July 4, 2022 |
2022 |
WIN2F06539 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bulacan 2nd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-Purpose Building, Poblacion, Marilao, Bulacan |
July 4, 2022 |
2022 |
WIN2F06538 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
San Roque - Maturanoc Road, Guimba By-pass, Nueva Ecija |
July 4, 2022 |
2022 |
WIN2F06523 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0064+236 - K0064+410 |
July 4, 2022 |
2022 |
WIN2F06521 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Arayat - Magalang Rd - K0092+168 - K0092+350 |
July 4, 2022 |
2022 |
WIN2F06528 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0067+676 - K0068+098 |
July 4, 2022 |
2022 |
WIN2F06525 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Candaba - Sn Miguel Rd - K0074+000 - K0074+151 |
July 4, 2022 |
2022 |
WIN2F06522 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0064+236 - K0064+410, K0067+425 - K0068+075, K0068+155 - K0069+730, K0069+781- K0070+330 |
July 4, 2022 |
2022 |
WIN2F06524 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0057+747 - K0057+851.20 |
July 4, 2022 |
2022 |
WIN2F06526 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0068+979 - K0069+102 |
July 4, 2022 |
2022 |
WIN2F06527 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sn Simon - Baliwag Rd - K0059+029 - K0059+416 |
July 4, 2022 |
2022 |
WIN2E02440 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215100637000
Project ID: P00633820MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Rehabilitation of Montilla Boulevard (Jct Salvador Calo-Villa Kananga), Sta. 0 + 000 - Sta. 1 + 793.80, Sta. 2 + 213.20 - Sta. 4 + 100, Butuan City
Type of Work:
CW1- Rehabilitation of Concrete Road
Physical Target:
CW1- 11.295 Lane Km
Allocation:
TOTAL: P 120,000,000
CW1: P 115,800,000
EAO: P 4,200,000
Unit Cost:
CW1: P 10,252,324.04/ Lane Km
TO:
Rehabilitation of Montilla Boulevard (Jct Salvador Calo-Villa Kananga), Sta. 0 + 000 - Sta. 1 + 651.00, Sta. 1 + 952.75 - Sta. 2 + 926.50, Sta. 3 + 244.84 - Sta. 3 + 298.84, Sta. 4 + 095.05 - Sta. 4 + 469.05, Butuan City
Type of Work:
CW1- Rehabilitation of Concrete Road
CW2- Preventive Maintenance of Road: Asphalt Overlay
CW3- Construction of Drainage Structure along Road
Physical Target:
CW1- 3.283 Lane Km
CW2- 8.294 Lane Km
CW3- 150.00 Lineal meters
Allocation:
TOTAL: P 120,000,000
CW1: P 31,845,220
CW2: P 59,020,050
CW3: 24,934,730
EAO: P 4,200,000
Unit Cost:
CW1: P 9,700,036.55/ Lane Km
CW2: P 7,115,993.49/ Lane Km
CW3: P 166,231.53/ Lineal meters |
July 1, 2022 |
2022 |
WIN2F06436 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction (Completion) of Access Road Opening from Mogao-Badeo Proper-Tableo (Continuation Phase II), Barangay Badeo, Kibungan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.302 Lane Km;
Allocation: Php 3,000,000.000
To: Construction (Completion) of Access Road Opening from Mogao-Badeo Proper-Tableo (Continuation Phase II), Barangay Badeo, Kibungan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 1.500 Lane Km;
Allocation: Php 3,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06428 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Road to Sitio Patapat, Topdac, Atok, Benguet;
Physical Target: 0.302 Lane Km;
Allocation: Php 3,000,000.000
To: Construction of Road to Sitio Patapat, Topdac, Atok, Benguet;
Physical Target: 0.155 Lane Km;
Allocation: Php 3,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06426 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet;
Physical Target: 3.021 Lane Km;
Allocation: Php 30,000,000.000
To: Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet;
Physical Target: 1.970 Lane Km;
Allocation: Php 30,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06423 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement (Completion) of Cantaw to Laglagan FMR, Tadayan, Pudong, Kapangan, Benguet;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000
To: Improvement (Completion) of Cantaw to Laglagan FMR, Tadayan, Pudong, Kapangan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.210 Lane Km;
Allocation: Php 3,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06408 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement of Road, Papayew, Caliking, Atok, Benguet;
Physical Target: 1.053 Lane Km;
Allocation: Php 10,000,000.000
To: Improvement of Road, Papayew, Caliking, Atok, Benguet;
Physical Target: 0.579 Lane Km;
Allocation: Php 10,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06407 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Rehabilitation (Completion) of Keyang to Proper Gadang Road, Gadang, Kapangan, Benguet ;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000
