June 8, 2022 |
FY 2022 GAA |
WIN2G03003 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100970000
Project ID : P00606276LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa North Road
K0147+000 - K0147+877
Physical Target - CW1 - Road Widening : 1.754 lane Km
Allocation - Php 26.310 Million
TO :
Puerto Princesa North Road
K0147+000 - K0147+820
Physical Target - CW1 - Road Widening : 1.640 Lane Km
Allocation - Php 26.310 Million |
June 8, 2022 |
FY 2022 |
WIN2E02387 |
300203101427000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 300203101427000
Project ID: P00632737MN
Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ Ayala-La Paz Road leading to La Paz Resort, Zamboanga City
CW1- Construction of Road Slope Protection Structure
Physical Target: 2,140.00 sq.m.
Unit Cost: ₱ 22,196.26/sq.m.
EAO: ₱ 1,750,000.00
Excess: ₱ 750,000.00
Allocation: ₱ 50,000,000.00 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03005 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101619000
Project ID : P00639238LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along taytay - Bantulan - Sta.Cruz Port Road
Sta. 2+214.00 - Sta. 2+284.00
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 476.553 square meter
Allocation - Php 21.266 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta.Cruz Port Road
Sta. 2+214.00 - Sta. 2+267.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 920.13 square meter
Allocation - Php 21.266 Million |
June 8, 2022 |
FY 2022 |
WIN2E02399 |
310107100341000 |
May 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310107100341000
Project ID: P00601379MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1868 + 680 - K1868 + 860, K1868 + 920 – K1869 + 000
CW1- Construction of Road Slope Protection Structure
Physical Target: 5,968.85 sq.m.
Unit Cost: ₱ 16,975.63/Sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
|
June 8, 2022 |
FY 2022 |
WIN2E02397 |
310204101597000 |
May 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101597000
Project ID: P00604239MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Zamboanga City Diversion Road, Package 2, Zamboanga City
CW1- Construction of Concrete Bridge
Physical Target: 580.986 sq.m.
Unit Cost: ₱ 165,494.52/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.330 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
June 8, 2022 |
2022 |
WIN2F06358 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 1, Pampanga |
June 8, 2022 |
FY 2022 |
WIN2E02345 |
310111100476000 |
March 23, 2022 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310111100476000
Project ID: P00601325MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd K1952 + 000 - K1952 + 1000
CW1 - Construction of Drainage Structure along Road: 932.89 ln.m.
Unit Cost: P 21,009.97974/ln.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00
|
June 8, 2022 |
FY 2022 |
WIN2E02340 |
310204101797000 |
May 4, 2022 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310204101797000
Project ID: P00604227MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Bobongan-Sapa Anding-Upper Laperian-NRJ Gapasan By-Pass Road, Zamboanga del Sur
CW1- Construction of Concrete Road
Physical Target: 2.79294 Lane km
Unit Cost: ₱ 17,544,236.54/Lane km
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00 |
June 8, 2022 |
FY 2022 GAA |
WIN2G3014 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100971000
Project ID : P00606278LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa North Road
K0158+000.00 - K0158+312,
K0158+343.20 - K0159+000
Physical Target - CW1 - Road Widening : 1.882 Lane Km
Allocation - Php 25.080 Million
TO :
Puerto Princesa North Road
K0158+000 - K0158+306,
K0158+348 - K0158+775
Physical Target - CW1 - Road Widening : 1.4660 Lane Km
Allocation - Php 25.080 Million |
June 8, 2022 |
FY 2022 GAA |
WIN2G03012 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101616000
Project ID : P00639235LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to major/Strategic Public buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Port Barton - Kemdeng Road
Sta. 1+394.00 - Sta. 1+454.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 510.593 square meter
Allocation - Php 22.785 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide :
Port Barton - Kemdeng Road
Sta. 0+848.00 - Sta. 1+070.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 626.64 square meter
Allocation - Php 22.785 Million
|
June 8, 2022 |
2022 |
WIN2F06354 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 2, Pampanga
|
June 8, 2022 |
2022 |
WIN2F06364 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 4, Pampanga
|
June 8, 2022 |
2022 |
WIN2F06359 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Concepcion - Mabalacat Bypass Road |
June 8, 2022 |
FY2022 |
WIN2B00870 |
300221100049000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100049000
Project ID: P00630770MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Junction Neog-Neog-Karungdong Road, Kalingalan Caluang, Sulu
CW1- Construction of Concrete Road
Physical Target: 1.102 Lane km
Unit Cost: ₱ 17,241,380.00 /Lane km
EAO: ₱ 200,000.00
EXCESS : ₱ 800,000.00
Total Allocation: ₱ 20,000,000.00 |
June 8, 2022 |
FY2022 |
WIN2B00862 |
300221101772000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221101772000
Project ID: P00634001MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Bangalaw-Bakaan Road, Banguingui, Sulu
CW1- Construction of Concrete Road
Physical Target: 0.45 Lane km
Unit Cost: ₱ 11,000,000.00 /Lane km
EAO: ₱ 50,000.00
Total Allocation: ₱ 5,000,000.00 |
June 8, 2022 |
FY2022 |
WIN2B00863 |
300222100008000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300222100008000
Project ID: P00631049MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Improvement of Patao - Ipil Access Road connecting to Badjao Indigenous People (IP)
Community, Barangay Ipil, Maimbung, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.85 Lane km
Unit Cost: ₱ 10,482,350.00 /Lane km
EAO: ₱ 90,000.00
Total Allocation: ₱ 9,000,000.00 |
June 8, 2022 |
FY2022 |
WIN2B00861 |
300221100058000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100058000
