Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 13, 2023 2023 WIN3F06833 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0161+609 - K0161+963
April 13, 2023 2023 WIN3F06810 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0147+822 - K0148+077
April 13, 2023 2023 WIN3F06827 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0132+073 -K0132+933
April 13, 2023 2023 WIN3F06838 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0154+790 - K0155+876
April 13, 2023 2023 WIN3F06823 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office

Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0150+522 - K0151+355
April 13, 2023 2023 WIN3F06821 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0151+068 - K0152+112
April 13, 2023 2023 WIN3F07091 SR2023-01-002782 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 000 - K0685 + 000, K0686 + 000 -K0687 + 000, K0691 + 000 - K0691 + 286, K0694 + 470 - K0696 + 321

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 101.325 M
Asphalt Overlay: 15.122 Lane Km

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 000 - K0685 + 000, K0686 + 000 -K0687 + 000, K0694 + 470 - K0694 + 726

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 101.325 M
Asphalt Overlay: 4.52 Lane Km

EAO P 3.675 M

Total P 105.00 M
April 13, 2023 2023 WIN3F06834 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0145+843 - K0146+865
April 13, 2023 2023 WIN3F06819 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0161+206 - K0162+770
April 13, 2023 2023 WIN3F06836 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0149+565 - K0150+522
April 13, 2023 2023 WIN3F07077 SR2023-01-002892 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1099 + 000 - K1099 + 809

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 24.759005 M
1.618 Lane Km

EAO P 897.995 M

Total P 25.657 M

AS MODIFIED:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1099 + 000 - K1100 + 050

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 24.759005 M
2.086 Lane Km

EAO P 897.995 M

Total P 25.657 M
April 13, 2023 2023 WIN3F07115 SR2023-01-002952 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 697 - K1069 + 760

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 106.150 M
Structure: 6,111.11 Square meters

EAO P 3.850 M

Total P 110.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1111 +811 - K1111 + 880, K1069 + 697 - K1069 + 760

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 106.150 M
Structure: 4,454.06 Square meters

EAO P 3.850 M

Total P 110.00 M
April 13, 2023 2023 310109101127000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0307+430 - K0307+665
April 12, 2023 CY 2023 WIN3F07160 UACS No. 320101109570000 March 16, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101109570000
Project ID.: P00727014LZ
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Right Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+027, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 270.00 Lineal Meters
Unit Cost (P’000) = P 181.48 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 223.00 Lineal Meters
Unit Cost (P’000) = P 219.73 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN3F07160
April 12, 2023 CY 2023 UACS No. 300215102953000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102953000
Project ID.: P00739945LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along Macabagdal Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.864 Lane Km
Unit Cost (P’000) = P 13,611.11 Lane/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along Macabagdal Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.864 Lane Km
Unit Cost (P’000) = P 13,611.11 Lane/Km P 27.2 m/km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
April 12, 2023 CY 2023 WIN3F07156 UACS No. 320101109569000 March 16, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101109569000
Project ID.: P00727013LZ
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+027, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 270.00 Lineal Meters
Unit Cost (P’000) = P 181.48 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 223.00 Lineal Meters
Unit Cost (P’000) = P 219.73 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN3F07156
April 12, 2023 CY 2023 UACS No. 300215102945000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102945000
Project ID.: P00739937LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along Cordero Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.230 Lane Km
Unit Cost (P’000) = P 34,086.96 Lane/Km
Allocation (P’000) = P 7,840.00
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along Cordero Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.230 Lane Km
Unit Cost (P’000) = P 34,086.96 Lane/Km P 68 m/km
Allocation (P’000) = P 7,840.00
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
April 12, 2023 CY 2023 UACS No. 300215102944000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102944000
Project ID.: P00739936LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along San Diego St., 4th St. and 3rd St. Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.208 Lane Km
Unit Cost (P’000) = P 7,301.32 Lane/Km
Allocation (P’000) = P 8,820.00
EAO (P’000) = P 180.00
Total (P’000) = P 9,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along San Diego St., 4th St. and 3rd St. Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.208 Lane Km
Unit Cost (P’000) = P 7,301.32 Lane/Km P 14.6 m/km
Allocation (P’000) = P 8,820.00
EAO (P’000) = P 180.00
Total (P’000) = P 9,000.00
April 12, 2023 CY 2023 UACS No. 300215102949000 March 14, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102949000
Project ID.: P00739941LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along A. Del Mundo Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.486 Lane Km
Unit Cost (P’000) = P 24,197.53 Lane/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along A. Del Mundo Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.486 Lane Km
Unit Cost (P’000) = P 24,197.53 Lane/Km P 48 m/km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
April 12, 2023 CY 2023 UACS No. 300215102952000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102952000
Project ID.: P00739944LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along William Shaw Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.780 Lane Km
Unit Cost (P’000) = P 16,333.33 Lane/Km
Allocation (P’000) = P 12,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 13,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along William Shaw Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.780 Lane Km
Unit Cost (P’000) = P 16,333.33 Lane/Km P 32.6 m/km
Allocation (P’000) = P 12,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 13,000.00
April 12, 2023 CY 2023 UACS No. 300215102897000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102897000
Project ID.: P00739924LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Roads and Drainage, Brgy. 52 and Vrgy. 56 Phase 2, Caloocan City
Physical Target: CW1 = Construction of Concrete Road 0.588 Lane Km
Unit Cost (P’000) = P 16,666.67 Lane/Km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Roads and Drainage, Brgy. 52 and Brgy. 56 Phase 2, Caloocan City
Physical Target: CW1 = Construction of Concrete Road 0.588 Lane Km
Unit Cost (P’000) = P 16,666.67 Lane/Km P 33.2 m/km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
April 11, 2023 2023 WIN3F07141 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta. 9+983 - Sta. 10+303, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07139 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta. 10+303 - Sta. 10+614.20, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07140 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta.8+264.80 - Sta. 8+564, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07108 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Network Development Program - Road Widening - Primary Roads

