May 20, 2021 |
2021 |
WIN1F06090 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Jct Buenavista-Lawaan-Marabut Rd - K0976 + 925 - K0977 + 097
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED :
Jct Buenavista-Lawaan-Marabut Rd – K0954 + 830 –K0954 + 950, K0962 + 110 – K0962 + 240, K0976 + 925 - K0977 + 097
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,735.41 square meters
EAO P 3.255 M
Total P 93.00 M
|
May 20, 2021 |
2021 |
WIN1F06094 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL :
Cabgan-Capinha Diversion Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 53.075 M
3.00 Lane Km
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED :
Cabgan-Capiñahan Diversion Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 53.075 M
1.592 Lane Km
EAO P 1.925 M
Total P 55.00 M
|
May 20, 2021 |
2021 |
WIN1F06100 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL :
Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+300, Carigara, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+283, Carigara, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 133.00 lineal meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
WIN1F06063 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 11+380.193, Motiong, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 207.475 M
18.571 Lane Km
EAO P 7.525 M
Total P 215.00 M
AS MODIFIED:
Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 1+570,Sta. 7+100 to Sta. 10+327.44, Motiong, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 207.475 M
9.60 Lane Km
EAO P 7.525 M
Total P 215.00 M
|
May 20, 2021 |
2021 |
WIN1F06135 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 097 - K0977 + 200
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED:
Jct Buenavista-Lawaan-Marabut Rd – K0962 + 600 – K0962 + 840, K0977 + 097 - K0977 + 200, K0982+620 – K0982 + 865, K0984 + 810 – K0985 + 605, K0994 + 265 – K0994 + 360
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 6,758.48 square meters
EAO P 3.255 M
Total P 93.00 M
|
May 19, 2021 |
2021 |
WIN1C03768 |
FY 2021 |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Concepcion - Capas Rd - K0113+200 - K0113+743 |
May 19, 2021 |
2021 |
WIN1C03772 |
FY2021 |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank), Package 2, Sta. 11+419.20 - Sta. 11+505.20, Sta. 13+911.40 - Sta. 14+395.40, La Paz, Tarlac |
May 19, 2021 |
2021 |
WIN1C03759 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development - Road Widening - Tertiary Roads
Bamban Poblacion Rd - K0099+(-438) - K0099+(-040), K0099+1249 - K0099+1486 |
May 19, 2021 |
2021 |
WIN1C03720 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 - Sta. 10+340, Capas, Tarlac |
May 19, 2021 |
2021 |
WIN1C03732 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac |
May 19, 2021 |
2021 |
WIN1C03757 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads
Construction of Road, Barangay Balanoy to Barangay Dumarais, La Paz, Tarlac |
May 19, 2021 |
2021 |
WIN1C03752 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Road - K0093+735 - K0094+443 |
May 13, 2021 |
2021 |
WIN1C03764 |
GAA 2021 |
May 31, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 271;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 150;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 200,000,000
|
May 13, 2021 |
2021 |
WIN1C03767 |
SR2021-02-004935 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+360.00, 325+510.00 - 325+960.00 (Hapid), Lamut, Ifugao;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
To: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+400.00, 325+680.00 - 326+060.00 (Hapid), Lamut, Ifugao ;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
|
May 13, 2021 |
2021 |
WIN1C03780 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0271+800;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000
To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0275+229;
Physical Target: CW1 : 20.958 Lane Km;
Allocation= Php 125,000,000
|
May 13, 2021 |
2021 |
WIN1C03763 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 942, K0342 + 220 - K0342 + 358;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 910;
Physical Target: CW1 : 8,845.4 Square meters;
Allocation= Php 200,000,000
|
May 13, 2021 |
2021 |
WIN1C03779 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0299+000 - K0319+726;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 300,000,000
To: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0288+000 - K0319+726;
Physical Target: CW1 : 64.002 Lane Km;
Allocation= Php 300,000,000
|
May 13, 2021 |
2021 |
WIN1C03778 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 486 - K0309 + 616, K0313 + 900 - K0314 + 000, K0316 + 225 - K0316 + 525, K0320 + 241 - K0320 + 442;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 510 - K0309 + 616, K0313 + 900 - K0314 + 000;
Physical Target: CW1 : 8,526.50 Square meters;
Allocation= Php 200,000,000
|
May 7, 2021 |
2021 |
WIN1G02897 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300118200324000
Project ID: P00551488MN
FROM:
Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Union - Malinao Bridge, General Luna, Surigao del Norte
Type of Work / Physical Target - CW1 - Construction of
Bridge / 1,666.452 sq.m.