Project ID: P00630779MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Improvement of Road leading to Bud Etahun, Barangay Anuling, Patikul, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.97 Lane km
Unit Cost: ₱ 10,206,185.00 /Lane km
EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00 |
June 8, 2022 |
2022 |
WIN2F06391 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0421+850 - K0421+870 |
June 8, 2022 |
FY2022 |
WIN2B00868 |
300221100061000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100061000
Project ID: P00630782MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Barangay Lapa to Barangay Lahi Road, leading to Lapa Elementary School, Barangay Lapa, Maimbung, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.956 Lane km
Unit Cost: ₱ 10,355,650.00 /Lane km
EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00 |
June 8, 2022 |
2022 |
WIN2F06395 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0419+500 - K0419+545 |
June 8, 2022 |
2022 |
WIN2F06383 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0294+445 - K0294+515 |
June 8, 2022 |
2022 |
WIN2F06385 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0302+900 - K0302+950 |
June 8, 2022 |
FY2022 |
WIN2B00857 |
310202101026000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310202101026000
Project ID: P00602307MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Romandier-Camp Andres-Tanduh Bato Road
KM49+650.00 - KM53+400.00
CW1- Road Widening
Physical Target: 7.50 Lane km
Unit Cost: ₱ 21,049,451.09 /Lane km
ROW-Acquisition
Physical Target : 1,297.056 sq.m.
Unit Cost: ₱ 300.00 /sq.m
EAO: ₱ 5,740,000.00
Total Allocation: ₱ 164,000,000.00 |
June 8, 2022 |
2022 |
WIN2F06384 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0418+800 - K0418+840 |
June 8, 2022 |
FY2022 |
WIN2B00849 |
310202101020000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310202101020000
Project ID: P00602303MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jolo - Indanan - Parang - Silangkan Road (Package 1)
Sta. 2+2560 - Sta. 6+060
CW1- Road Widening
Physical Target: 7.00 Lane km
Unit Cost: ₱ 16,857,142.86 /Lane km
ROW-Acquisition
Physical Target : 50,000 sq.m.
Unit Cost: ₱ 300.00 /sq.m
EAO: ₱ 4,900,000.00
EXCESS : ₱ 2,100,000.00
Total Allocation: ₱ 140,000,000.00 |
June 8, 2022 |
FY 2022 GAA |
WIn2G03009 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101623000
Project ID : P00639242LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps(SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Building/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 4+227.00 - Sta.4+255.00
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 163.385 square meter
Allocation - Php 7.291 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 4+227.00 - Sta. 4+258,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 313.79 square meter
Allocation - Php 7.291 Million
|
June 8, 2022 |
2022 |
WIN2F06394 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) - K0250+380 - K0250+420 |
June 8, 2022 |
FY2022 |
WIN2E02309 |
310202101025000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310202101025000
Project ID: P00602308MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Romandier-Camp Andres-Tanduh Bato Road - K0047 + 000 - K0049 + 650
CW1- Road Widening
Physical Target: 5.30 Lane km
Unit Cost: ₱ 20,686,476.31 /Lane km
ROW-Acquisition
Physical Target : 1,238.9186 sq.m.
Unit Cost: ₱ 300.00 /sq.m
EAO: ₱ 3,990,000.00
Total Allocation: ₱ 110,000,000.00 |
June 8, 2022 |
2022 |
WIN2F06393 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0416+505 - K0416+580, K0416+700 - K0416+740 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03002 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100237000
Project ID : P00636839LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 9+012.00 - Sta. 9+167.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,949.911 square meter
Allocation - Php 87.014 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 9+012.00 - Sta. *9+149.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,682.530 square meter
Allocation - Php 87.014 Million
|
June 8, 2022 |
2022 |
WIN2F06390 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0192+245 - K0192+290 |
June 8, 2022 |
2022 |
WIN2F06388 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0301+700 - K0301+869 |
June 8, 2022 |
2022 |
WIN2F06389 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) - K0255+280 - K0255+300 |
June 8, 2022 |
2022 |
WIN2F06387 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0174+465 - K0174+565 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03015 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101618000
Project ID : P00639237LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+057.00 - Sta. 1+198.00
Taytay, Palawan (L/S)
Physical Target - Construction of Road Slope Protection
Structure : 890.63 square meter
Allocation - Php 39.744 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+057.00 - Sta. 1+164.00,
Taytay, Palawan (L/S)
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,717.79 square meter
Allocation - Php 39.744 Million |
June 8, 2022 |
2022 |
WIN2F06386 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0206+600 - K0206+650 |
June 8, 2022 |
2022 |
WIN2F06392 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0422+800 - K0422+830 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03013 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100235000
Project ID : P00630730LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide -
Barangay Port Barton to barangay Kemdeng Road,
Sta. 2+389 - Sta. 2+495,
Sta. 2+514 - Sta. 2+659,
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 896.366 square meter
Allocation - Php 40.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Barangay Port Barton to Barangay Kemdeng Road
Sta. 0+573.00 - Sta. 0+633.00,
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,596.99 square meter
Allocation - Php 40.00 Million
|
June 8, 2022 |
FY2022 |
WIN2B00856 |
310105100636000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310105100636000
Project ID: P00601293MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Indanan-Parang-Silangkan Rd - K0002 + 000 - K0004 + 054.89
CW1- Reconstruction to Concrete Pavement
Physical Target: 4.10 Lane km
