December 4, 2020 |
2020 |
WIN0G03168 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS NO. 300111200149000
PROJECT ID: P00444709MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slip, Slope Collapse and Landslide along BCIR K1264+900 - K1266+000, Agusan Del Norte
Type of Work / Physical Target: CW1- Rehabilitation/Major Repair of Road Slope Protection Structure / 0 sq.m.
Unit Cost: Php 53,075,000/sq.m.
Allocation: Php 53,075,000
EAO: Php 1,925,000
Total: Php 55,000,000
TO:
Rehabilitation / Reconstruction of National Roads with Slip, Slope Collapse and Landslide along BCIR K1265+373.30 - K1265+471.30, K1265+507.70 - K1265+675.30, K1265+725.30 - K1265+900, Agusan Del Norte
Type of Work / Physical Target: CW1- Rehabilitation/Major Repair of Road Slope Protection Structure / 7,962.20 sq.m.
Unit Cost: Php 6,665.87/sq.m.
Allocation: Php 53,075,000
EAO: Php 1,925,000
Total: Php 55,000,000 |
December 3, 2020 |
2020 |
WIN0C03928 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100743000
Project ID: P00408569LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Albay
Physical Target: CW1 - Construction of Concrete Road – 0 Lane Km
Amount: Php 75,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Albay
Physical Target: CW1 - Construction of Gravel Road – 1.83 Lane Km
CW2 - Construction of Road Slope Protection Structure – 17,657.48 Square meters.
Amount: Php 75,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03928 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100743000
Project ID: P00408569LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Albay
Physical Target: CW1 - Construction of Concrete Road – 0 Lane Km
Amount: Php 75,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Albay
Physical Target: CW1 - Construction of Gravel Road – 1.83 Lane Km
CW2 - Construction of Road Slope Protection Structure – 17,657.48 Square meters.
Amount: Php 75,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03929 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 300207100084000
Project ID: P00432420LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in support of National Security – Concreting of Main Road with Cross Drainages, catch basin, curbs & gutter and sidewalk inside H9ID, Camp Elias Angeles, San Jose Pili, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 5.0 Lane Km
CW2 - Construction of Concrete Bridge – 291.924 Square Meters
Amount: Php 100,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in support of National Security – Concreting of Main Road with Cross Drainages, catch basin, curbs & gutter and sidewalk inside H9ID, Camp Elias Angeles, San Jose Pili, Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 5.76908 Lane Km
CW2 - Construction of Concrete Bridge – 291.924 Square Meters
CW2 - Construction of Revetment – 267.15 Lineal Meters
Amount: Php 100,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03870 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 300116202190000
Project ID: P00446500LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Balogo, Pasacao, Camarines Sur
Physical Target: CW1 – Construction of Concrete Road – 0 Lane Km
Amount: Php 100,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Balogo, Pasacao, Camarines Sur
Physical Target: CW1 – Construction of Gravel Road – 8.192 Lane Km
CW2 – Construction of Drainage Structure along Road – 3,995.16 Lineal meters
CW3 - Construction of Road Slope Protection Structure – 10,925.79 Square meters.
Amount: Php 100,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03886 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 300116202191000
Project ID: P00446501LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Cotmo, San Fernando, Camarines Sur
Physical Target: CW1 – Construction of Concrete Road – 0 Lane Km
Amount: Php 100,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Cotmo, San Fernando, Camarines Sur
Physical Target: CW1 – Construction of Road Slope Protection Structure – 1,811.03 Square meters.
Amount: Php 100,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03854 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 300116202192000
Project ID: P00446502LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Gñaran, San Fernando, Camarines Sur
Physical Target: CW1 – Construction of Concrete Road – 0 Lane Km
Amount: Php 100,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Gñaran, San Fernando, Camarines Sur
Physical Target:
CW1 – Construction of Gravel Road – 8.31968 Lane Km
CW2 – Construction of Drainage Structure along Road – 4,105.34 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 11,932.31 Square meters.
Amount: Php 100,000,000.00
|
December 3, 2020 |
2020 |
WIN0C03853 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 300116202194000
Project ID: P00446504LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Pinamasagan, San Fernando, Camarines Sur
Physical Target: CW1 – Construction of Concrete Road – 0 Lane Km
Amount: Php 100,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Construction of Pasacao-Balatan Coastal Road, Brgy. Pinamasagan, San Fernando, Camarines Sur
Physical Target:
CW1 – Construction of Gravel Road – 6.24864 Lane Km
CW2 – Construction of Road Slope Protection Structure – 5,392.87 Square meters.