Unit Cost: P 81,070.44 / sq.m.
Allocation: P 135,100,000
EAO: P 4,900,000
Total: P 140,000,000
TO:
Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Union - Malinao Bridge, General Luna, Surigao del Norte
Type of Work / Physical Target - CW1 - Construction of Steel
Bridge / 1,958.544 sq.m.
Unit Cost: P 68,979.81 / sq.m.
Allocation: P 135,100,000
EAO: P 4,900,000
Total: P 140,000,000 |
May 5, 2021 |
2021 |
WIN1E02219 |
FY 2021 RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310203100495000
Project ID: P00501569MN
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Pandanon-Magallanes Rd - K1221 + 450 - K1222 + 061
Type of Work/Physical Target: CW1 - Road Widening / 1.250 lane km
Unit Cost: P15,680,000 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Pandanon-Magallanes Rd - K1219 + 785.50 - K1220 + 000, K1221 + 450 - K1222 + 120
Type of Work/Physical Target: CW1 - Road Widening / 1.835 lane km
Unit Cost: P10,681,199 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000 |
May 3, 2021 |
2021 |
WIN1C03734 |
GAA 2021 |
April 27, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0259 +000, La Trinidad, Benguet ;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0260 + 750,
La Trinidad, Benguet;
Physical Target: CW1 : 12.61 Lane Km;
Allocation= Php 100,000,000
|
April 28, 2021 |
FY 2021 |
WIN1C03725 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Baler Casiguran Road (Dinadiawan - Casiguran), K0276+280 - K0276+410 |
April 28, 2021 |
FY 2021 |
WIN1C03733 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Improvement of Concrete Slope Protection along Angat River, Sta. Barbara Section, Baliuag, Sta. 0+238.8 to Sta. 0+380.8 |
April 28, 2021 |
FY 2021 |
WIN1C03732 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac |
April 27, 2021 |
2021 |
WIN1C03722 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads - Tarlac - Sta. Rosa Rd, K0132+380 - K0132+460, K0132+460 - K0132+780, K0132+780 - K0133+320 |
April 27, 2021 |
FY2021 |
WIN1C03720 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac |
April 27, 2021 |
FY 2021 |
WIN1C03721 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Pantabangan - Canili - Basal - Baler Rd, K0178+550 - K0178+618 |
March 18, 2021 |
FY 2020 GAA |
WIN0G02894 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+386 - K1513+520 (R/S), K1513+722 - K1513+775,
K1513+875 - K1514+020
Physical Target:
CW1: 1.370 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+535 - K1513+700, K1514+100 - K1514+581,
K1514+646 - K1515+000
Physical Target:
CW1: 2.741 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00 |
March 17, 2021 |
FY 2020 GAA |
WIN0F06037 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202186000
Project ID : P0044649LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package B, 5+000 - 10+000, Palawan
CW-1 Construction of Concrete Road: 0 Lane Km
Allocation: 55.00 Million
TO:
Construction of Missing links/New Road
Sumbiling - Canipaan, Package B,
Sta. 258+756.30 - Sta. 259+920, Palawan
CW-1 Construction of Gravel Road : 2.2674 sq.m.
