Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
November 5, 2021 FY2021 WIN1B00715 300117210039000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Darul Jambanganat Brgy. Matatal, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.654 Lane Km.
Unit Cost: 10,596,330.28/lane km.
EAO: Php 70,000.00
Total Allocation: Php 7,000,000.00
November 5, 2021 FY2021 WIN1B00726 300117210040000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Langgal Maas - Anak Jati at Brgy. Matatal and Brgy. Anak Jati, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.700 Lane Km.
Unit Cost: 12,728,571.43/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00
November 5, 2021 FY2021 WIN1B00708 300117210041000 October 26, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Ratag Limbun - Maimbung - Talipao Road, Brgy. Ratag Limbun, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.810 Lane Km.
Unit Cost: 11,000,000.00/lane km.
EAO: Php 90,000.00
Total Allocation: Php 9,000,000.00
November 5, 2021 FY2021 WIN1B01267 300117210044000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Tandu-Bato-Allayon Road, Brgy. Tandu-Bato, Luuk, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.910 Lane Km.
Unit Cost: 10,879,120.88/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 5, 2021 FY2021 WIN1B01187 300117210045000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Improvement/ Upgrading of Road in Jolo, Sulu

CW1: Rehabilitation of Concrete Road
Physical Target: 0.920 Lane Km.
Unit Cost: 10,760,869.57/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 5, 2021 FY2021 WIN1B00710 300117210046000 October 26, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Road at Brgy. Matatal, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.804 Lane Km.
Unit Cost: 12,313,432.84/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 5, 2021 FY2021 WIN1B00724 300119200559000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

Construction of Concrete Footbridge at Brgy. Datu Putih, Sitangkai, Tawi-Tawi

CW1: Construction of Bridge
Physical Target: 205.50 Sq. M.
Unit Cost: Php 24,087.59124/sq.m.
EAO: Php 50,000.00
Total Allocation: Php 5,000,000.00
November 4, 2021 FY2021 WIN1B01275 320101107046000 April 23, 2021 Region IX Regional Office IX
Construction /Maintenance of Flood Mitigation Structure and Drainage System

Improvement of Seawall in Brgy. Bangas (Phase II), Hadji Panglima Tahil, Sulu

CW1: Construction of Flood Mitigation Structure
Physical Target: 228.00 Lineal Meters
Unit Cost: Php 104,202.2487/ln.m.
EAO: Php 240,000.00
Excess: Php 1,887.30
Total Allocation: Php 24,000,000.00
November 4, 2021 FY2021 WIN1B00709 300207100533000 October 26, 2021 Region IX Regional Office IX
Convergence and Special Support Program - Convergence and Special Support - Construction/ Improvement of Various Infrastructure in support of National Security

Naval Station Juan Magluyan (NSJM), Batu-Batu, Tawi-Tawi

CW1: Construction of other Facilities
Physical Target: 1.00 Number of Facilities
Unit Cost: Php 36,075,000.00
EAO: Php 925,000.00
Total Allocation: Php 37,000,000.00
November 4, 2021 FY2021 WIN1B01277 300117209998000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Concreting of Bangungui Road, Bangungui, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.812 Lane Km.
Unit Cost: Php 18,262,857.82/lane km.
EAO: Php 150,000.00
Excess: Php 20,559.45
Total Allocation: Php 15,000,000.00
November 4, 2021 FY2021 WIN1B00718 300117210000000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Tambuanga Road, Brgy. Tubig Samin, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.960 Lane Km.
Unit Cost: Php 10,312,500.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B00716 300117210001000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Lower Tambaking Road, Brgy. Lower Tambaking, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.900 Lane Km.
Unit Cost: Php 11,000,000.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B01188 300117210002000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Road at Poblacion, Maimbung, Sulu

CW1: Rehabilitation of Concrete Road
Physical Target: 0.970 Lane Km.
Unit Cost: Php 10,206,185.57/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 CY 2021 WIN1F05733 UACS No. 3201011066470000 April 8, 2021 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 3201011066470000
Project ID.: P00525836LZ