Amount: Php 100,000,000.00
|
December 1, 2020 |
2020 |
WIN0C03944 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0181+000 - K0181+153.50, K0181+190 - K0181+207 |
December 1, 2020 |
2020 |
WIN0C04008 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Management Structures and Drainage Systems
Construction of Slope Protection / Flood Control Project at Bancal River (Cabatuhan Phase 3), Upstream, Iba, Zambales |
December 1, 2020 |
2020 |
WIN0C03907 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 1st District Engineering Office |
Network Development - Road Widening - Secondary Roads
Olongapo - Bugallon Rd - K0155+(-012) - K0155+997 |
December 1, 2020 |
2020 |
WIN0C03909 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 1st District Engineering Office |
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection/Flood Control along Bancal River (Cabatuhan Phase 2), Iba, Zambales (Upstream) |
December 1, 2020 |
FY 2020 GAA |
WIN0G03202 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Jct. Davao-Cotabato Rd. (Matina Crossing Section)-Matina Aplaya Rd.-Jct. Tulip Drive (Davao-Cotabato Rd)-Ecoland Drive-Jct. ABS-CBN Quimpo Boulevard Diversion Rd (John Paul Section) (Phase I), Davao City
Physical Target:
CW1: 6.680 lane km (Reconstruction of Paved Road)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Reconstruction to Paved Road)
EAO: P 7,000,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Jct. Davao-Cotabato Rd. (Matina Crossing Section)-Matina Aplaya Rd.-Jct. Tulip Drive (Davao-Cotabato Rd)-Ecoland Drive-Jct. ABS-CBN Quimpo Boulevard Diversion Rd (John Paul Section) (Phase I), Davao City
Physical Target:
CW1: 8.675 lane km (Reconstruction to Concrete Pavement)
CW2: 0.331 lane km (Road Widening)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 187,517,505.73 (Reconstruction to Concrete Pavement)
CW2: P 5,482,494.27 (Road Widening)
EAO: P 7,000,000.00 |
December 1, 2020 |
2020 |
WIN0G03027 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS NO. 310202100560000
PROJECT ID: P00400132MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
FROM:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1405 + 761 - K1407 + 163
Type of Work / Physical Target: CW1- Road Widening / 2.804 lane km
Unit Cost: Php 20,069.178/lane km
Allocation: Php 56,273,975
EAO: Php 2,041,025
Total: Php 58,315,000
TO:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1405 + 761 - K1407 + 343
Type of Work / Physical Target: CW1- Road Widening / 3.164 lane km
Unit Cost: Php 17,785.706/lane km
Allocation: Php 56,273,975
EAO: Php 2,041,025
Total: Php 58,315,000 |
December 1, 2020 |
2020 |
WIN0G03034 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS NO. 300111200340000
PROJECT ID: P00444746MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Road Widening - Secondary Roads - Surigao Davao Coastal Rd. K1403+020 - K1406+420, Hinatuan, Surigao del Sur
Type of Work / Physical Target: CW1- Road Widening / 1.688 lane km
Unit Cost: Php 26,125.592M/lane km
Allocation: Php 44,100,000
EAO: Php 900,000
Total: Php 45,000,000
TO:
Road Widening - Secondary Roads - Surigao Davao Coastal Rd. K1437+280 - K1438+476, Hinatuan, Surigao del Sur
Type of Work / Physical Target: CW1- Road Widening / 2.392 lane km
Unit Cost: Php 18,436.455M/lane km
Allocation: Php 44,100,000
EAO: Php 900,000
Total: Php 45,000,000 |
December 1, 2020 |
2020 |
WIN0G02992 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS NO. 310208100306000
PROJECT ID: P00400404MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1459 + 990 - K1462 + 656
Type of Work / Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving / Construction / 10,664 sq.m.
Unit Cost: Php 3.584 T/ sq.m.
Allocation: Php 38,220,000
EAO: Php 780,000
Total: Php 39,000,000
TO:
Surigao-Davao Coastal Rd - K1459 + 750 - K1460 + 814
Type of Work / Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving / Construction / 4,256 sq.m.
Unit Cost: Php 3.584 T/ sq.m.
Allocation: Php 38,220,000
EAO: Php 780,000
Total: Php 39,000,000 |
November 30, 2020 |
FY 2020 |
WIN0B00904 |
300111200202000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200202000
Project ID: P00442695MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Pang-Karungdong Road
Physical Target:
CW-1 - Road Widening: 5.72 lane km
Unit Cost: P 15,165,439.76 /lane km
Physical Target:
ROW: 673.69 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 3,036,121.04
Allocation: P 90,000,000.00
|
November 30, 2020 |
FY 2020 |
WIN0B00901 |
300111200192000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 300111200192000
Project ID: P00442677MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Reconstruction/Upgrading of Damaged Paved Roads along Jolo - Taglibi - Tiptipon Road K5+000-K7+820
Physical Target:
CW-1 - Reconstruction from Paved to Concrete: 5.64 lane km
Unit Cost: P 15,377,220.16/lane km
EAO: P 3,035,463.26
Excess: P 237,015.05
Allocation: P 90,000,000.00 |
November 27, 2020 |
FY 2020 GAA |
WIN0G03185 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Jct. Daang Maharlika Rd.-Gov. Gregorio V. Cañeda Rd.-Jct. F.S. Dizon Rd., Davao City
Physical Target:
CW1: 1.383 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 3,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Jct. Daang Maharlika Rd.-Gov. Gregorio V. Cañeda Rd.-Jct. F.S. Dizon Rd., Davao City
Physical Target:
CW1: 1.383 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 80,095,000.00 (Reconstruction to Concrete Pavement)
EAO: P 2,905,000.00
EXC: P 17,000,000.00 |
November 26, 2020 |
2020 |
310101100295000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - (S00701LZ) Chainage 000 – Chainage 078 |
November 23, 2020 |
2020 |
WIN0C04076 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Aquino By-Way Extension Bay, Brgy. Anao, Mexico, Pampanga |
November 23, 2020 |
FY 2020 |
WIN0G03183 |
310106100525000 |
August 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100525000
Project ID: P00400625MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Polanco - Macleodes Rd - K1828 + (-147.80) - K1829+813
CW1 - Reconstruction to Concrete Pavement: 3.6156 lane km.
Unit Cost: P 10,918,884.83/lane km.
ROW: 1,500.00 Sq.m
Unit Cost: P 1,000.00/Sq.m.