Unit Cost: ₱ 6,951,219.51 /Lane km
EAO: ₱ 1,050,000.00
EXCESS: ₱ 450,000.00
Total Allocation: ₱ 30,000,000.00 |
June 8, 2022 |
FY2022 |
WIN2B00871 |
300221100048000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100048000
Project ID: P00630769MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Ballian-Ut Bud Road, Patikul, Sulu
CW1- Construction of Concrete Pavement
Physical Target: 1.77 Lane km
Unit Cost: ₱ 16,101,694.92 /Lane km
EAO: ₱ 300,000.00
EXCESS: ₱ 1,200,000.00
Total Allocation: ₱ 30,000,000.00 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03011 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101621000
Project ID : P00639240LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 3+558.00 - Sta. 3+675.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 768.074 square meter
Allocation - Php 34.275 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 3+558.00 - Sta. 3+663.00
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,487.800 square meter
Allocation - Php 34.275 Million |
June 8, 2022 |
FY2022 |
WIN2B00864 |
300221100059000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100059000
Project ID: P00630780MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Improvement of Tubig Samin - Tambuang Access Road from Pagsalipangan - Maimbung Road, Barangay Tubig Samin, Maimbung,Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.88 Lane km
Unit Cost: ₱ 10,125,000.00 /Lane km
EAO: ₱ 90,000.00
Total Allocation: ₱ 9,000,000.00 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03001 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108101140000
Project ID : P00611371LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide
FROM :
PPSR Jct - Napsan - Apurawan Rd
K0039+658 - K0039+712
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,085.22 square meter
Allocation - Php 19.534 Million
TO :
PPSR Jct - Napsan - Apurawan Rd
K0039+658 - K0039+695
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 884.00 square meter
Allocation - Php 19.534 Million |
June 7, 2022 |
FY 2022 GAA |
WIN2G03010 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101639000
Project ID : P00636971LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Roads with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 1+250.00 - Sta. 1+316.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 577.708 square meter
Allocation - Php 25.780 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+770.00 - Sta. 0+812.00
Physical Target - Construction of Road Slope Protection
Structure : 1,047.04 square meter
Allocation - Php 25.780 Million |
June 7, 2022 |
FY 2022 GAA |
WIN2G03007 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS NO. : 300215101610000
Project ID : P00639229LZ
CONVERGEBCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+173.00 - Sta. 171+223.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 891.59 square meter
Allocation - Php 39.787 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide\
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+173.00 - Sta. 171+236.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,739.25 square meter
Allocation - Php 39.787 Million
|
June 7, 2022 |
2022 |
300219100600000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 3rd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities - Construction of Flood Control Structure along the Bank of Magat River, Marasat Pequeño, San Mateo, Isabela |
June 7, 2022 |
2022 |
300219100602000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 3rd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities - Construction of Flood Control Structure along the bank of Ganano River, Sta. Cruz, Alicia, Isabela |
June 7, 2022 |
FY 2022 GAA |
WIN2G03008 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100186000
Project ID : P00638852LZ
CONVERGENCE AND SPECIAL SUPPORT PRORAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Road leading to Ambulong Port, Brgy. Jao-asan -
Brgy. Dulangaan - Brgy. Poblacion,
Sta. 0+000 - Sta. 2+500.00
Odiongan, Romblon
Physical Target - CW1 - Construction of Gravel Road :
5.00 Lane Km
Allocation - Php 99.00 Million
TO :
Construction of Road leading to Ambulong Port, Brgy. Jao-asan -
Brgy. Dulangaan - Brgy. Poblacion,
Sta. 0+000 - Sta. 2+500.00
Magdiwang, Romblon
Physical Target - CW1 - Construction of Gravel Road :
5.00 Lane Km
Allocation - Php 99.00 MIllion
|
June 7, 2022 |
FY 2022 |
WIN2C03578 |
UACS No. 310106100693000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310106100693000
Project ID.: P00603569LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Juan Luna St – K0003+(-630) – K0003+598
Physical Target: CW1- Reconstruction to Concrete Pavement/ 2.456 lane km
Unit Cost = P 7,182,410/ lane km
Allocation = P 17,640,000
EAO = P 360,000
Total = P 18,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Juan Luna St – K0003+(-632) – K0003+(125.0)
Physical Target: CW1- Reconstruction to Concrete Pavement/ 1.514 lane km
Unit Cost = P 11,651,255/ lane km
Allocation = P 17,640,000
EAO = P 360,000
Total = P 18,000,000
WIN2C03578
|
June 7, 2022 |
FY 2022 GAA |
WIN2G03004 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101642000
Project ID : P00636974LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 1+605.00 - Sta. 1+627.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 240.719 square meter
Allocation - Php 10.742 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 1+105.00 - sta. 1+121.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 437.36 square meter
Allocation - Php 10.742 Million
|
June 6, 2022 |
FY 2022 |
WIN2C03582 |
UACS No. 300105200546000 |
April 21, 2022 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300105200546000
Project ID.: P00655216LZ
Local Program
Local – Buildings and Other Structures – Multipurpose Facilities – National Building Program
Construction of National Tobacco Authority Building, Quezon City
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Bldg
Unit Cost = P 193,000,000.00/Number of Bldg
Allocation = P 193,000,000.00
EAO = P 7,000,000.00
Total = P 200,000,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose Facilities – National Building Program
Construction of National Tobacco Administration Building, Quezon City
