March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building, Barangay Antipona, Bocaue, Bulacan
March 30, 2023 2023 310101100970000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Santiago - Tuguegarao Rd (Jct Kalinga - Tuguegarao Section) - K0439 + 000 - K0439 + 310
March 30, 2023 2023 310109101139000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Peñablanca - Callao Cave Rd Phase III Package 3 - K0479 + 798.33 - K0479 + 898
March 30, 2023 2023 310109101140000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca - Callao Cave Rd - Phase III Package 4 K0483 + 000 - K0483 + 128.50
March 30, 2023 2023 310109101138000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Peñablanca - Callao Cave Rd Phase III Package 2 - K0479 + 565 - K0479 + 670
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bulacan 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building, B-Tech, Pagala, Baliuag, Bulacan
March 30, 2023 2023 310109101141000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Peñablanca - Callao Cave Rd Phase III Package 5 K0483 + 128.50 - K0483 + 257
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Multi-Purpose Building (Covered Court), Valle Cruz Elementary School, Barangay Valle Cruz, Cabanatuan City, Nueva Ecija
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sta. Rosa - Fort Magsaysay Rd - K0108+(-421.00) - K0108+(-240.00), K0108+(-203.00) - K0108+(-187.50), K0108+(-147) - K0108+(-142.50), K0121+135.00 - K0121+543.90
March 30, 2023 2023 WIN3F07058 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Bongabon - Rizal - Aurora Rd - K0145+(-872) - K0145+147,K0145+153 - K0145+313, K0145+356.00 - K0145+364.00, K0145+556.50 - K0145+566.50, K0145+964.00 - K0145+1094.00, K0146+260.00 - K0146+320.00, K0146+580.00 - K0146+680.00, K0146+753.00 - K0146+810.00

March 30, 2023 2023 WIN3F07056 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Jct Tablang - Gabaldon Rd - K0136+000.00 - K0136+960.00, K0140+029.00 - K0140+140.00, K0141+000.00 - K0141+471.40, K0141+478.30 - K0141+835.00, K0144+795.00 - K0144+988.50, K0146+945.00 - K0147+307.50, K0147+314.50 - K0147+542.00, K0147+740.00 - K0147+955.00, K0147+1210.00 - K0147+1284.40, K0147+000.00 - K0149+305.00

March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Nueva Ecija - Aurora Rd - K0119+460.00 - K0120+020.00, K0124+225.70 - K0124+600.00, K0126+247.00 - K0126+297.70, K0126+769.70 - K0126+827.70, K0127+067.70 - K0127+134.40, K0127+210.40 - K0127+338.70, K0127+478.00 - K0127+567.50, K0127+722.90 - K0127+865.40, K0127+940.00 - K0128+141.60, K0128+354.60 - K0128+412.00
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Gapan - Fort Magsaysay Rd - K0094+(-215) - K0094+387, K0095+020 - K0095+240, K0095+320 - K0095+358, K0096+000 - K0096+600
March 30, 2023 2023 310109101128000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya - Malabing - Wangal - Binugawan - Tadji - Runruno Rd - K0307 + 850 - K0307 + 970
March 30, 2023 2023 310109101126000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya - Malabing - Wangal - Binugawan - Tadji - Runruno Rd - K0306 + 1040 - K0307 + 285
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Network Development Program - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) , K0109+872.30 - K0109+1010, K0110+000.00 - K0110+051.15