EAO: P 805,680.00
Allocation: P 41,784,000.00 |
November 19, 2020 |
FY 2020 GAA |
WIN0G03126 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening & Replacement of Bridge along Jct. Davao City Diversion Rd.-Magtuod Rd.- New Carmen-Biao Escuela-Biao Joaquin-Jct. Davao Bukidnon Rd., Davao City
Physical Target:
CW1: 5.000 lane km (Road Widening)
CW2: 3,730.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 100,360,000.00 (Road Widening)
CW2: P 189,140,000.00 (Construction of Road Slope Protection Structure)
EAO: P 10,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening & Replacement of Bridge along Jct. Davao City Diversion Rd.-Magtuod Rd.- New Carmen-Biao Escuela-Biao Joaquin-Jct. Davao Bukidnon Rd., Davao City
Physical Target:
CW1: 9.512 lane km (Road Widening)
CW2: 4,440.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 163,911,944.00 (Road Widening)
CW2: P 125,588,056.00 (Construction of Road Slope Protection Structure)
EAO: P 10,500,000.00 |
November 19, 2020 |
FY 2020 GAA |
WIN0G03101 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Paved Road along Bypass Rd. at Jct. Davao-Cotabato Rd.-Central Park (Cordillera Rd.)-Jct. Matina Aplaya Rd., Davao City
Physical Target:
CW1: 2.536 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 3,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Paved Road along Bypass Rd. at Jct. Davao-Cotabato Rd.-Central Park (Cordillera Rd.)-Jct. Matina Aplaya Rd., Davao City
Physical Target:
CW1: 2.552 lane km (Reconstruction to Concrete Pavement)
CW2: 0.440 lane km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 87,398,607.00 (Reconstruction to Concrete Pavement)
CW2: P 9,101,393.00 (Road Widening)
EAO: P 3,500,000.00 |
November 19, 2020 |
FY 2020 GAA |
WIN0G03136 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao-Cotabato Road-Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.836 lane km (Reconstruction to Concrete Pavement)
CW2: 0.678 lane km (Road Widening)
CW3: 1 intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: 7,500.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 110,258,000.00
CW1: P 11,999,775.00 (Reconstruction to Concrete Pavement)
CW2: P 23,999,550.00 (Road Widening)
CW3: P 17,199,195.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: P 55,130,000.00 (ROW Acquisition)
EAO: P 1,929,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao-Cotabato Road-Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.948 lane km (Reconstruction to Concrete Pavement)
CW2: 0.678 lane km (Road Widening)
CW3: 1 intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: 7,500.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 110,258,000.00
CW1: P 12,958,359.66 (Reconstruction to Concrete Pavement)
CW2: P 23,025,266.82 (Road Widening)
CW3: P 17,215,858.52 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: P 55,129,000.00 (ROW Acquisition)
EAO: P 1,929,515.00 |
November 19, 2020 |
FY 2020 GAA |
WIN0G03156 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Flyover along Davao-Cotabato Road-Junction Maa Road, Package 1, Davao City
Physical Target:
CW1: 5,532.300 sq.m. (Construction of Flyover)
ROW: 6,230.000 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 193,000,000.00 (Construction of Flyover)
ROW: P 200,000,000.00 (ROW Acquisition)
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Flyover along Davao-Cotabato Road-Junction Maa Road, Package 1, Davao City
Physical Target:
CW1: --- sq.m. (Construction of Flyover)
CW2: 2.555 lane km (Reconstruction to Concrete Pavement)
CW3: 1.153 lane km (Road Widening)
CW4: 1 intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: 6,230.000 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 400,000,000.00
CW1: --- (Construction of Flyover)
CW2: P 96,197,921.35 (Reconstruction to Concrete Pavement)
CW3: P 47,239,293.18 (Road Widening)
CW4: P 49,562,785.47 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: P 200,000,000.00 (ROW Acquisition)
EAO: P 7,000,000.00 |
November 19, 2020 |
FY 2020 GAA |
WIN0G03180 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. R. Magsaysay Ave.-L. Ma. Guerrero St.-Guzman St.-Vinzon St.-T. Palma Gil St.-Jct. Dacudao-Jct. J.P. Cabaguio Ave., Davao City
Physical Target:
CW1: 4.720 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 222,716,000.00
CW1: P 214,920,940.00 (Reconstruction to Concrete Pavement)
EAO: P 7,795,060.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. R. Magsaysay Ave.-L. Ma. Guerrero St.-Guzman St.-Vinzon St.-T. Palma Gil St.-Jct. Dacudao-Jct. J.P. Cabaguio Ave., Davao City
Physical Target:
CW1: 4.720 lane km (Reconstruction to Concrete Pavement)
CW2: 0.544 lane km (Road Widening)
Allocation:
TOTAL: P 222,716,000.00
CW1: P 202,065,101.00 (Reconstruction to Concrete Pavement)
CW2: P 12,855,839.00 (Road Widening)
EAO: P 7,795,060.00 |
November 16, 2020 |
2020 |
WIN0C04077 |
GAA 2020 |
September 9, 2020 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: Abbut-Conner Rd - K0550 + 728 - K0550 + 785, K0558 + (-282) - K0558 + (-247);
Type of Work: CW1: Construction of Road Slope Protection Structure; Physical Target: CW1 : 620 Square meters;
Allocation= Php 6330000
To: Abbut-Conner Rd - K0550 + 728 - K0550 + 785, K0558 + (-282) - K0558 + (-247);
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 500 Square meters
CW2: 120 Square meters;
Allocation= Php 6330000"
|
November 16, 2020 |
2020 |
WIN0C04061 |
GAA 2020 |
August 25, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Baney Flood Control, Buguias, Benguet;
Type of Work: CW1: Construction of Flood Mitigation Structure;
Physical Target: CW1: 600 Lineal meters;
Allocation= Php 30000000
To: Construction of Baney Flood Control, Buguias, Benguet;
Type of Work: CW1: Construction of Flood Mitigation Structure
CW2: Construction of Flood Mitigation Structure;
Physical Target: CW1: 200 Lineal meters
CW2: 400 Lineal meters;
Allocation= Php 30,000,000
|
November 11, 2020 |
FY 2020 GAA |
WIN0G03153 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening & Replacement of Bridge along Jct. Davao City Diversion Rd (Matina Pangi Section) - Matina Pangi Rd. - Sitio Toril - Jct. Catalunan Grande Rd., Davao City
Physical Target:
CW1: 4.631 lane km (Road Widening)
CW2: 6.616 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 191,376,042.00 (Road Widening)
CW2: P 98,123,958.00 (Reconstruction to Concrete Pavement)
EAO: P 10,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening & Replacement of Bridge along Jct. Davao City Diversion Rd (Matina Pangi Section) - Matina Pangi Rd. - Sitio Toril - Jct. Catalunan Grande Rd., Davao City
Physical Target:
CW1: 4.546 lane km (Road Widening)
CW2: 6.864 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 129,200,169.00 (Road Widening)
CW2: P 139,069,831.00 (Reconstruction to Concrete Pavement)
EAO: P 9,730,000.00
EXC: P 22,000,000.00 |
November 11, 2020 |
FY 2020 GAA |