Allocation : 55.00 Million
|
March 17, 2021 |
FY 2020 GAA |
WIN0F06386 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117206589000
Project ID : P00447608LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 20.00 Million
TO:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0.016 Lane Km
CW-1 Construction of Concrete Bridge : 244.224 sq.m
Allocation : 20.00 Million
|
March 17, 2021 |
FY 2020 GAA |
WIN0F06380 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202185000
Project ID : P00446496LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A,
0+000 - 5+000, Palawan
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 55.00 Million
TO:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A
Sta. 258+641.00 - Sta. 258+756.30, Palawan
CW-1 Construction of Gravel Road : 0.7706 Lane Km
CW-2 Construction Of Concrete Bridge : 286.20 sq m
Allocation : 55.00 Million
|
March 16, 2021 |
FY 2020 GAA |
WIN0F06031 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202940000
Project ID : P00447010LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot nterior - Tagusao Section), Package A
(Sta. 162+820 - Sta. 173+019), Palawan
CW-1 Construction of Concrete Road: 2027 Lane Km
Allocation : 50.00Million
TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package A
(Sta. 191+315.80 - Sta. 191+935.50), Palawan
CW-1 Construction of Concrete Road: 1.23940Lane Km
Allocation : 50.00 Million |
March 16, 2021 |
FY 2020 GAA |
WIN0F06381 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202920000
Project ID : P00446974LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Access Road,
New Agutaya - Alimanguan Tourism Road Leading to
San Vicente Long Beach, San Vicente, Palawan
CW- Construction of Concrete Road: 0 Lane Km
Allocation - 35.00 Million
TO:
Construction of Access Road -
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
CW-1 Construction of Concrete Road : 1.055 Lane Km
Allocation : 35.00 Million |
March 3, 2021 |
GAA CY 2020 |
WIN0F06361 |
UACS No. 300107200682000 |
April 1, 2020 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300107200682000
Project ID.: P00449030LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=250 l.m.
Unit Cost (P’000) = P 198.00 / l.m.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00
As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=618 l.m.
Unit Cost (P’000) = P 75.652 / l.m.
Allocation = P 46,752,750.00
EAO = P 472,250.00
FCR Amount = P 47,225,000.00
FLR Amt. Excess = P 2,775,000.00
Original Allocation = P 50,000,000.00
WIN0F06361 |
March 3, 2021 |
GAA CY 2020 |
WIN0F06221 |
UACS No. 300104213601000 |
April 1, 2020 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104213601000
Project ID.: P00442222LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortuna Village, Barangay San Isidro, Parañaque City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00 / No. of Bldg.
Allocation (P’000) = P 6,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 7,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortunata Village, Barangay San Isidro, Parañaque City
Construction of Slope Protection and Linear Parks along Taguig River, Brgy. Sta. Ana, Taguig City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00
Allocation (P’000) = P 148,282.29
EAO (P’000) = P 200.00
Total (P’000) = P 7,000.00
WIN0F06221 |
January 26, 2021 |
FY 2020 |
WIN1E02201 |
310201100469000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100469000
Project ID: P00400315MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Oroquieta National Rd -
K1808 + 882.51 - K1808+950,
K1810 + 900 - K1810+975,
K1817 + 700 - K1818 + 580,
K1818 + 800 - K1819 + 220,
K1819 + 420 - K1820 + 113,
K1826 + 086 - K1826 + 535
CW1 - Road Widening: 5.174 lane km.
Unit Cost: P 18,538,857.45/lane km.
ROW: 35,742.4995 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,357,201.70
Allocation: P 110,000,000.00 |
January 20, 2021 |
2020 |
WIN0G02993 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310107100187000
Project ID: P00400110MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (Surigao-Agusan Sect) - K1172 + 386 - K1172 + 440
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 1,020.00 sq.m.
Unit Cost: Php 9.80T / sq.m.
Allocation: Php 9.996M
EAO: Php 204.0T
Total: Php 10.200M
TO:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (Surigao-Agusan Sect) - K1172 + 435 - K1172 + 467.4
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 724.89 sq.m.
Unit Cost: Php 13.789678T / sq.m.
Allocation: Php 9.996M
EAO: Php 204.0T
Total: Php 10.200M |
January 20, 2021 |
2020 |
WIN0G02989 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310109100509000
Project ID: P00400005MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Agusan-Malaybalay Rd - K1275 + 000 - K1275 + 070, K1276 + 371 - K1276 + 463
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 2,172 sq.m.
