Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 20, 2021 2021 WIN1F06090 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Jct Buenavista-Lawaan-Marabut Rd - K0976 + 925 - K0977 + 097

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M

Total P 93.00 M

AS MODIFIED :

Jct Buenavista-Lawaan-Marabut Rd – K0954 + 830 –K0954 + 950, K0962 + 110 – K0962 + 240, K0976 + 925 - K0977 + 097

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,735.41 square meters
EAO P 3.255 M

Total P 93.00 M
May 20, 2021 2021 WIN1F06094 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL :

Cabgan-Capinha Diversion Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 53.075 M
3.00 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED :

Cabgan-Capiñahan Diversion Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 53.075 M
1.592 Lane Km

EAO P 1.925 M

Total P 55.00 M
May 20, 2021 2021 WIN1F06100 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL :

Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+300, Carigara, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 lineal meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED :

Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+283, Carigara, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 133.00 lineal meters
EAO P 3.500 M

Total P 100.00 M
May 20, 2021 2021 WIN1F06063 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 11+380.193, Motiong, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 207.475 M
18.571 Lane Km
EAO P 7.525 M

Total P 215.00 M

AS MODIFIED:

Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 1+570,Sta. 7+100 to Sta. 10+327.44, Motiong, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 207.475 M
9.60 Lane Km
EAO P 7.525 M

Total P 215.00 M
May 20, 2021 2021 WIN1F06135 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Jct Buenavista-Lawaan-Marabut Rd - K0977 + 097 - K0977 + 200

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M

Total P 93.00 M

AS MODIFIED:

Jct Buenavista-Lawaan-Marabut Rd – K0962 + 600 – K0962 + 840, K0977 + 097 - K0977 + 200, K0982+620 – K0982 + 865, K0984 + 810 – K0985 + 605, K0994 + 265 – K0994 + 360

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 6,758.48 square meters
EAO P 3.255 M

Total P 93.00 M
May 19, 2021 2021 WIN1C03768 FY 2021 December 28, 2020 Region III Tarlac 2nd District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Concepcion - Capas Rd - K0113+200 - K0113+743
May 19, 2021 2021 WIN1C03772 FY2021 December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank), Package 2, Sta. 11+419.20 - Sta. 11+505.20, Sta. 13+911.40 - Sta. 14+395.40, La Paz, Tarlac
May 19, 2021 2021 WIN1C03759 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Network Development - Road Widening - Tertiary Roads

Bamban Poblacion Rd - K0099+(-438) - K0099+(-040), K0099+1249 - K0099+1486
May 19, 2021 2021 WIN1C03720 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 - Sta. 10+340, Capas, Tarlac
May 19, 2021 2021 WIN1C03732 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac
May 19, 2021 2021 WIN1C03757 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads

Construction of Road, Barangay Balanoy to Barangay Dumarais, La Paz, Tarlac
May 19, 2021 2021 WIN1C03752 FY 2021 GAA December 28, 2020 Region III Pampanga 3rd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Manila North Road - K0093+735 - K0094+443
May 13, 2021 2021 WIN1C03764 GAA 2021 May 31, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 271;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 150;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 200,000,000
May 13, 2021 2021 WIN1C03767 SR2021-02-004935 February 17, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+360.00, 325+510.00 - 325+960.00 (Hapid), Lamut, Ifugao;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000

To: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+400.00, 325+680.00 - 326+060.00 (Hapid), Lamut, Ifugao ;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
May 13, 2021 2021 WIN1C03780 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0271+800;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000

To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0275+229;
Physical Target: CW1 : 20.958 Lane Km;
Allocation= Php 125,000,000
May 13, 2021 2021 WIN1C03763 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 942, K0342 + 220 - K0342 + 358;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 910;
Physical Target: CW1 : 8,845.4 Square meters;
Allocation= Php 200,000,000
May 13, 2021 2021 WIN1C03779 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0299+000 - K0319+726;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 300,000,000

To: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0288+000 - K0319+726;
Physical Target: CW1 : 64.002 Lane Km;
Allocation= Php 300,000,000
May 13, 2021 2021 WIN1C03778 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 486 - K0309 + 616, K0313 + 900 - K0314 + 000, K0316 + 225 - K0316 + 525, K0320 + 241 - K0320 + 442;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 510 - K0309 + 616, K0313 + 900 - K0314 + 000;
Physical Target: CW1 : 8,526.50 Square meters;
Allocation= Php 200,000,000
May 7, 2021 2021 WIN1G02897 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. 300118200324000
Project ID: P00551488MN

FROM:

Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Union - Malinao Bridge, General Luna, Surigao del Norte

Type of Work / Physical Target - CW1 - Construction of
Bridge / 1,666.452 sq.m.

