Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 25, 2022 FY 2022 GAA WIN2G02853 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105013000
Project ID : P00621116LZ

002 : Protect Lives and Properties

Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major Basins and Principal Rivers

FROM :

Construction of Bansud River Control,
Sta. 0+000 - Sta. 0+560,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 415.984 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Bansud River Control,
Sta. 0+000 - Sta. 670,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 670.00 l.m.
Allocation - Php 50.00 Million
May 25, 2022 FY 2022 GAA WIN2G02852 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105008000
Project ID : P00621119LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within Major River Basins and
Principal Rivers

FROM :

Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 Lane Km
Allocation - Php 50.00 Million

TO :

Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+770,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
770.0 Lane Km
Allocation - Php 50.00 Million



May 25, 2022 2022 WIN2C03566 SARO-BMB-A-22-0003173 March 21, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 2,748.610 Square meters

EAO P 0.989500 M

Total P 49.475 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 808 - K0872 + 858

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 1,741.05 Square meters

EAO P 0.989500 M

Total P 49.475 M
May 25, 2022 FY 2022 GAA WIN2G02845 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105013000
Project ID : P00621124LZ

002 ; Protect Lives and Properties

Flood Mitigation Program - Construction/Rehabilitation of Flood
Mitigation Facilities within Major Basins and Principal Rivers

FROM :

Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+440,
Pinamalaym.an, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.984 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+468.8,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
468.80 l.m.
Allocation - Php 50.00 Million

May 25, 2022 2022 WIN2C03564 SR2022-03-007930 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0871 + 400 - K0871 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 5,246.670 Square meters

EAO P 3.305400 M

Total P 94.440 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 558 - K0872 + 658

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 3,383.40 Square meters

EAO P 3.305400 M

Total P 94.440 M
May 25, 2022 FY 2022 GAA WIN2G02792 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105012000
Project ID : P00621123LZ

002 : Protect Lives and Properties

Flood management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major basins and Principal Rivers

FROM :

Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480,
Sta. 0+000 - Sta. 0+086
Physical Target - CW1 - Construction of Flood Mitigation Structure
566.00 l.m.
Allocation - Php 50.00 Million
May 25, 2022 2022 WIN2C03562 SR2022-03-007938 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0871 + 700 - K0872 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 5,376.170 Square meters

EAO P 3.386985 M

Total P 96.771 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 358 - K0872 + 458

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 3,493 Square meters

EAO P 3.386985 M

Total P 96.771 M

May 25, 2022 2022 WIN2E02386 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300217100099000
Project ID: P00630445MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

FROM:

Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Bridge

Physical Target:
CW1- 6.380 Lane Km
CW2- 286.200 Square meters

Allocation:
TOTAL: P 180,000,000
CW1: P 133,392,713
CW2: P 40,307,287
EAO: P 6,300,000

Unit Cost:
CW1: P 20,907,948.75/ Lane Km
CW2: P 140,836.08/ Square meters

TO:

Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road

Physical Target:
CW1- 0.600 Lane Km
CW2- 14.100 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 14,135,628.62
CW2: P 159,564,371.38
EAO: P 6,300,000

Unit Cost:
CW1: P 23,559,381.03/ Lane Km
CW2: P 11,316,622.08/ Lane Km
May 25, 2022 2022 WIN2C03567 SR2022-03-007943 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 000 - K0872 + 300

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 5,531.110 Square meters
EAO P 3.484600 M

Total P 99.560 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 258 - K0872 + 358

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 3,621 Square meters
EAO P 3.484600 M

Total P 99.560 M
May 25, 2022 2022 WIN2C03555 SR2022-03-007957 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 300 - K0872 + 600

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 5,425.560 Square meters

EAO P 3.418100 M

Total P 97.660 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 458 - K0872 + 558

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 3,534.50 Square meters

EAO P 3.418100 M

Total P 97.660 M
May 25, 2022 2022 WIN2C03563 SR2022-03-007960 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 600 - K0872 + 900

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 5,456.670 Square meters

EAO P 3.437700 M

Total P 98.220 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 658 - K0872 + 758

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 3,559.80 Square meters

EAO P 3.437700 M

Total P 98.220 M
May 25, 2022 2022 WIN2E02317 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300215102369000
Project ID: P00630409MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.983 Lane Km

Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000

Unit Cost:
CW1: P 9,969,481.18/ Lane Km

TO:

Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0.469 Lane Km
CW1- 960.225 Square meters

Allocation:
TOTAL: P 10,000,000
CW1: P 4,171,661.5
CW2: P 5,628,338.5
EAO: P 200,000

