Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 4, 2022 2022 WIN2F06539 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building, Poblacion, Marilao, Bulacan
July 4, 2022 2022 WIN2F06538 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

San Roque - Maturanoc Road, Guimba By-pass, Nueva Ecija
July 4, 2022 2022 WIN2F06523 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0064+236 - K0064+410
July 4, 2022 2022 WIN2F06521 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Arayat - Magalang Rd - K0092+168 - K0092+350
July 4, 2022 2022 WIN2F06528 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0067+676 - K0068+098
July 4, 2022 2022 WIN2F06525 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Candaba - Sn Miguel Rd - K0074+000 - K0074+151
July 4, 2022 2022 WIN2F06522 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0064+236 - K0064+410, K0067+425 - K0068+075, K0068+155 - K0069+730, K0069+781- K0070+330
July 4, 2022 2022 WIN2F06524 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0057+747 - K0057+851.20
July 4, 2022 2022 WIN2F06526 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0068+979 - K0069+102
July 4, 2022 2022 WIN2F06527 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Simon - Baliwag Rd - K0059+029 - K0059+416
July 4, 2022 2022 WIN2E02440 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300215100637000
Project ID: P00633820MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Rehabilitation of Montilla Boulevard (Jct Salvador Calo-Villa Kananga), Sta. 0 + 000 - Sta. 1 + 793.80, Sta. 2 + 213.20 - Sta. 4 + 100, Butuan City

Type of Work:
CW1- Rehabilitation of Concrete Road

Physical Target:
CW1- 11.295 Lane Km

Allocation:
TOTAL: P 120,000,000
CW1: P 115,800,000
EAO: P 4,200,000

Unit Cost:
CW1: P 10,252,324.04/ Lane Km

TO:

Rehabilitation of Montilla Boulevard (Jct Salvador Calo-Villa Kananga), Sta. 0 + 000 - Sta. 1 + 651.00, Sta. 1 + 952.75 - Sta. 2 + 926.50, Sta. 3 + 244.84 - Sta. 3 + 298.84, Sta. 4 + 095.05 - Sta. 4 + 469.05, Butuan City

Type of Work:
CW1- Rehabilitation of Concrete Road
CW2- Preventive Maintenance of Road: Asphalt Overlay
CW3- Construction of Drainage Structure along Road

Physical Target:
CW1- 3.283 Lane Km
CW2- 8.294 Lane Km
CW3- 150.00 Lineal meters

Allocation:
TOTAL: P 120,000,000
CW1: P 31,845,220
CW2: P 59,020,050
CW3: 24,934,730
EAO: P 4,200,000

Unit Cost:
CW1: P 9,700,036.55/ Lane Km
CW2: P 7,115,993.49/ Lane Km
CW3: P 166,231.53/ Lineal meters
July 1, 2022 2022 WIN2F06436 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction (Completion) of Access Road Opening from Mogao-Badeo Proper-Tableo (Continuation Phase II), Barangay Badeo, Kibungan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.302 Lane Km;
Allocation: Php 3,000,000.000

To: Construction (Completion) of Access Road Opening from Mogao-Badeo Proper-Tableo (Continuation Phase II), Barangay Badeo, Kibungan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 1.500 Lane Km;
Allocation: Php 3,000,000.000

July 1, 2022 2022 WIN2F06428 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Road to Sitio Patapat, Topdac, Atok, Benguet;
Physical Target: 0.302 Lane Km;
Allocation: Php 3,000,000.000

To: Construction of Road to Sitio Patapat, Topdac, Atok, Benguet;
Physical Target: 0.155 Lane Km;
Allocation: Php 3,000,000.000

July 1, 2022 2022 WIN2F06426 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet;
Physical Target: 3.021 Lane Km;
Allocation: Php 30,000,000.000

To: Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet;
Physical Target: 1.970 Lane Km;
Allocation: Php 30,000,000.000

July 1, 2022 2022 WIN2F06423 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement (Completion) of Cantaw to Laglagan FMR, Tadayan, Pudong, Kapangan, Benguet;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000

