June 21, 2023 |
2023 |
300226105674000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Completion of Multi-Purpose Buildings, Brgy. Caniguing, Echague, Isabela |
June 21, 2023 |
2023 |
310109101307000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct.Ipil - Quirino Bdry. Rd - K0357+830 - K0358+498 |
June 17, 2023 |
2023 |
WIN3E02957 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300222100135000
Project ID: P00732464MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
FROM:
Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.419 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 11,813,842.48/ Lane Km
TO:
Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.340 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 14,558,823.53/ Lane Km
|
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103490000
Project ID: P00733919MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.587 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 11,686,541.74/ Lane Km
TO:
Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 0.508 Lane Km
CW2- 10.200 Lineal meters
Allocation:
TOTAL: P 7,000,000
CW1: P 4,601,100
CW2: P2,258,900
EAO: P 140,000
Unit Cost:
CW1: P 9,057,283.46/ Lane Km
CW2: P 221,460.78/ Lineal meters |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300221102408000
Project ID: P00733920MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.677 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 11,687,537.27/ Lane Km
TO:
Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.044 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 9,589,041.10/ Lane Km |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300221102408000
Project ID: P00732383MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.419 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 11,813,842.48/ Lane Km
TO:
Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.566 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 8,745,583.04/ Lane Km |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103493000
Project ID: P00733922MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.587 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 11,686,541.74/ Lane Km
TO:
Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.776 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 8,840,206.19/ Lane Km
|
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103494000
Project ID: P00733923MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.677 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 11,687,537.27/ Lane Km
TO:
Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.155 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 9,095,127.61/ Lane Km |
June 17, 2023 |
2022 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300219101795000
Project ID: P00734001MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM:
Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 34.727 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 138,940.88/ Lineal meters
TO:
Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 70.060 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 68,869.54/ Lineal meters |
June 16, 2023 |
2023 |
WIN3F07161 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of By-pass and Diversion Roads, Tarlac City - San Jose Diversion Road, Tarlac City, Tarlac |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo - Bugallon Rd - K0170+380 - K0172+025 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Amungan - Palauig - Banlog Road - K0217+457 - K0217+520, K0218+753 - K0220+035.70 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0198+000 - K0198+944.30 |
June 16, 2023 |
2023 |
WIN3F07107 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Amungan - Palauig - Banlog Road - K0211+(-411) - K0211+(-312.40) |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo - Bugallon Rd - K0192+000 - K0192+324.20 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo - Bugallon Road - K0192+324.20 - K0193+403 |
June 16, 2023 |
2023 |
WIN3F07120 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo-Bugallon Road (OBR) - K0135+556 - K0136+000
|
June 16, 2023 |
2023 |
WIN3F06825 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo-Bugallon Rd (OBR) - K0-132+910 - K0133+185 |
June 16, 2023 |
2023 |
WIN3F07410 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740267LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 11.555 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.916 Lane Km, CW2 - Construction of Road Slope Protection Structure - 3952.52 Square |
June 16, 2023 |
2023 |
WIN3F07158 |
FY 2022 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo - Bugallon Rd (OBR) - Kalaklan K0128+860 - K0128+980, K0129+060 - K0129+160 |
June 16, 2023 |
2023 |
WIN3F07064 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Road
Olongapo-Bugallon Rd - K0139+000 - K0139+700, K0140+100- K0140+280, K0140+440 - K0140+600, K0141+981 - K0142+378, K0142+560 - K0142+660, K0145+976 - K01460+000, K0146+080 - K0146+200, K0146+260 - K0147+600, K0147+800 - K0148+000 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
San Marcelino - Nagbayto Rd - K0151+(-999) - K0151+(-921.50) , K0151+040 - K0152+180 |
June 16, 2023 |
2023 |