Unit Cost:
CW1: P 8,894,800.64/ Lane Km
CW2: P 5,861.48/ Square meters
May 25, 2022 2022 WIN2E02313 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310202101248000
Project ID: P00602517MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1201 + 000 - K1201 + 567

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 1.134 Lane Km

Allocation:
TOTAL: P 31,369,000
CW1: P 30,741,620
EAO: P 627,380

Unit Cost:
CW1: P 27,109,012.35/ Lane Km

TO:

Surigao-Davao Coastal Rd - K1200 + 454.10 - K1201 + 900

Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road

Physical Target:
CW1- 1.7979 Lane Km
CW2- 1,139.680 Lineal meters

Allocation:
TOTAL: P 31,369,000
CW1: P 25,425,058.22
CW2: P 5,316,561.78
EAO: P 627,380

Unit Cost:
CW1: P 14,141,530.8/ Lane Km
CW2: P 4,664.96/ Lineal meters
May 25, 2022 FY 2022 GAA WIN2G02726 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300201100085000
Project ID : P00635454LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAMM

FROM ;

Construction/Improvement of Access Roads leading to Airports
(Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN), Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge
230.955 sq.m.
Allocation - Php 24.264 Million

TO :

Construction/Improvement of Access Roads leading to Airports -
(Kalsada Tungo sa Paliparan, Riles at Daungan Program -
KATUPARAN0, Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge :
73 sq.m.
CW2 - Rehabilitation of Paved Road :
0.7344 lane km
Allocation - Php 24.264 Million
73 sq.m.

May 25, 2022 2022 WIN2C03557 SR2022-03-008098 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Arteche-Jipapad-Las Navas-Rawis Rd

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 5,160.060 Square meters

EAO P 3.250835 M

Total P 92.881 M

AS MODIFIED:

Arteche-Jipapad-Las Navas-Rawis Rd- (S00137SM) K0968 + 985 – K0970 + 060, (S00174SM) K0974 + 442 – K0977 + 428, (S00189SM) K0978 + 083 – K0979 + 437

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 11,785.20 Square meters

EAO P 3.250835 M

Total P 92.881 M
May 25, 2022 2022 WIN2C03565 GAA FY 2022 January 2, 2022 Region VIII Eastern Samar District Engineering Office
Convergence and Special Support Program

Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

AS PER GAA/ORIGINAL:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar


Physical Target: Allocation:

CW1-Construction of Concrete Road P 16.599240 M
: 1.129 Lane Km

EAO P 0.338760 M

Total P 16.938 M

AS MODIFIED:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar


Physical Target: Allocation:

CW1-Construction of Concrete Road P 16.599240 M
: 0.58 Lane Km

EAO P 0.338760 M

Total P 16.938 M
May 24, 2022 FY 2022 GAA WIN2G02906 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101135000
Project ID : P00606216LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0140+000 - K0140+405
Physical Target - CW1 - Road Widening - 0.810 Lane Km
Allocation - Php 12.00 Million

TO :

Calapan South Road
K0140+000 - K0140+283
Physical Target - CW1 - Road Widening - 0.566 Lane Km
Allocation - Php 12.00 Million
May 24, 2022 FY 2022 GAA WIN2G02683 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101134000
Project ID : P00606227LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0138+458 - K0138+910
Physical Target - CW1 - Road Widening - 0.904 Lane Km
Allocation - Php 15.00 Million

TO :

Calapan South Road
K0138+458 - K0138+908.70
Physical Target - CW1 - Road Widening - 0.9014 Lane Km
Allocation - Php 15.00 Million
May 24, 2022 FY 2022 GAA WIN2G02747 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101136000
Project ID : P00606268LZ

001 : Ensure Safe and Reliable national Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0145+637 - K0146+750
Physical Target - CW1 - Road Widening : 2.326 Lane Km
Allocation - Php 38.00 Million

TO :
Calapan South Road
K0145+637 - K0146+530
Physical Target - CW1 - Road Widening : 1.855 Lane Km
Allocation - Php 38.00 Million
May 24, 2022 2022 WIN2C03566 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0998 + 400 - K0998 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.600 M
Structure: 1,111.10 Square meters
EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0996 + 160 - K0996 + 200, K0998 + 325 - K0998 + 425

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.600 M
Structure: 550 Square meters
EAO P 0.400 M

Total P 20.00 M
May 24, 2022 FY 2022 GAA WIN2G02992 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310108100893000
Project ID : P00611271LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Calapan South Road
K0192+100 - K0192+151,
K0192+288 - K0192+334,
K0192+362 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 966.66 sq. m.
Allocation - Php 17.40 Million

TO :