March 30, 2023 2023 WIN3F07063 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 2nd District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Nueva Ecija - Aurora Road , K0148+168.20 - K0150+238.00
March 30, 2023 2023 310109101125000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya - Malabing - Wangal - Binugawan - Tadji - Runruno Rd - K0306 + 490 - K0306 +651, K0306 + 794 - K0306 + 980
March 30, 2023 2023 WIN3F06993 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac - Zambales Rd - K0115+000 - K0116+168
March 30, 2023 2023 WIN3F06968 FY 2023 GAA February 17, 2022 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta. 8+564 - Sta. 8+888, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Concepcion - La Paz Road - K0122+100 - K0124+000, K0126+000 - K0127+700
March 30, 2023 2023 310109101129000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya - Malabing - Wangal - Binugawan - Tadji - Runruno Rd - K0307 + 970 - K308 + 165
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Concepcion - La Paz Rd - K0117+110.50 - K0117+346, K0117+346 - K0117+675, K0117+675 - K0118+000, K0118+000 - K0118+266, K0118+266 - K0118+589
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0108+000 - K0110+120
March 30, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0098+(-532) - K0098+(-439), K0098+(-439) - K0098+(-071) , K0104+742 - K0104+966, K0104+966 - K0105+050, K0105+583 - K0105+838, K0110+120 - K0110+613, K0110+613 - K0110+643, K0110+643 - K0110+956
March 29, 2023 CY 2023 WIN3F07052 UACS No. 310103101058000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101058000
Project ID.: P00712438LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way East Service Rd – K0020+(-1064) – K0022+000
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 6.655 Lane Km
Unit Cost (P’000) = P 7,989.13/lane km
Allocation = P 53,167,640.00
EAO = P 1,928,360.00
Total = P 55,096,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way East Service Rd – K0020+(-1064) – K0020+(-299), K0020+(-274) – K0020+352
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 3.227 Lane Km
Unit Cost (P’000) = P 16,475.87/lane km P 32.8 m/km
Allocation = P 53,167,640.00
EAO = P 1,928,360.00
Total = P 55,096,000.00
WIN3F07052
March 29, 2023 CY 2023 WIN3F07030 UACS No. 310102101084000 March 7, 2023 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102101084000
Project ID.: P00714637LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance Preventive Maintenance – Secondary Roads – Jose Abad Santos Avenue, Tondo, Manila
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 11.756 lane Km
Unit Cost (P’000) = P 9,255.250/lane km
Allocation = P 108,804,715.00
EAO = P 3,946,285.00
Total = P 112,751,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance Preventive Maintenance – Secondary Roads – Jose Abad Santos Avenue, Tondo, Manila (S02299LZ) K0004 + 974.8 - K0004 + 1144.40, K0005 + 000.00 - K0005 + 407.3, K0005+418.1 – K0005 + 898.4, K0006+000.0 – K0006+301.1, (S02287LZ) K0005+515.1 – K0005 + 1061.
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 7.62 lane Km
Unit Cost (P’000) = P 14,278.834/lane km P 28.4 m/km
Allocation = P 108,804,715.00
EAO = P 3,946,285.00
Total = P 112,751,000.00
WIN3F07030
March 29, 2023 CY 2023 UACS No. 300226104876000 January 27, 2023 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300226104876000
Project ID.: P00742694LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to Support Social Services
Rehabilitation of Multipurpose Building in Highway Hills Elementary School Phase I, Calbayog Street,
Barangay Highway Hills, Mandaluyong City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 21,070.00 no. of bldg.
Allocation = P 21,070,000.00
EAO = P 430,000.00
Total = P 21,500,000.00

As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to Support Social Services
Rehabilitation of Multipurpose Building in Highway Hills Integrated School Phase I, Calbayog Street,
Barangay Highway Hills, Mandaluyong City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 21,070.00 no. of bldg.
Allocation = P 21,070,000.00
EAO = P 430,000.00
Total = P 21,500,000.00
March 28, 2023 CY 2023 UACS No. 310102101239000 February 21, 2023 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102101239000
Project ID.: P00714142LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along CM Recto Ave. (S02229LZ), Sta. Cruz, Manila City
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.90 Lane Km
Unit Cost (P’000) = P 13,926.31/Lane km
Allocation = P 26,460,000.00
EAO = P 540,000.00
Total = P 27,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along CM Recto Ave. (S02229LZ), Sta. Cruz, Manila City -
K0004+(-1584.70) – K0004(-1199.00), K0004+(099.40) – K0004+225.80
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 2.133 Lane Km
Unit Cost (P’000) = P 12,405.06/Lane km P 24.8 M/Km
Allocation = P 26,460,000.00
EAO = P 540,000.00
Total = P 27,000,000.00
March 28, 2023 CY 2023 UACS No. 310102101241000 February 21, 2023 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102101241000
Project ID.: P00714144LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along Blumentritt St., Manila City
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.672 lane km
Unit Cost (P’000) = P 16,710.99/lane km
Allocation = P 27,940,780.00
EAO = P 570,220.00
Total = P 278,511,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Preventive Maintenance (Asphalt Overlay) along Blumentritt St. C 400 – C 734 Manila City
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 2.004 lane km
Unit Cost (P’000) = P 13,942.50/lane km P 27.8 m/km
Allocation = P 27,940,780.00
EAO = P 570,220.00
Total = P 278,511,000.00
March 27, 2023 2023 WIN3F07009 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Roman Expressway - K0143+(-252) - K0143+100, K0143+300 - K0143+910
March 27, 2023 2023 none FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0018+(-583) - K0018+(-218), K0018+(-218) - K0018+457, K0019+287 - K0020+104
March 27, 2023 2023 FY 2023 GAA February 17, 2022 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0055+350 - K0055+750, K0056+300 - K0056+420, K0056+525 - K0056+602, K0056+690 - K0056+825, K0057+550 - K0057+747, K0061+396 - K0061+446, K0062+388 - K0062+450
March 27, 2023 CY 2023 UACS No. 310103101123000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101123000
Project ID.: P00712437LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Muntinlupa-Insular Prison Rd – K0031+109 -K0032+178
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 2.124 Lane Km
Unit Cost (P’000) = P 10,420.57/Lane km
Allocation = P 22,133,300.00
EAO = P 451,700.00
Total = P 22,585,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Muntinlupa-Insular Prison Rd – K0031+109 -K0032+274
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 2.316 Lane Km
Unit Cost (P’000) = P 9,556.69/lane km
Allocation = P 22,133,300.00
EAO = P 451,700.00
Total = P 22,585,000.00
March 27, 2023 2023 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0075+602 - K0075+958, K0093+672.50 - K0094+000
March 27, 2023 2023 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0078+097 - K0079+285, K0091+242 - K0093+672
March 24, 2023 CY 2023 WIN3F06953 UACS No. 300105200878000 February 17, 2023 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300105200878000
Project ID.: P00755159LZ
Local Program
National Building Program – Buildings And Other Structures – Multipurpose / Facilities
Construction of University of the Philippines (UP) Diliman College of Arts and Letters (CAL) Building,
Phase 3, Diliman, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00