To: Rehabilitation (Completion) of Keyang to Proper Gadang Road, Gadang, Kapangan, Benguet ;
Type of Work: Construction of Concrete Road;
Physical Target: 0.200 Lane Km;
Allocation: Php 3,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06406 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Rehabilitation (Completion) of Longboy-Tacal Road, Labueg, Kapangan, Benguet;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 0.316 Lane Km;
Allocation: Php 3,000,000.000
To: Rehabilitation (Completion) of Longboy-Tacal Road, Labueg, Kapangan, Benguet;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 510.000 Square meters;
Allocation: Php 3,000,000.000
|
July 1, 2022 |
2022 |
WIN2F06427 |
SARO-BMB-A-22-0002930 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 775.000 Lineal meters;
Allocation: Php 50,000,000.000
|
June 29, 2022 |
2022 |
WIN2F06486 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Ciudad De Victoria Tributaries leading to Bucaue River (Igulot Section), Bocaue, Bulacan
|
June 29, 2022 |
2022 |
WIN2F06425 |
SARO-BMB-A-22-0002944 RCUD |
March 11, 2022 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Katao Flood Control Structure, Sta. 085 + 870, Brgy. Buringal, Paracelis, Mountain Province;
Physical Target: 100.000 Lineal Meters;
Allocation: Php 10,000,000.000
To: Construction of Katao Flood Control Structure, Sta. 083+030 - Sta. 083+130 (R.S.), Brgy. Buringal, Paracelis, Mountain Province;
Physical Target: 100.000 Lineal Meters;
Allocation: Php 10,000,000.000
|
June 29, 2022 |
2022 |
WIN2F06424 |
GAA 2022 |
January 22, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108;
Physical Target: 2,420.000 Lineal Meters;
Allocation: Php 23,699,000.000
To: Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108;
Physical Target: 1,511.000 Lineal Meters;
Allocation: Php 23,699,000.000
|
June 29, 2022 |
2022 |
WIN2C03593 |
SR2022-03-008036 |
March 24, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Maasin Airport, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 17.05 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M
AS MODIFIED:
Construction of Road, Maasin Airport, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Gravel Road: 2.50 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M |
June 29, 2022 |
2022 |
WIN2C03592 |
SR2022-03-008024 |
March 23, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Access Road, Maasin Airport, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: 16.624 Lane Km P 188.175 M
EAO P 6.825 M
Total P 195.00 M
AS MODIFIED:
Construction of Access Road, Maasin Airport, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Gravel Road: 2.50 Lane Km P 188.175 M
EAO P 6.825 M
Total P 195.00 M
|
June 29, 2022 |
2022 |
WIN2C03581 |
SR2022-03-007304 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + (-127) - K0910 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 56.3367 M
Asphalt Overlay : 9.870 Lane Km
EAO P 2.0433 M
Total P 58.380 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + (-127) - K0910 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 56.3367 M
Asphalt Overlay : 5.882 Lane Km
EAO P 2.0433 M
Total P 58.380 M
|
June 29, 2022 |
2022 |
WIN2C03588 |
SR2022-03-008306 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction (Completion) of Storm Surge Protection: Tide Embankment, Subsection 4.6, Brgy. Baras, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 65.620 M
: 565.550 Lineal meters
EAO P 2.380 M
Total P 68.00 M
AS MODIFIED:
Construction (Completion) of Storm Surge Protection: Tide Embankment, Subsection 4.6, Brgy. Baras, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 37.620 M
: 640 Lineal meters
EAO P 2.380 M
EXCESS P 28.00 M
Total P 68.00 M |
June 29, 2022 |
2022 |
WIN2C03579 |
SR2022-03-008892 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 26.055 M
: 224.557 Lineal meters
EAO P 0.945 M
Total P 27.00 M
AS MODIFIED:
Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 25.812 M
: 630 Lineal meters
ROW-ROW Acquisition: 300 Square meters P 0.243 M
EAO P 0.945 M
Total P 27.00 M |
June 29, 2022 |
2022 |
WIN2C03583 |
SR2022-03-008200 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Binahaan River, Brgy. Cabalagnan Section (Upstream/Left Bank), Sta. 0 + 000 - Sta. 0 + 810, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 96.500 M
: 831.692 Lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Flood Control Structure along Binahaan River, Brgy. Cabalagnan Section (Upstream/Left Bank), Sta. 0 + 000 - Sta. 0 + 621, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 96.40685 M