To: Improvement (Completion) of Cantaw to Laglagan FMR, Tadayan, Pudong, Kapangan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.210 Lane Km;
Allocation: Php 3,000,000.000

July 1, 2022 2022 WIN2F06408 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement of Road, Papayew, Caliking, Atok, Benguet;
Physical Target: 1.053 Lane Km;
Allocation: Php 10,000,000.000

To: Improvement of Road, Papayew, Caliking, Atok, Benguet;
Physical Target: 0.579 Lane Km;
Allocation: Php 10,000,000.000

July 1, 2022 2022 WIN2F06407 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Rehabilitation (Completion) of Keyang to Proper Gadang Road, Gadang, Kapangan, Benguet ;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000

To: Rehabilitation (Completion) of Keyang to Proper Gadang Road, Gadang, Kapangan, Benguet ;
Type of Work: Construction of Concrete Road;
Physical Target: 0.200 Lane Km;
Allocation: Php 3,000,000.000

July 1, 2022 2022 WIN2F06406 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Rehabilitation (Completion) of Longboy-Tacal Road, Labueg, Kapangan, Benguet;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000

To: Rehabilitation (Completion) of Longboy-Tacal Road, Labueg, Kapangan, Benguet;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 510.000 Square meters;
Allocation: Php 3,000,000.000

July 1, 2022 2022 WIN2F06427 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 775.000 Lineal meters;
Allocation: Php 50,000,000.000

June 29, 2022 2022 WIN2F06486 FY 2022 GAA December 30, 2021 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Ciudad De Victoria Tributaries leading to Bucaue River (Igulot Section), Bocaue, Bulacan

June 29, 2022 2022 WIN2F06425 SARO-BMB-A-22-0002944 RCUD March 11, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Katao Flood Control Structure, Sta. 085 + 870, Brgy. Buringal, Paracelis, Mountain Province;
Physical Target: 100.000 Lineal Meters;
Allocation: Php 10,000,000.000

To: Construction of Katao Flood Control Structure, Sta. 083+030 - Sta. 083+130 (R.S.), Brgy. Buringal, Paracelis, Mountain Province;
Physical Target: 100.000 Lineal Meters;
Allocation: Php 10,000,000.000

June 29, 2022 2022 WIN2F06424 GAA 2022 January 22, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108;
Physical Target: 2,420.000 Lineal Meters;
Allocation: Php 23,699,000.000

To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108;
Physical Target: 1,511.000 Lineal Meters;
Allocation: Php 23,699,000.000

June 29, 2022 2022 WIN2C03593 SR2022-03-008036 March 24, 2022 Region VIII Southern Leyte District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities


AS PER GAA/ORIGINAL:

Construction of Road, Maasin Airport, Maasin City, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 17.05 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Construction of Road, Maasin Airport, Maasin City, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Gravel Road: 2.50 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M
June 29, 2022 2022 WIN2C03592 SR2022-03-008024 March 23, 2022 Region VIII Southern Leyte District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Access Road, Maasin Airport, Maasin City, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 16.624 Lane Km P 188.175 M

EAO P 6.825 M

Total P 195.00 M

AS MODIFIED:

Construction of Access Road, Maasin Airport, Maasin City, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Gravel Road: 2.50 Lane Km P 188.175 M

EAO P 6.825 M

Total P 195.00 M

June 29, 2022 2022 WIN2C03581 SR2022-03-007304 March 23, 2022 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + (-127) - K0910 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 56.3367 M
Asphalt Overlay : 9.870 Lane Km

EAO P 2.0433 M

Total P 58.380 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + (-127) - K0910 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 56.3367 M
Asphalt Overlay : 5.882 Lane Km

EAO P 2.0433 M

Total P 58.380 M
June 29, 2022 2022 WIN2C03588 SR2022-03-008306 March 23, 2022 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction (Completion) of Storm Surge Protection: Tide Embankment, Subsection 4.6, Brgy. Baras, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 65.620 M
: 565.550 Lineal meters

EAO P 2.380 M

Total P 68.00 M

AS MODIFIED:

Construction (Completion) of Storm Surge Protection: Tide Embankment, Subsection 4.6, Brgy. Baras, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure: P 37.620 M
: 640 Lineal meters