Manila North Road - K0101+203.20 - K0101+843.20
April 4, 2023 CY 2023 WIN3F07122 UACS No. 310103101122000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101122000
Project ID.: P00712243LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
Parañaque-Sucat Rd – (S03295LZ) Chainage 0 – Chainage 55
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 0.438 lane km
Unit Cost (P’000) = P 8,114.22/lane km.
Allocation = P 3,537,800.00
EAO = P 72,200.00
Total = P 3,610,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
Parañaque-Sucat Rd – (S03295LZ) Chainage 0 – Chainage 152
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 0.122 lane km
Unit Cost (P’000) = P 28,998.36/lane km.
Allocation = P 3,537,800.00
EAO = P 72,200.00
Total = P 3,610,000.00
WIN3F07122
April 4, 2023 CY 2023 WIN3F07118 UACS No. 310103101124000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101124000
Project ID.: P00712439LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way West Service Rd – K0020+(-764) – K0020+576
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 2.892 lane km
Unit Cost (P’000) = P 10,492.64/lane km.
Allocation = P 30,344,720.00
EAO = P 619,280.00
Total = P 30,964,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way West Service Rd – K0020+(-764) – K0020+(-578), K0020+(-544)-K0020+(-087)
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 1.408 lane km
Unit Cost (P’000) = P 21,551.65/lane km.
Allocation = P 30,344,720.00
EAO = P 619,280.00
Total = P 30,964,000.00
WIN3F07118
April 4, 2023 CY 2023 WIN3F07125 UACS No. 310102101219000 January 26, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310102101219000
Project ID.: P00712359LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang Rd – K0023+(-426.53) – K0023+178
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 2.943 lane km
Unit Cost (P’000) = P 8,327.17/lane
Allocation = P 24,506,860.00
EAO = P 500,140.00
Total = P 25,007,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang Rd – K0023+(-427) – K0023+(-152)
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 1.375 lane km
Unit Cost (P’000) = P 17,823.17/lane km. P 35.6 m/km
Allocation = P 24,506,860.00
EAO = P 500,140.00
Total = P 25,007,000.00
WIN3F07125
April 3, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Old Manila North Rd (Dau, San Nicolas, Lourdes North West, Agapito Del Rosario) - K0082+(-364.20) - K0082+988.40, K0084+171.70 - K0084+326.10
April 3, 2023 2023 WIN3F07087 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika (LZ) - K0205+000 - K0205+681
April 3, 2023 2023 WIN3F07049 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0249+194 - K0251+282
April 3, 2023 2023 WIN3F07047 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0253+041 - K0253+881, K0254+234 - K0255+440
April 3, 2023 FY 2023 GAA WIN3E02690 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+500 - K1569+780
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+450 - K1570+700
Physical Target:
CW1: 5,502.00 square meters (Construction of Road Slope Protection Structure)
ROW: 10,218.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 3, 2023 FY 2023 GAA WIN3E02689 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1574+500 - K1574+830
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1574+100 - K1574+250, K1574+350 - K1574+580
Physical Target:
CW1: 5,700.00 square meters (Construction of Road Slope Protection Structure)
ROW: 13,350.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 3, 2023 FY 2023 GAA WIN3E02698 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+100 - K1569+430
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+960 - K1570+260
Physical Target:
CW1: 5,582.00 square meters (Construction of Road Slope Protection Structure)
ROW: 10,800.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310101100918000
Project ID: P00706044MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + 000 - K1254 + 000