Calapan South Road
K0192+100.0 - K0192+150,
K0192+280.0 - K0192+332,
K0192+362.2 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1030.97 sq.m.
Allocation - Php 17.40 Million


May 24, 2022 2022 WIN2C03570 SARO-BMB-A-22-0003170 March 23, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0996 + 900 - K0997 + 100, K0997 + 200 - K0997 + 400

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0979 + 915 - K0979 + 985

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,534.00 Square meters
EAO P 3.500 M

Total P 100.00 M
May 24, 2022 2022 WIN2C03559 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply

AS PER GAA/ORIGINAL:

Construction of Level III Water Supply System, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Level III Water Supply System, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 15.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00
May 24, 2022 2022 WIN2C03558 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 4.262 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Other Facilities P 49.00 M
: 5.00 Number of Facilities

EAO P 1.00 M

Total P 50.00 M
May 24, 2022 2022 WIN2F06366 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 176.929 Lineal Meters;
Allocation: Php 20,000,000.000

To: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 323.000 Lineal Meters;
Allocation: Php 20,000,000.000

May 24, 2022 2022 WIN2F06367 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 88.464 Lineal Meters;
Allocation: Php 10,000,000.000

To: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 169.000 Lineal Meters;
Allocation: Php 10,000,000.000

May 24, 2022 2022 WIN2C03568 SARO-BMB-A-22-0003173 March 21, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0867 + 150 - K0867 + 450

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 2,748.670 Square meters

EAO P 0.989520 M

Total P 49.476 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 758 - K0872 + 808

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 1,738 Square meters

EAO P 0.989520 M

Total P 49.476 M
May 24, 2022 FY 2022 WIN2C03556 UACS No. 320101107911000 March 21, 2022 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 320101107911000
Project ID.: P00621436LZ
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Laguna Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 412.53 lineal meters
Unit Cost = P 71,267,540/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000

As Modified
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Lagarian Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 370.00 lineal meters
Unit Cost = P 79,459,460/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03556
May 24, 2022 FY 2022 WIN2C03569 UACS No. 310102100792000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310102100792000
Project ID.: P00610107LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+820 – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.16 lane km
Unit Cost = P 7,332,820/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+(-550) – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 6.94 lane km
Unit Cost = P 13,904,900/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03569
May 24, 2022 FY 2022 WIN2C03572 UACS No. 310103100854000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310103100854000
Project ID.: P00603593LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 1.476 lane km
Unit Cost = P 2,433,400/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking – 0.177 lane km
Unit Cost = P 20,290,430/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000
WIN2C03572
May 24, 2022 FY 2022 WIN2C03571 UACS No. 310103100778000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310103100778000
Project ID.: P00610134LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0013+1068 – K0014+(-399), K0013+900 – K0014+000
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.431 lane km
Unit Cost = P 7,184,870/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0012+(-079) – K0014+328
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 6.756 lane km
Unit Cost = P 14,283,490/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03571
May 24, 2022 FY 2022 WIN2C03573 UACS No. 310101100603000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310101100603000
Project ID.: P00603595LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 0.47 lane km
Unit Cost = P 7,800,380/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking - 0.184 lane km
Unit Cost = P 19,923,060/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000
WIN2C03573
May 24, 2022 2022 WIN2F06258 SARO-BMB-A-22-0002937 March 21, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+133 - K0341+163, K0341+427 - K0341+445, K0341+488 - K0341+507, K0342+583 - K0342+621, K0342+736 - K0342+760, K0344+724 - K0344+776, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0351+860 - K0351+894, K0352+333 - K0352+414, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 3,023.000 Square Meters;
Allocation: Php 30,230,000.000

To: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+427 - K0341+445, K0341+488 - K0341+507, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 2,098.700 Square Meters;
Allocation: Php 30,230,000.000
May 23, 2022 FY 2022 GAA WIN2G02869 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310106100772000
Project ID : P00603931LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Tertiary Roads

FROM :

Calapan South Road
K0187+398 - K0187+740,
K0187+846 - K0188+000
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.992 Lane Km
Allocation - Php 18.00 Million

TO :

Calapan South Road
K0187+380 - K0187+501.60
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.243 Lane Km
Allocation - Php 18.00 Million
May 23, 2022 2022 WIN2F06347 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0075+279 - K0075+596
May 23, 2022 2022 WIN2F06344 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) - K0072+465 - K0073+346, K0082+916 - K0084+540
May 23, 2022 FY 2022 GAA WIN2G02842 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310111100429000
Project ID : P00604078LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along national Roads - Secondary Roads

FROM :