EAO P 2.380 M

EXCESS P 28.00 M

Total P 68.00 M
June 29, 2022 2022 WIN2C03579 SR2022-03-008892 March 23, 2022 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 26.055 M
: 224.557 Lineal meters

EAO P 0.945 M

Total P 27.00 M

AS MODIFIED:

Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 25.812 M
: 630 Lineal meters

ROW-ROW Acquisition: 300 Square meters P 0.243 M

EAO P 0.945 M

Total P 27.00 M
June 29, 2022 2022 WIN2C03583 SR2022-03-008200 March 23, 2022 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Binahaan River, Brgy. Cabalagnan Section (Upstream/Left Bank), Sta. 0 + 000 - Sta. 0 + 810, Tanauan, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 96.500 M
: 831.692 Lineal meters

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Flood Control Structure along Binahaan River, Brgy. Cabalagnan Section (Upstream/Left Bank), Sta. 0 + 000 - Sta. 0 + 621, Tanauan, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 96.40685 M
: 621 Lineal meters

ROW-ROW Acquisition: 9,315 Square meters P 0.09315 M

EAO P 3.500 M

Total P 100.00 M
June 29, 2022 2022 WIN2C03580 SR2022-03-008310 March 23, 2022 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

AS PER GAA/ORIGINAL:

Construction of Flood Control Mitigation Facilities along Binahaan River, Brgy. Binongtoan Section (Downstream), Sta. 0 + 00 to Sta. 0 + 810, Tanauan, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 96.500 M
: 831.692 Lineal meters

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Flood Control Mitigation Facilities along Binahaan River, Brgy. Binongtoan Section (Downstream), Sta. 0 + 00 to Sta. 0 + 465, Tanauan, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure P 95.713 M
: 465 Lineal meters

ROW-ROW Acquisition: 6,975 Square meters P 0.787 M

EAO P 3.500 M

Total P 100.00 M
June 29, 2022 2022 WIN2C03589 SR2022-03-008137 March 23, 2022 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Junction National Road Brgy. Carolina, Can-avid-Dolores-Maslog Road (Brgy.Magsaysay-Brgy. Magongbong-Brgy. Gap-ang Section), Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: 10.220 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M

AS MODIFIED:

Construction of Junction National Road Brgy. Carolina, Can-avid-Dolores-Maslog Road (Brgy.Magsaysay-Brgy. Magongbong-Brgy. Gap-ang Section), Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: 9.08 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M
June 28, 2022 2022 WIN2F06494 FY 2022 GAA November 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Service Road (Alternative Route to NLEX), Bulacan
June 28, 2022 2022 WIN2F06491 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0192+240 - K0192+350
June 28, 2022 2022 WIN2F06492 FY 2022 GAA December 30, 2021 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dingalan - Dona Remedios Trinidad Road, Aurora

June 28, 2022 2022 WIN2F06493 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Jct Tablang - Gabaldon Rd - K0163+000 - K0163+160
June 28, 2022 2022 WIN2F06495 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0302+000 - K0302+110
June 28, 2022 2022 WIN2F06496 FY 2022 GAA November 30, 2021 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dinadiawan - Ditawini Bypass Road, Dinadiawan, Aurora
June 28, 2022 2022 WIN2F06497 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 3, Pampanga
June 28, 2022 2022 WIN2F06498 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0175+050 - K0175+070, K0176+240 - K0176+380
June 28, 2022 2022 WIN2F06489 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of Missing Links / New Roads

Capas - Botolan Road Package 3, Tarlac
June 27, 2022 2022 WIN2E02435 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road at Brgy. Pandaitan to Paradise Embak, Paquibato District, Davao City
Physical Target:
CW1: 4.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road at Brgy. Pandaitan to Paradise Embak, Paquibato District, Davao City
Physical Target:
CW1: 3.606 Lane Km (Construction of Concrete Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 63,690,000.00 (Construction of Concrete Road)
CW2: P 32,810,000.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00
June 27, 2022 2022 WIN2F06484 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Lubao - Guagua Section) Package 5, Pampanga

June 27, 2022 2022 WIN2F06487 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of Missing Links / New Roads