As Modified
Local Program
National Building Program – Buildings And Other Structures – Multipurpose / Facilities
Construction of University of the Philippines (UP) Diliman College of Arts and Letters (CAL) Building,
Phase 2, Diliman, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00
WIN3F06953
March 23, 2023 2023 WIN3F06921 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0020+104 - K0020+601
March 23, 2023 2023 WIN3F06887 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0160+740 - K0160+930
March 23, 2023 2023 WIN3F06886 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0156+240 - K0156+335
March 23, 2023 2023 WIN3F06866 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0411+258 - K0411+330, K0412+(-091) - K0412+025
March 23, 2023 2023 WIN3F06854 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0020+601 - K0021+587, K0022+464 - K0022+1209
March 23, 2023 2023 WIN3F06852 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A Castañeda - Ma. Aurora - Sn Luis Rd - K0220+000 - K0220+903
March 23, 2023 2023 WIN3F06848 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0097+ 000 - K0097+180, K0104+000 - K0105+000, K0110+000 - K0110+695, K0112+934 - K0114+000, K0114+138 - K0114+675
March 23, 2023 2023 WIN3F06849 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella- Dinadiawan Rd - K0410+012 - K0410+100, K0410+580 - K0410+615
March 23, 2023 2023 WIN3F06847 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella - Dinadiawan Rd - K0416+111 - K0416+185, K0416+265 - K0416+340, K0416+407 - K0416+475
March 23, 2023 2023 WIN3F06857 FY 2023 GAA February 17, 2022 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika (LZ) -K0085+(-916) - K0085+(-385), K0085+(-375) - K0085+758, K0085+768 - K0086+116
March 23, 2023 CY 2023 WIN3F06911 UACS No. 300105200587000 February 7, 2023 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300105200587000
Project ID.: P00755199LZ
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of Public Attorney’s Office (PAO) Building Phase II, Commonwealth, Batasan Hills, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00

As Modified
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of Public Attorney’s Office (PAO) Building Phase III, Commonwealth Avenue, Batasan Hills,
Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00
WIN3F06911
March 23, 2023 CY 2023 WIN3F06915 UACS No. 300105200585000 February 7, 2023 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300105200585000
Project ID.: P00755201LZ
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of Professional Regulation Commission Building (Phase II), Central Business Part 1,
Island A, Macapagal Boulevard, Pasay City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00