Unit Cost: P 81,070.44 / sq.m.

Allocation: P 135,100,000

EAO: P 4,900,000

Total: P 140,000,000

TO:

Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Union - Malinao Bridge, General Luna, Surigao del Norte

Type of Work / Physical Target - CW1 - Construction of Steel
Bridge / 1,958.544 sq.m.

Unit Cost: P 68,979.81 / sq.m.

Allocation: P 135,100,000

EAO: P 4,900,000

Total: P 140,000,000
May 5, 2021 2021 WIN1E02219 FY 2021 RA 11518 January 25, 2021 Region XIII Agusan del Norte District Engineering Office
UACS No. 310203100495000
Project ID: P00501569MN

FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Pandanon-Magallanes Rd - K1221 + 450 - K1222 + 061

Type of Work/Physical Target: CW1 - Road Widening / 1.250 lane km
Unit Cost: P15,680,000 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000

TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Pandanon-Magallanes Rd - K1219 + 785.50 - K1220 + 000, K1221 + 450 - K1222 + 120

Type of Work/Physical Target: CW1 - Road Widening / 1.835 lane km
Unit Cost: P10,681,199 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000
May 3, 2021 2021 WIN1C03734 GAA 2021 April 27, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0259 +000, La Trinidad, Benguet ;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000

To: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0260 + 750,
La Trinidad, Benguet;
Physical Target: CW1 : 12.61 Lane Km;
Allocation= Php 100,000,000
April 28, 2021 FY 2021 WIN1C03725 FY 2021 GAA December 28, 2020 Region III Regional Office III
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Baler Casiguran Road (Dinadiawan - Casiguran), K0276+280 - K0276+410
April 28, 2021 FY 2021 WIN1C03733 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Improvement of Concrete Slope Protection along Angat River, Sta. Barbara Section, Baliuag, Sta. 0+238.8 to Sta. 0+380.8
April 28, 2021 FY 2021 WIN1C03732 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac
April 27, 2021 2021 WIN1C03722 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Network Development - Off-Carriageway Improvement - Primary Roads - Tarlac - Sta. Rosa Rd, K0132+380 - K0132+460, K0132+460 - K0132+780, K0132+780 - K0133+320
April 27, 2021 FY2021 WIN1C03720 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac
April 27, 2021 FY 2021 WIN1C03721 FY 2021 GAA December 28, 2020 Region III Regional Office III
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Pantabangan - Canili - Basal - Baler Rd, K0178+550 - K0178+618
March 18, 2021 FY 2020 GAA WIN0G02894 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+386 - K1513+520 (R/S), K1513+722 - K1513+775,
K1513+875 - K1514+020
Physical Target:
CW1: 1.370 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+535 - K1513+700, K1514+100 - K1514+581,
K1514+646 - K1515+000
Physical Target:
CW1: 2.741 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00
March 17, 2021 FY 2020 GAA WIN0F06037 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202186000
Project ID : P0044649LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package B, 5+000 - 10+000, Palawan
CW-1 Construction of Concrete Road: 0 Lane Km
Allocation: 55.00 Million

TO:
Construction of Missing links/New Road
Sumbiling - Canipaan, Package B,
Sta. 258+756.30 - Sta. 259+920, Palawan
CW-1 Construction of Gravel Road : 2.2674 sq.m.
Allocation : 55.00 Million

March 17, 2021 FY 2020 GAA WIN0F06386 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300117206589000
Project ID : P00447608LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 20.00 Million

TO:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0.016 Lane Km
CW-1 Construction of Concrete Bridge : 244.224 sq.m
Allocation : 20.00 Million
March 17, 2021 FY 2020 GAA WIN0F06380 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202185000
Project ID : P00446496LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A,
0+000 - 5+000, Palawan
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 55.00 Million

TO:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A
Sta. 258+641.00 - Sta. 258+756.30, Palawan
CW-1 Construction of Gravel Road : 0.7706 Lane Km
CW-2 Construction Of Concrete Bridge : 286.20 sq m
Allocation : 55.00 Million
March 16, 2021 FY 2020 GAA WIN0F06031 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202940000
Project ID : P00447010LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot nterior - Tagusao Section), Package A
(Sta. 162+820 - Sta. 173+019), Palawan
CW-1 Construction of Concrete Road: 2027 Lane Km
Allocation : 50.00Million

TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package A
(Sta. 191+315.80 - Sta. 191+935.50), Palawan
CW-1 Construction of Concrete Road: 1.23940Lane Km
Allocation : 50.00 Million
March 16, 2021 FY 2020 GAA WIN0F06381 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202920000
Project ID : P00446974LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Access Road,
New Agutaya - Alimanguan Tourism Road Leading to
San Vicente Long Beach, San Vicente, Palawan
CW- Construction of Concrete Road: 0 Lane Km
Allocation - 35.00 Million

TO:
Construction of Access Road -
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
CW-1 Construction of Concrete Road : 1.055 Lane Km
Allocation : 35.00 Million
March 3, 2021 GAA CY 2020 WIN0F06361 UACS No. 300107200682000 April 1, 2020 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300107200682000
Project ID.: P00449030LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=250 l.m.
Unit Cost (P’000) = P 198.00 / l.m.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00

As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=618 l.m.
Unit Cost (P’000) = P 75.652 / l.m.
Allocation = P 46,752,750.00
EAO = P 472,250.00
FCR Amount = P 47,225,000.00
FLR Amt. Excess = P 2,775,000.00
Original Allocation = P 50,000,000.00
WIN0F06361
March 3, 2021 GAA CY 2020 WIN0F06221 UACS No. 300104213601000 April 1, 2020 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300104213601000
Project ID.: P00442222LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortuna Village, Barangay San Isidro, Parañaque City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00 / No. of Bldg.
Allocation (P’000) = P 6,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 7,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortunata Village, Barangay San Isidro, Parañaque City
Construction of Slope Protection and Linear Parks along Taguig River, Brgy. Sta. Ana, Taguig City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00
Allocation (P’000) = P 148,282.29
EAO (P’000) = P 200.00
Total (P’000) = P 7,000.00
WIN0F06221
January 26, 2021 FY 2020 WIN1E02201 310201100469000 April 29, 2020 Region IX Regional Office IX
UACS No. 310201100469000
Project ID: P00400315MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Oroquieta National Rd -
K1808 + 882.51 - K1808+950,
K1810 + 900 - K1810+975,
K1817 + 700 - K1818 + 580,
K1818 + 800 - K1819 + 220,
K1819 + 420 - K1820 + 113,
K1826 + 086 - K1826 + 535

CW1 - Road Widening: 5.174 lane km.
Unit Cost: P 18,538,857.45/lane km.
ROW: 35,742.4995 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,357,201.70
Allocation: P 110,000,000.00
January 20, 2021 2020 WIN0G02993 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310107100187000
Project ID: P00400110MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (Surigao-Agusan Sect) - K1172 + 386 - K1172 + 440

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 1,020.00 sq.m.

Unit Cost: Php 9.80T / sq.m.

Allocation: Php 9.996M

EAO: Php 204.0T

Total: Php 10.200M

TO:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (Surigao-Agusan Sect) - K1172 + 435 - K1172 + 467.4

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 724.89 sq.m.

Unit Cost: Php 13.789678T / sq.m.

Allocation: Php 9.996M

EAO: Php 204.0T

Total: Php 10.200M
January 20, 2021 2020 WIN0G02989 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310109100509000
Project ID: P00400005MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1275 + 000 - K1275 + 070, K1276 + 371 - K1276 + 463

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 2,172 sq.m.

Unit Cost: Php 22.559853T / sq.m.

Allocation: Php 49.0M

EAO: Php 1.0M

Total: Php 50.0M

TO:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1274 + 901 - K1275 + 072, K1276 + 371 - K1276 + 467.57

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 3,403.51 sq.m.

Unit Cost: Php 14.396902T / sq.m.

Allocation: Php 49.0M

EAO: Php 1.0M

Total: Php 50.0M
January 20, 2021 FY 2020 WIN0G03220 300117207302000 July 23, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300117207302000
Project ID: P00444014MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Brgy. Salvador, Dumingag, Zamboanga del Sur

Physical Target:
CW-1- Construction of Concrete Road: 1.968 lane km
Unit Cost: P 7,545,731.71/Lane km
EAO: P 150,000.00
Allocation: P 15,000,000.00
January 20, 2021 FY 2020 WIN0G03227 310203100384000 July 23, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
'UACS No. 310203100384000
Project ID: P00401557MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct. Aurora-Monte Alegre-Jct Labangan Rd-
K1630+(-260) - K1630+776