002: Protect Lives and Properties

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection in Marikina River, Sta. 20+750 –Sta. 20+900, Barangay Bagong Silangan,
Quezon City
Physical Target: CW1 = Construction of Slope Protection Structure = 438.84 sq.m.
Unit Cost (P’000) = P 66.9948 / sq. m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00

As Modified

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection in Marikina River, Sta. 20+400 –Sta. 20+450, Barangay Bagong Silangan,
Quezon City
Physical Target: CW1 = Construction of Slope Protection Structure = 580.00 sq.m.
Unit Cost (P’000) = P 49.35483 / sq. m.
Allocation (P’000) = P 28,625.00
EAO (P’000) = P 584.20
Excess (P’000) = 790.00
Total (P’000) = P 30,000.00
WIN1F05733
November 4, 2021 FY2021 WIN1B01189 300117210003000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road along Maimbung Port, Maimbung Sulu

CW1: Construction of Concrete Road
Physical Target: 0.970 Lane Km.
Unit Cost: Php 10,206,185.57/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B00717 300117210004000 October 29, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road at Brgy. Bualoh, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.934 Lane Km.
Unit Cost: Php 10,599,571.73/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B01183 300117210005000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road at Brgy. Saimbangon, Pata, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.770 Lane Km.
Unit Cost: Php 12,857,142.86/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B01183 300117210005000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road at Brgy. Saimbangon, Pata, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.770 Lane Km.
Unit Cost: Php 12,857,142.86/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 4, 2021 FY2021 WIN1B01183 300117210005000 April 23, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road at Brgy. Saimbangon, Pata, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.770 Lane Km.
Unit Cost: Php 12,857,142.86/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
November 3, 2021 2021 WIN1E01907 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 300117210466000
Project ID: P00551475MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Concreting of Baywalk Road, Brgy. Lacasa, Hinatuan, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.935 Lane Km

Allocation:
TOTAL: P 10,000,000
CW1: P 9,900,000
EAO: P 100,000

Unit Cost:
CW1: P 10,588,235.29/Lane Km

TO:

Concreting of Baywalk Road, Brgy. Lacasa, Hinatuan, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.10 Lane Km
CW2- 178.204 Square meters

Allocation:
TOTAL: P 10,000,000
CW1: P 1,123,186.76
CW2: P 8,654,287.52
EAO: P 99,525.72
Excess: P 123,000

Unit Cost:
CW1: P 11,231,867.60/Lane Km
CW2: P 48,563.95/Square meters
November 3, 2021 FY2021 WIN1B01186 310202100725000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Camp Andres - Lahing-Lahing Rd. Sta 6+490 - Sta 8+170

CW1: Road Widening
Physical Target: 4.440 Lane Km.
Unit Cost: Php 18,139,301.32/lane km.
EAO: Php 2,818,847.42
Excess: Php 642,654.73
Total Allocation: Php 84,000,000.00
November 3, 2021 FY2021 WIN1B01265 310202100728000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Pang - Karungdong Rd. Sta 6+480 - Sta 8+070

CW1: Road Widening
Physical Target: 3.18 Lane Km.
Unit Cost: Php 17,969,967.08/lane km.
EAO: Php 2,000,057.34
Excess: Php 255,447.36
Total Allocation: Php 59,400,000.00
November 3, 2021 FY2021 WIN1B01272 310103100612000 April 23, 2021 Region IX Regional Office IX
Preventive Maintenance - Tertiary Roads

Ungus Matala - Tandubas Rd. Sta 1+000 - Sta 3+440

CW1: Concrete Reblocking
Physical Target: 4.880 Lane Km.
Unit Cost: Php 12,518,602.06/lane km.
EAO: Php 2,223,375.00
Excess: Php 210,846.96
Total Allocation: Php 63,525,000.00
November 3, 2021 FY2021 WIN1B01178 310103100611000 April 23, 2021 Region IX Regional Office IX
Preventive Maintenance - Tertiary Roads