As Modified
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of Professional Regulation Commission Building (Phase III), Central Business Part 1,
Island A, Macapagal Boulevard, Pasay City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 289,500.00/no. of bldg.
Allocation = P 289,500,000.00
EAO = P 10,500,000.00
Total = P 300,000,000.00
WIN3F06915
March 23, 2023 2023 WIN3F06846 FY 2023 GAA February 17, 2022 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd - K0065+585 - K0065+958, K0066+093 - K0066+754, K0066+850 - K0067+120, K0068+101 - K0068+460, K0068+481 - K0068+650, K0068+650 - K0069+310
March 23, 2023 CY 2023 WIN3F06917 UACS No. 300105200897000 February 7, 2023 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300105200897000
Project ID.: P00755171LZ
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of 9-Storey with Roof Deck-Main Academic Building, Polytechnic University of the
Philippines (PUP), A. Mabini Campus, Anonas St., Sta. Mesa, Manila
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 38,600.00/no. of bldg.
Allocation = P 38,600,000.00
EAO = P 1,400,000.00
Total = P 40,000,000.00

As Modified
Local Program
Local – Building and Other Structures – Multipurpose/Facilities – National Building Program
Construction of 9-Storey with Roof Deck-Main Academic Building, Polytechnic University of the
Philippines (PUP), A. Mabini Campus, Anonas St., Sta. Mesa, Manila (Phase II)
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost (P’000) = P 38,600.00/no. of bldg.
Allocation = P 38,600,000.00
EAO = P 1,400,000.00
Total = P 40,000,000.00
WIN3F06917
March 23, 2023 2023 WIN3F06864 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Romulo H-way - K0126+500 - K0127+050
March 23, 2023 2023 WIN3F06835 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Romulo H-way - K0148+395 - K0148+968
March 23, 2023 2023 WIN3F06833 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0161+609 - K0161+963
March 23, 2023 2023 WIN3F06836 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0149+565 - K0150+522
March 23, 2023 2023 WIN3F06838 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0154+790 - K0155+876
March 23, 2023 2023 WIN3F06834 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0145+843 - K0146+865
March 23, 2023 2023 WIN3F06827 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads


Manila North Rd - K0132+073 - K0132+933
March 23, 2023 2023 WIN3F06828 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Tarlac - Sn Miguel via Macabulos Rd - K0119+(-530) - K0119+(-340)
March 21, 2023 CY 2023 WIN3F06867 SR2023-01-0002495 January 30, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310101100773000
Project ID.: P00712434LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (LZ) – K0026+(-120) – K0028+240
Physical Target: CW1 = Maintenance of Road: Asphalt Overlay = 9.416 Lane Km
Unit Cost (P’000) = P 10,249.51/lane km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (LZ) – K0026+(-120) – K0027+285.28
Physical Target: CW1 = Maintenance of Road: Asphalt Overlay = 5.605 Lane Km
Unit Cost (P’000) = P 17,216.77/lane km = P34.4 m/km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
WIN3F06867
March 21, 2023 CY 2023 WIN3F06882 UACS No. 310101100923000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310101100923000
Project ID.: P00712435LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (LZ) – K0030+000 – K0030+783
Physical Target: CW1 = Maintenance of Road: Asphalt Overlay =3.132 Lane Km
Unit Cost (P’000) = P 13,767.56/lane km
Allocation = P 43,120,000.00
EAO = P 880,000.00
Total = P 44,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (LZ) – K0030+180 – K0030+783
Physical Target: CW1 = Maintenance of Road: Asphalt Overlay =2.412 Lane Km
Unit Cost (P’000) = P 17,877.28/lane km = P35.6 m/Km
Allocation = P 43,120,000.00
EAO = P 880,000.00
Total = P 44,000,000.00
WIN3F06882
March 10, 2023 2023 WIN3F06826 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0025+(-1138) - K0025+(-236), K0025+618 - K0026+010, K0027+098 - K0028+000, K0028+000 - K0028+310
February 1, 2023 2022 WIN2E02548 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0457 + 000 - K0457 + 100;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0457 + 427 - K0457 + 527;
Physical Target: 3404.88 Square meters;
Allocation: Php 99,834,000.000
Excess: Php 166,000.000
February 1, 2023 2022 WIN2E02560 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, Abra;
Physical Target: 368 Lineal meters;
Allocation: Php 94,860,000.000
Excess: Php 5,140,000.000

February 1, 2023 2022 WIN2E02554 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Patagui Flood Control Structure, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Patagui Flood Control Structure, La Paz, Abra;
Physical Target: 372.4 Lineal meters;
Allocation: Php 97,746,000.000
Excess: Php 2,254,000.000