WIN3F06824 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo -Bugallon Rd (OBR) - K0145+866 - K0146+180, K0146+942 - K0147+300, K0149+556 - K0149+818.75 |
June 16, 2023 |
2023 |
300221102734000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Improvement of Road, Brgy. Culong - Brgy. Bugnay, Tuao, Cagayan |
June 16, 2023 |
2023 |
310101100780000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0461+(-117) - K0461+000, K0462+000 - K0462+538, K0462+609 - K0462+897, K0465+000 - K0465+1003, K0467+000 - K0467+686, K0469+000 - K0469+709 |
June 16, 2023 |
2023 |
300221102736000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities - Construction of Bulagao Purok 5 to Sitio Turud Road, Tuao, Cagayan |
June 15, 2023 |
2023 |
WIN3F07423 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00739856LZ
FROM : CSSP - SIPAG - Access Road and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Access Road to Calpi Port, Barangay Calpi, Rapu-Rapu, Albay
Physical Target : CW1 - Construction of Concrete Road - 6.419 Lane
TO : CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Access Road to Calpi Port, Barangay Calanaga, Rapu-Rapu, Albay
Physical Target : CW1 - Construction of Gravel Road - 2.04 Lane Km |
June 15, 2023 |
2023 |
WIN3E02973 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100597000
Project ID: P00706546MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1171 + 700 - K1171 + 744
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3000 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 9,800/Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1171+700 – K1171 + 744, K1171 + 780 – K1171 + 823.20
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1944.56 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 15,119.10/Square meters |
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310201101240000
Project ID: P00705648MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 341 - K1199 + 372, K1200 + 404 - K1200 + 413, K1200 + 919 - K1201 + 025
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.918 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 21,350,762.53/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 553 - K1199 + 572, K1200 + 404 - K1200 + 416, K1200 + 917 - K1201 + 025
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.802 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 24,438,902.74/Lane Km
|
June 15, 2023 |
2023 |
WIN3E02982 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310108101686000
Project ID: P00706571MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 038 - K1531 + 100, K1535 + 302 - K1535 + 400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4363.530 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 11,229.44/Square meters
TO:
Asuncion-San Isidro-Laak-Veruela Rd - K1530 + 971 - K1531 + 100, K1535 + 320 - K1535 + 400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3503.8 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 13,984.82/Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310101100921000
Project ID: P00707530MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1330 + 984 - K1331 + 759, K1331 + 774 - K1332 + 571, K1333 + 653 - K1334 + 135, K1334 + 157 - K1335 + 000, K1336 + 000 - K1336 + 234
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.262 Lane Km
Allocation:
TOTAL: P 99,993,000
CW1: P 96,493,245
EAO: P 3,499,755
Unit Cost:
CW1: P 15,409,333.28/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1326 + 300 - K1326 + 818, K1330 + 591 - K1330 + 669, K1331 + 095 - K1331 + 754, K1331 + 779 - K1332 + 571, K1333 + 653 - K1333 + 960, K1335 + 102 - K1335 + 320, K1336 + 500 - K1336 + 990, K1337 + 000 - K1338 + 146, K1348 + 896 - K1349 + 393
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
CW2- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 6.262 Lane Km
CW2- 3.6725 Lane Km
Allocation:
TOTAL: P 99,993,000
CW1: P 36,338,435.42
CW2: P 60,154,809.58
EAO: P 3,499,755
Unit Cost:
CW1: P 9,227,637.23/Lane Km
CW2: P 16,379,798.39/Lane Km
|
June 15, 2023 |
2023 |
WIN3E02979 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310204102290000
Project ID: P00705705MN
ORGANIZATIONAL OUTCOME 1 : Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Surigao-Agusan West Coastal Road, Package G, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 9.565 Lane Km
Allocation:
TOTAL: P 155,000,000
CW1: P 149,575,000
EAO: P 5,425,000
Unit Cost:
CW1: P 15,637,741.77/Lane Km
TO:
Surigao-Agusan West Coastal Road, Package G, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Bridge 1
CW2- Construction of Concrete Bridge 2
ROW- ROW Acquisition
Physical Target:
CW1- 333.900 Square meters
CW2- 333.900 Square meters
ROW- 808.860 Square meters
Allocation:
TOTAL: P 155,000,000
CW1: P 73,836,010
CW2: P 74,773,990
ROW: P 965,000
EAO: P 5,425,000
Unit Cost:
CW1: P 221,132.110/ Square meters
CW2: P 223,941.27/ Square meters
ROW: P 1193.04/ Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310108101451000
Project ID: P00706381MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1262 + 210 - K1262 + 325
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5555.56 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 18,238.49/Square meters
TO:
Surigao-Davao Coastal Rd - K1262+220 - K1262+460 - K1264+340 - K1264+400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 6858 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 14,774.72/ Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310108101455000
Project ID: P00707534MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1265 + 022 - K1265 + 135
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5833.333 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 17,370 /Square meters
TO:
Surigao-Davao Coastal Rd - K1258+740 - K1258+995, K1259+410 - K1259+463
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7040.88 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 14,390.96 /Square meters
|
June 15, 2023 |
2023 |
WIN3F07411 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740268LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 9.629 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.68 Lane Km, CW2 - Construction of Road Slope Protection Structure - 2495.6 Square meters
|
June 15, 2023 |
2023 |
WIN3F07426 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00741999LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.930 Lane Km |
June 15, 2023 |
2023 |
WIN3F07428 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00742000LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.670 Lane Km |
June 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P007403960LZ
FROM : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon
TO : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon
|
June 14, 2023 |
2023 |
WIN3F07438 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Service Road (Alternative route to NLEX), Bulacan |
June 14, 2023 |
2023 |
WIN3F07390 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712752LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (LZ) - K0522 + 035 - K0522 + 434
Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 0.798 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (LZ) - K0519 + 092 - K0519 + 400
Physical Target : CW1 - Preventive Maintenance of Road: Concrete Reblocking 0.54 Lane Km |
June 14, 2023 |
CY 2023 |
|
UACS No. 300207100843000 |
May 2, 2023 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300207100843000
Project ID.: P00732627LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase III
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase II
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00
|
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713074LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slop Collapse, and Landslide - Secondary Roads
Catanduanes Cir Rd - K0143 + 660 - K0143 + 957
Physical Target : CW1 - Construction of Road Slope Protection Structure - 3896.1 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Catanduanes Cir Rd - K0143 + 760.00 - K0143 + 1060.00
Physical Target : CW1 - Construction of Road Slope Protection Structure - 3585 Square meters |
June 14, 2023 |
2023 |
WIN3F07425 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00713294LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (LZ) - K0513 + 700 - K0513 + 730, K0514 + 200 - K0514 + 220, K0521 + 200 - K0522 + 000
Physical Target : CW1 - Construction Road Slope Protection Structure - 2547.33 Square Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (LZ) - K0520 + 416 - K0520 + 543
Physical Target : CW1 - Construction Road Slope Protection Structure 1328 Square Meters |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
P00714086LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0530 + (-054) - K0531 + 000
Physical Target : CW1 - Construction of Drainage Structure along Road 2126 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0528 + 000 - K0531 + 000, K0532 + 000 - K0532 + 220
Physical Target : CW1 - Construction of Drainage Structure along Road - 2790 Lineal Meters |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00714800LZ
FROM : OO1 Ensure Safe and Reliable National Road System - National Development - Off-Carriageway Improvement - Tertiary Roads
Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K014 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S), K0615 + 682 - K0615 + 904 (R/S), K0616 + 018 - K0616 + 061 (R/S), K0620 + 216 - K0620 + 409 (R/S)
Physical Target : CW1 - Off-Carriageway Improvement: Pavement of Shoulder 2416.5 Square Meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Off-Carriagway Improvement - Tertiary Roads
Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K0614 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0614 + 534 - K0615 + 018 (R/S), K0615 + 018 - K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S)
Physical Target : CW1 - Off-Carriageway Improvement : Paving of Shoulder - 2276.18 Square meters, CW2 - Construction of Road Slope Protection Structure - 1796.49 Square meters |
June 14, 2023 |
2023 |
RXII-112 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0024 - Construction of Malasila River Flood Control, Sta. 39+600 - Sta. 40+770, Sta. 40+170 - Sta. 40+770, Barangay Bulacanon, Makilala, North Cotabato, Package 2 |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00726291LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 50 + 020.00, Lupi, Camarines Sur
Physical Target : CW1 - Construction of Revetment 105.00 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 49 + 925.00, Lupi, Camarines Sur |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 1st District Engineering Office |