WIN0G03152 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road along Bypass Rd., at Jct. Elpidio Quirino Ave. (Tionko Ave. Section) - Jct. Ponciano St. (Davao City Post Office), Davao City
Physical Target:
CW1: 0.756 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road along Bypass Rd., at Jct. Elpidio Quirino Ave. (Tionko Ave. Section) - Jct. Ponciano St. (Davao City Post Office), Davao City
Physical Target:
CW1: 1.42742 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
EAO: P 1,750,000.00
EXC: P 50,000,000.00 |
November 11, 2020 |
FY 2020 GAA |
WIN0G03178 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika -
K1399+950 - K1400+040, K1400+400 - K1400+570, K1401+930 - K1402+000,
K1402+050 - K1402+100, K1407+800 - K1407+900, K1408+400 - K1408+562
Physical Target:
CW1: 6,666.680 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika -
K1399+920 - K1399+960, K1400+400 - K1400+570, K1401+923 - K1402+000,
K1402+033 - K1402+054, K1408+400 - K1408+562
Physical Target:
CW1: 3,907.553 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
November 11, 2020 |
FY 2020 GAA |
WIN0G03174 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Tagum-Panabo Circum Rd -
K1463+000 - K1464+000, K1469+180 - K1471+510
Physical Target:
CW1: 8,857.00 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 2,016.00 lm (Road Safety: Pavement of Markings)
ROW: 15,444.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 56,136,000.00
CW1: P 50,005,335.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P1,930,000.00 (Road Safety: Pavement of Markings)
ROW: 2,317,000.00
EAO: P 1,883,665.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Tagum-Panabo Circum Rd -
K1460+000 - K1461+000, K1463+000 - K1464+000, K1469+210 - K1471+200
Physical Target:
CW1: 6,581.35 sq.m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 1,406.00 lm (Road Safety: Pavement of Markings)
ROW: 15,444.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 56,136,000.00
CW1: P 34,937,206.80 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P16,998,128.20 (Road Safety: Pavement of Markings)
ROW: 2,317,000.00
EAO: P 1,883,665.00 |
November 6, 2020 |
2020 |
310101100296000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0463 + 477 - K0463 + 601 |
November 6, 2020 |
2020 |
310108100366000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Isabela 3rd District Engineering Office |
1. Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads – Jct Natl-Potia Rd – K0342+476 – K0342+511, K0342+532 – K0342+572, K0342+597 – K0342+615, K0342+640 – K0342+706, K0342+779 – K0342+791, K0342+844 – K0342+860, K0342+870 – K0342+900, K0342+904 – K0342+962 |
November 6, 2020 |
2020 |
310204100403000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads - Claveria Bypass Road, Cagayan |
November 6, 2020 |
2020 |
300204100261000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 2nd District Engineering Office |
CSSP: Construction/Improvement of Access Roads leading to Trades and Industries and Economic Zones – Access Road leading to Pineapple Growers, Baran, Ballesteros, Cagayan |
November 6, 2020 |
2020 |
300204100292000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 2nd District Engineering Office |
CSSP: Construction/Improvement of Access Roads leading to Trades and Industries and Economic Zones – Sta. Filomena – Langay Barangay Road leading to Jct. Ayaga in support of Agribusiness, Banguian, and Sta. Filomena, Abulug, Cagayan |
November 6, 2020 |
2020 |
300117205806000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 2nd District Engineering Office |
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Continuation of the Access Road going to Mingay CIADP road in the Sta. Praxedes, Cagayan |
October 31, 2020 |
FY 2020 GAA |
WIN0G03158 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+473, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 89,261,000.00
CW1: P 86,136,865.00 (Construction of Revetment)
EAO: P 3,124,135.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+441, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 89,261,000.00
CW1: P 86,136,865.00 (Construction of Revetment)
EAO: P 3,124,135.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03162 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina River Outfall Section, Both Bank, Davao City
Physical Target:
CW1: 90.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 28,420,000.00 (Construction of Flood Mitigation Structure)
EAO: P 580,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina River Outfall Section, Both Bank, Davao City
Physical Target:
CW1: 130.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 28,420,000.00 (Construction of Flood Mitigation Structure)
EAO: P 580,000.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03119 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Juna Subdivision, Brgy. Matina Crossing, Davao City
Physical Target:
CW1: 3.120 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,750,000.00 (Construction of Concrete Road)
EAO: P 250,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Juna Subdivision, Brgy. Matina Crossing, Davao City
Physical Target:
CW1: 1.606 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,750,000.00 (Construction of Concrete Road)
EAO: P 250,000.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03120 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd -
K1503+845 - K1503+880, K1503+925 - K1503+960,
K1510+600 - K1510+645, K1516+710 - K1516+750
Physical Target:
CW1: 1,194.460 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 49,600,000.00
CW1: P 48,608,000.00 (Construction of Road Slope Protection Structure)
EAO: P 992,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd -
K1503+845 - K1503+880, K1510+600 - K1510+645, K1516+710 - K1516+750
Physical Target:
CW1: 1,075.770 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 49,600,000.00
CW1: P 48,608,000.00 (Construction of Road Slope Protection Structure)
EAO: P 992,000.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03110 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd -
K1520+365 - K1520+396, K1520+640 - K1520+680,
K1525+520 - K1525+590, K1528+061 - K1528+104,
K1528+489 - K1528+573
Physical Target:
CW1: 1,699.369 sq.m. (Construction of Road Slope Protection Structure)
CW2: 0.168 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 74,405,000.00
CW1: P 69,899,775.00 (Construction of Road Slope Protection Structure)
CW2: P 1,901,050.00 (Reconstruction to Concrete Pavement)
EAO: P 2,604,175.00
TO: OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd -
K1520+365 - K1520+396, K1525+520 - K1525+590,
K1528+061 - K1528+105, K1528+489 - K1528+573
Physical Target:
CW1: 1,727.680 sq.m. (Construction of Road Slope Protection Structure)
CW2: 0.168 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 74,405,000.00
CW1: P 70,416,709.00 (Construction of Road Slope Protection Structure)
CW2: P 1,384,116.00 (Reconstruction to Concrete Pavement)