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 16.024 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 12,044,433.35/Lane Km

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + (-542) - K1254 + 670

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 20.872 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 9,246,837.87/Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310104100508000
Project ID: P00706321MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1360 + 000 - K1360 + 952, K1361 + 000 - K1361 + 907, K1363 + 611 - K1364 + 000

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 7.088 Lane Km

Allocation:
TOTAL: P 131,863,000
CW1: P 127,247,795
EAO: P 4,615,205

Unit Cost:
CW1: P 17,952,57.01/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1360 + 519 - K1361 + 907, K1363 + 611 - K1366 + 000, K1371 + 088 - K1371 + 500, K1372 + 400 - K1373 + 220

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 9.862 Lane Km

Allocation:
TOTAL: P 131,863,000
CW1: P 127,247,795
EAO: P 4,615,205

Unit Cost:
CW1: P 12,902,838.67/Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310102101216000
Project ID: P00706200MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1431 + 365 - K1434 + 399

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.066 Lane Km

Allocation:
TOTAL: P 107,385,000
CW1: P 103,626,525
EAO: P 3,758,475

Unit Cost:
CW1: P 8,588,308.06/Lane Km

TO:

Surigao-Davao Coastal Rd - K1431 + 365 - K1434 + 075

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 10.79 Lane Km

Allocation:
TOTAL: P 107,385,000
CW1: P 103,626,525
EAO: P 3,758,475

Unit Cost:
CW1: P 9,603,941.15/Lane Km

April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108101452000
Project ID: P00707701MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd K0072 + 322 - K0072.623 + 301, K0073 + 327 - K0073 + 312

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5555.550 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,370.00/ Square meters

TO:

Dinagat-Loreto Rd – K0072 + 428.30 – K0072 + 758.61, K0073 + 672.60 – K0073 + 900

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7250.230 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 13,310.00/ Square meters
April 1, 2023 2023 WIN3E02613 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300221104529000
Project ID: P00734351MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Brgy. Maridel, Libjo going to Brgy. Montag, Basilisa, Dinagat, Matridel Dinagat Island

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.096 Lane Km

Allocation:
TOTAL: P 25,000,000
CW1: P 24,750,000
EAO: P 250,000

Unit Cost:
CW1: P 11,808,206/ Lane Km

TO:

Construction of Road, Brgy. Plaridel, Libjo going to Brgy. Montag, Basilisa, Dinagat Islands

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.200 Lane Km

Allocation:
TOTAL: P 25,000,000
CW1: P 24,750,000
EAO: P 250,000

Unit Cost:
CW1: P 20,625,000/ Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 300228100480000
Project ID: P00734962MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Evacuation Centers/ Quarantine Facilities/ Public Health Facilities

FROM:

Construction of Mutli-Purpose Building (Evacuation Center) in Brgy. Libertad, Municipality of Prosperidad, Agusan Del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 4,950,000/ Number of Buildings