Project ID : P00726606LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 335.00, Sipocot, Camarines Sur
Physical Target : CW1 - Construction of Revetment - 133.00 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 193.00, Sipocot, Camarines Sur
Physical Target : CW1 - Construction of Revetment 133.00 Lineal meters |
June 14, 2023 |
2023 |
WIN3F07421 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00732483LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.333 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.800 Lane Km |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00732952LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 0.400 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 0.378 Lane Km |
June 14, 2023 |
2023 |
RXII-111 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0073 Construction of Road Slope Protection along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) K1608 + 410 - K1609 + 758, Makilala, North Cotabato |
June 14, 2023 |
2023 |
WIN3F07388 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00732953LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 1.702 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 1.200 Lane Km |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732964LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 0.064 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 0.086 Lane Km |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736380LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 2.093 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2093.48 Lineal maters,
CW3 - Construction of Road Slope Protection Structure - 6799.36 Square meters
TO : Physical Target :
CW1 - Construction of Concrete Road - 2.06608 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2066.08,
CW3 - Construction of Road Slope Protection Structure - 6740.39 Square meters |
June 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00712762LZ
FROM : Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 1.824 Lane Km
TO : Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 1.596 Lane Km |
June 13, 2023 |
2023 |
WIN3F07389 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00711989LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Legazpi City - Punta de Jesus Rd - K0571 + 110 - K0571 + 370
Physical Target : CW1 - Road Widening - 0.52 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Legazpi City - Punta de Jesus Rd - K0571 + 227 - K0571 + 346
Physical Target : CW1 - Road Widening - 0.238 Lane Km, RROW - ROW Acquisition - 1148 Square Meters |
June 13, 2023 |
2023 |
WIN3F07391 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00711993LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Legazpi City - Punta de Jesus Rd - K0549 + 650 - K0549 + 884
Physical Target : CW1 - Road Widening - 0.468 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Legazpi City - Punta de Jesus Road - K0563 + 053 - K0563 + 163
Physical Target : CW1 - Road Widening - 0.22 Lane Km |
June 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712233LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Comun - Inarado - Peñafrancia Rd - K0520 + 020 - K0520 + 400, K0522 + 300 - K0522 + 310
Physical Target : CW1 - Construction of Drainage Structure along Road - 400 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Comun - Inarado - Peñafrancia Rd - K0528 + 883 - K0529 + 230
Physical Target : CW1 - Construction of Drainage Structure along Road - 351 Lineal Meters |
June 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712234LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Legazpi City - Punta de Jesus Rd - K0533 + 607 - K0533 + 700, K0539 + 800 - K0539 + 900, K0540 + 150 - K0540 + 290
Physical Target : CW1 - Construction of Drainage Structure along Road 333 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Legazpi City - Punta de Jesus Rd - K0533 + 607 - K0533 + 787
Physical Target : CW1 - Construction of Drainage Structure along Road - 360 Lineal Meters |
June 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00712241LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Masbate - Milagros Rd - K0002 + (-489) - K0002 + (-082), K0022 + 930 - K0022 + 981
Physical Target : CW1 - Construction of Drainage Structure along Road - 509 Lineal meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Masbate - Milagros Rd - K0002 + (-489) - K0002 + (-082)
Physical Target : CW1 - Construction of Drainage Structure along Road - 484 Lineal meters, CW2 - Off-Carriageway Improvement Construction of Bike Lanes - 1904.75 Square meters, EAO
|
June 8, 2023 |
CY 2023 |
|
UACS No. 300215102950000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102950000
Project ID.: P00739942LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/Facilities
Rehabiliation of Road along P. Sevilla Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.450 Lane Km
Unit Cost (P’000) = P 26,133.33/Lane Km
Allocation (P’000) = P 11,760.00
EAO = P 240,000.00
Total = P 12,000,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/Facilities
Rehabilitation of Road along P. Sevilla Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.450 Lane Km
Unit Cost (P’000) = P 26,133.33/Lane Km P 52 m Km.