Capas - Botolan Rd, Package 7, Tarlac
June 27, 2022 2022 WIn2F06488 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Road Widening - Tertiary Roads

Gapan - Fort Magsaysay Rd - K0097+069 - K0099+612
June 27, 2022 2022 WIN2F06480 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

A Castañeda - Ma Aurora - Sn Luis Rd - K0202+550 - K0202+690; K0202+75 - K0202+880, K0208+100 - K0208+150
June 27, 2022 2022 WIN2F06481 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

A Castañeda - Ma Aurora - Sn Luis Rd - K0202+100 - K0202+280, K0202+320 - K0202+410, K0207+900 - K0207+960
June 27, 2022 2022 WIN2F06482 FY 2022 GAA December 30, 2021 Region III Regional Office III
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure

Construction of Camiling - Agno River Floodway, Tarlac, Phase 3

June 27, 2022 2022 WIN2F06483 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0176+380 - K0176+480
June 27, 2022 2022 WIN2F06485 FY 2022 GAA December 30, 2021 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0189+935 - K0190+026
June 27, 2022 2022 WIN2F06490 FY 2022 GAA December 30, 2021 Region III Regional Office III
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure

Construction of Camiling - Agno River Floodway, Tarlac, Phase 4
June 22, 2022 FY 2022 GAA WIN2G03035 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101622000
Project ID : P00639241LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz port Road,
Sta. 4+131.00 - Sta. 4+181.00, Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 401.191 square meter
Allocation - Php 17.903 million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 4+131.00 - Sta. 4+191.00, Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 776.24 square meter
Allocation - Php 17.903 Million
June 22, 2022 FY 2022 GAA WIN2G03036 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100223000
Project ID : P00638889LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+841.00 - Sta. 170+041.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,034.379 square meter
Allocation - Php 135.408 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+841.00 - Sta. 170+041.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,829.200 square meter
Allocation - Php 135.408 Million
June 22, 2022 FY 2022 GAA WIN2G03032 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100217000
Project ID : P00638883LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+246.00 - Sta. 171+482.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,601.219 square meter
Allocation - Php 160.703 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171 + 246.00 - Sta. 171+482.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 6,933.750 square meter
Allocation - Php 160.703 Million
June 22, 2022 FY 2022 GAA WIN2G03033 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101632000
Project ID : P{00636964LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide -
Sta. 9+047.00 - Sta. 9+097.00, Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Roads Slope Protection
Structure - 492.352 square meter
Allocation - Php 21.971.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 9+047.00 - Sta. 9+108.00, Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 956.86 square meter
Allocation - Php 21.971 Million
June 22, 2022 FY 2022 GAA WIN2G03028 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101631000
Project ID : P00636963LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 16+534.0 - Sta. 16+555.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 214.456 square meter
Allocation - Php 9.570 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 16+534.00 - Sta. 16+555.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 415.14 square meter
Allocation - Php 9.570 Million

June 21, 2022 FY 2022 GAA WIN2G03037 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100221000
Project ID : P00638887LZ

CONVERGENCE AND SPECIAL SUPPORT SYSTEM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+191.00 - Sta. 165+359.00,
San Vicente Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,777.615 square meter
Allocation - Php 123.950 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+191.00 - Sta. 161+374.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,354.990 square meter
Allocation - Php 123.950 Million
June 21, 2022 FY 2022 GAA WIN2G03027 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 3002151016340000
Project ID : P00636966LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 10+302.00 - Sta. 10+348.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 413.830 square meter
Allocation - Php 18.467 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 10 + 320 - Sta. 10 + 360.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 803.27 square meter
Allocation - Php 18.467Million


June 21, 2022 FY 2022 GAA WIN2G03022 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100218000
Project ID : P00638884LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG ) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+482.00 - Sta. 171+718.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,601.219 square meter
Allocation - Php 160.703 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente Palawan
Sta. 171+482.00 - Sta. 171+718.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 6,933.980 square meter
Allocation - Php 160.703 Million