Laum Sicubong - Licud Sicubong Rd. Sta 0+000 - Sta 2+230

CW1: Concrete Reblocking
Physical Target: 4.46 Lane Km.
Unit Cost: Php 13,679,958.60/lane km.
EAO: Php 2,223,375.00
Excess: Php 289,009.65
Total Allocation: Php 63,525,000.00
November 3, 2021 FY2021 WIN1B01174 310105100509000 April 17, 2021 Region IX Regional Office IX
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo - Taglibi - Tiptipon Rd. K0017+000 - K0017+840

CW1: Rehabilitation of Paved Roads
Physical Target: 1.68 Lane Km.
Unit Cost: Php 17,241,773.98/lane km.
EAO: Php 1,013,816.31
Excess: Php 20,003.41
Total Allocation: Php 30,000,000.00
November 3, 2021 FY2021 WIN1B01162 310105100505000 April 17, 2021 Region IX Regional Office IX
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo Port - Bud Daho - Romadier Rd. K0002+700 - K0005+480

CW1: Rehabilitation of Paved Road
Physical Target: 5.560 Lane Km.
Unit Cost: Php 14,751,184.25/lane km.
EAO: Php 2,870,580.45
Excess: Php 112,835.13
Total Allocation: Php 85,000,000.00
November 3, 2021 FY2021 WIN1B01230 310105100510000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitaion/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Romandier - Camp Andres - Tanduh Bato Rd. KM 31+200 - KM 34+580

CW1: Rehabilitation of Paved Road
Physical Target: 6.760 Lane Km.
Unit Cost: Php 17,816,578.72/labe km.
EAO: Php 4,375,000.00
Excess: Php 184,927.87
Total Allocation: Php 125,000,000.00
November 3, 2021 FY2021 WIN1B01232 310105100504000 April 17, 2021 Region IX Regional Office IX
Rehabilitation/ Reconstruction/ Upgrading of Damage Paved Roads - Secondary Roads

Jct Timbangan - Romandier Rd. K0019+000 - K0019+930

CW1: Rehabilitation of Paved Road
Physical Target: 1.86 Lane Km.
Unit Cost: Php 15,574,978.10/lane km.
EAO: Php 1,013,931.07
Excess: Php 16,609.66
Total Allocation: Php 30,000,000.00
November 3, 2021 FY2021 WIN1B01269 300117207671000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Concrete Road at Brgy. Lapa, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 4.450 Lane Km.
Unit Cost: Php 15,668,724.33/lane km.
EAO: Php 700,000.00
Excess: Php 44,238.48
Total Allocation: Php 70,000,000.00
November 3, 2021 FY2021 WIN1B01160 300117207672000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Concrete Road at Brgy. Matatal, Maimbung, Sulu

CW1: Construction of Concrete Road
Physical Target: 3.800 Lane Km.
Unit Cost: Php 15,622,858.46/lane km.
EAO: Php 600,000.00
Excess: Php 33,137.85
Total Allocation: Php 60,000,000.00
November 3, 2021 FY2021 WIN1B01270 300117209999000 May 24, 2021 Region IX Regional Office IX
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Improvement of Tabawan Circumferential Road, South Ubian, Tawi-Tawi

CW1: Construction of Concrete Road
Physical Target: 1.850 Lane Km.
Unit Cost: Php 13,335,483.78/lane km.
EAO: Php 250,000.00
Excess: Php 79,355.01
Total Allocation: Php 25,000,000.00
November 2, 2021 2021 WIN1E01906 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. : 300116203508000
Project ID: P00550688MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Bunawan - Varuela Road (Phase 2), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 10,324,253.15/Lane Km

TO:

Construction of Bunawan - Veruela Road (Phase 2), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1- 1,144.80 Square meters

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 109,582.46/Square meters
October 27, 2021 2021 WIN1E01901 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 320101107199000
Project ID: P00522291MN

OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of River Bank Protection along Hinatuan River, Surigao del Sur

Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 189.901 Lineal meters

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 206,423.35/Lineal meters

TO:

Construction of River Bank Protection along Hinatuan River, Surigao del Sur

Type of Work:
CW1- Construction of Revetment

Physical Target:
CW1- 115 Lineal meters

Allocation:
TOTAL: P 40,000,000
CW1: P 38,963,487.80
EAO: P 796,512.20
Excess: 240,000