Allocation (P’000) = P 11,760.00
EAO = P 240,000.00
Total = P 12,000,000.00
|
June 7, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310302100405000
Project ID: P00706720MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges
FROM:
Wawa Br. (B00896MN) along Daang Maharlika (Agusan-Davao Sect)
Type of Work:
CW1- Replacement of Bridge
Physical Target:
CW1- 2128.173 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 68,016.09/Square meters
TO:
Wawa Br. (B00896MN) along Daang Maharlika (Agusan-Davao Sect)
Type of Work:
CW1- Replacement of Bridge
Physical Target:
CW1- 2289.6 Square meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 63,220.65/Square meters
|
June 7, 2023 |
2023 |
WIN3F07365 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740251LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 9.269 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 4.52558 Lane Km,
CW2 - Construction of Drainage Structure along Road 3496,55 Lineal meters |
June 7, 2023 |
2023 |
WIN3F07076 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00736134LZ
FROM : CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities
Construction of Flood Mitigation Structure along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, Masbate
Physical Target : CW1 - Construction of Flood Mitigation Structure - 382.002 Lineal meters
TO : CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities
Construction of Flood Mitigation Structure along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, Masbate
Physical Target : CW1 - Structure of Flood Mitigation Structure - 222.8 Lineal meters |
June 6, 2023 |
2023 |
WIN3F06916 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00713034LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Fernando - Talisay Rd - K0004 + 007 - K0004 + 163
Physical Target : CW1 - Rehabilitation of Paved Road - 0.312 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Fernando - Talisay Rd - K0004 + 007 - K0004 + 121
Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km |
June 6, 2023 |
2023 |
WIN3F06892 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00713035LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0003 + 099 - K0003 + 140, K0003 + 884 - K0004 + 000
Physical Target : CW1 - Rehabilitation of Paved Road - 0.318 Lane Km
TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0003 + 099 - K0003 + 140, K0003 + 929 - K0004 + 000
Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km |
June 6, 2023 |
2023 |
WIN3F06890 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00713036LZ
FROM : OO1 Ensure Safe and Reliable National Road - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0005 + 368 - K0005 + 524
Physical Target : CW1 - Rehabilitation of Paved Road - 0.312 Lane Km
TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0005 + 410 - K0005 + 524
Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km |
June 6, 2023 |
2023 |
WIN3F06895 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00713037LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0006 + 909 - K0007 + 000, K0008 + 596 - K0008 + 654
Physical Target : CW1 - Rehabilitation of Paved Road - 0.310 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Pascual - Claveria Rd - K0006 + 909 - K0007 + 000, K0008 + 596 - K0008 + 612
CW1 - Rehabilitation of Paved Road - 0.226 Lane Km |
June 6, 2023 |
2023 |
WIN3F06893 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00714182LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Sn Fernando North Rd - K0006 + 132 - K0006 + 538, K0009 + 846 - K0010 + 650, K0011 + 678 - K0011 + 1010
Physical Target : CW1 - Rehabilitation of Paved Road - 3.098 Lane Km
TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Sn Fernando North Rd - K0006 + 132 - K0006 + 538, K0009 + 000 - K0009 + 356, K0009 + 966 - K0010 + 238, K0010 + 586 - K0010 + 686
Physical Target : CW1 - Rehabilitation of Paved Road - 2.282 Lane Km |
June 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 1st District Engineering Office |
Project ID : P00714185LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Sn Fernando South Rd - K0001 + 170 - K0002 + 000, K0006 + 249 K0006 + 299