June 21, 2022 FY 2022 GAA WIN2G03029 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100222000
Project ID : P00638888LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road
Sta. 169+642.00 - Sta. 169+841.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,019.208 square meter
Allocation - Php 134.731 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+642.00 - Sta. 169+841.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,799.870 square meter
Allocation - Php 134.731 Million
June 17, 2022 FY 2022 GAA WIN2G03023 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101635000
Project ID : P00636967LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Roads with Slips, Slope Collapse, and Landslide
Sta. 11+007.00 - Sta. 11+098.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,006.709 square meter
Allocation - Php 44.924 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 11+007.00 - Sta. 11+102.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1- Construction of Road Slope Protection
Structure - 1,865.50 square meter
Allocation - Php 44.924 Million

June 17, 2022 FY 2022 GAA WIN2G03025 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100220000
Project ID : P00638886LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak -San Vicente Road,
Sta. 169 + 254.00 - Sat. 169 + 390.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,851.691 square meter
Allocation - Php 82.631 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169 + 254.00 - Sta. 169 + 405.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,480.92 square meter
Allocation - Php 82.631 Million
June 17, 2022 FY 2022 GAA WIN2G3034 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101629000
Project ID : P00636961LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+040.00 - Sta. 14+122.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 787.525 square meter
Allocation - Php 35.143 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+040.00 - Sta. 14+113.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,517.27 square meter
Allocation - Php 35.143 million
June 16, 2022 FY 2022 GAA WIN2G03026 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101613000
Project ID : P00639232LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+444.00 - Sta. 172+557.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 879.201 square meter
Allocation - Php 39.234 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+444.00 - Sta.0172+560.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,711.78 square meter
Allocation - Php 39.234 Million
June 16, 2022 FY 2022 GAA WIN2G03031 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100219000
Project ID : P00638885LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 167+325.00 - Sta. 167+430.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,582.849 square meter
Allocation - Php 70.634 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 167+325.00 - Sta. 167+445.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,076.880 square meter
Allocation - Php 70.634 million














June 15, 2022 FY 2022 GAA WIn2G03019 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS no. : 300225100434000
Project ID : P00640566LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) - Flood Mitigation Structure
Protecting Public Infrastructure/Facilities

FROM :

Construction of Seawall,
Brgy. Masudsud, Sitio Proper, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
120.00 lineal meters
Allocation - Php 20.00 Million

TO :

Construction of Seawall,
Brgy. Masudsid, Sitio Proper, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
228.20 lineal meters
Allocation - Php 20.00 Million
June 15, 2022 FY 2022 GAA WIN2G03024 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101624000
Project ID : P00639243LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 4+305.00 - Sta. 4+332.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 157.56 square meter
Allocation - Php 7.031 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 4+305.00 - Sta. 4+338.00
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 303.26 square meter
Allocation - Php 7.031 Million
June 15, 2022 FY 2022 GAA WIn2G03030 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS NO. : 300203101628000
Project ID : P00635468LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destination
(Tourism Road Infrastructure Program - TRIP)

FROM :

Access Road leading to Roxas Diving Spots,
Roxas, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.090 lane km
Allocation - Php 121.355 Million

TO :

Access Road leading to Roxas Diving Spot,
Roxas, Palawan
Physical Target - CW1 - Construction of Concrete Road :
3.282 lane km
CW2 - Road Safety: Pavement Markings :
3,282 lane km
CW3 - Construction of Road Slope Protection
Structure : 8,045.90 square meters
Allocation - Php 121.355 Million

June 14, 2022 FY 2022 GAA WIN2G03021 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100194000
Project ID : P00638860LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Sugod - Cawayan Road Leading to Blue Holes,
Sta. 11+100 - Sta. 11+230,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,070 Square meters
Allocation - Php 80.00 Million

TO :

Construction of Sugod - Cawayan Road leading to Blue holes,
Sta. 11+100 - Sta. 11+200,
Sta. 11+510 - Sta. 11+548.50
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,604.19 Square meters
Allocation - Php 80.00 Million
June 14, 2022 FY 2022 GAA WIN2G03018 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100017000
Project ID : P00639299LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Shore Protection/Causeway along
Tablas Circumferential Road (Bachawan Area),
Bgry. Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.324 Lane Km
Allocation - Php 100.00 Million