: 621 Lineal meters
ROW-ROW Acquisition: 9,315 Square meters P 0.09315 M
EAO P 3.500 M
Total P 100.00 M |
June 29, 2022 |
2022 |
WIN2C03580 |
SR2022-03-008310 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
AS PER GAA/ORIGINAL:
Construction of Flood Control Mitigation Facilities along Binahaan River, Brgy. Binongtoan Section (Downstream), Sta. 0 + 00 to Sta. 0 + 810, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 96.500 M
: 831.692 Lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Flood Control Mitigation Facilities along Binahaan River, Brgy. Binongtoan Section (Downstream), Sta. 0 + 00 to Sta. 0 + 465, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure P 95.713 M
: 465 Lineal meters
ROW-ROW Acquisition: 6,975 Square meters P 0.787 M
EAO P 3.500 M
Total P 100.00 M
|
June 29, 2022 |
2022 |
WIN2C03589 |
SR2022-03-008137 |
March 23, 2022 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Junction National Road Brgy. Carolina, Can-avid-Dolores-Maslog Road (Brgy.Magsaysay-Brgy. Magongbong-Brgy. Gap-ang Section), Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: 10.220 Lane Km P 241.250 M
EAO P 8.750 M
Total P 250.00 M
AS MODIFIED:
Construction of Junction National Road Brgy. Carolina, Can-avid-Dolores-Maslog Road (Brgy.Magsaysay-Brgy. Magongbong-Brgy. Gap-ang Section), Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: 9.08 Lane Km P 241.250 M
EAO P 8.750 M
Total P 250.00 M |
June 28, 2022 |
2022 |
WIN2F06494 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Service Road (Alternative Route to NLEX), Bulacan |
June 28, 2022 |
2022 |
WIN2F06491 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0192+240 - K0192+350 |
June 28, 2022 |
2022 |
WIN2F06492 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Dingalan - Dona Remedios Trinidad Road, Aurora
|
June 28, 2022 |
2022 |
WIN2F06493 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct Tablang - Gabaldon Rd - K0163+000 - K0163+160 |
June 28, 2022 |
2022 |
WIN2F06495 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0302+000 - K0302+110 |
June 28, 2022 |
2022 |
WIN2F06496 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Dinadiawan - Ditawini Bypass Road, Dinadiawan, Aurora |
June 28, 2022 |
2022 |
WIN2F06497 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 3, Pampanga
|
June 28, 2022 |
2022 |
WIN2F06498 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0175+050 - K0175+070, K0176+240 - K0176+380 |
June 28, 2022 |
2022 |
WIN2F06489 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of Missing Links / New Roads
Capas - Botolan Road Package 3, Tarlac |
June 27, 2022 |
2022 |
WIN2E02435 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road at Brgy. Pandaitan to Paradise Embak, Paquibato District, Davao City
Physical Target:
CW1: 4.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road at Brgy. Pandaitan to Paradise Embak, Paquibato District, Davao City
Physical Target:
CW1: 3.606 Lane Km (Construction of Concrete Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 63,690,000.00 (Construction of Concrete Road)
CW2: P 32,810,000.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00 |
June 27, 2022 |
2022 |
WIN2F06484 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Lubao - Guagua Section) Package 5, Pampanga
|
June 27, 2022 |
2022 |
WIN2F06487 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of Missing Links / New Roads
Capas - Botolan Rd, Package 7, Tarlac |
June 27, 2022 |
2022 |
WIn2F06488 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Tertiary Roads
Gapan - Fort Magsaysay Rd - K0097+069 - K0099+612 |
June 27, 2022 |
2022 |
WIN2F06480 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
A Castañeda - Ma Aurora - Sn Luis Rd - K0202+550 - K0202+690; K0202+75 - K0202+880, K0208+100 - K0208+150 |
June 27, 2022 |
2022 |
WIN2F06481 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
A Castañeda - Ma Aurora - Sn Luis Rd - K0202+100 - K0202+280, K0202+320 - K0202+410, K0207+900 - K0207+960 |
June 27, 2022 |
2022 |
WIN2F06482 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure
Construction of Camiling - Agno River Floodway, Tarlac, Phase 3
|
June 27, 2022 |
2022 |
WIN2F06483 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0176+380 - K0176+480 |
June 27, 2022 |
2022 |
WIN2F06485 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0189+935 - K0190+026 |
June 27, 2022 |
2022 |
WIN2F06490 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure
Construction of Camiling - Agno River Floodway, Tarlac, Phase 4 |
June 22, 2022 |
FY 2022 GAA |
WIN2G03035 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101622000