Unit Cost:
CW1: P 338,812.94/Lineal meters
October 22, 2021 FY 2021 WIN1C04466 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 310204101441000
Project ID: P00506306LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road (Access Road), Albay
Physical Target: Construction of Concrete Road – 11,359.506 Lane km.
Allocation: Php 50,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road (Access Road), Albay
Physical Target: CW1- Reconstruction of Concrete Pavement – 0.68212 Lane Km
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Allocation: Php 50,000,000.00
October 22, 2021 FY 2021 WIN1C04462 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
ACS No.: 300211100150000
Project ID: P00534723LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy Road K0574+700 – K0575+096, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 6,925 Square meters
Allocation: Php 180,000,000.00

AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy Road K0574+700 – K0574+852, K0575 + 000 – K0575 + 096, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 9,381.76 Square meters
Allocation: Php 180,000,000.00
October 22, 2021 FY 2021 WIN1C04427 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 300116203394000
Project ID: P00561887LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.798 Lane km.
CW2- Construction of Road Slope Protection Structure – 2,059.64 Square meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.7756 Lane km.
CW2- Construction of Road Slope Protection Structure – 2,001.82 Square meters
Allocation: Php 100,000,000.00
October 22, 2021 FY 2021 WIN1C04430 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 300116203395000
Project ID: P00561888LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package III, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.831 Lane km.
CW2- Construction of Road Slope Protection Structure – 2,143,78S quare meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package III, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.7814 Lane km.
CW2- Construction of Road Slope Protection Structure – 2,016.79 Square meters
Allocation: Php 100,000,000.00
October 22, 2021 FY 2021 WIN1C04421 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 300116203396000
Project ID: P00561889LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.746 Lane km.
CW2- Construction of Road Slope Protection Structure – 1,925.37 Square meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco -Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.950 Lane km.
CW2- Construction of Road Slope Protection Structure – 3,142 Square meters
Allocation: Php 100,000,000.00
October 22, 2021 FY 2021 WIN1C04428 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 300116203403000
Project ID: P00561890LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Diamante-Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane km.
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Diamante-Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 1.356 Lane km.
CW2- Construction of Road Slope Protection Structure – 1,074.16 Square meters
Allocation: Php 100,000,000.00
October 22, 2021 FY 2021 WIN1C04412 FY 2021 GAA RA 11518 March 27, 2021 Region V Regional Office V
UACS No.: 300116203424000
Project ID: P00561895LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Zone 2 – Sabang- San Vicente Coastal Road with Shore Protection, Package I, Bulan, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.856 Lane km.
CW2- Construction of Road Slope Protection Structure – 1,618.8 Square meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Zone 2 – Sabang- San Vicente Coastal Road with Shore Protection, Package I, Bulan, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.806 Lane km.
CW2- Construction of Road Slope Protection Structure – 1,497.87 Square meters
Allocation: Php 100,000,000.00
October 21, 2021 FY 2021 WIN1C04444 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310108100641000
Project ID: P00515575LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City – Punta de Jesus Rd – K0535 + 790 – K0535 + 850
Physical Target: CW1- Construction of Road Slope Protection Structure – 0 Square meters
Allocation: Php 40,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City – Punta de Jesus Rd – K0535 + 640 – K0535 + 740
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,410 Square meters
Allocation: Php 40,000,000.00
October 21, 2021 FY 2021 WIN1C02702 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310108100643000
Project ID: P00515577LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City – Punta de Jesus Rd – K0558 + 000 – K0558 + 100
Physical Target: CW1- Construction of Road Slope Protection Structure – 0 Square meters
Allocation: Php 32,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City – Punta de Jesus Rd – K0558 + 000 – K0558 + 220
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,359 Square meters
Allocation: Php 32,000,000.00
October 21, 2021 FY 2021 WIN1C04467 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310108100657000
Project ID: P00515584LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Comun-Inarado-Peñafrancia Rd – K0521 + 318 – K0521 +768, K0521 + 945 – K0522+067
Physical Target: CW1- Construction of Road Slope Protection Structure – 0 Square meters
Allocation: Php 23,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation– Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Comun-Inarado-Peñafrancia Rd – K0521 + 300 – K0521 +768
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,491 Square meters