February 1, 2023 2022 WIN2E02561 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Soot Flood Control Structure, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Soot Flood Control Structure, La Paz, Abra;
Physical Target: 177 Lineal meters;
Allocation: Php 95,450,000.000
Excess: Php 4,550,000.000
February 1, 2023 2022 WIN2E02555 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra;
Physical Target: 351.8 Lineal meters;
Allocation: Php 99,408,000.000
Excess: Php 592,000.000


February 1, 2023 2022 WIN2E02550 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Poblacion East Flood Control, Pidigan, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Poblacion East Flood Control, Pidigan, Abra;
Physical Target: 127.2 Lineal meters;
Allocation: Php 99,521,000.000
Excess: Php 479,000.000

February 1, 2023 2022 WIN2E02552 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Bañacao Flood Control, Bangued, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Bañacao Flood Control, Bangued, Abra;
Physical Target: 284 Lineal meters;
Allocation: Php 99,807,000.000
Excess: Php 193,000.000
February 1, 2023 2022 WIN2E02551 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Coribot Flood Control Phase 2, Mudeng, La Paz, Abra;
Physical Target: 443.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Coribot Flood Control Phase 2, Mudeng, La Paz, Abra;
Physical Target: 115 Lineal meters;
Allocation: Php 50,000,000.000



February 1, 2023 2022 WIN2E02547 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra;
Physical Target: 444.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra;
Physical Target: 111.8 Lineal meters;
Allocation: Php 50,000,000.000

February 1, 2023 2022 WIN2E02558 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Flood Control Structure, Barangay Isit, Dolores, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Flood Control Structure, Barangay Isit, Dolores, Abra;
Physical Target: 339.2 Lineal meters;
Allocation: Php 97,550,000.000
Excess: Php 2,450,000.000

February 1, 2023 2022 WIN2E02549 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Flood Control Structure, Barangay Mudeng, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Flood Control Structure, Barangay Mudeng, La Paz, Abra;
Physical Target: 232.4 Lineal meters;
Allocation: Php 98,693,000.000
Excess: Php 1,307,000.000

February 1, 2023 2022 WIN2E02557 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra;
Physical Target: 224.8 Lineal meters;
Allocation: Php 97,516,000.000
Excess: Php 2,484,000.000

February 1, 2023 2022 WIN2E02553 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Flood Control Structure, Malabbaga, La Paz, Abra;
Physical Target: 884.642 Lineal meters;
Allocation: Php 100,000,000.000

To: Construction of Flood Control Structure, Malabbaga, La Paz, Abra;
Physical Target: 355.6 Lineal meters;
Allocation: Php 94,723,000.000
Excess: Php 5,277,000.000

February 1, 2023 2022 WIN2E02559 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra;
Physical Target: 265.393 Lineal meters;
Allocation: Php 30,000,000.000

To: Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra;
Physical Target: 98 Lineal meters;
Allocation: Php 29,592,000.000
Excess: Php 408,000.000

January 27, 2023 FY 2022 WIN3F06768 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100199000
Project ID : P00638865LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

FROM:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 2 + 926 - Sta. 3 + 230
Physical Target : CW1- Construction of Concrete Road :
10.556 lane km (l-km)
Allocation : Php 127.400Million

TO:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 014 +050.00 - Sta. 014 + 360.00
Physical Target : CW1- Construction of Road Slope Protection
Structure : 4,580.00 square meter
Allocation : Php 127.400 Million