EAO: P 2,604,175.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03116 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika -
K1474+091 - K1474+109, K1474+300 - K1475+846
Physical Target:
CW1: 3,148.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 72,418,000.00
CW1: P 69,883,370.00 (Construction of Drainage Structure along Road)
EAO: P 2,534,630.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika -
K1474+300 - K1475+747
Physical Target:
CW1: 3,148.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 72,418,000.00
CW1: P 69,883,370.00 (Construction of Drainage Structure along Road)
EAO: P 2,534,630.00 |
October 31, 2020 |
FY 2020 GAA |
WIN0G03115 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika -
K1451+670 - K1452+676
Physical Target:
CW1: 2,018.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika -
K1452+369 - K1453+264
Physical Target:
CW1: 1,802.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00 |
October 30, 2020 |
2020 |
WIN0C04051 |
GAA 2020 |
September 7, 2020 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Sta. Filomena Road in support of Multi-crop Processing Center (Coffee, Cacao, Pineapple, Coconut) Furniture Processing Center, Calanasan, Apayao;
Type of Work: CW1: Construction of Concrete Road; Physical Target: CW1 : 2.47 Lane Km;
Allocation= Php 25000000
"To: Sta. Filomena Road in support of Multi-crop Processing Center (Coffee, Cacao, Pineapple, Coconut) Furniture Processing Center, Calanasan, Apayao;
Type of Work: CW1: Construction of Concrete Road
CW2: Construction of Concrete Road;
Physical Target: CW1 : 0.542 Lane Km
CW2 : 1.928 Lane Km;
Allocation= Php 25000000"
|
October 30, 2020 |
2020 |
WIN0C04040 |
GAA 2020 |
August 25, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Lucog-Magnao Road connecting Mt. Province Boundary-Calanan-Abbut National Road and Magnao Road in Support to the Coffee and Tiger Grass Processing, Tabuk City, Kalinga;
Type of Work: CW1: Construction of Concrete Road; Physical Target: CW1: 1.85 Lane Km;
Allocation= Php 22970000
"To: Lucog-Magnao Road connecting Mt. Province Boundary-Calanan-Abbut National Road and Magnao Road in Support to the Coffee and Tiger Grass Processing, tabuk City, Kalinga;
Type of Work: CW1: Construction of Concrete Road
CW2: Construction of Concrete Road;
Physical Target: CW1: 0.84 Lane Km
CW2: 1.01 Lane Km;
Allocation= Php 22970000"
|
October 29, 2020 |
2020 |
WIN0C04052 |
GAA 2020 |
September 2, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Bauang Rd - K0288 + 631 - K0288 + 745; Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2,353.00 Square meters; Allocation= Php 63200000
To: Baguio-Bauang Rd - K0288 + 631 - K0288 + 745; Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure; Physical Target: CW1: 1,786.00 Square meters
CW2: 567 Square meters;
Allocation= Php 63200000"
|
October 29, 2020 |
2020 |
WIN0C04054 |
GAA 2020 |
August 29, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: City Limit - Sto. Tomas Rd - K0255+000 - K0255+063;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.126 Lane Km;
Allocation= Php 2200000
To: City Limit - Sto. Tomas Rd - K0255+000 - K0255+063;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.072 Lane Km
CW2: 0.054 Lane Km;
Allocation= Php 2200000"
|
October 29, 2020 |
2020 |
WIN0C04053 |
GAA 2020 |
August 25, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Itogon Rd - K0258 + 595 - K0259 + 050, K0259 + 150 - K0259 + 204, K0259 + 480 - K0259 + 534; Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 1.116 Lane Km;
Allocation= Php 20000000
To: Baguio-Itogon Rd - K0258 + 595 - K0259 + 050, K0259 + 150 - K0259 + 204, K0259 + 480 - K0259 + 534;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.758 Lane Km
CW2: 0.358 Lane Km;
Allocation= Php 20000000"
|
October 29, 2020 |
2020 |
WIN0C04050 |
GAA 2020 |
September 7, 2020 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From: Bontoc - Mainit - Sagada Road leading to Guina-ang Rice Terraces, Mainit Hotsprings, Bomod-ok Falls, Mountain Province;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure; Physical Target: CW1: 3.070 Lane Km
CW2: 6,140 Square Meters;
Allocation= Php 60000000"
"To: Bontoc - Mainit - Sagada Road leading to Guina-ang Rice Terraces, Mainit Hotsprings, Bomod-ok Falls, Mountain Province;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure
CW3: Reconstruction to Concrete Pavement
CW4: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.713 Lane Km
CW2: 3,342.67 Square Meters
CW3: 2.040 Lane Km
CW4: 1,358.50 Square Meters;
Allocation= Php 60000000"
|
October 28, 2020 |
FY 2020 GAA |
WIN0G03149 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd -
K1458+900 - K1458+925, K1460+840 - K1460+865, K1460+900 - K1460+915
Physical Target:
CW1: 1,515.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Road Slope Protection Structure)
EAO: P 480,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd -
K1458+947 - K1458+985, K1459+870 - K1459+910, K1460+055 - K1460+096
Physical Target:
CW1: 1,070.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Road Slope Protection Structure)
EAO: P 480,000.00 |
October 28, 2020 |
FY 2020 GAA |
WIN0G03171 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Rd (Davao City-Jct. Digos Section) -
K1516+329 - K1518+112, K1518+666 - K1519+923
Physical Target:
CW1: 4.608 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Rd (Davao City-Jct. Digos Section) -
K1516+329 - K1517+229
Physical Target:
CW1: 1.750 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
October 26, 2020 |
2020 |
WIN0C04066 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Tarlac District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities
Rehabilitation of Multi-Purpose Building, Barangay Poblacion II, Gerona, Tarlac |
October 23, 2020 |
2020 |
WIN0C04015 |
GAA 2020 |
September 9, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Cagaluan-Calanan Section) - K0470 + 230 - K0470 + 308, K0472 + 099 - K0472 + 136, K0475 + 350 - K0475 + 390, K0476 + 671 - K0476 + 725, K0479 + 141 - K0479 + 171, K0487 + 059 - K0487 + 072, K0487 + 354 - K0487 + 387, K0487 + 425 - K0487 + 458, K0494 + 219 - K0494 + 234;
Physical Target: CW1 : 3,038 Square meters;
Allocation= Php 40,716,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Cagaluan-Calanan Section) - K0470 + 230 - K0470 + 308, K0472 + 099 - K0472 + 136, K0473 + 606 - K0473 + 619, K0475 + 350 - K0475 + 390, K0476 + 671 - K0476 + 725, K0479 + 141 - K0479 + 171, K0487 + 354 - K0487 + 387, K0487 + 425 - K0487 + 458, K0494 + 219 - K0494 + 234;
Physical Target: CW1 : 3,038 Square meters;
Allocation= Php 40,716,000
|
October 20, 2020 |
FY 2020 |
WIN0G03025 |
310305100839000 |
June 22, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100839000
Project ID: P00400785MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Sibuguey Br. (B00480MN) along Lanao - Pagadian - Zamboanga City Rd
CW1 - Widening of Bridge: 677.34 sq.m.