Physical Target : CW1 - Rehabilitation of Paved Road 1.724 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Sn Fernando South Rd - K0001 + 282 - K0002 + 000, K0006 + 060 - K0006 + 130, K0006 + 200 + 200 - K0006 + 320, K0006 + 390 - K0006 + 432
Physical Target : CW1 - Rehabilitation of Paved Road - 1.858 Lane Km |
June 6, 2023 |
2023 |
WIN3F07380 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 3rd District Engineering Office |
Project ID : P00726303LZ
FROM : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+300.00, Uson, Masbate
Physical Target : CW1 Construction of Flood Mitigation Structure - 305.602 lineal meter
TO : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Concrete Revetment at Marcella River, Upstream leftside, Barangay Marcella, Sta. 0+000.00 - Sta.0+165.00 Uson, Masbate
Physical Target : CW1 Construction of Flood Mitigation Structure - 165 lineal meter |
June 6, 2023 |
2023 |
WIN3F07350 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 3rd District Engineering Office |
Project ID : P00727224LZ
FROM : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Gaid Flood Constrol, Sta. 0 + 796.00 - Sta. 1 + 100.00, Upstream left side, Barangay Gaid, Dimasalang, Masbate
Physical Target : CW1 - Construction of Flood Mitigation Structure Structure - 290.322 lineal meter
TO : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Gaid Flood Control, Sta. 0 + 0796.00 - Sta. 0 + 937.00, Upstream Left Side, Barangay Gaid, Dimasalang, Masbate
Physical Target : CW1 - Construction of Flood Mitigation Structure - 141 lineal meter |
June 6, 2023 |
2023 |
WIN3F07059 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732973LZ
FROM : CSSP - Construction/ Improvement of Access Roads leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)
Guinobatan - Jovellar - Donsol Road leading to Pilar Port, Guinobatan and Jovellar, Albay
Physical Target : CW1 - Reconstruction to Concrete Pavement - 4.417 Lane Km
TO : CCSSP - Construction/ Improvement of Access Roads leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)
Guinobatan - Jovellar - Donsol Road leading to Pilar Port, Guinabatan and Jovellar, Albay
Physical Target :
CW1 - Construction of Concrete Road - 2.14834 Lane Km,
CW2 - Off-Carriageway Improvement: Paving of Shoulders - 2715 Square meters,
CW3 - Construction of Road Slope Protection Structure 3674.7 Square meters |
June 6, 2023 |
2023 |
310201101064000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 3rd District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0376+616 -K0378+000 |
June 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732978LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 5.3 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 5.84 Lane Km |
June 6, 2023 |
2023 |
WIN3F07048 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732980LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 1.582 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 0.487 Lane Km,
CW2 - Construction of Road Slope Protection Structure - 1804.34 Square meters |
June 6, 2023 |
2023 |
WIN3F07363 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID P00736334LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 12.839 Lane Km
TO : Physical Target :
CW1 - Construction of Gravel Road - 4.42562 Lane Km,
CW2 - Construction of Drainage Structure along Road - 3756,2 Lineal meters |
June 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P0073732LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road 3.21 Lane Kilometers
TO : Physical Target :
CW1 - Construction of Concrete Road - 0.807 Lane Kilometers,
CW2 - Widening of Bridge - 131.76 Square meters,
CW3 - Construction of Drainage Structure 774 Lineal-meters |
June 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00739859LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 2.55 Lane Km,
CW2 - Construction of Drainage Structure along Road - 1387.6 Lineal meters,
CW3 - Construction of Road Slope Protection Structure - 4149.43 Square meters |
June 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740250LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 9.629 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 5.9 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2732.88 Lineal meters |
June 6, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 310105100832000
Project ID: P00706327MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