TO :

Construction of Shore Protection/Causeway along
Tablas Circumferential Road (Bachawan Area),
Brgy. Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.3085.Lane Km
Allocation - Php 100.00 Million

June 14, 2022 FY 2022 GAA WIN2F06434 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215101651000
Project ID : P00639246LZ

CONVERGENVE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Project Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+720 - Sta. 10+780,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slop[e Protection
Structure - 1,152 Square Meters
Allocation - Php 24.00 million

TO :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+720 - Sta. 10+792.50,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,037.11 Square Meters
Allocation - Php 24.00 Million
June 14, 2022 FY 2022 GAA WIN2G03017 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100193000
Project ID : P00638859LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+500 - Sta.010+600,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,030 Square meters
Allocation - php 60.00 Million

TO :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+500 - Sta. 10+620,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,623.15 Square Meters
Allocation - Php 60.00 Million
June 14, 2022 FY 2022 GAA WIN2G03020 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300225100432000
Project ID : P00640564LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Back Infrastructure Program (BIP) - Flood Mitigations Structures
Protecting Public Infrastructure/Facilities

FROM :

Construction of Seawall in Brgy. Vicente, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure:
120.00 Lineal meters
Allocation - Php 20.00 Million

To :

Construction of Seawall in Brgy. Vicente, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure:
229.40 Lineal meters
Allocation - Php 20.00 Million




June 13, 2022 FY 2022 GAA WIN2G02643 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100580000
Project ID : P00606190LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

CSR Jct - Pola Road
K0068+030 - K0068+097
Physical Target - CW1 - Network Development -
Road Widening : 0.134 Lane Km
Allocation - php 1.675 Million

TO :

CSR Jct - Pola Road
K0066+057 - K0066+087
Physical Target - CW1 - Network Development -
Road Widening : 0.060 Lane Km
Allocation - Php 1.675 Million


June 13, 2022 FY 2022 GAA WIn2G02681 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100581000
Project ID : P00606191LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

CSR Jct - Pola Road
K0068+414 - K0069+000
Physical Target - CW1- Network Development -
Road Widening : 1.098 Lane Km
Allocation - Php 13.725 Million

TO :

CSR Jct - Pola Road
K0068+414 - K0068+732
Physical Target - CW1 - Network Development -
Road Widening : 0.636 Lane Km
Allocation - Php 13.725 Million
June 13, 2022 FY 2022 GAA WIN2G02628 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100582000
Project ID : P00606192LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

CSR JCT - Pola Road
K0070+990 - K0072+010
Physical Target - CW1 - Network Development -
Road Widening : 2.046 Lane Km
Allocation - Php 25.00 Million

TO :

CSR Jct - Pola Road
K0070+990 - K0072+012
Physical Target - CW1 - Network Development -
Road Widening : 2.050 Lane Km
Allocation - Php 25.00 Million
June 13, 2022 FY 2022 GAA WIN0G02764 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100583000
Project ID : P00606193LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

CSR Jct - Pola Road
K0072+119 - K0072+500
Physical Target - CW1 - Network Development -
Road Widening : 0.762 Lane Km
Allocation - Php 9.525 Million

TO :

CSR Jct - Pola Road
K0066+107 - K0066+179,
K0072+119 - K0072+440
Physical Target - CW1 - Network Development -
Road Widening ; 0.786 Lane Km
Allocation - Php 9.525 Million

June 13, 2022 FY 2022 GAA WIn2G02765 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310208100433000
Project ID : P00606194LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriage Improvement -
Secondary Roads


FROM :

Calapan North Road
K0039+197 - K0039+809
Physical Target - CW1 - Off-Carriageway Improvement -
Paving of shoulders:
1,224.0 Square meters
Allocation - Php 5.50 Million

TO :

Calapan North Road
K0026+1259 - K0026+1324,
K0039+197 - K0039+820
Physical Target - CW1 - Off-carriageway Improvement -
Paving of Shoulders:
2,129.0 Square meters
Allocation - Php 5.50 Million
June 13, 2022 FY 2022 GAA WIN2G02732 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. ; 310208100434000
Project ID : P00606195LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-carriageway Improvement -
Secondary Roads