Unit Cost: P 145,449.51/sq.m.
EAO: P 3,448,157.24
Excess: P 33,068.52
Allocation: P 102,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03144 |
310204100792000 |
July 2, 2020 |
Region IX |
Regional Office IX |
'UACS No. 310204100792000
Project ID: P00401262MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Road
Buenavista - Bolong Bypass Road, Package 2, Zamboanga City
CW1 - Construction of Concrete Road: 1.74 lane km.
Unit Cost: P 79,404,178.94/lane km.
ROW: 29,103.00 sq.m.
Unit Cost: P 343.64/sq.m.
EAO: P 4,835,714.50
Allocation: P 153,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03117 |
320101104223000 |
June 18, 2020 |
Region IX |
Regional Office IX |
'UACS No. 320101104223000
Project ID: P00420381MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Kumalarang River, Isabela City
CW1 - Construction of Revetment: 588.42 lm
Unit Cost: P 180,580.46/lm
EAO: P 3,719,000.43
Excess: P 8,844.30
Allocation: P 109,985,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03106 |
300116203186000 |
July 23, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203186000
Project ID: P00443640MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of local roads, Junction Imelda - Alicia Road, Brgy. Mountain View, Payao, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 5.857 lane km.
Unit Cost: P 7,529,451.94/lane km.
EAO: P 900,000.00
Allocation: P 45,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03103 |
310101100371000 |
July 24, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310101100371000
Project ID: P00400521MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City - Zamboanga City Rd
K1666+846 - K1667+310,
K1666+(-034) - K1666+(-400)
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 3.32 lane km.
Unit Cost: P 7,768,861.45/lane km.
EAO: P 526,380.00
Allocation: P 26,319,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03105 |
300117207300000 |
July 27, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207300000
Project ID: P00444009MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Brgy. Guripan, Mahayag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.3476 lane km
Unit Cost: P 8,434,145.51/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03079 |
300117207299000 |
July 15, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207299000
Project ID: P00444007MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Brgy. Dapiwak, Dumingag, Zamboanga del Dur
Physical Target:
CW-1- Construction of Concrete Road: 2.622 lane km
Unit Cost: P7,551,487.41/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03087 |
300203100518000 |
July 14, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100518000
Project ID: P00431600MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Bugwak Spring, Brgy. Lower Dimalinao, Molave, Zamboanga del Sur
CW1 - Construction of Concrete Road: 1.39 lane km.
Unit Cost: P 10,575,539.57/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03094 |
310201100474000 |
July 15, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100474000
Project ID: P00400273MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Jct. Blancia - Molave - Josefina Rd
K1655+611.8 - K1657+527
CW1 - Road Widening: 3.8304 lane km.
Unit Cost: P 16,123,642.44/lane km.
EAO: P 2,240,000.00
Allocation: P 64,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03100 |
300116203183000 |
July 14, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
'UACS No. 300116203183000
Project ID: P00443637MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Concreting of NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Road (NRJ Lantian - San Isidro Section) Labangan, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 4.40 lane km.
Unit Cost: P 11,136,363.64/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03091 |
310104100248000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310104100248000
Project ID: P00400627MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Jct. Aurora - Ozamis City Rd
K1655+025 - K1655+570,
K1655+616 - K1655+880,
K1655+940 - K1656+965
CW1 - Reconstruction to Concrete Pavement: 3.668 lane km.
Unit Cost: P 8,015,267.18/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03090 |
310212100153000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310212100153000
Project ID: P00401558MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Eastern Bobongan - Sominot - Midsalip - Dumingag Rd
K1664+538 - K1664+894.15,
K1665+162.12 - K1665+205
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.79806 lane km
Unit Cost: P 13,507,756.31/lane km
EAO: P 220,000.00
Allocation: P 11,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03020 |
310203100385000 |
June 18, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310203100385000
Project ID: P00400233MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dipolog - Polanco - Piñan - Jct Oroquieta Rd
K1811+290.80 - K1812+242,
K1812+267 - K1812+735.60
CW1 - Road Widening: 2.8436 lane km.
Unit Cost: P 13,227,520.00/lane km.
ROW: 6,666.67 Square meter
Unit Cost: P 300/ Sq. m.
EAO: P 779,560.00
Excess: P 584,670.00
Allocation: P 40,978,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03096 |
300116203197000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203197000
Project ID: P00443650MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Construction/Concreting of Labasan - Camanga Road (Phase III), Brgy. Bagong Silang, Siay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.262 lane km.
Unit Cost: P 7,765,451.66/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0F06299 |
300116203193000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203193000
Project ID: P00443646MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road Phase II, Brgy. Malagandis, Titay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.38 lane km.
Unit Cost: P 10,652,173.91/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03099 |
310104100252000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 310104100252000
Project ID: P00400630MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1814+816 - K1814+987,
K1815+185 - K1815+327,
K1845+237 - K1845+296,
K1846+000 - K1846+210,
K1846+326 - K1846+371,
K1846+371 - K1846+448,
K1846+550 - K1846+587,
K1846+587 - 1846+614,
K1846+614 - K1846+677,
K1846+677 - K1846+791
CW1 - Reconstruction of Concrete Pavement: 1.4465 lane km.
Unit Cost: P 10,518,147.25/lane km.