FROM:
Dapa-Gen Luna Rd - K0001 + (-990) - K0001 + (-946), K0006 + 104 - K0007 + 520, K0011 + 900 - K0012 + 000
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 3.160 Lane Km
Allocation:
TOTAL: P 52,663,000
CW1: P 50,819,795
EAO: P 1,843,205
Unit Cost:
CW1: P 16,082,213.61/Lane Km
TO:
Dapa-Gen Luna Rd - K0001 + (-960) - K0001 + (-946), K0006 + 104 - K0007 + 520, K0011 + 900 - K0012 + 000
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 3.100 Lane Km
Allocation:
TOTAL: P 52,663,000
CW1: P 50,819,795
EAO: P 1,843,205
Unit Cost:
CW1: P 16,393,482.26/Lane Km
|
June 5, 2023 |
FY 2023 GAA |
P00707740MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1471+468 - K1472+048
Physical Target:
CW1: 1.168 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1469+098 - K1469+231, K1471+468 - K1471+864,
K1471+864 - K1472+048, K1473+994 - K1472+140
Physical Target:
CW1: 4.302 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00 |
June 5, 2023 |
FY 2023 GAA |
P00706139MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1478+833 - K1479+384
Physical Target:
CW1: 2.406 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,872,000.00
CW1: P 27,861,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,010,520.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+013 - K1479+145,
K1479+(-145) - K1479+(-013), K1479+145 - K1479+384
Physical Target:
CW1: 2.226 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,872,000.00
CW1: P 27,861,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,010,520.00 |
June 5, 2023 |
FY 2023 GAA |
WIN3E02885 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+002 - K1479+179
Physical Target:
CW1: 0.531 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,372,000.00
CW1: P 6,148,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 223,020.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-330) - K1480+(-220)
Physical Target:
CW1: 0.330 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,372,000.00
CW1: P 6,148,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 223,020.00 |
June 5, 2023 |
FY 2023 GAA |
WIN3E02903 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-411) - K1480+339,
K1480+(-956) - K1480+(-665), K1480+339 - K1480+455
Physical Target:
CW1: 3.471 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,652,000.00
CW1: P 40,194,180.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,457,820.00
TO OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-220) - K1480+455
Physical Target:
CW1: 2.025 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,652,000.00
CW1: P 40,194,180.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,457,820.00 |
June 5, 2023 |
FY 2023 GAA |
P00705592MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd -
K1501+180 - K1501+345, K1502+001 - K1502+059,
K1502+239 - K1502+358, K1502+540 - K1502+597,
K1504+606 - K1504+905, K1510+950 - K1511+227
Physical Target:
CW1: 1.884 lane km (Road Widening)
Allocation:
TOTAL: P 24,963,000.00
CW1: P 24,089,295.00 (Road Widening)
EAO: P 873,705.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd -
K1492+474 - K1492+528, K1482+806 - K1492+899,
K1501+180 - K1501+345, K1502+001 - K1502+133,
K1502+300 - K1502+423, K1502+540 - K1502+597,
K1504+606 - K1504+906, K1510+935 - K1511+227
Physical Target:
CW1: 2.045 lane km (Road Widening)
Allocation:
TOTAL: P 24,963,000.00
CW1: P 24,089,295.00 (Road Widening)
EAO: P 873,705.00 |
June 5, 2023 |
FY 2023 GAA |
WIN3E02911 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pilan Parallel Br. along Davao-Cotabato Rd (Davao City-Jct Digos Section)
Physical Target:
CW1: 238.500 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Widening of Bridge)
EAO: P 300,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pilan Parallel Br. along Davao-Cotabato Rd (Davao City-Jct Digos Section)
Physical Target:
CW1: 119.250 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Widening of Bridge)
EAO: P 300,000.00 |
June 5, 2023 |
FY 2023 GAA |
WIN3E02900 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1504+905 - K1504+989, K1505+800 - K1506+500
Physical Target:
CW1: 1.524 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1504+000 - K1504+216
Physical Target:
CW1: 0.864 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,000.00 |