TO:

Construction of Multi-Purpose Building (Evacuation Center) in Brgy. Libertad, Municipality of Prosperidad, Agusan Del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 4,950,000/ Number of Buildings
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100237000
Project ID: P00705652MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

NRJ Bayugan-Calaitan-Tandag Rd - K1282 + 484 - K1283 + 1032

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.256 Lane Km

Allocation:
TOTAL: P 66,220,000
CW1: P 63,902,300
EAO: P 2,317,700

Unit Cost:
CW1: P 19,626,013.51/ Lane Km

TO:

NRJ Bayugan-Calaitan-Tandag Rd - K1282 + 484 - K1284 + 450.59

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.870 Lane Km

Allocation:
TOTAL: P 66,220,000
CW1: P 63,902,300
EAO: P 2,317,700

Unit Cost:
CW1: P 16,512,222.22/ Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310107100516000
Project ID: P00706552MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1272 + 292.50 - K1272 + 338, K1277 + 490 - K1277 + 522, K1279 + 176.50 - K1279 + 458.50

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5340.070 Square meters

Allocation:
TOTAL: P 80,101,000
CW1: P 77,297,465
EAO: P 2,803,535

Unit Cost:
CW1: P 14,474.99/ Square meters

TO:

Daang Maharlika (Agusan-Davao Sect) – K1272 + 297.00 - K1272 + 338.00, K1277 + 490.00 - K1277 + 530.00, K1279 + 176.50 - K1279 + 455.94, K1284 + 822.40 - K1284 + 845.00, K1289 + 431.00 - K1289 + 467.00, K1297 + 672.20 - K1297 + 712.46

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5970.900 Square meters

Allocation:
TOTAL: P 80,101,000
CW1: P 77,297,465
EAO: P 2,803,535

Unit Cost:
CW1: P 12,945.70/ Square meters
April 1, 2023 2023 WIN3E02679 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310103101120000
Project ID: P00706052MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

FROM:

Preventive Maintenance (Asphalt Overlay) along Butuan City - Malaybalay Road - K1247 + 000 - K1266 + 000

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 49.512 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000

Unit Cost:
CW1: P 3,508,240.43/ Square meters

TO:

Preventive Maintenance (Asphalt Overlay) along Butuan City - Malaybalay Road - K1247 + 775 - K1250 + 742, K1250 + 839 - K1255 + 022.5

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 20.253 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000

Unit Cost:
CW1: P 8,576,507.18/ Square meters
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Primary Roads

Jose Abad Santos Ave (JASA) - K0083+973 - K0084+380, K0085+052 - K0086+260.24, K0086+478.06 - K0086+952
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd - K0087+444 - K0087+943.50
March 31, 2023 2023 WIN3F06954 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles - Porac- Floridablanca - Dinalupihan Rd - K0096+829.66 - K0098+687.43, K0099+000 - K0099+382.00
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Slope Protection along Porac River Paguiruan Section, Floridablanca, Pampanga
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Arayat - Magalang - Mabalacat Rd - K0112+820.04 - K0113+630.04
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road (Sto. Domingo) - K0082+(-751) - K0082+072
March 31, 2023 2023 310101100779000 GAA FY 2023 December 26, 2022 Region II Regional Office II
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0417+890 - K0419+000, K0420+127 - K0421+000, K0423+360 - K0423+861
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road (Sto. Domingo, Sto. Rosario) - K0082+254 - K0083+237
March 31, 2023 2023 310101100778000 GAA FY 2023 December 26, 2022 Region II Regional Office II
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0511 + (-104) - K0513 + 045, K0513 + 272 - K0513 + 870.19
March 31, 2023 2023 310203100674000 GAA FY 2023 December 26, 2022 Region II Quirino District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Jct Abbag - Nagtipunan - Nueva Vizcaya Rd via Dupax - K0396 + 084 - K0397 + 436, K0397 + 766 - K0398 + 600
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Rehabilitation of Angeles - Magalang Road, Magalang, Pampanga , Sta. 2+180 - Sta. 4+312