January 26, 2023 FY 2021 WIN2F06733 UACS No. 320101106342000 March 14, 2022 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101106342000
Project ID.: P00525708LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 6), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 0.00 lm
Unit Cost (P’000) = P 0.00/ l.m.
Allocation (P’000) = P 34,790.00
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 6), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 74.50 lm
Unit Cost (P’000) = P 466.98/ l.m.
Allocation (P’000) = P 34,790.00/l.m.
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00
WIN2F06733
January 26, 2023 CY 2021 WIN3F06735 UACS No. 320101106344000 March 14, 2022 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101106344000
Project ID.: P00525710LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 8), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 0.00 lm
Unit Cost (P’000) = P 0.00/ l.m.
Allocation (P’000) = P 34,790.00
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 8), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 74.50 lm
Unit Cost (P’000) = P 460.7947/ l.m.
Allocation (P’000) = P 34,790.00/l.m.
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00
WIN3F06735
January 26, 2023 CY 2021 WIN3F06734 UACS No. 320101106345000 March 14, 2022 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101106345000
Project ID.: P00525711LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 9), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 0.00 lm
Unit Cost (P’000) = P 0.00/ l.m.
Allocation (P’000) = P 34,790.00
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 9), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 74.50 lm
Unit Cost (P’000) = P 466.98/ l.m.
Allocation (P’000) = P 34,790.00/l.m.
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00
WIN3F06734
January 26, 2023 CY 2021 WIN3F06736 UACS No. 320101106346000 March 14, 2022 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101106346000
Project ID.: P00525712LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 10), Brgy. Dampalit, Malabon City
Physical Target: CW1- Construction of Dike 0.00 lm
Unit Cost (P’000) = P 0.00/ l.m.
Allocation (P’000) = P 34,790.00
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike along Batasan River (Phase 10), Brgy. Dampalit, Malabon City Physical Target: CW1- Construction of Dike 74.50 lm
Unit Cost (P’000) = P 466.98/ l.m.
Allocation (P’000) = P 34,790.00/l.m.
EAO (P’000) = P 710.00
Total (P’000) = P 35,500.00
WIN3F06736
January 16, 2023 2022 WIN2F06531 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Road, Mongol - Bolok Road, Batan, Kabayan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 3.021 Lane Km;
Allocation: Php 30,000,000.00

To: Construction of Road, Mongol - Bolok Road, Batan, Kabayan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 4.980 Lane Km;
Allocation: Php 30,000,000.00

January 16, 2023 2022 WIN2F06530 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Road, Disay Shelpi, Wangal, La Trinidad, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.504 Lane Km;
Allocation: Php 50,000,000.000

To: Construction of Road, Disay Shelpi, Wangal, La Trinidad, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.400 Lane Km;
Allocation: Php 50,000,000.000

January 16, 2023 2022 WIN2F06536 SR2022-03-007807 March 23, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Road, Ambacuan - Orign - La Trinidad Road, Sablan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 7.049 Lane Km;
Allocation: Php 70,000,000.000

To: Construction of Road, Ambacuag - Oring - La Trinidad Road, Sablan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 9.600 Lane Km;
Allocation: Php 70,000,000.000

January 16, 2023 2022 WIN2F06537 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Road, Baay to Crossing Apanberang, Pacso, Kabayan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 5.035 Lane Km;
Allocation: Php 50,000,000.000

To: Construction of Road, Baay to Crossing Apanberang, Pacso, Kabayan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 8.220 Lane Km;
Allocation: Php 50,000,000.000

January 16, 2023 2022 WIN2F06529 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Pines Park to Lubas-Ambiong Road, La Trinidad, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 1.41 Lane Km;
Allocation: Php 14,000,000.000

To: Construction of Pines Park to Lubas-Ambiong Road, La Trinidad, Benguet;
Type of Work: Rehabilitation of Paved Road;
Physical Target: 1.124 Lane Km;
Allocation: Php 14,000,000.000

January 13, 2023 2022 WIN2E02556 SR2022-02-000130 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0228 + 886 - K0228 + 970, K0237 + 529 - K0237 + 777, K0239 + 000 - K0239 + 100;
Physical Target: 26,507.780 Square meters;
Allocation: Php 477,140,000.000

To: Kennon Rd - K0228 + 810 - K0228 + 874, K0237 + 529 - K0237 + 680, K0239 + 395 - K0239 + 480;
Physical Target: 9861.800 Square meters;
Allocation: Php 476,866,000.000
Excess: Php 137,000.000
December 21, 2022 2022 WIN2F06703 FY 2022 GAA December 28, 2021 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Candaba - Sn Miguel Rd - K0074+000 - K0074+120
November 21, 2022 2022 WIN2F06696 FY 2022 GAA November 28, 2021 Region III Regional Office III
Network Development Program - Construction of Flyovers / Interchanges / Underpasses / Long Span Bridges