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Bldg
Unit Cost = P 193,000,000.00/Number of Bldg
Allocation = P 193,000,000.00
EAO = P 7,000,000.00
Total = P 200,000,000.00
WIN2C03582
|
June 6, 2022 |
2022 |
WIN2C03560 |
SARO-BMB-A-22-0003185 |
March 21, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Liloan-S Ricardo Rd - K1077 + 764 - K1077 + 789
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 6,000 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Liloan-S Ricardo Rd - K1077 + 764 - K1077 + 789
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 875 Square meters
EAO P 1.00 M
Total P 50.00 M |
June 6, 2022 |
2022 |
WIN2C03561 |
GAA FY 2022 |
January 10, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Liloan-S Ricardo Rd - K1083 + 747 - K1084 + 417
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 16.317 M
: 1.332 Lane Km
EAO P 0.333 M
Total P 16.650 M
AS MODIFIED:
Liloan-S Ricardo Rd - K1081 + 938.5 - K1082 + 082, K1084 + 013 – K1084 + 623
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 16.317 M
: 0.8325 Lane Km
EAO P 0.333 M
Total P 16.650 M |
June 6, 2022 |
2022 |
WIN2C03575 |
SR2022-03-007348 |
March 23, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0986 + 607 - K0987 + 300
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0987 + 498 - K0987 + 578, K0990 + 483 –K0990 + 589
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 1,500 Square meters
EAO P 3.500 M
Total P 100.00 M
|
June 2, 2022 |
FY 2022 GAA |
WIN2G02695 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100415000
Project ID : P00604070LZ
001 : Ensure Safe and Reliable national Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan North Road
K0016+134 - K0016+220
Physical Target - CW1 - Construction of Drainage Structure
along Road : 172.00 Lineal meters
Allocation - Php 2.226 Million
TO :
Calapan North Road
K0051+548 - K0051+770
Physical Target - CW1 - Construction of Drainage Structure
along Road : 222.00 Lineal Meter
Allocation - Php 2.226 Million
|
June 2, 2022 |
2022 |
WIN2E02369 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+ 780 – K1570 + 880
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 160 – K1568 + 225
Physical Target:
CW1: 3,586.050 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
June 2, 2022 |
FY 2022 GAA |
WIN2G02731 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100416000
Project ID : P00604071LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan North Road
K0030+589 - K0030+969
Physical Target - CW1 - Construction of Drainage Structure
along Road : 760.00 Lineal Meters
Allocation - Php 9.836 Million
TO :
Calapan North Road
K0030+589 - K0030+975,
K0031+437 - K0031+519
Physical Target - CW1 - Construction of Drainage Structure
along Road : 936.00 Lineal Meters
Allocation - Php 9.836 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G02688 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101124000
Project ID : P00604384 LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0035+854 - K0036+192
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,969.5 Square Meters
Allocation - Php 19.695 Million
To :
Calapan North Road
K0035+460 - K0035+587,
K0035+641 - K0035+669,
K0035+737 - K0035+766.50.
K0039+065 - K0039+181,
K0040+015 - K0040+091
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,694.25 Square meters
Allocation - Php 19.695 Million
|
June 2, 2022 |
2022 |
WIN2E02121 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Batasan Creek, Sta. 0+000 – Sta. 1+500, Brgy. Bagumbayan, Lupon, Davao Oriental
Physical Target:
CW1: 881.61 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Batasan Creek, Sta. 0+000 – Sta. 1+440, Brgy. Bagumbayan, Lupon, Davao Oriental
Physical Target:
CW1: 1,415.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00 |
June 2, 2022 |
FY 2022 GAA |
WIN2G02760 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101125000
Project ID : P00604385LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0036+900 - K0037+100
Physical Target - CW1 Construction of Road Slope Protection
Structure : 1,280.80 Square Meters
Allocation - Php 12.808 Million
TO :
Calapan North Road
K0023+300 - K0023+320.40,
K0023+420 - K0023+452,
K0037+000 - K0037+090
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 487.00 Square Meters
Allocation - Php 12.808 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G02666 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101126000
Project ID : P00604387LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0043+611 - K0043+684
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 441.00 Square Meters
Allocation - Php 4.410 Million
TO :
Calapan North Road
K0043+616.40 - K0043+684
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 338.00 Square Meters
Allocation - Php 4.410 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G0667 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101127000
Project ID : P00604388LZ
001 : Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0043+738 - K0043+796
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 350.40 Square Meters
Allocation - Php 3.504 million
TO :
Calapan North Road
K0043+738 - K0043+790.40
Physical Target - CW1 - Construction of Rod Slope Protection
Structure - 262.00 Square Meters
Allocation - Php 3.504 Million
|
June 2, 2022 |
FY 2022 GAA |
WIN2G02679 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101121000
Project ID : P00606183LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM ;
Calapan South Road
K0062+647 - K0062+649,
K0062+662 - K0063+015
Physical Target - CW1 - Network Development - Road Widening :
0.728 Lane Km
Allocation - Php 9.425 Million
TO :
Calapan South Road
K0062+649 - K0062+926.50
Physical Target - CW1 - Network Development - Road Widening ;
0.555 Lsne Km
Allocation - Php 9.425 million
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02854 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS NO. : 310109100869000
Project ID : P00604406LZ
001 : Ensure Safe and Reliable National Road System
Asset preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Road
FROM :
Calapan South Road
K0189+566 - K0189+602,
K0189+888 - K0190+011
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1873.33 sq.m.