FROM :

Calapan North Road
K0041+982 - K0042+000
Physical Target - CW1 - Network Development -
Off-Carriageway Improvement -
309.00 Square meters
Allocation - Php 1,391.00 Million

TO :

Calapan North Road
K0026+1324 - K0027+116,
K0041+982 - K0041+997
Physical Target - CW1 - Network Development -
Off-carriageway Improvement ;
565.00 Square meters
Allocation - Php 1,391.00 Million
June 13, 2022 FY 2022 GAA WIN2G02682 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 320102104994000
Project ID : P00621112LZ

002 : Protect lives and Properties

Flood management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

FROM :

Construction of Flood mitigating Structure along
Mag-Asawang Tubig River,
Sta. 0+000 - Sta. 0+360,
San Andres Putik, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood mitigation Structure :
360.00 Lineal Meters
Allocation - Php 50.00 million

TO :

Construction of Flood Mitigating Structure along
mag-Asawang Tubig River,
Sta. 0+000 - Sta. 0+242 L/S,
Sta. 0+000 - Sta. 0+123 D/S,
San Andres Putik, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure ;
365.00 Lineal meters
Allocation - Php 50.00 Million


June 13, 2022 FY 2022 GAA WIN2g02714 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 320102104995000
Project ID : P00621113LZ

002: Protect Lives and Properties

Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major Basins and Principal Rivers

FROM :

Construction of Mag-Asawang Tubig River Control
along Brgy. San Carlos, Sta. 0+000 - Sta. 0+360,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitgiation Structure :
360.00 Lineal Meters
Allocation - Php 1.50 Million

TO :

Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+301.60,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
301.60 Lineal Meters
Allocation - Php 1.50 Million
June 10, 2022 2022 WIN2F06419 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0420+015 - K0420+070
June 10, 2022 2022 WIN2F06391 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0421+850 - K0421+870
June 10, 2022 2022 WIN2F06422 FY 2022 GAA November 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0184+230 - K0184+250, K0187+516 - K0187+550
June 10, 2022 FY2022 WIN2B00867 300221101771000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221101771000
Project ID: P00634000MN

Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Kasanyangan - Kan Hadjili Road, Barangay Kan Mindus, Luuk, Sulu



CW1- Rehabilitation of Concrete Road
Physical Target: 0.99 Lane km
Unit Cost: ₱ 10,000,000.00 /Lane km

EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00
June 10, 2022 2022 WIN2F06429 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

A Castañeda - Ma. Aurora - Sn Luis Rd - K0211+310 - K0211+500
June 10, 2022 FY2022 WIN2B00866 300221100056000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221100056000
Project ID: P00630777MN

Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Improvement of Laum Maimbung - Lagaklak Access Road from Pagsalipangan - Maimbung Road, Barangay Laum Maimbung, Maimbung, Sulu

CW1- Rehabilitation of Concrete Road
Physical Target: 0.82 Lane km
Unit Cost: ₱ 10,865,850.00 /Lane km

EAO: ₱ 90,000.00
Total Allocation: ₱ 9,000,000.00
June 10, 2022 FY2022 WIN2B00865 300221100055000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221100055000
Project ID: P00630776MN

Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Improvement of Barangay Gulangan Road leading to Gulangan Primary School, Barangay Gulangan, Maimbung, Sulu


CW1- Rehabilitation of Concrete Road
Physical Target: 0.83 Lane km
Unit Cost: ₱ 11,927,710.00 /Lane km

EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00
June 10, 2022 FY 2022 GAA WIN2G02691 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202101115000
Project ID : P00606184LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road
K0021+771 - K0022+000
Physical Target - CW1 - Network Development -
Road Widening : 0.480 Lane Km
Allocation - Php 6.00 Million


TO :
\
Calapan North Road
K0021+771 - K0021+989
Physical Target - CW1 - Network Development -
Road Widening : 0.369 Lane Km
Allocation - Php 6.00 million


June 10, 2022 FY 2022 GAA WIN2G02696 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202101116000
Project ID : P00606185LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road
K0029+491 - K0029+720
Physical Target - CW1 - Network Development -
Road Widening : 0.458 Lane Km
Allocation - Php 5.725 Million