Project ID : P00639241LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz port Road,
Sta. 4+131.00 - Sta. 4+181.00, Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 401.191 square meter
Allocation - Php 17.903 million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 4+131.00 - Sta. 4+191.00, Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 776.24 square meter
Allocation - Php 17.903 Million |
June 22, 2022 |
FY 2022 GAA |
WIN2G03036 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100223000
Project ID : P00638889LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+841.00 - Sta. 170+041.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,034.379 square meter
Allocation - Php 135.408 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+841.00 - Sta. 170+041.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,829.200 square meter
Allocation - Php 135.408 Million |
June 22, 2022 |
FY 2022 GAA |
WIN2G03032 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100217000
Project ID : P00638883LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+246.00 - Sta. 171+482.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,601.219 square meter
Allocation - Php 160.703 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171 + 246.00 - Sta. 171+482.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 6,933.750 square meter
Allocation - Php 160.703 Million
|
June 22, 2022 |
FY 2022 GAA |
WIN2G03033 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101632000
Project ID : P{00636964LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide -
Sta. 9+047.00 - Sta. 9+097.00, Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Roads Slope Protection
Structure - 492.352 square meter
Allocation - Php 21.971.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 9+047.00 - Sta. 9+108.00, Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 956.86 square meter
Allocation - Php 21.971 Million |
June 22, 2022 |
FY 2022 GAA |
WIN2G03028 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101631000
Project ID : P00636963LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 16+534.0 - Sta. 16+555.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 214.456 square meter
Allocation - Php 9.570 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 16+534.00 - Sta. 16+555.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 415.14 square meter
Allocation - Php 9.570 Million
|
June 21, 2022 |
FY 2022 GAA |
WIN2G03037 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100221000
Project ID : P00638887LZ
CONVERGENCE AND SPECIAL SUPPORT SYSTEM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+191.00 - Sta. 165+359.00,
San Vicente Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,777.615 square meter
Allocation - Php 123.950 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+191.00 - Sta. 161+374.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,354.990 square meter
Allocation - Php 123.950 Million |
June 21, 2022 |
FY 2022 GAA |
WIN2G03027 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 3002151016340000
Project ID : P00636966LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 10+302.00 - Sta. 10+348.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 413.830 square meter
Allocation - Php 18.467 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Sta. 10 + 320 - Sta. 10 + 360.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 803.27 square meter
Allocation - Php 18.467Million
|
June 21, 2022 |
FY 2022 GAA |
WIN2G03022 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100218000
Project ID : P00638884LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG ) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+482.00 - Sta. 171+718.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,601.219 square meter
Allocation - Php 160.703 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente Palawan
Sta. 171+482.00 - Sta. 171+718.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 6,933.980 square meter
Allocation - Php 160.703 Million
|
June 21, 2022 |
FY 2022 GAA |
WIN2G03029 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100222000
Project ID : P00638888LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road
Sta. 169+642.00 - Sta. 169+841.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,019.208 square meter
Allocation - Php 134.731 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169+642.00 - Sta. 169+841.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,799.870 square meter
Allocation - Php 134.731 Million |
June 17, 2022 |
FY 2022 GAA |
WIN2G03023 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101635000