Calapan South Road
K0070+181 - K0071+184,
K0071+236 - K0072+004
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,572.00 l.m.
Allocation - Php 50.00 Million

TO :

Calapan South Road
K0069+476 - K0071+167.10,
K0071+300 - K071+775
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,638.70 l.m.
Allocation - Php 50.00 Million
May 23, 2022 FY 2022 GAA WIN2G02716 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310111100428000
Project ID : P00604079LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along national Roads - Secondary Roads

FROM :

Calapan South Road
K0064+(-249) - K0064+950,
K0064+(-289) - K0064+(-269)
Physical Target - CW1 - Construction of Drainage Structure
along Road - 2,438.00 l.m.
Allocation - Php 35.00 Million

TO :

Calapan South Road
K0064+(-249) - K0064+833
Physical Target - CW1 - Construction of Drainage Structure
along Road - 1,082.00 l.m.
Allocation - Php 35.00 Million
May 23, 2022 2022 320101107354000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Sinait Section), Quirino, Isabela
May 23, 2022 2022 320101107355000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Rang-Ayan Section), Roxas, Isabela
May 23, 2022 2022 320101107358000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Holy Friday Section), Mallig, Isabela
May 23, 2022 2022 320101107359000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Olango Section), Mallig, Isabela
May 23, 2022 2022 310201100972000 GAA FY 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0309+(-496) - K0309+(-413), K0309+(-423) - K0309+(-284), K0323+200 - K0323+505
May 23, 2022 2022 320101107356000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela
May 23, 2022 2022 320101107357000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Luna Section), Quirino, Isabela
May 23, 2022 2022 310112100297000 GAA FY 2022 January 3, 2022 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads - San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd- (S00003ST) K0020+670 - K0020+782
May 23, 2022 FY 2022 GAA WIN2G02851 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310109100859000
Project ID : p00604404Lz

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Calapan South Road
K0184+902 - K0184+948
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 366.67 sq.m.
Allocation - Php 5.50 Million

TO :

Calapan South Road
K0184+902 - K0184+966.80
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 339.55 sq.m.
Allocation - Php 5.50 Million
May 23, 2022 FY 2022 GAA WIN2G02871 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310109100860000
Project ID : P00604405LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Calapan South Road
K0187+348 - K0187+505
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1886.67 sq. m.
Allocation - Php 28.300 million

TO :

Calapan South Road
K0187+690 - K0187+934.8
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1282.75 sq.m.
Allocation - Php 28.30 Million
May 21, 2022 FY 2022 WIN2E02315 310204101795000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310204101795000
Project ID: P00604221MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Bagalupa-Labangan-Gubang Road, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 3.8719 Lane km
Unit Cost: ₱ 12,526,149.95/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 5,807.85 sq.m.
Unit Cost: ₱ 86.09/sq.m.
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00
May 21, 2022 FY 2022 WIN2E02316 310204101799000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310204101799000
Project ID: P00604222MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Molave-Tambulig-Don Victoriano Diversion Road, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 3.575 Lane km
Unit Cost: ₱ 13,706,293.71/Lane km
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00
May 21, 2022 FY 2022 WIN2E02302 300215102015000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300215102015000
Project ID : P00630163MN

Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

Construction of Alang-Alang-Lower Tiparak-Tungawan By-Pass Road, Zamboanga del Sur

CW1 - Construction of Concrete Road
Physical Target: 1.064 Lane km
Unit Cost : P 18,421,052.63/Lane km
EAO : P 400,000.00
Allocation : P 20,000,000.00
May 21, 2022 FY 2022 WIN2E02180 310104100360000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310104100360000
Project ID: P00601149MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Dipolog-Sindangan-Liloy Rd (S01057MN) K1861 + 698.00 - K1863 + 556.00, K1863 + 834.84 - K1865 + 911.66, K1865 + 952.00 - K1866 + 867.23

CW1 : Reconstruction to Concrete Pavement
Physical Target: 9.58904 Lane km
Unit Cost : P 8,273.77/Lane km
EAO : P 2,877,525.00
Allocation : P 82,215,000.00
May 20, 2022 FY 2022 GAA WIN2G02827 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 3201011081820000
Project ID : P00620660LZ

002 : Protect Lives and Properties

Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Marangas River Flood Control Structure,
Sta. 0+000 - Sta. 1+080,
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610 LM
Allocation - Php 30.00 Million

TO :

Construction of Marangas River Flood Control Structure,
Sta. 0+800 - Sta. 1+250, Left Bank
Sta. 1+080 - Sta.1+240
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610.0 LM
Allocation - Php 30.00 Million
May 20, 2022 FY 2022 GAA WIN2G02789 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 3201011081830000
Project ID : P00620661LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 2+000,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - Php 48.00 Million