Allocation - Php 28.100 Million
TO :
Calapan South Road
K0189+488 - K0189+753.20,
K0189+936 - K0190+011.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1627.61 sq.m.
Allocation - Php 28.100 Million |
June 1, 2022 |
2022 |
WIN2G02706 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310103100997000
Project ID: P00603748VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd (S00203NR) - K0040 + (-664) - K0040 + (-240), K0040 + 000 - K0040 + 189
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
1.226 lane km - 6,178.90
EAO - 126.10
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd (S00203NR) – K0040 + (-557)- K0040+200
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
1.51 Lane Km - 6,178.90
EAO - 126.10
|
June 1, 2022 |
2022 |
WIN2G02671 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100695000
Project ID: P00603749VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 000 - K0032 + 003.20, K0032 + 021.30 - K0032 + 043.80, K0032 + 061.70 - K0032 + 066.30, K0032 + 070.70 - K0032 + 075.30, K0032 + 091.70 - K0032 + 392, K0032 + 491.20 - K0032 + 558.80
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
1.609 lane km - 7,216.72
EAO 147.28
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 022 -K0032 + 049, K0032 + 067 - K0032 + 076, K0032 + 092 - K0032 + 393, K0032 + 303 -K0032 + 316, K0032 + 493 - K0032 + 974
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
0.840 lane km - 7,216.72
EAO 147.28
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02778 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310105100696000
Project ID : P00603925LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgradingof Damaged Paved Roads - Secondary Roads
FROM :
Calapan North Road
K0036+000 - K037+540
Physical Target - CW1 - Reconstruction to Concrete Pavement :
3.104 Lane Km
Allocation - Php 20.186 Million
TO :
Calapan North Road
K0035+705 - K0037+000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.590 Lane Km
Allocation - Php 20.186 Million
|
June 1, 2022 |
2022 |
WIN2G02698 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310104100413000
Project ID: P00603750VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR) - K0031 + 614 - K0031 + 633.30, K0031 + 669.50 - K0031 + 777.50, K0031 + 791.10 - K0031 + 868, K0031 + 890.50 - K0031 + 949.20, K0031 + 953.70 - K0032 + 000
CW1 - Reconstruction to Concrete Pavement:
1.257 lane km - 21,490.42
EAO - 438.58
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary
Roads
Bacolod South Rd (S00127NR) – K0027 + 288 – K0028 + 200
CW1- Reconstruction to Concrete Pavement:
1.83 lane km - 21,490.42
EAO - 438.58
|
June 1, 2022 |
2022 |
WIN2G02738 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310104100415000
Project ID: P00603752VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR) - K0037 + 050 - K0037 + 081, K0037 + 237 - K0037 + 285
CW1 - Reconstruction to Concrete Pavement:
0.212 Lane Km - 3,625.02
EAO - 73.98
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR)- K0044+482-K0044+662
CW1- Reconstruction to Concrete Pavement:
0.360 Lane Km - 3,625.02
EAO - 73.98
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02720 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100417000
Project ID : P00604064LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROm :
Calapan South Road
K0008+334 - K0008+630
Physical Target - CW1 - Construction of Drainage Structure
along Road : 296.00 Lineal meters
Allocation - Php 2.664 Million
TO :
Calapan South Road
K0058+224 - K0058+451
Physical Target - CW1 - Construction of Drainage Structure
along Road : 227.00 Lineal meters
Allocation - Php 2.664 Million
|
June 1, 2022 |
2022 |
WIN2G02865 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310102100999000
Project ID: P00603755VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Assert Preservation-
Preventive Maintenance- Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd (S00208NR) - Chainage 5792 - Chainage 5885, Chainage 6087 - Chainage 6155
CW1 – Preventive Maintenance of Road: Concrete Reblocking:
0.551 lane km - 2,471.56
EAO - 50.44
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Assert Preservation–
Preventive Maintenance- Secondary Roads
Don Jorge Araneta – Ayungon – Yungue – Gurrea – La Carlota City Rd (S00208NR) – Chainage 2362- Chainage 2531.8, Chainage 2362 - Chainage 2392, Chainage 2645 - Chainage 2663, Chainage 2843 - Chainage 2847
CW1 – Preventive Maintenance of Road: Concrete Reblocking:
0.2258 lane km - 2,471.56
EAO - 50.44
|
June 1, 2022 |
2022 |
WIN2G02737 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310105100736000
Project ID: P00603756VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd (S00208NR) - Chainage 5752 - Chainage 5792, Chainage 6155 - Chainage 6355
CW1 – Reconstruction to Concrete Pavement:
0.920 lane km - 15,625.12
EAO - 318.88
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Don Jorge Araneta – Ayungon – Yungue – Gurrea – La Carlota City Rd (S00208NR) – Chainage 4236 - Chainage 4290, Chainage 4418 - Chainage 4436 , Chainage 4459 - Chainage 4495 , Chainage 4509 - Chainage 4518, Chainage 4536 - Chainage 4567.50, Chainage 4618 - Chainage 4663, Chainage 4748 - Chainage 4758.50, Chainage 4772 - Chainage 4809.50, Chainage 4895 - Chainage 4989.50, Chainage 5374 - Chainage 5431, Chainage 5499 - Chainage 5521, Chainage 5521 - Chainage 5617, Chainage 5793 - Chainage 5868, Chainage 5868 - Chainage 5918, Chainage 6157 - Chainage 6209, Chainage 6231 - Chainage 6358