Project ID : P00636967LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Roads with Slips, Slope Collapse, and Landslide
Sta. 11+007.00 - Sta. 11+098.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,006.709 square meter
Allocation - Php 44.924 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 11+007.00 - Sta. 11+102.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1- Construction of Road Slope Protection
Structure - 1,865.50 square meter
Allocation - Php 44.924 Million
|
June 17, 2022 |
FY 2022 GAA |
WIN2G03025 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100220000
Project ID : P00638886LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak -San Vicente Road,
Sta. 169 + 254.00 - Sat. 169 + 390.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,851.691 square meter
Allocation - Php 82.631 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 169 + 254.00 - Sta. 169 + 405.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,480.92 square meter
Allocation - Php 82.631 Million |
June 17, 2022 |
FY 2022 GAA |
WIN2G3034 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101629000
Project ID : P00636961LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+040.00 - Sta. 14+122.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 787.525 square meter
Allocation - Php 35.143 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+040.00 - Sta. 14+113.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,517.27 square meter
Allocation - Php 35.143 million |
June 16, 2022 |
FY 2022 GAA |
WIN2G03026 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101613000
Project ID : P00639232LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+444.00 - Sta. 172+557.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 879.201 square meter
Allocation - Php 39.234 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+444.00 - Sta.0172+560.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,711.78 square meter
Allocation - Php 39.234 Million |
June 16, 2022 |
FY 2022 GAA |
WIN2G03031 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100219000
Project ID : P00638885LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 167+325.00 - Sta. 167+430.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,582.849 square meter
Allocation - Php 70.634 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 167+325.00 - Sta. 167+445.00, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,076.880 square meter
Allocation - Php 70.634 million
|
June 15, 2022 |
FY 2022 GAA |
WIn2G03019 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS no. : 300225100434000
Project ID : P00640566LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Flood Mitigation Structure
Protecting Public Infrastructure/Facilities
FROM :
Construction of Seawall,
Brgy. Masudsud, Sitio Proper, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
120.00 lineal meters
Allocation - Php 20.00 Million
TO :
Construction of Seawall,
Brgy. Masudsid, Sitio Proper, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
228.20 lineal meters
Allocation - Php 20.00 Million |
June 15, 2022 |
FY 2022 GAA |
WIN2G03024 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101624000
Project ID : P00639243LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road,
Sta. 4+305.00 - Sta. 4+332.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 157.56 square meter
Allocation - Php 7.031 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 4+305.00 - Sta. 4+338.00
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 303.26 square meter
Allocation - Php 7.031 Million
|
June 15, 2022 |
FY 2022 GAA |
WIn2G03030 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS NO. : 300203101628000
Project ID : P00635468LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to
Declared Tourism Destination
(Tourism Road Infrastructure Program - TRIP)
FROM :
Access Road leading to Roxas Diving Spots,
Roxas, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.090 lane km
Allocation - Php 121.355 Million
TO :
Access Road leading to Roxas Diving Spot,
Roxas, Palawan
Physical Target - CW1 - Construction of Concrete Road :
3.282 lane km
CW2 - Road Safety: Pavement Markings :
3,282 lane km
CW3 - Construction of Road Slope Protection
Structure : 8,045.90 square meters
Allocation - Php 121.355 Million
|
June 14, 2022 |
FY 2022 GAA |
WIN2G03021 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100194000
Project ID : P00638860LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Sugod - Cawayan Road Leading to Blue Holes,
Sta. 11+100 - Sta. 11+230,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,070 Square meters