TO :

Calapan North Road
K0029+542 - K0029+720
Physical Target - CW1 - Network Development -
Road Widening : 0.356 Lane km
Allocation - Php 5.725 Million

June 10, 2022 FY 2022 GAA WIN2G02663 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202101117000
Project ID : P00606185LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road
K0048+067 - K0048+127
Physical Target - CW1 - Network Development -
Road Widening : 0.120 Lane Km
Allocation - Php 1.500 Million

TO :

Calapan North Road
K0048+067 - K00148+183.50
Physical Target - CW1 - Network Development -
Road Widening : 0.1815 Lane Km
Allocation - Php 1.500 Million
June 10, 2022 FY2022 WIN2B00850 310105100637000 March 23, 2022 Region IX Regional Office IX
UACS No. 310105100637000
Project ID: P00601291MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo-Taglibi-Tiptipon Rd - K0009 + 000 - K0011 + 002.5


CW1- Reconstruction to Concrete Pavement
Physical Target: 4.005 Lane km
Unit Cost: ₱ 13,845,059.94 /Lane km

EAO: ₱ 2,100,000.00
EXCESS: ₱ 2,450,534.93
Total Allocation: ₱ 60,000,000.00
June 10, 2022 FY 2022 GAA WIN2G02674 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202101118000
Project ID : P00606187LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road
K0053+434 - K0053+768
Physical Target - CW1 - Network Development
Road Widening : 0.668 Lane Km
Allocation - Php 8.350 Million

TO :

Calapan North Road
K0053+434 - K0053+693.80
Physical Target - CW1 - Network Development -
Road Widening : 0.5196 Lane Km
Allocation - Php 8.350 Million
June 10, 2022 FY 2022 GAA WIN2G02674 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202101118000
Project ID : P00606187LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road
K0053+434 - K0053+768
Physical Target - CW1 - Network Development
Road Widening : 0.668 Lane Km
Allocation - Php 8.350 Million

TO :

Calapan North Road
K0053+434 - K0053+693.80
Physical Target - CW1 - Network Development -
Road Widening : 0.5196 Lane Km
Allocation - Php 8.350 Million
June 10, 2022 FY 2022 GAA WIN2G02929 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100578000
Project ID : P00606188LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

CSR Jct - Pola Road
K0064+993 - K0065+052
Physical Target - CW1 - Network Development -
Road Widening : 0.122 Lane Km
Allocation - Php 1.500 Million

TO :

CSR Jct - Pola Road
K0064+993 - K0065+093
Physical Target - CW1 - Network Development -
Road Widening : 0.204 Lane Km
Allocation - Php 1.500 million
June 10, 2022 FY 2022 GAA WIN2G02659 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310203100579000
Project ID : P00606189LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

CSR Jct - Pola Road
K0065+052 - K0065+254
Physical Target - CW1 - Network Development -
Road Widening : 0.404 Lane Km
Allocation - Php 2.500 million

TO :

CSr Jct - Pola Road
K0065+093 - K0065+254,
K0066+087 - K0066+107
Physical Target - CW1 - Network Development -
Road Widening : 0.201 Lane Km
Allocation - Php 2.500 Million
June 9, 2022 2022 WIN2F06420 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road, Brgy. Punglo, Maria Aurora, Aurora
June 9, 2022 2022 WIN2F06432 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0276+400 - K0276+425
June 9, 2022 2022 WIN2F06421 FY 2022 GAA November 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0280+000 - K0280+050.50
June 9, 2022 2022 WIN2F06430 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0409+330 - K0409+380, K0409+520 - K0409+565
June 9, 2022 2022 WIn2F06431 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0410+500 - K0410+580
June 8, 2022 FY 2022 GAA WIN2G03006 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101611000
Project ID : P00639230LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+736.00 - Sta. 171+797.00
Physical Target - CW1- Construction of Road Slope Protection
Structure : 637.76 square meter
Allocation - Php 28.460 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+736.00 - Sta. 171+797.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,240.72 square meter
Allocation - Php 28.460 Million