Unit Cost: Php 22.559853T / sq.m.
Allocation: Php 49.0M
EAO: Php 1.0M
Total: Php 50.0M
TO:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Agusan-Malaybalay Rd - K1274 + 901 - K1275 + 072, K1276 + 371 - K1276 + 467.57
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 3,403.51 sq.m.
Unit Cost: Php 14.396902T / sq.m.
Allocation: Php 49.0M
EAO: Php 1.0M
Total: Php 50.0M
|
January 20, 2021 |
FY 2020 |
WIN0G03220 |
300117207302000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207302000
Project ID: P00444014MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Brgy. Salvador, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 1.968 lane km
Unit Cost: P 7,545,731.71/Lane km
EAO: P 150,000.00
Allocation: P 15,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G03227 |
310203100384000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
'UACS No. 310203100384000
Project ID: P00401557MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct. Aurora-Monte Alegre-Jct Labangan Rd-
K1630+(-260) - K1630+776
CW1 - Road Widening: 2.072 lane km.
Unit Cost: P 14,189,189.19/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G02884 |
310201100596000 |
July 24, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100596000
Project ID: P00400272MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Jct Aurora-Ozamis City Rd -
K1631 + 220 - K1631 + 700
CW1 - Road Widening: 0.96 lane km.
Unit Cost: P 35,729,166.67/lane km.
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G03219 |
300202100170000 |
September 21, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300202100170000
Project ID: P00431597MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports
Access Road leading to Panubigan Wharf, Zamboanga City, Zamboanga del Sur
CW1 - Construction of Concrete Road: 1.132 lane km.
Unit Cost: P 19,825,088.00/lane km.
EAO: P 458,000.00
Allocation: P 22,900,000.00 |
January 15, 2021 |
2020 |
310204100692000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Bypass and Diversion Roads - Alicia-Angadanan-San Guillermo- Cauayan City - Naguilian Alternate Route, Package 1, Isabela |
January 15, 2021 |
2020 |
300203100244000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Quirino District Engineering Office |
Construction/Improvement of Access Road Declared Tourism Destinations - Access Road leading to MAddela Eco-Park, Maddela, Quirino |
January 15, 2021 |
2020 |
310203100324000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Quirino District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Dumabato - Balligui Road - K0372+877 - K0373+836 (S04758LZ), Maddela, Quirino |
January 15, 2021 |
2020 |
WIN0G02868 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 300111200157000
Project ID: P00444717MN
FROM:
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126) - K0001 + 129, Dinagat
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 0.000 sq.m.
Unit Cost: Php 0.000 / sq.m.
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00
TO:
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-146) - K0001 + 102.5, Dinagat
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 4,044.075 sq.m.
Unit Cost: Php 13,124.14 / sq.m.