CW1 – Reconstruction to Concrete Pavement:
1.5185 lane km - 15,625.12
EAO - 318.88
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02647 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No : 310111100418000
Project ID : P00604065LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0021+000 - K0021+786
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,572.00 Lineal meters
Allocation - Php 20.339 Million
TO :
Calapan South Road
K0021+000 - K0022+345
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2,197.00 Lineal meters
Allocation - Php 20.339 Million
|
June 1, 2022 |
2022 |
WIN2G02788 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100699000
Project ID: P00603759VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 003.20 - K0032 + 021.30, K0032 + 043.80 - K0032 + 061.70, K0032 + 066.30 - K0032 + 070.70, K0032 + 075.30 - K0032 + 091.70, K0032 + 392 - K0032 + 491.20, K0032 + 558.80 - K0032 + 596.30, K0032 + 804.90 - K0032 + 836.50, K0032 + 841 - K0032 + 849.80, K0032 + 971.30 - K0033 + 000, K0037 + 081 - K0037 + 237
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
1.375 lane km - 6,167.14
EAO - 125.86
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0033 + 070 - K0033 + 079, K0033 + 102 - K0033 + 111, K0033 + 156 -K0033 + 174, K0033 + 201 - K0033 + 301, K0033 + 373 - K0033 + 423, K0033 + 531 - K0033 + 735, K0033 + 771 - K0033 + 942
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
0.579 lane km - 6,167.14
EAO - 125.86
|
June 1, 2022 |
2022 |
WIN2G02811 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310110100307000
Project ID: P00604046VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + 180 - K0024 + 898, K0024 + 908 - K0026 + 000
CW1 – Construction of Drainage Structure along Road:
2,081 lineal meters - 19,375.58
EAO - 395.42
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + 450 - K0024 + 898, K0024 + 908 - K0026 + 000
CW1 – Construction of Drainage Structure along Road:
1,811 Lineal Meters - 19,375.58
EAO - 395.42
|
June 1, 2022 |
2022 |
WIN2G02797 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310112100337000
Project ID: P00604049VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0045 + 025 - K0045 + 525
CW1 – Upgrading of Drainage Structure along Road:
500 lineal meters - 4,410.00
EAO - 90.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0044 + 025 - K0044 + 525
CW1 – Upgrading of Drainage Structure along Road:
500 lineal meters - 4,410.00
EAO - 90.00
|
June 1, 2022 |
2022 |
WIN2G02728 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310110100306000
Project ID: P00604054VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + (-881) - K0024 + 180
CW1 – Construction of Drainage Structure along Road:
1061 lineal meters - 2,372.58
EAO - 48.42
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd – K0024 + 235 - K0024 + 450
CW1 – Construction of Drainage Structure along Road:
215 lineal meters - 2,372.58
EAO - 48.42
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02705 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100419000
Project ID : P00604066LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0036+741 - K0037+200
Physical Target - CW1 - Construction of Drainage Structure
along Road : 432.00 Lineal meters
Allocation - Php 5.591 Million
TO :
Calapan South Road
K0036+490 - K0036+927
Physical Target - CW1 - Construction of Drainage Structure
along Road : 437.00 Lineal meters
Allocation - Php 5.591 Miilion |
June 1, 2022 |
2022 |
WIN2G02785 |
SARO-BMB-A-22-0002991 |
March 21, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100696000
Project ID: P00605962VS
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South By-Pass Rd - K0019 + (-175) - K0022 + 110
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 13.38 Lane Km - 49,000.00
EAO 1,000.00
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South By-Pass Rd - K0019 + 670 - K0022 + 110
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 10.00 Lane Km - 49,000.00
EAO 1,000.00
|
June 1, 2022 |
2022 |
WIN2G02775 |
SARO-BMB-A-22-0002991 |
March 21, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100697000
Project ID: P00605963VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Sum-ag-Abuanan Rd - K0015 + 560 - K0018 + 469
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 5.946 Lane Km - 49,000.00
EAO 1,000.00
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Sum-ag-Abuanan Rd - K0015 + 560 - K0020+597
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 10.21 Lane Km- 49,000.00
EAO 1,000.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02729 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100420000
Project ID : P00604067LZ
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0043+875 - K0044+421
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1180.00 Lineal meters
Allocation - Php 15.270 million
TO :
Calapan South Road
K0020+964 - K0021+000,
K0043+907 - K0044+380
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1066.00 Lineal meters