CW1 - Road Widening: 2.072 lane km.
Unit Cost: P 14,189,189.19/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00
January 20, 2021 FY 2020 WIN0G02884 310201100596000 July 24, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201100596000
Project ID: P00400272MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Jct Aurora-Ozamis City Rd -
K1631 + 220 - K1631 + 700

CW1 - Road Widening: 0.96 lane km.
Unit Cost: P 35,729,166.67/lane km.
EAO: P 700,000.00
Allocation: P 35,000,000.00
January 20, 2021 FY 2020 WIN0G03219 300202100170000 September 21, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300202100170000
Project ID: P00431597MN

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports

Access Road leading to Panubigan Wharf, Zamboanga City, Zamboanga del Sur

CW1 - Construction of Concrete Road: 1.132 lane km.
Unit Cost: P 19,825,088.00/lane km.
EAO: P 458,000.00
Allocation: P 22,900,000.00
January 15, 2021 2020 310204100692000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Bypass and Diversion Roads - Alicia-Angadanan-San Guillermo- Cauayan City - Naguilian Alternate Route, Package 1, Isabela
January 15, 2021 2020 300203100244000 GAA FY 2020 February 11, 2020 Region II Quirino District Engineering Office
Construction/Improvement of Access Road Declared Tourism Destinations - Access Road leading to MAddela Eco-Park, Maddela, Quirino
January 15, 2021 2020 310203100324000 GAA FY 2020 February 11, 2020 Region II Quirino District Engineering Office
Network Development Program - Road Widening - Tertiary Roads - Dumabato - Balligui Road - K0372+877 - K0373+836 (S04758LZ), Maddela, Quirino
January 15, 2021 2020 WIN0G02868 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 300111200157000
Project ID: P00444717MN

FROM:

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126) - K0001 + 129, Dinagat

Type of Work/Physical Target:

CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 0.000 sq.m.

Unit Cost: Php 0.000 / sq.m.

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00

TO:

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-146) - K0001 + 102.5, Dinagat

Type of Work/Physical Target:

CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 4,044.075 sq.m.

Unit Cost: Php 13,124.14 / sq.m.

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00
January 14, 2021 FY 2020 WIN0G03226 300116203187000 July 23, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300116203187000
Project ID: P00443641MN


Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Concreting of local roads-Junction Imelda-Alicia Road, Binangonan-Nanan Road, Payao, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Concrete Road: 6.276 Lane Km
Unit Cost: P 7,026,768.64/Lane Km
EAO: P 900,000.00
Allocation: P 45,000,000.00
January 14, 2021 FY 2020 WIN0G03218 300116203189000 July 24, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300116203189000
Project ID: P00443643MN


Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Concreting of local roads-Junction leading to Dumpok-Baluyan Road, Imelda, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Concrete Road: 4.389 Lane Km
Unit Cost: P 7,814,992.03/Lane Km
EAO: P 700,000.00
Allocation: P 35,000,000.00
January 14, 2021 FY 2020 WIN0G03223 300117207307000 July 24, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300117207307000
Project ID: P00444026MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Local Road from Brgy. Labrador - Poblacion, Buug, Zamboanga Sibugay

Physical Target:
CW-1- Construction of Concrete Road: 1.394 lane km
Unit Cost: P 7,101,865.14/Lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00
January 8, 2021 2020 WIN0G02873 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Butuan City District Engineering Office
UACS No. 310212100165000
Project ID: P00400405MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + 000, K1245 + 149 - K1246 + 420, K1246 + 537 - K1246 + 621, K1249 + 400 - K 1249 + 860, (S00441MN) K1241 + 875 - K1242 + 028

Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 6.028 lane km

Unit Cost: Php 11,584,582 / lane km

Allocation: Php 69,831,860.00

EAO: Php 1,425,140.00

Total: Php 71,257,000.00

TO:

OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + (-090), K1245 + 272 - K1246 + 458, K1246 + 571 - K1246 + 661.50, K1249 + 439 - K 1249 + 930, (S00441MN) K1241 + 924 - K1242 + 028

Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 5.655 lane km

Unit Cost: Php 12,348,693 / lane km

Allocation: Php 69,831,860.00

EAO: Php 1,425,140.00

Total: Php 71,257,000.00
January 8, 2021 2020 WIN0G02862 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Butuan City District Engineering Office
UACS No. 300204100435000
Project ID: P00431499MN

FROM:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work/Physical Target:

CW1 - Road Widening / 2.2 lane km

Unit Cost: Php 24,125,000 / lane km

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00

TO:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work/Physical Target:

CW1 - Widening of Bridge / 172.10 sq.m
CW2 - Construction of Slope Protection Structure / 965.19 sq.m

Unit Cost1: Php 97,369.55 / sq.m
Unit Cost2: Php 37,627.51 / sq.m

Estimated Cost1: Php 16,757,300.00
Estimated Cost2: Php 36,317,700.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00
January 7, 2021 2020 WIN0C04101 GAA 2020 December 1, 2020 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 270 Square meters;
Allocation= Php 44000000

To: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 442.274 Square meters; Allocation= Php 44000000
January 7, 2021 2020 WIN0C04091 GAA 2020 November 27, 2020 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 964.0 Square meters;
Allocation= Php 20000000

To: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 240.0 Square meters
CW2: 724.0 Square meters;
Allocation= Php 20000000
January 7, 2021 2020 WIN0C04089 GAA 2020 November 27, 2020 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 260 Lineal meters;
Allocation= Php 50000000

"To: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: CW1: Construction of Flood Mitigation Structure
CW2: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 170.5 Lineal meters
CW2 : 121.5 Lineal meters;
Allocation= Php 50000000"
January 6, 2021 2020 WIN0C04088 GAA 2020 November 11, 2020 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000

To: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Slope Protection Structure
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 198 Square Meters
CW2 : 0.956 Lane Km;
Allocation= Php 15000000
January 6, 2021 2020 WIN0C03692 GAA 2020 December 9, 2020 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000

"To: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Gravel Road
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 0.248 Lane Km
CW2 : 0.752 Lane Km;
Allocation= Php 15000000"

January 5, 2021 FY 2020 GAA WIN0G02887 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City
Physical Target:
CW1: 195.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Construction of Revetment)
EAO: P 1,400,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 4+292 to Sta. 4+480, Davao City
Physical Target:
CW1: 188.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Construction of Revetment)
EAO: P 1,400,000.00
January 5, 2021 FY 2020 GAA WIN0G02882 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Right Bank, Davao City
Physical Target:
CW1: 160.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Right Bank, Davao City
Physical Target:
CW1: 123.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00
January 5, 2021 FY 2020 GAA WIN0G02883 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 0+512 to Sta. 0+852, Davao City
Physical Target:
CW1: 100.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 1+013 to Sta. 1+095, Davao City
Physical Target:
CW1: 82.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
January 5, 2021 FY 2020 GAA WIN0G02886 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Shoulder Paving along Jct. Daang Maharlika Rd.-Iñigo St.-Jct. Dacudao, Davao City
Physical Target:
CW1: 2,032.73 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 8,640,000.00
CW1: P 8,467,000.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 172,800.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Shoulder Paving along Jct. Daang Maharlika Rd.-Iñigo St.-Jct. Dacudao, Davao City
Physical Target:
CW1: 854.40 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 0.320 lane km (Road Widening)
Allocation:
TOTAL: P 8,640,000.00
CW1: P 6,834,177.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P 1,633,023.00 (Road Widening)
EAO: P 172,800.00
January 5, 2021 FY 2020 GAA WIN0G02880 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bunawan River, Sta. 5+060 to Sta. 5+282, Davao City
Physical Target:
CW1: 250.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bunawan River, Sta. 5+260 to Sta. 5+482, Davao City
Physical Target:
CW1: 444.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00
January 5, 2021 FY 2020 GAA WIN0G02879 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge Upstream Section, Davao City
Physical Target:
CW1: 245.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge Upstream Section, Davao City
Physical Target:
CW1: 203.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
January 5, 2021 FY 2020 GAA WIN0G02881 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 150.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Revetment)
EAO: P 500,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 125.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Revetment)
EAO: P 500,000.00
January 5, 2021 FY 2020 GAA WIN0G02878 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City
Physical Target:
CW1: 115.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,055,000.00 (Construction of Revetment)
EAO: P 945,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 4+071 to Sta. 4+186, Davao City
Physical Target:
CW1: 115.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,055,000.00 (Construction of Revetment)
EAO: P 945,000.00
December 30, 2020 FY 2020 WIN0B00953 300113200026000 October 1, 2020 Region IX Regional Office IX
UACS No. 300113200026000
Project ID: P00442692MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Ukilan Bridge along Jolo - Taglibi - Tiptipon Road K19+829.08 - K19+839.92