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03226 |
300116203187000 |
July 23, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203187000
Project ID: P00443641MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of local roads-Junction Imelda-Alicia Road, Binangonan-Nanan Road, Payao, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 6.276 Lane Km
Unit Cost: P 7,026,768.64/Lane Km
EAO: P 900,000.00
Allocation: P 45,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03218 |
300116203189000 |
July 24, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203189000
Project ID: P00443643MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of local roads-Junction leading to Dumpok-Baluyan Road, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 4.389 Lane Km
Unit Cost: P 7,814,992.03/Lane Km
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03223 |
300117207307000 |
July 24, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300117207307000
Project ID: P00444026MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Road from Brgy. Labrador - Poblacion, Buug, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.394 lane km
Unit Cost: P 7,101,865.14/Lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
January 8, 2021 |
2020 |
WIN0G02873 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 310212100165000
Project ID: P00400405MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + 000, K1245 + 149 - K1246 + 420, K1246 + 537 - K1246 + 621, K1249 + 400 - K 1249 + 860, (S00441MN) K1241 + 875 - K1242 + 028
Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 6.028 lane km
Unit Cost: Php 11,584,582 / lane km
Allocation: Php 69,831,860.00
EAO: Php 1,425,140.00
Total: Php 71,257,000.00
TO:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + (-090), K1245 + 272 - K1246 + 458, K1246 + 571 - K1246 + 661.50, K1249 + 439 - K 1249 + 930, (S00441MN) K1241 + 924 - K1242 + 028
Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 5.655 lane km
Unit Cost: Php 12,348,693 / lane km
Allocation: Php 69,831,860.00
EAO: Php 1,425,140.00
Total: Php 71,257,000.00 |
January 8, 2021 |
2020 |
WIN0G02862 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 300204100435000
Project ID: P00431499MN
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Road Widening / 2.2 lane km
Unit Cost: Php 24,125,000 / lane km
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Widening of Bridge / 172.10 sq.m
CW2 - Construction of Slope Protection Structure / 965.19 sq.m
Unit Cost1: Php 97,369.55 / sq.m
Unit Cost2: Php 37,627.51 / sq.m
Estimated Cost1: Php 16,757,300.00
Estimated Cost2: Php 36,317,700.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00 |
January 7, 2021 |
2020 |
WIN0C04101 |
GAA 2020 |
December 1, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 270 Square meters;
Allocation= Php 44000000
To: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 442.274 Square meters; Allocation= Php 44000000
|
January 7, 2021 |
2020 |
WIN0C04091 |
GAA 2020 |
November 27, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 964.0 Square meters;
Allocation= Php 20000000
To: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 240.0 Square meters
CW2: 724.0 Square meters;
Allocation= Php 20000000
|
January 7, 2021 |
2020 |
WIN0C04089 |
GAA 2020 |
November 27, 2020 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 260 Lineal meters;
Allocation= Php 50000000
"To: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: CW1: Construction of Flood Mitigation Structure
CW2: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 170.5 Lineal meters
CW2 : 121.5 Lineal meters;
Allocation= Php 50000000"
|
January 6, 2021 |
2020 |
WIN0C04088 |
GAA 2020 |
November 11, 2020 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000
To: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Slope Protection Structure
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 198 Square Meters
CW2 : 0.956 Lane Km;
Allocation= Php 15000000 |
January 6, 2021 |
2020 |
WIN0C03692 |
GAA 2020 |
December 9, 2020 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000
"To: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Gravel Road
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 0.248 Lane Km
CW2 : 0.752 Lane Km;
Allocation= Php 15000000"
|
January 5, 2021 |
FY 2020 GAA |
WIN0G02887 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City
Physical Target:
CW1: 195.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Construction of Revetment)
EAO: P 1,400,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 4+292 to Sta. 4+480, Davao City
Physical Target:
CW1: 188.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Construction of Revetment)
EAO: P 1,400,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02882 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Right Bank, Davao City
Physical Target:
CW1: 160.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Right Bank, Davao City
Physical Target:
CW1: 123.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 500,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02883 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 0+512 to Sta. 0+852, Davao City
Physical Target:
CW1: 100.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 1+013 to Sta. 1+095, Davao City
Physical Target:
CW1: 82.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02886 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Shoulder Paving along Jct. Daang Maharlika Rd.-Iñigo St.-Jct. Dacudao, Davao City
Physical Target:
CW1: 2,032.73 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 8,640,000.00
CW1: P 8,467,000.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 172,800.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Shoulder Paving along Jct. Daang Maharlika Rd.-Iñigo St.-Jct. Dacudao, Davao City
Physical Target:
CW1: 854.40 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 0.320 lane km (Road Widening)
Allocation:
TOTAL: P 8,640,000.00
CW1: P 6,834,177.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P 1,633,023.00 (Road Widening)
EAO: P 172,800.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02880 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bunawan River, Sta. 5+060 to Sta. 5+282, Davao City
Physical Target:
CW1: 250.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bunawan River, Sta. 5+260 to Sta. 5+482, Davao City
Physical Target:
CW1: 444.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 800,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02879 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge Upstream Section, Davao City
Physical Target:
CW1: 245.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge Upstream Section, Davao City
Physical Target:
CW1: 203.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02881 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 150.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Revetment)
EAO: P 500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 125.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Revetment)
EAO: P 500,000.00 |
January 5, 2021 |
FY 2020 GAA |
WIN0G02878 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City
Physical Target:
CW1: 115.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,055,000.00 (Construction of Revetment)
EAO: P 945,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Sta. 4+071 to Sta. 4+186, Davao City
Physical Target:
CW1: 115.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 27,000,000.00
CW1: P 26,055,000.00 (Construction of Revetment)
EAO: P 945,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00953 |
300113200026000 |
October 1, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200026000
Project ID: P00442692MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Ukilan Bridge along Jolo - Taglibi - Tiptipon Road K19+829.08 - K19+839.92
Physical Target:
CW-1 - Replacement of Bridge: 103.41 sq.m.