TO :

Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 1+790
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - 48.00 Million
May 20, 2022 2022 WIN2E02351 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100437000
Project ID: P00601522MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 875

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,310.50 Square meters

Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100

Unit Cost:
CW1: P 9,800/ Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 858

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 984.500 Square meters

Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100

Unit Cost:
CW1: P 22,999.39055/ Square meters

May 20, 2022 2022 WIN2E02349 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300215100607000
Project ID: P00630145MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 7.864 Lane Km

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 9,816,887.08/ Lane Km

TO:

Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road

Physical Target:
CW1- 4.2536 Lane Km
CW2- 3,034.38 Lineal meters

Allocation:
TOTAL: P 80,000,000
CW1: P 62,067,108.74
CW2: P 15,132,891.26
EAO: P 2,800,000

Unit Cost:
CW1: P 14,591,665.59/ Lane Km
CW2: P 4,987.14/ Lineal meters
May 20, 2022 2022 WIN2E02199 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 300219100392000
Project ID: P00632322MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1445+100 -K1445+300

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 4,295.082 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 22,467.56/ Square meters

TO:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 - K1508+750

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 10,393.78 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 9,824.39/ Square meters
May 20, 2022 FY 2022 GAA WIN2G02910 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108185000
Project ID : P00620663LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Ransang River Flood Control Structure
Sta. 0+000 - Sta. 0+300,
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structures
233.50 LM
Allocation - Php 20.00 Million

TO :

Construction of Ransang Flood Control Structure
Left Bank Sta. 0+000 - Sta. 0+083 Downstream,
Sta. 0+102.20 - Sta. 0+253 Upstream,
Rizal, Palawan\
Physical Target - CW1 - Construction of Flood Mitigation Structure
233.50 LM
Allocation - Php 20.00 Million
May 20, 2022 FY 2022 GAA WIN2G02824 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108186000
Project ID : P00620664LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Salogon River Flood Control Structure
Sta. 0+000 - Sta. 0+450
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640.00 LM
Allocation - Php 40.00 Million

TO :

Construction of Salogon River Flood Control Structure,
Sta. 0+000 - Sta. 0+520 Right Bank,
Sta. 0+360 - Sta. 0+480 Left Bank,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640 LM
Allocation - Php 40.00 Million
May 20, 2022 FY 2022 GAA WIN2G06274 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108188000
Project ID : P00620666LZ

002 : Protect Lives and Properties Against Major Floods

Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Tagusao River Flood Control Structure,
Sta. 0+100 - Sta. 0+400,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million

TO :

Construction of Tagusao River Flood Control Structure,
Sta. 0+070 - Sta. 0+620 Right Riverbank,
Quezon Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million
May 20, 2022 FY 2022 GAA WIN2G02932 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320102104996000
Project ID : P00621114LZ

002: Protect Lives and Properties against Major Floods

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers

FROM :

Construction of Culasian River Flood Control Structure,
Sta. 0+000 - Sta. 0+152
Rizal, Palawan, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million

TO:

Construction of Culasian River Flood Control Structure,
Sat. 0+000 - Sta. 0+082
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million
May 20, 2022 FY 2022 GAA WIN2G02933 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320102104997000
Project ID : P00621115LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers

FROM :

Construction of Panitian River Flood Control Structure,
Sta. 0+000 - Sta. 0+250
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million

TO :

Construction of Panitian River Flood Control Structure
Sta. 0+000 - Sta. 0+131,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million
May 20, 2022 FY 2022 GAA WIN2Go2903 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 300214100243000
Project ID : P00635991LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle Users Charge (MVUC)
as per R.A. 11239

FROM :

Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd
K0160+000 - K0160+859,
K0166+000 - K0167+000,
K0172+229 - K0172+548
Physical Target - CW1 - Preventive maintenance of Road :
Asphlat Overlay : 4.478 Lane Km
Allocation - Php 43.687 Million

TO :

Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd\
K0156+504 - K0158+662
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 4.478Lane Km
Allocation - Php 43.687 Million
May 19, 2022 FY 2022 WIN2E02312 310204101141000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101141000
Project ID: P00604246MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Airport - Turno - Sinaman Bypass Road, Zamboanga del Norte

CW1- Road Widening
Physical Target: 4.91 Lane Km
Unit Cost: ₱ 20,061,099.80/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 20,000.00 sq.m.
Unit Cost: ₱ 382.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02318 320101107683000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107683000
Project ID: P00620007MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Panganuran River, Gutalac, Zamboanga del Norte (at Panganuran Br. Section along Liloy - Siocon Road (S01146MN))