Physical Target:
CW-1 - Replacement of Bridge: 103.41 sq.m.
Unit Cost: P 113,212.62/sq.m.
EAO: P 292,682.93
Allocation: P 12,000,000.00
December 30, 2020 FY 2020 WIN0B00968 300113200025000 December 3, 2020 Region IX Regional Office IX
UACS No. 300113200025000
Project ID: P00442691MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Tumarikin Bridge along Jolo - Taglibi - Tiptipon Road K17+638.08 - K17+648.92

Physical Target:
CW-1 - Replacement of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B00966 300111200015000 December 3, 2020 Region IX Regional Office IX
UACS No. 300111200015000
Project ID: P00442700MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Bridge Widening of Pang II Bridge (Sta. 43+966.38 - Sta. 43+977.22)

Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B00970 300113200023000 December 3, 2020 Region IX Regional Office IX
UACS No. 300113200023000
Project ID: P00442687MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Taung Bridge along Jolo - Taglibi - Tiptipon Road K16+419.08 - K16+427.92

Physical Target:
CW-1 - Replacement of Bridge: 84.3336 sq.m.
Unit Cost: P 104,051.0544/sq.m.
EAO: P 225,000.00
Allocation: P 9,000,000.00
December 30, 2020 FY 2020 WIN0B00954 300111200012000 December 3, 2020 Region IX Regional Office IX
UACS No. 300111200012000
Project ID: P00442703MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Bridge Widening of Bulingbuling Bridge (Sta. 22+955.08 - Sta. 22+965.92)

Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B00951 300113200018000 October 1, 2020 Region IX Regional Office IX
UACS No. 300113200018000
Project ID: P00442688MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Binuang Bridge along Jolo - Taglibi - Tiptipon Road K17+093.08 - K17+051.92

Physical Target:
CW-1 - Replacement of Bridge: 122.4936 sq.m.
Unit Cost: P 111,504.08/sq.m.
EAO: P 341,463.41
Allocation: P 14,000,000.00
December 30, 2020 FY 2020 WIN0B00952 300113200021000 October 5, 2020 Region IX Regional Office IX
UACS No. 300113200021000
Project ID: P00442686MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Lubluban Gadja Bridge along Jolo - Taglibi - Tiptipon Road K15+008.08 - K15+020.92

Physical Target:
CW-1 - Replacement of Bridge: 122.4936 sq.m.
Unit Cost: P 103,539.51/sq.m.
EAO: P 317,073.17
Allocation: P 13,000,000.00
December 30, 2020 FY 2020 WIN0B00967 3001112001267000 December 2, 2020 Region IX Regional Office IX
UACS No. 3001112001267000
Project ID: P00444701MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Slope Protection Along Seit - Tayungan National Road Km 39+520 - 40+870.00, Km 38+000 - Km41+660 (with exemption), Sulu

Physical Target:
CW-1 - Construction of Slope Protection: 22,143.33 sq.m.
Unit Cost: P 1,968.80939/sq.m.
CW-2 - Preventive Maintenance of Road: Concrete Reblocking: 3.04 Lane km
Unit Cost: P 17,377,704.03/Lane km
ROW: 669.79 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,374,847.57
Allocation: P 100,000,000.00
December 30, 2020 FY 2020 WIN0B00962 300111200014000 December 3, 2020 Region IX Regional Office IX
UACS No. 300111200014000
Project ID: P00442699MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Bridge Widening of Pang I Bridge along Seit-Pang-Camp Andres Road

Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B00950 300107200933000 August 19, 2020 Region IX Regional Office IX
UACS No. 300107200933000
Project ID: P00444669MN

Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program

Construction of Seawall from Brgy. Tanduh Bagua to Brgy. Umangay, Patikul, Sulu

Physical Target:
CW-1- Construction of Flood Mitigation Structure: 91.00 Ln.m.
Unit Cost: P 21,758.24/Ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00
December 30, 2020 FY 2020 WIN0B00961 300111200016000 December 3, 2020 Region IX Regional Office IX
UACS No. 300111200016000
Project ID: P00442701MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Bridge Widening of Sapah Biray Bridge (Sta. 35+156.58 - Sta. 35+167.42)

Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B00959 300113200022000 December 3, 2020 Region IX Regional Office IX
UACS No. 300113200022000
Project ID: P00442690MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Lumukan Bridge along Jolo - Taglibi - Tiptipon Road K18+108.08 - K18+118.92

Physical Target:
CW-1 - Replacement of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00
December 30, 2020 FY 2020 WIN0B01103 300113200024000 October 2, 2020 Region IX Regional Office IX
UACS No. 300113200024000
Project ID: P00442689MN


Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Replacement of Permanent Weak Bridges - Tuburan Bridge along Jolo - Taglibi - Tiptipon Road K17+339.08 - K17+351.92

Physical Target:
CW-1 - Replacement of Bridge: 122.4963 sq.m.
Unit Cost: P 111,504.08/sq.m.
EAO: P 341,463.41
Allocation: P 14,000,000.00
December 30, 2020 FY 2020 WIN0B01104 300111200203000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200203000
Project ID: P00442698MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Punay Road

Physical Target:
CW-1 - Road Widening: 5.26 lane km
Unit Cost: P 16,482,853.87/lane km
ROW: 885.65 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,034,493.40
Allocation: P 90,000,000.00
December 29, 2020 FY 2020 WIN0B00939 300111200100000 March 20, 2020 Region IX Regional Office IX
UACS No. 300111200100000
Project ID: P00442712MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Missing Links - Tonggusong - Tubig Indangan National Road

Physical Target:
CW-1 - Road Upgrading Gravel to Paved: 1.685 lane km
Unit Cost: P 15,280,999.47/lane km
ROW: 1,167.73 Sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 901,196.94
Excess: P 28,000,000.00
Allocation: P 55,000,000.00
December 29, 2020 FY 2020 WIN0B00925 300111200194000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200194000
Project ID: P00442680MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Reconstruction/Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road, K5+140.00 - K7+310.00

Physical Target:
CW-1 - Reconstruction to Concrete Pavement: 4.34 lane km
Unit Cost: P 17,773,500.65/lane km
ROW: 544.04 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 2,699,794.75
Allocation: P 80,000,000.00
December 29, 2020 FY 2020 WIN0B00927 300111200200000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200200000
Project ID: P00442694MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Camp Andres - Sucuban Road

Physical Target:
CW-1 - Road Widening: 5.58 lane km
Unit Cost: P 15,546,969.90/lane km
ROW: 705.28 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,036,323.22
Allocation: P 90,000,000.00
December 29, 2020 FY 2020 WIN0B00934 300111200201000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200201000
Project ID: P00442697MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Karungdong - Kulay-Kulay Road

Physical Target:
CW-1 - Road Widening: 5.28 lane km
Unit Cost: P 16,432,055.05/lane km
ROW: 673.69 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,036,643.77
Allocation: P 90,000,000.00
December 29, 2020 FY 2020 WIN0B00916 300116202154000 December 2, 2020 Region IX Regional Office IX
UACS No. 300116202154000
Project ID: P00443222MN

Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Concrete Road - Concreting of Lower Patibulan - Lubhang Road, Phase I, Old Panamao, Sulu

Physical Target:
CW-1- Construction of Concrete Road: 8.92 lane km
Unit Cost: P 16,217,455.19/Lane km
EAO: P 5,063,089.51
Excess: P 277,210.21
Allocation: P 150,000,000.00
December 29, 2020 FY 2020 WIN0B00944 300111200193000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200193000
Project ID: P00442679MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Reconstruction/Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road, K0+000 - K2+510

Physical Target:
CW-1 - Reconstruction from Paved to Concrete: 5.02 lane km
Unit Cost: P 16,314,609.29/lane km
EAO: P 2,866,476.85
Excess: P 234,184.50
Allocation: P 85,000,000.00
December 29, 2020 FY 2020 WIN0B00946 300117207258000 December 2, 2020 Region IX Regional Office IX
UACS No. 300117207258000
Project ID: P00443951MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Concrete Road - Concreting of Road along Gulangan Ipil Road, Maimbung, Sulu

Physical Target:
CW-1- Construction of Concrete Road: 0.95 lane km
Unit Cost: P 15,237,986.39/Lane km
EAO: P 144,760.87
Excess: P 379,152.06
Allocation: P 15,000,000.00
December 29, 2020 FY 2020 WIN0B00948 300116202252000 June 15, 2020 Region IX Regional Office IX
UACS No. 300116202252000
Project ID: P00443443MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Slope Protection Along Seit-Tanguyan National Road, Sulu, Km 38+000 - 39+520

Physical Target:
CW-1 - Construction of Concrete Road: 3.04 lane km
Unit Cost: P 25,375,422.16/lane km
EAO: P 2,699,944.92
Excess: P 158,771.70
Allocation: P 80,000,000.00
December 29, 2020 FY 2020 WIN0B00945 300117205331000 December 2, 2020 Region IX Regional Office IX
UACS No. 300117205331000
Project ID: P00443757MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Bypass Road from Barangay Limook Emergency Hospital-Barangay Maligaya Isla Verde-Barangay Maganda Junction National Highway, Lamitan City, Basilan