Unit Cost: P 113,212.62/sq.m.
EAO: P 292,682.93
Allocation: P 12,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00968 |
300113200025000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200025000
Project ID: P00442691MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Tumarikin Bridge along Jolo - Taglibi - Tiptipon Road K17+638.08 - K17+648.92
Physical Target:
CW-1 - Replacement of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00966 |
300111200015000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200015000
Project ID: P00442700MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Bridge Widening of Pang II Bridge (Sta. 43+966.38 - Sta. 43+977.22)
Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00970 |
300113200023000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200023000
Project ID: P00442687MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Taung Bridge along Jolo - Taglibi - Tiptipon Road K16+419.08 - K16+427.92
Physical Target:
CW-1 - Replacement of Bridge: 84.3336 sq.m.
Unit Cost: P 104,051.0544/sq.m.
EAO: P 225,000.00
Allocation: P 9,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00954 |
300111200012000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200012000
Project ID: P00442703MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Bridge Widening of Bulingbuling Bridge (Sta. 22+955.08 - Sta. 22+965.92)
Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00951 |
300113200018000 |
October 1, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200018000
Project ID: P00442688MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Binuang Bridge along Jolo - Taglibi - Tiptipon Road K17+093.08 - K17+051.92
Physical Target:
CW-1 - Replacement of Bridge: 122.4936 sq.m.
Unit Cost: P 111,504.08/sq.m.
EAO: P 341,463.41
Allocation: P 14,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00952 |
300113200021000 |
October 5, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200021000
Project ID: P00442686MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Lubluban Gadja Bridge along Jolo - Taglibi - Tiptipon Road K15+008.08 - K15+020.92
Physical Target:
CW-1 - Replacement of Bridge: 122.4936 sq.m.
Unit Cost: P 103,539.51/sq.m.
EAO: P 317,073.17
Allocation: P 13,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00967 |
3001112001267000 |
December 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 3001112001267000
Project ID: P00444701MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Slope Protection Along Seit - Tayungan National Road Km 39+520 - 40+870.00, Km 38+000 - Km41+660 (with exemption), Sulu
Physical Target:
CW-1 - Construction of Slope Protection: 22,143.33 sq.m.
Unit Cost: P 1,968.80939/sq.m.
CW-2 - Preventive Maintenance of Road: Concrete Reblocking: 3.04 Lane km
Unit Cost: P 17,377,704.03/Lane km
ROW: 669.79 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,374,847.57
Allocation: P 100,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00962 |
300111200014000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200014000
Project ID: P00442699MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Bridge Widening of Pang I Bridge along Seit-Pang-Camp Andres Road
Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00950 |
300107200933000 |
August 19, 2020 |
Region IX |
Regional Office IX |
UACS No. 300107200933000
Project ID: P00444669MN
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Seawall from Brgy. Tanduh Bagua to Brgy. Umangay, Patikul, Sulu
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 91.00 Ln.m.
Unit Cost: P 21,758.24/Ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00961 |
300111200016000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200016000
Project ID: P00442701MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Bridge Widening of Sapah Biray Bridge (Sta. 35+156.58 - Sta. 35+167.42)
Physical Target:
CW-1 - Widening of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B00959 |
300113200022000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200022000
Project ID: P00442690MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Lumukan Bridge along Jolo - Taglibi - Tiptipon Road K18+108.08 - K18+118.92
Physical Target:
CW-1 - Replacement of Bridge: 103.4136 sq.m.