June 5, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + 671 - K0470 + 707, K0471 + 961 - K0472 + 095, K0472 + 207 - K0472 + 232, K0472 + 480 - K0472 + 535, K0474 + 117 - K0474 + 130, K0474 + 584 - K0474 + 684, K0478 + 502 - K0478 + 522, K0492 + 635 - K0492 + 771;
Physical Target: 2433.89 Square Meters;
Allocation: Php 33,000,000.000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + 671 - K0470 + 707, K0471 + 961 - K0472 + 095, K0472 + 480 - K0472 + 535, K0474 + 117 - K0474 + 130, K0474 + 584 - K0474 + 684, K0478 + 502 - K0478 + 522, K0492 + 635 - K0492 + 771;
Physical Target: 2731 Square Meters;
Allocation: Php 33,000,000.000"
|
June 5, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Bulanao-Paracelis Rd - K0500 + (-965) - K0500 + 135;
Physical Target: 682 Square Meters;
Allocation: Php 12,167,000.000"
"To:
Bulanao-Paracelis Rd - K0500 + (-1035) - K0500 + 135;
Physical Target: 882.9 Square Meters;
Allocation: Php 12,167,000.000"
|
June 5, 2023 |
2023 |
|
SR2023-01-001876 |
January 30, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0499 + (-593)- K0499 + 900, Tabuk City, Kalinga;
Physical Target: 17.012 Lane Km;
Allocation: Php 85,062,000.000"
"To:
Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0496 + (-593) - K0499 + 900, Tabuk City, Kalinga;
Physical Target: 23.971 Lane Km;
Allocation: Php 85,062,000.000"
|
June 5, 2023 |
2023 |
|
SR2023-03-005742 |
March 2, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 152 - K529 + 192;
Physical Target: 5000 Square Meters;
Allocation: Php 90,000,000.000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 +212 - K529 + 269;
Physical Target: 4182.09 Square Meters;
Allocation: Php 90,000,000.000"
|
June 5, 2023 |
2023 |
|
SR2023-03-005743 |
March 2, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 192 - K529 + 232;
Physical Target: 5277.78 Square Meters;
Allocation: Php 95,000,000.000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 262 - K529 + 365;
Physical Target: 4412.5 Square Meters;
Allocation: Php 95,000,000.000"
|
June 5, 2023 |
2023 |
|
SR2023-01-001832 |
January 30, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 272 - K0529 + 312;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 164 - K0529 + 212;
Physical Target: 4650 Square Meters;
Allocation: Php 100,000,000.000"
|
June 2, 2023 |
2023 |
WIN3F07368 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00739857LZ
FROM : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Calanga Bridge Road, Barangay Calanga, Rapu-Rapu Albay
Physical Target :
CW1 - Construction of Bridge 1152.415 Square Meters
TO : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Calanga Ridge Road, Barangay Calanga, Rapu-Rapu Albay
Physical Target :
CW1 - Construction of Gravel Road 1.88 Lane Km |
June 2, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711996LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road
Guinobatan Poblacion Rd - K0511 + (-212) - K0511 + 261
Physical Target :
CW1 - Road Widening - 0.946 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road
Guinobatan Poblacion Rd - K0511 + (-459) - K0511 + 041
Physical Target :
CW1 - Road Widening - 1 Lane Km |
June 2, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00713320LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Albay West Coast Rd. - K0508 + 189 - K0508 + 326
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 561.56 Square Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Albay West Coast Rd. - K0508 + 189 - K0508 + 297
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 529.2 Square Meters |
June 2, 2023 |
2023 |
WIN3F07324 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00737572LZ
FROM : Physical target :
CW1 - Construction of Flood Mitigation Structure 68.878 Lineal meters
TO : Physical target :
CW1 - Construction of Flood Mitigation Structure 40.00 Lineal meters |
June 2, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00741997LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road 0.963 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road 0.822 Lane Km |
June 2, 2023 |
2023 |
P00706061mn |
SR2023-01-002045 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00115 - PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD - K1646+475-K1647+434, DATU PAGLAS, MAGUINDANAO |