Allocation: Php 23,000,000.00
October 21, 2021 FY 2021 WIN1C04498 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 320101106812000
Project ID: P00526178LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Flood Control and Lahar Mitigation System (Ground Sill) along Yawa River, Legazpi City
Physical Target: CW1- Construction of Flood Mitigation Structure – 222.998 Lineal Meters
Allocation: Php 50,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Flood Control and Lahar Mitigation System (Ground Sill) along Yawa River, Legazpi City
Physical Target: CW1- Construction of Flood Mitigation Structure – 140 Lineal Meters
Allocation: Php 50,000,000.00
October 21, 2021 FY 2021 WIN1C04456 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 320101106819000
Project ID: P00526185LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Road Dike/Esplande along Cagsawa Tributary “A”, Busay Section, Daraga, Albay
Physical Target: CW1- Construction of Dike – 1,650.089 Lineal Meters
Allocation: Php 50,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Road Dike/Esplande along Cagsawa Tributary “A”, Busay Section, Daraga, Albay
Physical Target: CW1- Construction of Dike – 150 Lineal Meters
Allocation: Php 50,000,000.00
October 21, 2021 FY 2021 WIN1C04494 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 320101106821000
Project ID: P00526187LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Shore Protection along San Francisco Coastal Road, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 222.998 Lineal Meters
Allocation: Php 50,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Flood- Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Shore Protection along San Francisco Coastal Road, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 110 Lineal Meters
Allocation: Php 50,000,000.00
October 21, 2021 FY 2021 WIN1C04463 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 300201100088000
Project ID: P00534524LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Airports – Construction/Improvement of Pawa-Bogtong Bridge leading to Legazpi City Airport, Phase I, Legazpi City, Albay
Physical Target: CW1- Construction of Concrete Bridge – 0 Square Meters
Allocation: Php 60,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Airports – Construction/Improvement of Pawa-Bogtong Bridge leading to Legazpi City Airport, Phase I, Legazpi City, Albay
Physical Target: CW1- Construction of Concrete Bridge – 2,400 Square Meters
Allocation: Php 60,000,000.00
October 21, 2021 FY 2021 WIN1C04477 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 2nd Engineering Office
UACS No.: 320117209306000
Project ID: P00564859LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Drainage/Protection Works – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction/Improvement of Seawall, Poblacion – Gogon, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Drainage Structure along Road – 881.016 Lineal meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program – Flood Control and Drainage – Drainage/Protection Works – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction/Improvement of Seawall, Poblacion – Gogon, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Drainage Structure along Road – 173 Lineal meters
Allocation: Php 100,000,000.00
October 19, 2021 FY 2021 WIN1C04457 FY 2021 GAA RA 11518 March 27, 2021 Region V Catanduanes District Engineering Office
UACS No.: 320109100660000
Project ID: P00516189LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide
- Tertiary Roads – Jct Bato-Baras Rd – K0021 + 980 – K0022 + 000
Physical Target: CW1- Construction of Road Slope Protection Structure – 500 Square meters
Allocation: Php 5,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide
- Tertiary Roads – Jct Bato-Baras Rd – K0022 + 041 – K0022 + 066
Physical Target: CW1- Construction of Road Slope Protection Structure – 312.5 Square meters
Allocation: Php 5,000,000.00
October 19, 2021 FY 2021 WIN1C04484 FY 2021 GAA RA 11518 March 27, 2021 Region V Catanduanes District Engineering Office
UACS No.: 320109100661000
Project ID: P00516190LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide
- Tertiary Roads – Baras – Gigmoto - Viga Rd – K0032 + 200 – K0032 + 220
Physical Target: CW1- Construction of Road Slope Protection Structure – 500 Square meters
Allocation: Php 5,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide
- Tertiary Roads – Baras – Gigmoto - Viga Rd – K0032 + 200 – K0032 + 224
Physical Target: CW1- Construction of Road Slope Protection Structure – 240 Square meters
Allocation: Php 5,000,000.00
October 19, 2021 FY 2021 WIN1C04442 FY 2021 GAA RA 11518 March 23, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310111100307000
Project ID: P00505405LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Masbate - Milagros Rd – K0022 + 435 – K0022 + 683
Physical Target: CW1 - Construction of Drainage Structure along Road – 496 Lineal meters
Allocation: Php 5,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Masbate - Milagros Rd – K0023 + 285 – K0023+ 396
Physical Target: CW1 - Construction of Drainage Structure along Road – 111 Lineal meters
Allocation: Php 5,000,000.00
October 18, 2021 2021 WIN1C04497 GAA 2021 August 27, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Malabbaga Flood Control, La Paz, Abra; Physical Target: CW1: 528.40 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Malabbaga Flood Control, La Paz, Abra; Physical Target: CW1: 472.80 Lineal meters;
Allocation= Php 100,000,000