Physical Target:
CW-1- Construction of Concrete Road: 2.728 lane km
Unit Cost: P 21,250,371.90/Lane km
EAO: P 579,710.14
Excess: P 1,449,275.37
Allocation: P 60,000,000.00
December 29, 2020 FY 2020 WIN0B00949 300107200934000 August 19, 2020 Region IX Regional Office IX
UACS No. 300107200934000
Project ID: P00444670MN

Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program

Construction of Seawall from Brgy. Bangas, Hadji Panglima Tahil, Sulu

Physical Target:
CW-1- Construction of Flood Mitigation Structure: 90.00 Ln.m.
Unit Cost: P 22,000.00/Ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00
December 29, 2020 FY 2020 WIN0B00947 300111200199000 June 15, 2020 Region IX Regional Office IX
UACS No. 300111200199000
Project ID: P00442693MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Camp Andres - Lahing-Lahing

Physical Target:
CW-1 - Road Widening: 5.28 lane km
Unit Cost: P 16,438,144.71/lane km
ROW: 562.76 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,037,769.14
Allocation: P 90,000,000.00
December 29, 2020 FY 2020 GAA WIN0G02872 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Left Bank, Davao City
Physical Target:
CW1: 180.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Left Bank, Davao City
Physical Target:
CW1: 146.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
December 29, 2020 FY 2020 GAA WIN0G02866 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 2+149 to Sta. 2+585, Davao City
Physical Target:
CW1: 170.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 2+075 to Sta. 2+245, Davao City
Physical Target:
CW1: 170.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
December 29, 2020 FY 2020 GAA WIN0G02864 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Jct. F. Torres-Mt. Mayon-E. Quirino Road, Davao City
Physical Target:
CW1: 350.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Jct. F. Torres-Mt. Mayon-E. Quirino Road, Davao City
Physical Target:
CW1: 947.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00
December 29, 2020 FY 2020 WIN0B00960 300111200126000 December 2, 2020 Region IX Regional Office IX
UACS No. 300111200126000
Project ID: P00444700MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Slope Protection Along Camp Andres Romandier National Road, KM 29+000.00 - KM31+220.00, KM 29+000 - KM 34+000 (with exemption), Sulu

Physical Target:
CW-1 - Construction of Slope Protection: 20,830 sq.m.
Unit Cost: P 2,495.69/sq.m.
CW-2 - Preventive Maintenance of Road: Concrete Reblocking: 7.40 Lane km
Unit Cost: P 12,559,779.55/Lane km
EAO: P 5,072,463.77
Allocation: P 150,000,000.00
December 29, 2020 FY 2020 GAA WIN0G02863 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Cotabato Old Road (Bago Gallera Section) Leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 4.120 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Cotabato Old Road (Bago Gallera Section) Leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 2.210 lane km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00
December 29, 2020 FY 2020 GAA WIN0G02869 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+632 to Sta. 3+821, Davao City
Physical Target:
CW1: 150.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 2+680, Sta. 2+687 to Sta. 2+782 Sta. 2+850, Davao City
Physical Target:
CW1: 184.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
December 29, 2020 FY 2020 GAA WIN0G02861 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+110 to Sta. 3+365, Davao City
Physical Target:
CW1: 230.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+340 to Sta. 3+455, Davao City
Physical Target:
CW1: 230.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
December 29, 2020 FY 2020 GAA WIN0G02865 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Generoso Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 125.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Generoso Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 107.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
December 29, 2020 FY 2020 GAA WIN0G02874 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City
Physical Target:
CW1: 120.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+566 to Sta. 3+686, Davao City
Physical Target:
CW1: 120.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
December 29, 2020 FY 2020 WIN0B00957 300111200290000 December 3, 2020 Region IX Regional Office IX
UACS No. 300111200290000
Project ID: P00442705MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Reconstruction from Paved to Concrete - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Mahalu - Boki Road

Physical Target:
CW-1 - Construction of Concrete Road: 2.13 lane km
Unit Cost: P 16,947,211.72/lane km
EAO: P 902,439.02
Allocation: P 37,000,000.00
December 29, 2020 FY 2020 GAA WIN0G02870 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control Structures for Datu Loho Creek, Davao City
Physical Target:
CW1: 1,000.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Flood Mitigation Structure)
EAO: P 300,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control Structures for Datu Loho Creek, Davao City
Physical Target:
CW1: 87.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Flood Mitigation Structure)
EAO: P 300,000.00