EAO: P 310,500.00
Allocation: P 15,525,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03092 |
310212100157000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 310212100157000
Project ID: P00400480MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Crossing Sta. Clara - Sandayong Road
K1795+593 - K1795+623,
K1796+682 - K1796+765,
K1796+786 - K1796+858,
K1801+753 - K1801+861,
K1801+915 - K1802+000,
K1810+415 - K1810+519
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.964 lane km
Unit Cost: P 14,006,680.50/lane km
EAO: P 275,560.00
Allocation: P 13,778,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03095 |
310201100599000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310201100599000
Project ID: P00400320MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Ipil - Liloy - Sindangan Rd
K1996+(-863) - K1996+(-656),
K2002+680 - K2003+000,
K2011+837.84 - K2012+097
CW1 - Road Widening: 1.55832 lane km.
Unit Cost: P 17,090,448.55/lane km.
ROW: 6,060.00 Sq. m.
Unit Cost: P 300.00/Sq.m.
EAO: P 544,260.00
Excess: P 36,360.00
Allocation: P 29,031,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03107 |
300116203196000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203196000
Project ID: P00443649MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of the Provincial Road connecting Brgy Canacan - Sininan - Banker - Tampilisan - Diampak - Siolan, Brgy. Sininan, Kabasalan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 0.804 lane km.
Unit Cost: P 12,189,054.73/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03102 |
300116203194000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 300116203194000
Project ID: P00443647MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road, Brgy. Banco, Titay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.56692 lane km.
Unit Cost: P 9,381,461.72/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03104 |
310101100375000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.310101100375000
Project ID: P00400527MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Ipil - Liloy - Sindangan Rd
K1996+000 - K1996+287,
K1998+000 - K1998+216,
K1998+614 - K1999+000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.778 lane km.
Unit Cost: P 11,513,622.05/lane km.
EAO: P 417,780.00
Allocation: P 20,889,000.00
|
October 20, 2020 |
FY 2020 |
WIN0G03044 |
300116203192000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203192000
Project ID: P00443645MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of the Access Road of Ipil Airport, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 4.42026 lane km.
Unit Cost: P 11,085,320.77/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03041 |
300107200939000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300107200939000
Project ID: P00444672MN
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of River Wall along the Sibuguey River from Brgy. Minsulao to Brgy. Paruk, Siay, Zamboanga Sibugay
Physical Target:
CW1- Construction of Flood Mitigation Structure: 58.50 ln.m.
Unit Cost: P 33,846.15/ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03067 |
310201100600000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310201100600000
Project ID: P00401391MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1801+497 - K1802+921.38
CW1 - Road Widening: 3.39176 lane km.
Unit Cost: P 10,910,659.95/lane km.
ROW: 11,666.667 Sq. m.
Unit Cost: P 300.00/Sq.m.
EAO: P 756,660.00
Excess: P 70,000.00
Allocation: P 41,333,000.00 |
October 19, 2020 |
FY 2020 |
WIN0G03155 |
310204100794000 |
July 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100794000
Project ID: P00401266MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Road
Labangan - Pagadian City - Dumalinao By-Pass Road. Package A, Zamboanga del Sur
CW1 - Construction of Concrete Road: 6.562 lane km.
Unit Cost: P 15,687,196.44/lane km.
ROW: 11,525.80 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,602,878.41
Allocation: P 110,000,000.00 |
October 16, 2020 |
FY 2020 |
WINOG03163 |
310102100405000 |
July 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 310102100405000
Project ID: P00400513MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1939+(-848) - K1943+820
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 11.40 lane km.
Unit Cost: P 8,610,103.50/lane km.
EAO: P 3,435,431.30
Excess: P 2,409,388.78
Allocation: P 104,000,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03165 |
310101100262000 |
August 24, 2020 |
Region IX |
Regional Office IX |
UACS No. 310101100262000
Project ID: P00400526MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+153.76 - K1743+492.27
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 6.677 lane km.
Unit Cost: P 14,632,897.88/lane km.
EAO: P 3,419,635.07
Excess: P 282,505.79
Allocation: P 101,406,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03166 |
310305100836000 |
July 14, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100836000
Project ID: P00400901MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Dicayo Br. (B00425MN) along Dipolog - Sindangan - Liloy Rd (Phase II)
CW1 - Widening of Bridge: 1,486.714 sq.m.
Unit Cost: P 12,997.57/sq.m.
EAO: P 676,328.50
Allocation: P 20,000,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03164 |
310201100482000 |
August 24, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100482000
Project ID: P00400270MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1875+880 - K1882+040
CW1 - Road Widening:6.32 lane km.
Unit Cost: P 17,431,843.26/lane km.