CW1- Construction of Flood Mitigation Structure
Physical Target: 567.610 Lineal Meters
Unit Cost: ₱ 171,425.73/Lineal Meters
EAO: ₱ 3,535,000.00
Excess: ₱ 162,042.35
Allocation: ₱ 101,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02660 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104987000
Project ID : P00621103LZ

Construction/Rehabilitation of Flood Mitigation Facilities
within major River basins and principal Rivers

Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+473,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.0 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+315,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.00 lineal meter
Allocation - Php 45.00 Million

May 19, 2022 FY 2022 WIN2E02333 310103100817000 March 23, 2022 Region IX Regional Office IX
UACS No. 310103100817000
Project ID: P00601163MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads


Imelda-Bayog-Kumalarang - Lapuyan-Margosatubig Rd - K1763 + (-656) - K1763 + (-276), K1763 + (-276) - K1763 + 000, K1763 + 000 - K1764 + 316.49, K1765 + 000 - K1767 + 610.51

CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 9.17 Lane Km
Unit Cost: ₱ 10,687,966.19/Lane Km
EAO: ₱ 3,610,845.00
Excess: ₱ 1,547,505.00
Allocation: ₱ 103,167,000.00
May 19, 2022 FY 2022 GAA WIN2G02753 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104988000
Project ID : P00621104LZ

Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+474,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+377
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million
May 19, 2022 FY 2022 WIN2E02327 310204101148000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101148000
Project ID: P00604243MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan – Lamisahan - Victoria By-Pass Road, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 1.76 Lane Km
Unit Cost: ₱ 54,882,011.25/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 286.7298/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02328 310101100578000 March 22, 2022 Region IX Regional Office IX
UACS No. 310101100578000
Project ID: P00604683MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd – K1697+400.00 – K1699+000.00, K1719+000.00 – K1719+294.00, K1719+314.00 – K1720+000.00, K1721+200.00 – K1721+420.00, K1704 + 370 - K1704 + 420

CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target: 5.60 Lane km
Unit Cost: ₱ 16,820,495.08/Lane km
CW2- Construction of Road Slope Protection Structure
Physical Target: 8,678.50 sq.m.
Unit Cost: ₱ 507.60/sq.m.
EAO: ₱ 3,605,000.00
Excess: ₱ 795,000.00
Allocation: ₱ 103,000,000.00
May 19, 2022 FY 2022 WIN2E02331 310305101537000 March 22, 2022 Region IX Regional Office IX
UACS No. 310305101537000
Project ID: P00602123MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Opao Br. (B01784MN) along Dipolog-Oroquieta National Rd

CW1- Widening of Bridge
Physical Target: 867.186 sq.m.
Unit Cost: ₱ 115,027.23/Sq.m.
EAO: ₱ 3,675,000.00
Excess: ₱ 1,575,000.00
Allocation: ₱ 105,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02975 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104991000
Project ID : P00621623LZ

002 : Protect Lives and Properties Against Major Flood

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers

FROM :

Construction of River Protection Structures along
Calawagan River,
Sta. 0+000.00 - Sta. 0+722.89,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation - Php 50.00 Million

TO :

Construction of River Protection Structure
along Calawagan River
Sta. 0+000 - Sta. 0+322,
Sta. 0+492 - Sta. 0+772,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation -Php 50.00
May 19, 2022 FY 2022 WIN2E02332 310204101585000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101585000
Project ID: P00604236MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Baluno - La Paz (Sitio Pole) Diversion Road, (Phase II), Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 2.00 Lane Km
Unit Cost: ₱ 48,177,832.77/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 32,647.78 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02326 310204101581000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101581000
Project ID: P00604256MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package II, Zamboanga Sibugay

CW1- Road Widening
Physical Target: 6.89 Lane Km
Unit Cost: ₱ 12,612,481.86/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 38,433.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Allocation : ₱ 102,000,000.00
May 19, 2022 FY 2022 WIN2E02330 310201100904000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100904000
Project ID: P00602316MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Liloy-Ipil Rd - K1985 + 081.41 - K1985 + 794.28, K1985 + 981.19 - K1987 + 960.00

CW1- Road Widening
Physical Target: 5.383 Lane Km
Unit Cost: ₱ 15,455,469.15/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 27,509.66 sq.m.
Unit Cost: ₱ 500.00/Sq.m.
EAO : ₱ 3,516,380.00
Allocation: ₱ 100,468,000.00
May 19, 2022 FY 2022 WIN2E02329 310108100969000 March 23, 2022 Region IX Regional Office IX
UACS No. 310108100969000
Project ID: P00601386MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads


Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) - K1991 + 276.00 - K1991 + 385.00, K1993 + 100.39 - K1995 + 413.38

CW1- Construction of Road Slope Protection Structure
Physical Target: 3,978.50 sq.m.
Unit Cost: ₱ 25,493.70/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 6,136.22 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,745,455.00
Allocation: ₱ 107,013,000.00
May 19, 2022 FY 2022 GAA WIN2G02769 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104992000
Project ID : P00621624LZ

002 ; Protect Lives and Properties Against Major Flood

Flood management Program -
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and principal Rivers

FROM :

Construction of River Protection Structures along
Katanlawan River,
Sta. 0+000 - Sta. 0+679.42
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - Php 47.00 Million

TO :

Construction of River Protection Structure
along Katanlawan River,
Sta. 0+000 - Sta. 0+840(L/S),
Sta. 0+200 - Sta.0+360(R/S),
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - 47.00 Million


May 19, 2022 FY 2022 WIN2E02357 310211100090000 April 5, 2022 Region IX Zamboanga del Norte 2nd District Engineering Office
UACS No. 310211100090000
Project ID : P00604483MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads

Zamboanga West Coastal Road (Sibuco - Sirawai Section) S01166MN
Chainage 12494 - Chainage 14094

CW1 - Paving of Unpaved Roads: 3.200 Lane km
Unit Cost : P 15,312.50/Lane km
EAO : P 1,000,000.00
Allocation : P 50,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02931 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 300105200731000
Project ID : P00655135LZ

LOCAL PROGRAM

National Building Program - Buildings and other Structures

FROM :

Construction(Completion) of Four Storey Hostel Building,
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - 22.230 Million

TO :

Construction of 2 Storey Hostel Building
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - Php 22.230 Million
May 19, 2022 2022 WIN2E02365 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 250 - K1519 + 310
Physical Target:
CW1: 3,333.33 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522 + 340 - K1522 + 403, K1528 + 180 – K1528 + 300
Physical Target:
CW1: 1,916.34 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
May 19, 2022 2022 WIN2E02366 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 5.660 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 1.360 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
May 19, 2022 FY 2022 WIN2E02343 300204101215000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300204101215000
Project ID : P00632755MN

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Access Road at Sitio Anuling, Pamucutan to Sta. Rita in Support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City

CW1 - Construction of Concrete Road : 1.17 Lane km
Unit Cost : P 41,381,945.56/Lane km
EAO : P 1,000,000.00
Excess: P 583,123.70
Allocation : P 50,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02846 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108178000
Project ID : P00620656LZ

002: Protect Lives and Properties against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Barong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+700,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million

TO :

Construction of B0arong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+745,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million
May 19, 2022 FY 2022 WIN2E02347 310102101054000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310102101054000
Project ID : P00604475MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Old Rd (Ayala-Talisayan) - K1956 + (-597) - K1956 + 000

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.194 Lane km
Unit Cost : P 7,368,347.11/Lane km
EAO : P 180,000.00
Physical Reserved: P 22,193.55
Allocation : P 9,000,000.00
May 19, 2022 FY 2022 WIN2E02342 310111100474000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310111100474000
Project ID: P00601323MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Zamboanga City-Labuan-Limpapa Rd - K1944 + 747 - K1945 + 599.30

CW1 - Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target: 852.30 Ln.m.
Unit Cost: P 16,766.9386/Ln.m.
EAO: P 299,960.00
Excess: P 407,578.23
Allocation: P 14,998,000.00
May 19, 2022 FY 2022 WIN2E02344 310101100739000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310101100739000
Project ID : P00601144MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd K1900 + 911 - K1901 + 000, K1901 + 829 - K1902 + 318

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.228 Lane km
Unit Cost : P 7,955,629.28/Lane km
EAO : P 200,000.00
Excess: P 30,487.25
Allocation : P 10,000,000.00
May 19, 2022 2022 WIN2E02348 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566+ 935 - K1567 + 035
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566 + 640 - K1566 + 817
Physical Target:
CW1: 3,540.00 sq. m. (Construction of Road Slope Protection Structure)
ROW: 7,434.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,000,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 19, 2022 2022 WIN2E02378 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1764 + 184 – K1764 + 632
Physical Target:
CW1: 0.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,699,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1759 + 889.129 – K1759 + 976.871
Physical Target:
CW1: 0.526 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,669,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00
May 19, 2022 2022 WIN2E02376 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1523 + 953 – K1524 + 228
Physical Target:
CW1: 1.540 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1524 + 083 – K1524 + 228
Physical Target:
CW1: 0.045 Lane Km (Reconstruction to Concrete Pavement)
CW2: 540 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,655,690.00 (Reconstruction to Concrete Pavement)
CW2: P 9,844,310.00 (Construction of Road Slope Protection Structure)
EAO: P 500,000.00
May 19, 2022 2022 WIN2E02380 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River,
Sta. 0+000 - Sta. 0+500, Mati City, Davao Oriental
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River, Sta. 0+054 – Sta. 0+136,
Sta. 0+057 – Sta. 0+232, Mati City, Davao Oriental
Physical Target:
CW1: 261.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00
May 19, 2022 2022 WIN2E02379 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.654 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00