Hermosa - SCTEX Interchange, Hermosa, Bataan

November 9, 2022 2022 WIN2E02524 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Concrete Revetment including Pump Station, Sadpudon Creek, Carmen, Davao del Sur
Physical Target:
CW1: 60 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Concrete Revetment including Pump Station, Sadpudon Creek, Carmen, Davao del Norte
Physical Target:
CW1: 60 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
October 17, 2022 FY 2022 WIN2XY00069 310204101150000 August 2, 2022 Region IX Regional Office IX
UACS No. 310204101150000
Project ID: P00604249MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Sominot-Dumingag Road, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 0.956 Lane Km
Unit Cost: ₱ 36,465,670.09/Lane km
CW2- Construction of Concrete Bridge
Physical Target: 294.786 square meters
Unit Cost: ₱ 110,296.3485/square meters
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,625,000.00
Allocation: ₱ 75,000,000.00
October 17, 2022 FY 2022 WIN2XY00068 310204101596000 July 20, 2022 Region IX Regional Office IX
UACS No. 310204101596000
Project ID: P00604238MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-pass Road, Widening of Tulungatung Bridge including approaches), Zamboanga City
CW1- Widening of Bridge
Physical Target: 390.186 sq.m.
Unit Cost: ₱ 196,089.92/sq.m.
CW2- Road Widening
Physical Target: 1.16 Lane km
Unit Cost: ₱ 19,352,120.17/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 2,800.00 sq.m.
Unit Cost: ₱ 500.00/sq.m.
EAO: ₱ 3,640,000.00
Total Allocation: ₱ 104,000,000.00
October 17, 2022 FY 2022 WIN2XY00064 310206100068000 July 20, 2022 Region IX Regional Office IX
UACS No. 310206100068000
Project ID: P00603881MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges

Gov. Camins/MCLL Highway and Veterans Ave. Flyover

CW1- Construction of Flyover
Physical Target: 7,659.75 Square Meters
Unit cost: ₱ 16,685.99/Square Meters
ROW- Right of Way Acquisition
Physical Target: 564.65 sq.m.
Unit cost: ₱ 30,000.00/sq.m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
October 17, 2022 FY 2022 WIN2XY00081 310205100833000 July 13, 2022 Region IX Regional Office IX
UACS No. 310205100833000
Project ID: P00603790MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Zamboanga del Sur Coastal Road, Brgy. Biu os-Brgy. Talanusa, Phase 2, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 1.88 Lane Km
Unit Cost: ₱ 46,728,723.40/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.333 sq.m.
Unit Cost: ₱ 346.35/sq.m.
EAO: ₱ 3,605,000.00
Total Allocation: ₱ 103,000,000.00
October 17, 2022 FY 2022 WIN2XY00067 300217100046000 July 20, 2022 Region IX Regional Office IX
UACS No. 300217100046000
Project ID: P00633888MN

Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Preventive Maintenance along Lanao-Pagadian-Zamboanga City Road

CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 2.982 Lane km
Unit Cost: ₱ 16,501,470.56/Lane km
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target: 0.852 Lane km
Unit Cost: ₱ 10,202,599.51/Lane km
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00
October 10, 2022 2022 WIN2XY00102 SR2022-02-000855 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 040 - K0362 + 240, K0386 + 536 - K0387 + 000, K0409 + 600 - K0409 + 765;
Physical Target: 3,333.300 Square meters;
Allocation: Php 60,000,000.000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 080 - K0362 + 140;
Physical Target: 2,190.000 Square meters;
Allocation: Php 60,000,000.000

October 3, 2022 2022 WIN2F06615 FY 2022 GAA December 28, 2021 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Road, Ciudad de Victoria (Phase II), Bocaue, Bulacan
September 29, 2022 FY 2022 WIN2B00921 300215100441000 July 1, 2022 Region IX Regional Office IX
UACS No. 300215100441000
Project ID: P00633756MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road, Camp Andres Tandu Bato Romandier National, Km. 40 + 200 - Km. 41 + 520, Luuk, Sulu


CW1 - Construction of Concrete Road : 2.64 lane km
Unit Cost: P 21,931,818.18 /lane km

EAO: P 2,100,000.00
Allocation: P 60,000,000.00
September 29, 2022 FY 2022 WIN2B00892 300221100054000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221100054000
Project ID: P00630775MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Tabu Bato Access Road from Maimbung - Indanan Road, Barangay Tabo Bato, Maimbung, Sulu

CW1 - Construction of Concrete Road : 0.78 lane km
Unit Cost: P 10,153,846.00 /lane km

EAO: P 800,000.00
Allocation: P 8,000,000.00
September 29, 2022 FY 2022 WIN2B00896 300221100051000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221100051000
Project ID: P00630772MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading to Bud Agad, Barangay Anuling, Patikul, Sulu

CW1 - Construction of Concrete Road : 0.99 lane km
Unit Cost: P 10,000,000.00 /lane km

EAO: P 100,000.00
Allocation: P 10,000,000.00