ROW: 33,333.33 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,855,923.73
Excess: P 829,826.86
Allocation: P 124,855,000.00 |
October 15, 2020 |
2020 |
310203100317000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 1st District Engineering Office |
Network Development - Road Widening - Tertiary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Dect) - K0566 + (-228) - K0566 +1192 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03145 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+440 to Sta. 3+632, Davao City
Physical Target:
CW1: 100.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 2+437 to Sta. 2+557, Davao City
Physical Target:
CW1: 120.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03151 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi and Matina Balusong, Both Bank, Davao City
Physical Target:
CW1: 185.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi and Matina Balusong, Both Bank, Davao City
Physical Target:
CW1: 143.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03147 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 3+000 to Sta. 3+326, Davao City
Physical Target:
CW1: 170.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 32,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 1+905 to Sta. 2+075, Davao City
Physical Target:
CW1: 170.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 32,200,000.00 (Construction of Revetment)
EAO: P 800,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03146 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties among Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Lasang River Flood Control, Sta. 38+999 - Sta. 39+464, Sta. 39+992 - 40+231, Right Bank, Davao City
Physical Target:
CW1: 650.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties among Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Lasang River Flood Control, Sta. 40+925 - Sta. 41+575, Right Bank, Davao City
Physical Target:
CW1: 650.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
October 8, 2020 |
2020 |
WIN0C03883 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100448000
Project ID: P00400456LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0356 + 076– K0357 + 377, K0357 + 406 – K0357 +894, K0357 + 920 – K0360 + 111
Physical Target: CW1 – Road Widening – 3.956 Lane Km
Amount: Php 150,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0356 + 076– K0357 + 377, K0357 + 406 – K0357 +894, K0357 + 920 – K0358 + 819
Physical Target: CW1 – Road Widening – 5.3276 Lane Km
CW2 – Construction of Drainage Structure along Road – 5,277.40 Lineal meters
Amount: Php 150,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03865 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100489000
Project ID: P00401503LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0056 + 300 – K0058 + 000, K0059 + 252 – K0060 + 854, K0060 + 869 – K0062 + 527
Physical Target: CW1 – Road Widening – 10.046 Lane Km
Amount: Php 145,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0064 + 540 – K0066 + 380
Physical Target: CW1 – Road Widening – 3.689 Lane Km
CW2 – Construction of Drainage Structure along Road – 3,697.74 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 3,947.44 Square meters
Amount: Php 145,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03898 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100453000
Project ID: P00401507LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads – Rolando A Andaya Highway – K0300 + 000 – K0301 + 395
Physical Target: CW1 – Road Widening – 2.75 Lane Km
CW2 – Construction of Drainage Structure along Road – 2,895 Lineal meters
Amount: Php 120,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads – Rolando A Andaya Highway – K0300 + 000 – K0301 + 526
Physical Target: CW1 – Road Widening – 3.012 Lane Km
CW2 – Construction of Drainage Structure along Road – 2,322 Lineal meters
Amount: Php 120,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03984 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310305100819000
Project ID: P00402060LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Pili Airport Br. (B00418LZ) along Pili-Airport Rd
Physical Target: CW1 – Widening of Permanent Bridges – 558.09 Square meters.
Amount: Php 60,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Pili Airport Br. (B00418LZ) along Pili-Airport Rd
Physical Target: CW1 – Widening of Permanent Bridges – 623.61 Square meters.
Amount: Php 60,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03926 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310108100314000
Project ID: P00402090LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0489 + 488 - K0489 + 566, K0490 + 352 - K0490 + 510, K0490 + 720 - K0490 + 743, K0493 + 048 - K0493 + 128, K0493 + 600 - K0493 + 765, K0495 + 580 - K0495 + 680, K0497 + 171 - K0497 + 211, K0497 + 455 - K0497 + 475, K0497 + 520 - K0497 + 555, K0498 + 300 - K0498 + 340
Physical Target: CW1 - Construction of Road Slope Protection – 21,811 Sq.m.
Amount: Php 125,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0497 + 580 - K0497 + 680.44
Physical Target: CW1 - Construction of Road Slope Protection – 5,068 Sq.m.
Amount: Php 125,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03969 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100760000
Project ID: P00402253LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Sorsogon City Coastal By-Pass Road Package 6
Physical Target: CW1 - Construction of Gravel Road – 2.504 Lane Km
Amount: Php 200,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Sorsogon City Coastal By-Pass Road Package 6
Physical Target: CW1 - Construction of Gravel Road – 2.594 Lane Km
CW2 - Construction of Road Slope Protection – 4,249.42 Sq.m
Amount: Php 200,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03875 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100762000
Project ID: P00402267LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Tagkawayan-Labo Diversion Road, (Labo Section), Camarines Norte
Physical Target: CW1 - Construction of Concrete Bridge – 1,240.2 Square meters
Amount: Php 130,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Tagkawayan-Labo Diversion Road, (Labo Section), Camarines Norte
Physical Target: CW1 - Construction of Concrete Bridge – 1,760.59 Square meters
Amount: Php 130,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03887 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100459000
Project ID: P00402411LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target: Construction of Concrete Road – 1.644 Lane Km
CW2 - Construction of Road Slope Protection – 3,372.80 Sq.m.
CW3 - Construction of Drainage Structure along Road – 1,644.50 Lineal meters.
Amount: Php 50,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target: Construction of Concrete Road – 1.565 Lane Km
CW2 - Construction of Road Slope Protection – 1,564.5 Square meters
CW3 - Construction of Drainage Structure along Road – 3,196.40 Lineal meters.
ROW – ROW Acquisition – 3,911.25 Square meters
Amount: Php 50,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03887 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100754000
Project ID: P00402412LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road, Albay
Physical Target: Construction of Concrete Road – 1.691 Lane Km
CW2 - Construction of Road Slope Protection – 2,167.35 Sq.m.
CW3 - Construction of Drainage Structure along Road – 805.75 Lineal meters.
ROW – ROW Acquisition – 14,055 Square meters
Amount: Php 100,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road, Albay
Physical Target: Construction of Concrete Road – 1.57276 Lane Km
CW2 - Construction of Road Slope Protection – 2,310.34 Sq.m.
CW3 - Construction of Drainage Structure along Road – 746.66 Lineal meters.
ROW – ROW Acquisition – 14,055 Square meters
Amount: Php 100,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03927 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310108100315000
Project ID: P00402598LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0499 + 470 - K0499 + 500, K0499 + 720 - K0499 + 760, K0499 + 865 - K0499 + 900, K0500 + 235 - K0500 + 250, K0500 + 390 - K0500 + 440, K0500 + 540 - K0500 + 560, K0500 + 740 - K0500 + 755, K0501 + 230 - K0501 + 260, K0501 + 390 - K0501 + 410, K0501 + 500 - K0501 + 630, K0501 + 680 - K0501 + 745, K0502 + 710 - K0502 + 755, K0503 + 890 - K0503+1000, K0504 + 220 - K0504 + 252, K0504 + 348 - K0504 + 400, K0504 + 690 - K0504 + 750, K0505 + 000 - K0505 + 065, K0505 + 640 - K0505 + 700, K0505 + 970 - K0506 + 060, K0506 + 200 - K0506 + 255, K0507 + 170 - K0507 + 320
Physical Target: CW1 - Construction of Road Slope Protection – 20,441 Sq.m.
Amount: Php 125,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0497 + 680.44 – K0497 + 744.50, K0506 + 080.00 – K0506 + 190.00
Physical Target: CW1 - Construction of Road Slope Protection – 5,457 Sq.m.
Amount: Php 125,000,000.00
|