Allocation - Php 15.270 Million |
June 1, 2022 |
2022 |
WIN2E02393 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Jct. Sulop (Along Digos - Makar Road) Waterfall - Labon - Osmeña - Banate (Along Digos - Makar Road), Package 3, Davao del Sur
Physical Target:
CW1: 10.609 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Jct. Sulop (Along Digos - Makar Road) Waterfall - Labon - Osmeña - Banate (Along Digos - Makar Road), Package 3, Davao del Sur
Physical Target:
CW1: 2.6845 Lane Km (Reconstruction to Concrete Road Pavement)
CW2: 13.732 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 64,819,659.00 (Reconstruction to Concrete Road Pavement)
CW2: P 31,680,341.00 (Road Widening)
EAO: P 3,500,000.00 |
June 1, 2022 |
2022 |
WIN2G02665 |
SR2022-02-001715 |
February 4, 2022 |
Region VI |
Regional Office VI |
UACS No. 300214100070000
Project ID: P00632376VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Iloilo East Coast-Capiz Rd - K0131 + 400 - K0133 + 700, K0170 + 132 - K0171 + 773
CW1- Preventive Maintenance of Road: Concrete Reblocking
4.071 lane km - 48,250.00
EAO - 1,750.00
TO:
CONVERGENCE AND SPECIAL SUPPORT
PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Iloilo East Coast-Capiz Rd - K0131 + 400 - K0132 + 840, K0170 + 132 - K0171 + 773
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.854 lane km - 48,250.00
EAO - 1,750.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02730 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100421000
Project ID : P00604068LZ
001 : Ensure Safe and Reliable National Road Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0055+662 - K0056+251
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1036.00 Lineal meters
Allocation - Php 13.408 Million
TO :
Calapan South Road
K0055+427 - K0056+142
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1288.00 Lineal meters
Allocation - Php 13.408 Million
|
June 1, 2022 |
2022 |
WIN2G02805 |
SR2022-03-006816 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310204101557000
Project ID: P00606462VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Construction of Iloilo River North Bank Road, Iloilo City
CW1- Construction of
Concrete Road: 4,000.00 lane km - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Construction of By-Pass and Diversion Roads
Construction of Iloilo River North Bank Road, Iloilo City
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 4,327.91 sq.m. - 16,500.00
ROW Acquisition: 22,857 sq.m. - 80,000.00
EAO - 3,500.00
|
June 1, 2022 |
2022 |
WIN2G02981 |
SR2022-03-006763 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100904000
Project ID: P00606413VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0072 + (-248) - K0072 + 500
CW1- Construction of Road Slope Protection
Structure: 5,833.33 sq.m. - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0074+ 805 – K0075 + 914, K0075 + 986 – K0076 + 004, K0076 + 039 – K0076 + 058, K0076 + 133 – K0076 + 561, K0076 + 615 – K0076 + 645, K0076 + 746 – K0076 + 766, K0076 + 956 – K0076 + 978, K0077 + 180 – K0077 + 404, K0077 + 507 – K0077 + 688
CW1- Construction of Road Slope
Protection Structure:
12,637.06 sq.m. - 99,099.00
ROW Acquisition: 665 square meters - 2,226.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02980 |
SR2022-03-006762 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100902000
Project ID: P00606412VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0072 + 500 - K0073 + 200
CW1- Construction of Road Slope
Protection Structure:
5,833.33 sq.m. - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd – K0077 + 688 – K0078 + 541, K0078 + 570 – K0078 + 770, K0079 + 002 – K0079 + 529, K0079 + 625 – K0079 +879
CW1- Construction of Road Slope
Protection
Structure:
8,911 sq.m. - 99,151.00
ROW Acquisition: 305 sq.m. - 2,174.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02949 |
SR2022-03-006761 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310107100328000
Project ID: P00606405VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0077 + 450 - K0077 + 700
CW1- Construction of Road Slope Protection Structure:
5,555.56 sq.m - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0077 + 520 - K0078 + 662
CW1- Construction of Road Slope Protection Structure:
9,757 sq.m - 96,500.00
EAO - 3,500.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02733 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100422000
Project ID : P00604069LZ
001 : Ensure Safe and Reliable national Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROM :
Calapan South Road
K0058+523 - K0059+594
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2110.00 Lineal meters
Allocation - Php 27.306 Million
TO :
Calapan South Road
K0056+142 - K0056+350,
K0058+523 - K0059+545
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2228.00 Lineal meters
Allocation - Php 27.306 Million
|
June 1, 2022 |
2022 |
WIN2G02948 |
SR2022-03-006807 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100995000
Project ID: P00606039VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Iloilo-Antique Rd - K0073 + 200 - K0074 + 000
CW1- Road Widening:
1.634 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Iloilo-Antique Rd - K0073 + 200 - K0074 + 805