Unit Cost: P 94,281.60319/sq.m.
EAO: P 250,000.00
Allocation: P 10,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B01103 |
300113200024000 |
October 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 300113200024000
Project ID: P00442689MN
Local Program - National Roads and Bridges - National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Replacement of Permanent Weak Bridges - Tuburan Bridge along Jolo - Taglibi - Tiptipon Road K17+339.08 - K17+351.92
Physical Target:
CW-1 - Replacement of Bridge: 122.4963 sq.m.
Unit Cost: P 111,504.08/sq.m.
EAO: P 341,463.41
Allocation: P 14,000,000.00 |
December 30, 2020 |
FY 2020 |
WIN0B01104 |
300111200203000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200203000
Project ID: P00442698MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Punay Road
Physical Target:
CW-1 - Road Widening: 5.26 lane km
Unit Cost: P 16,482,853.87/lane km
ROW: 885.65 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,034,493.40
Allocation: P 90,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00939 |
300111200100000 |
March 20, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200100000
Project ID: P00442712MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Missing Links - Tonggusong - Tubig Indangan National Road
Physical Target:
CW-1 - Road Upgrading Gravel to Paved: 1.685 lane km
Unit Cost: P 15,280,999.47/lane km
ROW: 1,167.73 Sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 901,196.94
Excess: P 28,000,000.00
Allocation: P 55,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00925 |
300111200194000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200194000
Project ID: P00442680MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Reconstruction/Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road, K5+140.00 - K7+310.00
Physical Target:
CW-1 - Reconstruction to Concrete Pavement: 4.34 lane km
Unit Cost: P 17,773,500.65/lane km
ROW: 544.04 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 2,699,794.75
Allocation: P 80,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00927 |
300111200200000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200200000
Project ID: P00442694MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Camp Andres - Sucuban Road
Physical Target:
CW-1 - Road Widening: 5.58 lane km
Unit Cost: P 15,546,969.90/lane km
ROW: 705.28 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,036,323.22
Allocation: P 90,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00934 |
300111200201000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200201000
Project ID: P00442697MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Karungdong - Kulay-Kulay Road
Physical Target:
CW-1 - Road Widening: 5.28 lane km
Unit Cost: P 16,432,055.05/lane km
ROW: 673.69 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,036,643.77
Allocation: P 90,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00916 |
300116202154000 |
December 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 300116202154000
Project ID: P00443222MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road - Concreting of Lower Patibulan - Lubhang Road, Phase I, Old Panamao, Sulu
Physical Target:
CW-1- Construction of Concrete Road: 8.92 lane km
Unit Cost: P 16,217,455.19/Lane km
EAO: P 5,063,089.51
Excess: P 277,210.21
Allocation: P 150,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00944 |
300111200193000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200193000
Project ID: P00442679MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Reconstruction/Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road, K0+000 - K2+510
Physical Target:
CW-1 - Reconstruction from Paved to Concrete: 5.02 lane km
Unit Cost: P 16,314,609.29/lane km
EAO: P 2,866,476.85
Excess: P 234,184.50
Allocation: P 85,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00946 |
300117207258000 |
December 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 300117207258000
Project ID: P00443951MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road - Concreting of Road along Gulangan Ipil Road, Maimbung, Sulu
Physical Target:
CW-1- Construction of Concrete Road: 0.95 lane km
Unit Cost: P 15,237,986.39/Lane km
EAO: P 144,760.87
Excess: P 379,152.06
Allocation: P 15,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00948 |
300116202252000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300116202252000
Project ID: P00443443MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Slope Protection Along Seit-Tanguyan National Road, Sulu, Km 38+000 - 39+520
Physical Target:
CW-1 - Construction of Concrete Road: 3.04 lane km
Unit Cost: P 25,375,422.16/lane km
EAO: P 2,699,944.92
Excess: P 158,771.70
Allocation: P 80,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00945 |
300117205331000 |
December 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 300117205331000
Project ID: P00443757MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Bypass Road from Barangay Limook Emergency Hospital-Barangay Maligaya Isla Verde-Barangay Maganda Junction National Highway, Lamitan City, Basilan
Physical Target:
CW-1- Construction of Concrete Road: 2.728 lane km
Unit Cost: P 21,250,371.90/Lane km
EAO: P 579,710.14
Excess: P 1,449,275.37
Allocation: P 60,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00949 |
300107200934000 |
August 19, 2020 |
Region IX |
Regional Office IX |
UACS No. 300107200934000
Project ID: P00444670MN
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Seawall from Brgy. Bangas, Hadji Panglima Tahil, Sulu
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 90.00 Ln.m.