March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Rehabilitation of Magalang Road, Magalang, Pampanga, Sta. 0+000 - Sta. 6+014
March 31, 2023 FY 2023 WIN3F06837 SR2023-01-003434 January 31, 2023 Region IV-B Regional Office IV-B
Mindoro Oriental/Occidental East Coastal Rd K0183+780 – K0184+722, K0185+000 – K0185+282, K0187+537 – K0188+000, K0193+946 – K0194+607, K0195+086 – K0195+412
March 31, 2023 FY 2023 WIN3F07007 SR2023-01-003442 January 31, 2023 Region IV-B Regional Office IV-B Tablas Circumferential Rd - K0000 + 000 - K0001 + 477, K0002 + 186 - K0003 + 538
March 31, 2023 FY 2023 WIN3F06840 SR2023-01-003449 January 31, 2023 Region IV-B Regional Office IV-B Tablas Circumferential Rd - K0021 + 574 - K0024 + 000, K0031 + 242 - K0031 + 567
March 31, 2023 FY 2023 WIN3F06962 SR2023-01-003468 January 31, 2023 Region IV-B Regional Office IV-B
Tablas Circumferential Rd - K0062 + 000 - K0062 + 684, K0062 + 692 - K0064 + 449, K0065 + 000 - K0065 + 380
March 31, 2023 FY 2023 WIN3F06839 SR2023-01-003471 January 31, 2023 Region IV-B Regional Office IV-B
Tablas Circumferential Rd -
K0088+674 - K0089+000, K0090+952 - K0093+045
March 31, 2023 FY 2023 WIN3F06959 SR2023-01-003491 January 31, 2023 Region IV-B Regional Office IV-B
Sibuyan Circumferential Rd Sta. 37+000 - Sta. 37+280, Sta. 65+255.49 - Sta. 65+316.16
March 31, 2023 FY 2023 WIN3F07072 SR2023-01-003487 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd. - K0267 + 1600 - K0267 + 1733
March 31, 2023 FY 2023 WIN3F06961 SR2023-01-003480 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0110 + 765 - K0110 + 816, K0266 + 530 - K0266 + 741
March 31, 2023 FY 2023 WIN3F06963 SR2023-01-003484 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd. - K0150 + 030 - K0150 + 140
March 31, 2023 FY 2023 WIN3F06842 SR2023-01-003609 January 31, 2023 Region IV-B Regional Office IV-B Roxas Diversion Rd - K0137 + (-709) - K0137 + 268
March 31, 2023 FY 2023 WIN3F07008 SR2023-01-003510 January 31, 2023 Region IV-B Regional Office IV-B El Nido-Jct New Ibahay Rd - K0283+133 - K0283+454, K0283+598 - K0284+971
March 31, 2023 FY 2023 WIN3F06960 SR2023-01-003511 January 31, 2023 Region IV-B Regional Office IV-B
El Nido-Jct New Ibahay Rd –
K0284+971 – K0285+000, K0285+000 – K0286+000, K0286+000 – K0287+000, K0287+000 – K0287+145
March 31, 2023 FY 2023 WIN3F06946 SR2023-01-003515 January 31, 2023 Region IV-B Regional Office IV-B
El Nido-Jct New Ibahay Rd –
K0287+145 – K0288+000, K0288+000 – K0288+480, K0288+620 – K0289+000, K0289+000 – K0289+513
March 31, 2023 FY 2023 WIN3F06855 SR2023-01-003545 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0184 + 1007 - K0185 + 683
March 31, 2023 FY 2023 WIN3F06841 SR2023-01-003547 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0197 + 000 - K0201 + 000
March 31, 2023 FY 2023 WIN3F07006 SR2023-01-003557 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa South Rd - K0060+227 - K0061+1068; K0062+002 - K0063+089
March 31, 2023 FY 2023 WIN3F07005 SR2023-01-003564 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa South Rd - K0053 + 096 - K0055 + 203
March 31, 2023 FY 2023 WIN3F06964 SR2023-01-003600 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa South Rd - K0058 + (-494) - K0060 + 227
March 31, 2023 FY 2023 WIN3F06966 SR2023-01-003527 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0050 + 098 - K0052 + 551
March 31, 2023 FY 2023 GAA WIN3E02684 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1679+430 - K1679+720
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1679+430 - K1679+720
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
ROW: 15,000.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
March 31, 2023 FY 2023 GAA P00706496MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1660+250 - K1660+275
Physical Target:
CW1: 146.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 2,190,000.00
CW1: P 2,146,200.00 (Construction of Road Slope Protection Structure)
EAO: P 43,800.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1660+140 - K1660+165
Physical Target:
CW1: 160.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 2,190,000.00
CW1: P 2,146,200.00 (Construction of Road Slope Protection Structure)
EAO: P 43,800.00
March 31, 2023 CY 2023 UACS No. 310102101240000 February 21, 2023 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102101240000