Allocation - Php 80.00 Million
TO :
Construction of Sugod - Cawayan Road leading to Blue holes,
Sta. 11+100 - Sta. 11+200,
Sta. 11+510 - Sta. 11+548.50
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,604.19 Square meters
Allocation - Php 80.00 Million |
June 14, 2022 |
FY 2022 GAA |
WIN2G03018 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100017000
Project ID : P00639299LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Shore Protection/Causeway along
Tablas Circumferential Road (Bachawan Area),
Bgry. Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.324 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Shore Protection/Causeway along
Tablas Circumferential Road (Bachawan Area),
Brgy. Bachawan, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.3085.Lane Km
Allocation - Php 100.00 Million
|
June 14, 2022 |
FY 2022 GAA |
WIN2F06434 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215101651000
Project ID : P00639246LZ
CONVERGENVE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Project Alleviating gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+720 - Sta. 10+780,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slop[e Protection
Structure - 1,152 Square Meters
Allocation - Php 24.00 million
TO :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+720 - Sta. 10+792.50,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,037.11 Square Meters
Allocation - Php 24.00 Million
|
June 14, 2022 |
FY 2022 GAA |
WIN2G03017 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100193000
Project ID : P00638859LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+500 - Sta.010+600,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 3,030 Square meters
Allocation - php 60.00 Million
TO :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+500 - Sta. 10+620,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,623.15 Square Meters
Allocation - Php 60.00 Million
|
June 14, 2022 |
FY 2022 GAA |
WIN2G03020 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300225100432000
Project ID : P00640564LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Back Infrastructure Program (BIP) - Flood Mitigations Structures
Protecting Public Infrastructure/Facilities
FROM :
Construction of Seawall in Brgy. Vicente, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure:
120.00 Lineal meters
Allocation - Php 20.00 Million
To :
Construction of Seawall in Brgy. Vicente, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure:
229.40 Lineal meters
Allocation - Php 20.00 Million
|
June 13, 2022 |
FY 2022 GAA |
WIN2G02643 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100580000
Project ID : P00606190LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road
K0068+030 - K0068+097
Physical Target - CW1 - Network Development -
Road Widening : 0.134 Lane Km
Allocation - php 1.675 Million
TO :
CSR Jct - Pola Road
K0066+057 - K0066+087
Physical Target - CW1 - Network Development -
Road Widening : 0.060 Lane Km
Allocation - Php 1.675 Million
|
June 13, 2022 |
FY 2022 GAA |
WIn2G02681 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100581000
Project ID : P00606191LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road
K0068+414 - K0069+000
Physical Target - CW1- Network Development -
Road Widening : 1.098 Lane Km
Allocation - Php 13.725 Million
TO :
CSR Jct - Pola Road
K0068+414 - K0068+732
Physical Target - CW1 - Network Development -
Road Widening : 0.636 Lane Km
Allocation - Php 13.725 Million |
June 13, 2022 |
FY 2022 GAA |
WIN2G02628 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100582000
Project ID : P00606192LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR JCT - Pola Road
K0070+990 - K0072+010
Physical Target - CW1 - Network Development -
Road Widening : 2.046 Lane Km
Allocation - Php 25.00 Million
TO :
CSR Jct - Pola Road
K0070+990 - K0072+012
Physical Target - CW1 - Network Development -
Road Widening : 2.050 Lane Km
Allocation - Php 25.00 Million |
June 13, 2022 |
FY 2022 GAA |
WIN0G02764 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100583000
Project ID : P00606193LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road
K0072+119 - K0072+500
Physical Target - CW1 - Network Development -
Road Widening : 0.762 Lane Km
Allocation - Php 9.525 Million
TO :
CSR Jct - Pola Road
K0066+107 - K0066+179,
K0072+119 - K0072+440
Physical Target - CW1 - Network Development -
Road Widening ; 0.786 Lane Km
Allocation - Php 9.525 Million
|
June 13, 2022 |
FY 2022 GAA |
WIn2G02765 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310208100433000
Project ID : P00606194LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriage Improvement -