Unit Cost: P 22,000.00/Ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00947 |
300111200199000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200199000
Project ID: P00442693MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Camp Andres - Lahing-Lahing
Physical Target:
CW-1 - Road Widening: 5.28 lane km
Unit Cost: P 16,438,144.71/lane km
ROW: 562.76 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,037,769.14
Allocation: P 90,000,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02872 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Left Bank, Davao City
Physical Target:
CW1: 180.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Aplaya Section, Left Bank, Davao City
Physical Target:
CW1: 146.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02866 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 2+149 to Sta. 2+585, Davao City
Physical Target:
CW1: 170.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 2+075 to Sta. 2+245, Davao City
Physical Target:
CW1: 170.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Revetment)
EAO: P 800,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02864 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Jct. F. Torres-Mt. Mayon-E. Quirino Road, Davao City
Physical Target:
CW1: 350.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Jct. F. Torres-Mt. Mayon-E. Quirino Road, Davao City
Physical Target:
CW1: 947.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00960 |
300111200126000 |
December 2, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200126000
Project ID: P00444700MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Slope Protection Along Camp Andres Romandier National Road, KM 29+000.00 - KM31+220.00, KM 29+000 - KM 34+000 (with exemption), Sulu
Physical Target:
CW-1 - Construction of Slope Protection: 20,830 sq.m.
Unit Cost: P 2,495.69/sq.m.
CW-2 - Preventive Maintenance of Road: Concrete Reblocking: 7.40 Lane km
Unit Cost: P 12,559,779.55/Lane km
EAO: P 5,072,463.77
Allocation: P 150,000,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02863 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Cotabato Old Road (Bago Gallera Section) Leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 4.120 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. Davao-Cotabato Old Road (Bago Gallera Section) Leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 2.210 lane km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02869 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+632 to Sta. 3+821, Davao City
Physical Target:
CW1: 150.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 2+680, Sta. 2+687 to Sta. 2+782 Sta. 2+850, Davao City
Physical Target:
CW1: 184.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02861 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+110 to Sta. 3+365, Davao City
Physical Target:
CW1: 230.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Talomo River, Sta. 3+340 to Sta. 3+455, Davao City
Physical Target:
CW1: 230.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02865 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Generoso Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 125.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Generoso Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 107.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02874 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City
Physical Target:
CW1: 120.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+566 to Sta. 3+686, Davao City
Physical Target:
CW1: 120.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00 |
December 29, 2020 |
FY 2020 |
WIN0B00957 |
300111200290000 |
December 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200290000
Project ID: P00442705MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Reconstruction from Paved to Concrete - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Mahalu - Boki Road
Physical Target:
CW-1 - Construction of Concrete Road: 2.13 lane km
Unit Cost: P 16,947,211.72/lane km
EAO: P 902,439.02
Allocation: P 37,000,000.00 |
December 29, 2020 |
FY 2020 GAA |
WIN0G02870 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control Structures for Datu Loho Creek, Davao City
Physical Target:
CW1: 1,000.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Flood Mitigation Structure)
EAO: P 300,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control Structures for Datu Loho Creek, Davao City
Physical Target:
CW1: 87.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Flood Mitigation Structure)
EAO: P 300,000.00 |