Project ID.: P00714414LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along Tayuman St. (S02325LZ), Manila
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 3.295 lane km
Unit Cost (P’000) = P 6,840.66/lane km.
Allocation = P 22,540,000.00
EAO = P 460,000.00
Total = P 23,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along Tayuman St. (S02325LZ), Manila
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 2.782 lane km
Unit Cost (P’000) = P 8,102.08/lane km. P 16.2 M/Km
Allocation = P 22,540,000.00
EAO = P 460,000.00
Total = P 23,000,000.00
March 31, 2023 FY 2023 GAA WIN3E02657 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1600+000 - K1602+000,
K1604+000 - K1605+000, K1605+367 - K1608+000
Physical Target:
CW1: 11.266 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,450,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1600+000 - K1602+000,
K1604+000 - K1605+000, K1605+367 - K1606+257.50
Physical Target:
CW1: 7.785 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,450,000.00
March 31, 2023 FY 2023 GAA P00706293MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1549+000 - K1549+662
Physical Target:
CW1: 1.144 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 38,217,000.00
CW1: P 37,452,660.00 (Rehabilitation of Paved Road)
EAO: P 764,340.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1549+000 - K1550+000
Physical Target:
CW1: 1.996 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 38,217,000.00
CW1: P 37,452,660.00 (Rehabilitation of Paved Road)
EAO: P 764,340.00
March 31, 2023 FY 2023 GAA WIN3E02636 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1683+563 - K1683+775
Physical Target:
CW1: 0.424 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 2,247,000.00
CW1: P 2,202,000.00 (Rehabilitation of Paved Road)
EAO: P 44,940.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1683+563 - K1683+686
Physical Target:
CW1: 0.246 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 2,247,000.00
CW1: P 2,202,000.00 (Rehabilitation of Paved Road)
EAO: P 44,940.00
March 31, 2023 FY 2023 GAA P00706500MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692+650 - K1692+680
Physical Target:
CW1: 480.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,760,000.00 (Construction of Road Slope Protection Structure)
EAO: P 240,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692+614 - K1692+672
Physical Target:
CW1: 696.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,760,000.00 (Construction of Road Slope Protection Structure)
EAO: P 240,000.00
March 31, 2023 FY 2023 GAA WIN3E02634 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1552+748 - K1552+1017,
K1554+000 - K1554+991, K1555+772 - K1557+000,
K1557+167 - K1557+411, K1571+000 - K1573+000
Physical Target:
CW1: 9.482 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,450,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1552+748 - K1552+1017,
K1554+000 - K1554+991, K1555+772 - K1556+000,
K1557+167 - K1557+411, K1571+000 - K1573+000
Physical Target:
CW1: 7.406 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,450,000.00
March 31, 2023 FY 2023 GAA P00734730MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tagugpo ES, Kingking, Pantukan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tagugpo ES, Brgy. Tagugpo, Pantukan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
March 31, 2023 FY 2023 GAA P00734741MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tagbaros ES, Nabunturan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tagbaros ES, Maco, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
March 31, 2023 2023 SR2023-03-005796 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Kennon Road (S00393LZ), K0216+814 - K0219+080, K0220+184 - K0220+303, K0221+092 - K0221+490, K0221+550 - K0223+244, K0223+960 - K0227+122, K0228+080 - K0228+435, K0228+801 - K0229+057, K0229+629 - K0230+608, K0230+681 - K0231+765, K0231+811 - K0232+399, K0232+835 - K0233+287, K0233+298 - K0233+425, K0233+434 - K0235+314, K0235+359 - K0235+554, K0235+825 - K0237+011, K0237+123 - K0238+234, K0238+278 - K0239+593, Tuba, Benguet;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 34.912 Lane Km;
Allocation: Php 300,000,000.000