TO: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00
May 19, 2022 FY 2022 GAA WIN2G02864 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108179000
Project ID : P00620657LZ

002 : Protect Lives and Properties Against major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million

TO :

Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+760
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million
May 19, 2022 FY 2022 GAA WIN2G02847 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108180000
Project ID : P00620658LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million

TO :

Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+094 Left Riverbank,
Sta. 0+020 - Sta. 0+094 Right Riverbank,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million
May 19, 2022 FY 2022 GAA WIn2G02809 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108181000
Project ID : P00620659LZ

002: Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System\

FROM :

Construction of Malinao River Flood Control Structure,
Sta. 0+000 - Sta. 0+125,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million

TO :

Construction of Malinao River Flood Control Structure
Sta. 0+000 - Sta. 0+234 Right Bank,
Sta. 0+040 - Sta. 0+240 Left Bank,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million


May 19, 2022 2022 WIN2E02361 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – (S01460MN) Chainage 760 – Chainage 1204
Physical Target:
CW1: 1.332 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1499 + 015 – K1499 + 325, K1499 + 344 – K1499 + 386, K1499 + 971 – K1500+000
Physical Target:
CW1: 0.782 lane km (Off Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00
May 19, 2022 2022 WIN2E02353 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1511 + 360 - K1511 + 420
Physical Target:
CW1: 3,208.440 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 810 – K1511 + 837
Physical Target:
CW1: 1,702.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00
May 19, 2022 2022 WIN2E02354 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 848 – K1511 + 956
Physical Target:
CW1: 5,310.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 837 – K1511 + 890
Physical Target
CW1: 2,277.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00
May 19, 2022 2022 WIN2E02358 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd - K1698 + 541 - K1698 + 552, K1698 + 624 - K1698 + 649, K1698 + 918 - K1699 + 020, K1701 + 000 - K1701 + 029, K1701 + 093 - K1701 + 104
Physical Target:
CW1: 0.148 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao–Bukidnon Rd – K1698 + 541 – K1698 + 552, K1698 + 624 – K1698 + 649, K1698 + 918 – K1699 + 020
Physical Target:
CW1: 0.108 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00
May 19, 2022 2022 WIN2E02367 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 145 - K1512 + 444
Physical Target:
CW1: 0.598 lane km (Road Widening)
ROW Acquisition: 2,098.98 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 75,976,380.00 (Road Widening)
ROW Acquisition: P 55,002,105.00
EAO: P 4,750,515.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 120 - K1512 + 220, K1512 + 280 - K1512 + 442, K1512 + 600 - K1513 + 630, K1515 + 291- K1515 + 343
Physical Target:
CW1: 1.876 lane km (Road Widening)
ROW Acquisition: 1,067.386 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 73,949,880.00 (Road Widening)
ROW Acquisition: P 57,028,605.00
EAO: P 4,750,515.00
May 19, 2022 2022 WIN2E02359 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1509 + 000 - K1509 + 320, K1509 + 575 - K1509 + 940, K1511 + 045 - K1511 + 445, K1511 + 961 - K1511 + 983, K1512 + 172 - K1512 + 294, K1512 + 350 - K1512 + 408, K1514 + 893 - K1514 + 901, K1515 + 015 - K1515 + 030
Physical Target:
CW1: 1,140.00 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 432.00 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 189.60 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 13,918,940.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,600,880.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 1,861,020.00
EAO: P 477,160.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1507 + 311 – K1507 + 352, K1510 + 470 – K1510 + 850, K1512 + 528 – K1512 + 565, K1512 + 572 – K1512 + 595, K1512 + 820 – K1512 + 860, K1514 + 581 – K1514 + 646, K1514 + 992 – K1515 + 012
Physical Target:
CW1: 384.00 square meters (Construction of Road Slope Protection Structure)
CW2: 1,247.04 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 395.431 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 4,932,798.91 (Construction of Road Slope Protection Structure)
CW2: P 14,185,531.09 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 4,262,510.00
EAO: P 477,160.00