Secondary Roads
FROM :
Calapan North Road
K0039+197 - K0039+809
Physical Target - CW1 - Off-Carriageway Improvement -
Paving of shoulders:
1,224.0 Square meters
Allocation - Php 5.50 Million
TO :
Calapan North Road
K0026+1259 - K0026+1324,
K0039+197 - K0039+820
Physical Target - CW1 - Off-carriageway Improvement -
Paving of Shoulders:
2,129.0 Square meters
Allocation - Php 5.50 Million |
June 13, 2022 |
FY 2022 GAA |
WIN2G02732 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. ; 310208100434000
Project ID : P00606195LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-carriageway Improvement -
Secondary Roads
FROM :
Calapan North Road
K0041+982 - K0042+000
Physical Target - CW1 - Network Development -
Off-Carriageway Improvement -
309.00 Square meters
Allocation - Php 1,391.00 Million
TO :
Calapan North Road
K0026+1324 - K0027+116,
K0041+982 - K0041+997
Physical Target - CW1 - Network Development -
Off-carriageway Improvement ;
565.00 Square meters
Allocation - Php 1,391.00 Million |
June 13, 2022 |
FY 2022 GAA |
WIN2G02682 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 320102104994000
Project ID : P00621112LZ
002 : Protect lives and Properties
Flood management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
FROM :
Construction of Flood mitigating Structure along
Mag-Asawang Tubig River,
Sta. 0+000 - Sta. 0+360,
San Andres Putik, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood mitigation Structure :
360.00 Lineal Meters
Allocation - Php 50.00 million
TO :
Construction of Flood Mitigating Structure along
mag-Asawang Tubig River,
Sta. 0+000 - Sta. 0+242 L/S,
Sta. 0+000 - Sta. 0+123 D/S,
San Andres Putik, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure ;
365.00 Lineal meters
Allocation - Php 50.00 Million
|
June 13, 2022 |
FY 2022 GAA |
WIN2g02714 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 320102104995000
Project ID : P00621113LZ
002: Protect Lives and Properties
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major Basins and Principal Rivers
FROM :
Construction of Mag-Asawang Tubig River Control
along Brgy. San Carlos, Sta. 0+000 - Sta. 0+360,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitgiation Structure :
360.00 Lineal Meters
Allocation - Php 1.50 Million
TO :
Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+301.60,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
301.60 Lineal Meters
Allocation - Php 1.50 Million
|
June 10, 2022 |
2022 |
WIN2F06419 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0420+015 - K0420+070 |
June 10, 2022 |
2022 |
WIN2F06391 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0421+850 - K0421+870 |
June 10, 2022 |
2022 |
WIN2F06422 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0184+230 - K0184+250, K0187+516 - K0187+550 |
June 10, 2022 |
FY2022 |
WIN2B00867 |
300221101771000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221101771000
Project ID: P00634000MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Kasanyangan - Kan Hadjili Road, Barangay Kan Mindus, Luuk, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.99 Lane km
Unit Cost: ₱ 10,000,000.00 /Lane km
EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00 |
June 10, 2022 |
2022 |
WIN2F06429 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
A Castañeda - Ma. Aurora - Sn Luis Rd - K0211+310 - K0211+500 |
June 10, 2022 |
FY2022 |
WIN2B00866 |
300221100056000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100056000
Project ID: P00630777MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Improvement of Laum Maimbung - Lagaklak Access Road from Pagsalipangan - Maimbung Road, Barangay Laum Maimbung, Maimbung, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.82 Lane km
Unit Cost: ₱ 10,865,850.00 /Lane km
EAO: ₱ 90,000.00
Total Allocation: ₱ 9,000,000.00 |
June 10, 2022 |
FY2022 |
WIN2B00865 |
300221100055000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100055000
Project ID: P00630776MN
Convergence and Special Support Program (CSSP)
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Improvement of Barangay Gulangan Road leading to Gulangan Primary School, Barangay Gulangan, Maimbung, Sulu
CW1- Rehabilitation of Concrete Road
Physical Target: 0.83 Lane km
Unit Cost: ₱ 11,927,710.00 /Lane km
EAO: ₱ 100,000.00
Total Allocation: ₱ 10,000,000.00 |
June 10, 2022 |
FY 2022 GAA |
WIN2G02691 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101115000
Project ID : P00606184LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road
K0021+771 - K0022+000
Physical Target - CW1 - Network Development -
Road Widening : 0.480 Lane Km
