along San Jose - Port Barton Road Section,
K0013+060 - K0013+122.50
Physical Target: CW1 - Construction of Road Slope Protection
Structure: 1,716.86 square meters
Allocation: Php 40.00 Million
June 19, 2020 FY 2020 GAA WIN0F06112 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206533000
Project ID: P00447541LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation/Improvement of Sibuyao - Sabong Road,
Sta 0+000 - Sta 1+000,
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.078 lane km
Allocation: Php 73.50 Million

TO:
Rehabilittion/Improvement of Sibuyao - Sabang Road,
Sta. 0+000 - Sta. 2+539,
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.078 lane km
Allocation: Php 73.50 Million
June 19, 2020 FY 2020 GAA WIN0F06116 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200112000
Project ID: P0049186LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects

FROM:
Calapan North Road (S00008MR),
K0024+300 - K0024+700
Physical Target: CW1 - Construction of Road Slope Protection
Structure : 3,957.00 square meters
allocation: Php 95.00 Million

TO:
Calapan North Road (S00008MR),
K0024+375 - K0024+556.10
Physical Target: CW1 - Construction of Road Slope Protection
Structure : 4,254.00 square meters
Allocation: Php 95.00 Million
June 19, 2020 2020 WIN0C03836 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0071+000 - K0071+636, K0072+056 - K0072+474
June 19, 2020 2020 WIN0C03840 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0069+412 - k0069+750
June 19, 2020 2020 WIN0C03841 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Avenue - K0070+(-046) - K0070+109
June 19, 2020 FY 2020 GAA WIN0G02849 FY 2020 GAA RA 11465 January 1, 2020 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
JP Cabaguio Ave -
K1507+(-896) - K1507+770
Physical Target:
CW1: 7.718 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 106,150,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
JP Cabaguio Ave -
K1507+(-876) - K1507+549
Physical Target:
CW1: 5.704 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 106,150,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 19, 2020 FY 2020 GAA WIN0G02917 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1525+252 - K1525+828
Physical Target:
CW1: 1,152.00 lm (Construction of Drainage Structure along Road)
ROW: 12,130.80 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 24,500,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1525+080.84 - K1525+810.84
Physical Target:
CW1: 1,460.00 lm (Construction of Drainage Structure along Road)
ROW: 12,130.80 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 24,500,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 500,000.00
June 19, 2020 2020 WIN0C03846 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

Sn Fernando - Lubao Rd - K0068+556 - K0068+653
June 19, 2020 FY 2020 GAA WIN0G02921 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1472+(-005) - K1472+380, K1472+405 - K1473+367
Physical Target:
CW1: 2.726 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,447,000.00
CW1: P 31,798,060.00 (Road Widening)
EAO: P 648,940.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1472+(-005) - K1472+380, K1472+405 - K1472+695
Physical Target:
CW1: 2.230 Lane Km (Road Widening)
Allocation:
TOTAL: P 32,447,000.00
CW1: P 31,798,060.00 (Road Widening)
EAO: P 648,940.00
June 19, 2020 FY 2020 GAA WIN0G02916 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) -
K1474+091 - K1477+665, K1478+355 - K1479+500
Physical Target:
CW1: 26,594.40 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 82,964,000.00
CW1: P 80,060,230.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,903,740.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) -
K1477+405 - K1477+665, K1478+355 - K1478+615
Physical Target:
CW1: 20,914.80 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 82,964,000.00
CW1: P 80,060,230.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,903,740.00
June 19, 2020 FY 2020 GAA WIN0G02838 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+600 - K1770+200, K1771+000 - K1772+530
Physical Target:
CW1: 4.400 lane km (Road Widening)
Allocation:
TOTAL: P 53,928,000.00
CW1: P 52,040,520.00 (Road Widening)
EAO: P 1,887,480.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1769+600 - K1770+200, K1771+000 - K1771+820
Physical Target:
CW1: 2.840 lane km (Road Widening)
Allocation:
TOTAL: P 53,928,000.00
CW1: P 52,040,520.00 (Road Widening)
EAO: P 1,887,480.00
June 19, 2020 FY 2020 GAA WIN0G02922 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1713+357 - K1714+230, K1717+000 - K1718+500,
K1759+000 - K1759+500
Physical Target:
CW1: 7,492.00 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 16,894,000.00
CW1: P 16,556,120.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 337,880.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1713+354 - K1714+000, K1714+000 - K1714+176,
K1714+322 - K1714+573
Physical Target:
CW1: 5,105.46 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 16,894,000.00
CW1: P 16,556,120.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 337,880.00
June 19, 2020 FY 2020 GAA WIN0G02915 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1721+622 - K1721+942
Physical Target:
CW1: 1,810.240 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Road Slope Protection Structure)
EAO: P 140,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1721+754 - K1721+951.60
Physical Target:
CW1: 861.536 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Road Slope Protection Structure)