CW1- Road Widening:
3.210 lane km - 99,325.00
ROW Acquisition: 16,050 square meters - 2,000.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02977 |
SR2022-03-006821 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100994000
Project ID: P00606038VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0097 + 000 - K0097 + 890
CW1- Road Widening:
1.78 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0097 + 000 - K0098 + 297
CW1- Road Widening:
2.60 lane km - 98,325.00
ROW Acquisition: 13,000 square meters - 3,000.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02956 |
SR2022-03-006820 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100993000
Project ID: P00606037VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0093 + 707 - K0094 + 191
CW1- Road Widening:
0.960 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0091 + 377 - K0094 + 190
CW1- Road Widening:
5.650 lane km - 98,226.00
ROW Acquisition: 28,250 square meters - 3,099.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02963 |
SR2022-03-006818 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100992000
Project ID: P00606036VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0076 + 700 - K0077 + 377
CW1- Road Widening:
1.368 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0076 + 700 - K0077 + 564
CW1- Road Widening:
1.742 lane km - 98,453.43
ROW Acquisition: 8,710 square meters - 2,871.57
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02957 |
SR2022-03-006755 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310102100831000
Project ID: P00605972VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd
CW1- Preventive
Maintenance of Road: Asphalt Overlay:
27.00 lane km - 144,750.00
EAO - 5,250.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd
CW1- Preventive Maintenance of Road: Asphalt
Overlay:
21.424 lane km - 144,750.00
EAO - 5,250.00
|
June 1, 2022 |
2022 |
WIN2G02905 |
SR2022-03-006747 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310111100343000
Project ID: P00605706VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. (S00094PN) - Chainage 000 - Chainage 1190, Chainage 3057
- Chainage 5307
CW1- Construction of Drainage
Structure along Road:
6,880.00 lineal meters - 135,100.00
EAO - 4,900.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. (S00094PN) - Chainage 2736 - Chainage 3109, Chainage 3830
- Chainage 5223
CW1-
Construction of Drainage Structure along
Road:
3,578.00 lineal meters - 135,100.00
EAO - 4,900.00
|
June 1, 2022 |
2022 |
WIN2G02787 |
SR2022-02-001230 |
February 4, 2022 |
Region VI |
Regional Office VI |
UACS No. 310205100690000
Project ID: P00605265VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Concrete Road:
8.067 lane km - 116,765.00
EAO - 4,235.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Gravel Road:
1.50 lane km - 115,765.00
ROW Acquisition: 7,500 square meters - 1,000.00
EAO - 4,235.00
|
June 1, 2022 |
2022 |
WIN2G02727 |
SR2022-02-000538 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202101010000
Project ID: P00604801VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0283 + 408 - K0283 + 500, K0283 + 568 - K0283 + 570, K0284 + 032 - K0287 + 595, K0288 + (-618) - K0290 + 164
CW1- Road Widening:
12.708 lane km - 178,763.355
EAO - 6,483.645
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0286 + 600 - K0287 + 595, K0288 + (-618) - K0290 + 493
CW1- Road Widening:
8.150 lane km - 172,763.355
ROW Acquisition: 40,750 square meters - 6,000.00
EAO - 6,483.645
|
June 1, 2022 |
2022 |
WIN2G02664 |
SR2022-02-000240 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100905000
Project ID: P00604068VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Guimaras Circumferential Rd - K0020 + 600 - K0021 + 100
CW1- Construction of Road Slope Protection Structure:
4,444.44 sq.m - 77,200.00
EAO - 2,800.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Guimaras Circumferential Rd - K0020 + 415 - K0020 + 833
CW1- Construction of Road Slope Protection Structure:
4,619.035 sq.m - 70,161.90
ROW Acquisition: 4,180 square meters 1-
EAO - 2,800.00
|
June 1, 2022 |
2022 |
WIN2G02722 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103100988000
Project ID: P00603702VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Arroyo St (S00077PN) - Chainage 0 - Chainage 77.8, Chainage 127 - Chainage 201, Chainage 77.8 - Chainage 127
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.046 Lane Km - 10,308.62
EAO - 210.38
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Arroyo St (S00077PN) Chainage 7 – Chainage 194
CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.374 Lane Km - 10,308.62
EAO - 210.38
|
June 1, 2022 |
2022 |
WIN2G02723 |
SR2022-02-001117 |
February 4, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310203100517000
Project ID: P00604808VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Cubay-Balabago Rd - K0004 + (-162) - K0006 + 785
CW1 - Road Widening: 5.862 Lane Km - 42,470.615
ROW Acquisition: 2,750.00 sq.m. - 13,252.345
EAO - 2,021.04
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Cubay-Balabago Rd - K0005 + (-305) - K0005 + 353
CW1-Road Widening : 1.29 Lane Km - 41,989.34406
ROW Acquisition: 2,750.00 sq.m. - 13,733.61594
EAO - 2,021.04
|