To: Kennon Road (S00393LZ), K0216+814 - K0219+092, K0220+182 - K0221+000, K0221+090 - K0221+481, K0221+543 - K0223+264, K0223+958 - K0227+122, K0228+078 - K0228+433, K0228+797 - K0229+363, K0229+631 - K0230+600, K0230+681 - K0231+765, K0231+811 - K0232+454.50, K0232+544.50 - K0233+287, K0233+298 - K0233+425, K0233+434 - K0235+314, K0235+359 - K0235+558, K0235+816 - K0238+117, K0238+372 - K0238+734, K0238+854 - K0239+593, Tuba, Benguet;
Physical Target: CW1: 33.994 Lane Km
CW2: 2.740 Lane Km;
Allocation: Php 300,000,000.000

March 31, 2023 FY 2023 GAA P00734734MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tugas, Sta. Emilia ES, Laak, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Tugas, Sta. Emilia ES, Brgy. Sta. Emilia, Laak, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
March 31, 2023 FY 2023 GAA P00705610MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1776+421 - K1777+043
Physical Target:
CW1: 1.232 lane km (Road Widening)
Allocation:
TOTAL: P 38,312,000.00
CW1: P 37,545,760.00 (Road Widening)
EAO: P 766,240.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1776+380 - K1777+372
Physical Target:
CW1: 1.772 lane km (Road Widening)
Allocation:
TOTAL: P 38,312,000.00
CW1: P 37,545,760.00 (Road Widening)
EAO: P 766,240.00
March 31, 2023 FY 2023 GAA WIN3E02659 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1469+265 - K1471+000
Physical Target:
CW1: 3.470 lane km (Road Widening)
Allocation:
TOTAL: P 53,501,000.00
CW1: P 51,628,465.00 (Road Widening)
EAO: P 1,872,535.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1470+147 - K1471+265
Physical Target:
CW1: 2.236 lane km (Road Widening)
ROW: 22,360.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 53,501,000.00
CW1: P 43,628,465.00 (Road Widening)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 1,872,535.00
March 31, 2023 FY 2023 GAA P00732840MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction (Completion) of Multi-Purpose Building, Kingking NHS, Pantukan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction (Completion) of Multi-Purpose Building, Pantukan NHS, Pantukan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
March 31, 2023 FY 2023 GAA P00734725MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Rehabilitation/Completion of Multi-Purpose Building, Brgy. Kao, Nabunturan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Rehabilitation/Completion of Multi-Purpose Building, Brgy. Sto. Niñ (Kao), Nabunturan, Davao de Oro
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
March 30, 2023 2023 WIN3F07017 FY 2023 GAA February 17, 2023 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan, K0000+761 - K0000+972.20
March 30, 2023 2023 WIN3F07016 FY 2023 GAA February 17, 2023 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan, K000+972.20 - K001+183.40
March 30, 2023 2023 WIN3F07018 FY 2023 GAA February 17, 2023 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Flood Control Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan, K003+835 - K004+033
March 30, 2023 2023 WIN3F06972 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Talisay River, (6+164 - 6+369), Pilar, Bataan
March 30, 2023 2023 WIN3F06970 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Talisay River, (6+369 - 6+574), Pilar, Bataan
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building at Limay Polytechnic College, Barangay Kitang II & Luz, Limay, Bataan

March 30, 2023 2023 310109101137000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca - Callao Cave Rd - Phase III Package 1 - K0483 + (-090) - K0483 + (-068)
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building (New Municipal Hall), Barangay San Vicente, Orion, Bataan
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS)

Construction of Multi-Purpose Building (with Perimeter Fence), PNP, Brgy. Sto. Domingo, Orion, Bataan