Allocation - Php 6.00 Million
TO :
\
Calapan North Road
K0021+771 - K0021+989
Physical Target - CW1 - Network Development -
Road Widening : 0.369 Lane Km
Allocation - Php 6.00 million
|
June 10, 2022 |
FY 2022 GAA |
WIN2G02696 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101116000
Project ID : P00606185LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road
K0029+491 - K0029+720
Physical Target - CW1 - Network Development -
Road Widening : 0.458 Lane Km
Allocation - Php 5.725 Million
TO :
Calapan North Road
K0029+542 - K0029+720
Physical Target - CW1 - Network Development -
Road Widening : 0.356 Lane km
Allocation - Php 5.725 Million
|
June 10, 2022 |
FY 2022 GAA |
WIN2G02663 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101117000
Project ID : P00606185LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road
K0048+067 - K0048+127
Physical Target - CW1 - Network Development -
Road Widening : 0.120 Lane Km
Allocation - Php 1.500 Million
TO :
Calapan North Road
K0048+067 - K00148+183.50
Physical Target - CW1 - Network Development -
Road Widening : 0.1815 Lane Km
Allocation - Php 1.500 Million
|
June 10, 2022 |
FY2022 |
WIN2B00850 |
310105100637000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310105100637000
Project ID: P00601291MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Taglibi-Tiptipon Rd - K0009 + 000 - K0011 + 002.5
CW1- Reconstruction to Concrete Pavement
Physical Target: 4.005 Lane km
Unit Cost: ₱ 13,845,059.94 /Lane km
EAO: ₱ 2,100,000.00
EXCESS: ₱ 2,450,534.93
Total Allocation: ₱ 60,000,000.00 |
June 10, 2022 |
FY 2022 GAA |
WIN2G02674 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101118000
Project ID : P00606187LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road
K0053+434 - K0053+768
Physical Target - CW1 - Network Development
Road Widening : 0.668 Lane Km
Allocation - Php 8.350 Million
TO :
Calapan North Road
K0053+434 - K0053+693.80
Physical Target - CW1 - Network Development -
Road Widening : 0.5196 Lane Km
Allocation - Php 8.350 Million
|
June 10, 2022 |
FY 2022 GAA |
WIN2G02674 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101118000
Project ID : P00606187LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan North Road
K0053+434 - K0053+768
Physical Target - CW1 - Network Development
Road Widening : 0.668 Lane Km
Allocation - Php 8.350 Million
TO :
Calapan North Road
K0053+434 - K0053+693.80
Physical Target - CW1 - Network Development -
Road Widening : 0.5196 Lane Km
Allocation - Php 8.350 Million
|
June 10, 2022 |
FY 2022 GAA |
WIN2G02929 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100578000
Project ID : P00606188LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
CSR Jct - Pola Road
K0064+993 - K0065+052
Physical Target - CW1 - Network Development -
Road Widening : 0.122 Lane Km
Allocation - Php 1.500 Million
TO :
CSR Jct - Pola Road
K0064+993 - K0065+093
Physical Target - CW1 - Network Development -
Road Widening : 0.204 Lane Km
Allocation - Php 1.500 million
|
June 10, 2022 |
FY 2022 GAA |
WIN2G02659 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100579000
Project ID : P00606189LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
CSR Jct - Pola Road
K0065+052 - K0065+254
Physical Target - CW1 - Network Development -
Road Widening : 0.404 Lane Km
Allocation - Php 2.500 million
TO :
CSr Jct - Pola Road
K0065+093 - K0065+254,
K0066+087 - K0066+107
Physical Target - CW1 - Network Development -
Road Widening : 0.201 Lane Km
Allocation - Php 2.500 Million |
June 9, 2022 |
2022 |
WIN2F06420 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Road, Brgy. Punglo, Maria Aurora, Aurora |
June 9, 2022 |
2022 |
WIN2F06432 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) - K0276+400 - K0276+425 |
June 9, 2022 |
2022 |
WIN2F06421 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) - K0280+000 - K0280+050.50 |
June 9, 2022 |
2022 |
WIN2F06430 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0409+330 - K0409+380, K0409+520 - K0409+565 |
June 9, 2022 |
2022 |
WIn2F06431 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0410+500 - K0410+580 |
June 8, 2022 |
FY 2022 GAA |
WIN2G03006 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101611000
Project ID : P00639230LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+736.00 - Sta. 171+797.00
Physical Target - CW1- Construction of Road Slope Protection
Structure : 637.76 square meter
Allocation - Php 28.460 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+736.00 - Sta. 171+797.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,240.72 square meter
Allocation - Php 28.460 Million
|