October 18, 2021 2021 WIN1C04357 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection along Porac River, Paguiruan Section, Floridablanca, Pampanga
October 18, 2021 FY 2021 WIN1C04503 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 1st Engineering Office
UACS No.: 320101106809000
Project ID: P00526175LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction/Extension of San Carlos Seawall, Tabaco City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 206.496 Lineal Meters
Allocation: Php 46,300,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction/Extension of San Carlos Seawall, Tabaco City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 105.56 Lineal Meters
Allocation: Php 46,300,000.00
October 18, 2021 FY 2021 WIN1C04417 FY 2021 GAA RA 11518 March 27, 2021 Region V Albay 1st Engineering Office
UACS No.: 320107201196000
Project ID: P00561812LZ
AS PER GAA:
Local Program - Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Flood mitigation and rehabilitation of river control infrastructures along the Tagas River, Tabaco City, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 150.0 Lineal meters
Allocation: Php 21,250,000.00

AS MODIFIED:
Local Program - Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Flood mitigation and rehabilitation of river control infrastructures along the Tagas River, Tabaco City, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 73.6 Lineal meters
Allocation: Php 21,250,000.00
October 18, 2021 FY 2021 WIN1C04435 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320107201211000
Project ID: P00561827LZ
AS PER GAA:
Local Program - Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction/Improvement of Flood Control River (Phase 2) in Barangay Dalas , Labo, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 126.766 Lineal meters
Allocation: Php 10,000,000.00

AS MODIFIED:
Local Program - Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction/Improvement of Flood Control River (Phase 2) in Barangay Dalas , Labo, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 43.0 Lineal meters
Allocation: Php 10,000,000.00
October 18, 2021 FY 2021 WIN1C04473 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Sur 2nd District Engineering Office
UACS No.: 320102104354000
Project ID: P00526498LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation of Riverwall along Libmanan River within Bicol River Basin, Barangay Uson, Libamanan, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 278.764 Lineal Meters
Allocation: Php 35,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation of Riverwall along Libmanan River within Bicol River Basin, Barangay Uson, Libamanan, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 105.0 Lineal Meters
Allocation: Php 35,000,000.00
October 18, 2021 FY 2021 WIN1C04473 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Sur 2nd District Engineering Office
UACS No.: 320102104354000
Project ID: P00526498LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation of Riverwall along Libmanan River within Bicol River Basin, Barangay Uson, Libamanan, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 278.764 Lineal Meters
Allocation: Php 35,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation of Riverwall along Libmanan River within Bicol River Basin, Barangay Uson, Libamanan, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 105.0 Lineal Meters
Allocation: Php 35,000,000.00
October 18, 2021 FY 2021 WIN1C04502 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Sur 5th District Engineering Office
UACS No.: 320117209306000
Project ID: P00564859LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction of Concrete Drainage/Box Culvert, Cotmo, Bato, Camarines Sur
Physical Target: CW1- Construction of Drainage Structure along Road – 184.24 Lineal meters
Allocation: Php 2,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction of Concrete Drainage/Box Culvert, Cotmo, Bato, Camarines Sur
Physical Target: CW1- Construction of Drainage Structure along Road – 20 Lineal meters
CW2- Reconstruction of Concrete Pavement – 0.13 Lane Km
Allocation: Php 2,000,000.00
October 14, 2021 FY 2021 GAA WIN1F06700 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310109100554000
Project ID : P00515583LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads

FROM :

Dr. Damian Reyes Rd (Boac Side),
K0017 + 000 - K0017 + 117,
K0017 + 280 - K017 + 415
Physical Target - CW1 - Construction of Road Slope Protection :
2,488.107 Square Meter
Allocation - Php 113.00 Million

TO :

Dr. Damian Reyes Rd (Boac Side)
K0017 + 000 - K0017 + 117,
K0017 + 280 - K0017 + 415
Physical Target - CW1 - Construction of Road Slope Protection :
5,359.00 Square Meter
Allocation - Php 113.00 Million
October 14, 2021 FY 2021 GAA WIN1F06336 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203410000
Project ID : P00561891LZ

LOCAL PROGRAM

Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Parang - Palhi - Sapul - Bayanan Bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0 Lane Km
Allocation - Php 90.00 Million

TO :

Construction of - Parang - Palhi - Sapul - Bayanan Bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.844 Lane Km
Allocation - Php 90.00 Million
October 14, 2021 FY 2021 GAA WIN1F06704 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310306100186000
Project ID : P00516214LZ

001 : Ensure Safe and Reliable National Road System

Bridge Construction of New Bridges

FROM :

Lumintao Bridge (Parallel Bridge) along
Mindoro West Coastal Road
Physical Target - CW1 - Construction of Parallel Bridge :
0 Square Meters
Allocation - Php 180.00 Million

TO :

Luintao Bridge (Parallel Bridge) along
Mindoro West Coastal Road
Physical Target - CW1 - Construction of Parallel Bridge :
1,717.20 Square Meters
Allocation - Php 180.00 Million
October 14, 2021 FY 2021 GAA WIN1F06693 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310202100702000
Project ID : P00515586LZ

001 : Ensure Safe and Reliable National Road System

Network Development And Program - Road Widening -
Secondary Roads

FROM :

Marinduque Ciecumferential Road
K0016 + 000 - K0018 + 000,
K0018 + 000 - K0021 + 000
Physical Target - CW1 - Road Widening : 10.048 Lane Km
Allocation - Php 250.200 Million

TO :

Marinduque Circumferential Road
K0016 + 000.00 - K0018 + 351.00
Physical Target - CW1 - Road Widening : 4.734 Lane Km
Allocation - Php 250.200 Million
October 14, 2021 FY 2021 GAA WIN1F06574 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300117209169000
Project ID : P00564722LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM :

Construction of Slope Protection along
Calapan South Road
K0128+ (-008) + K0128 + 278.50,
Bongabong, Oriental Mindoro
Physical Target - Construction of Road Slope Protection Structure:
0 Square Meters
Allocation - Php 50.00 Million

TO :

Construction of Slope Protection along
Calapan South Road
K0119 + 200 - K0119 + 287,
Bongabong, Oriental Mindoro
Physical Target - Construction of Road Slope Protection Structure :
2,284.36 Square Meters
Allocation - Php 50.00 Million

October 13, 2021 2021 WIN1F06106 SR2021-09-012565 September 14, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1116 + 900 - K1117 + 100

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: square meters
EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1116 + 782 - K1116 + 900

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 5,633.69 square meters
EAO P 5.250 M

Total P 150.00 M
October 13, 2021 2021 WIN1EO2215 SR2021-09-012563 September 14, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1040+571 - K1040+640

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 125.450 M
Structure: square meters
EAO P 4.550 M

Total P 130.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1040+571 - K1040+660, K1009 +630 – K1009 +684

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 125.450 M
Structure: 6,307.99 square meters
EAO P 4.550 M

Total P 130.00 M
October 13, 2021 2021 WIN1F06104 SR2021-09-012564 September 14, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 200 - K1069 + 600

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: square meters
EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 300 - K1069 + 440

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 7,028.40 square meters
EAO P 5.250 M

Total P 150.00 M
October 13, 2021 2021 WIN1F06136 SR2021-09-012771 September 18, 2021 Region VIII Regional Office VIII
Convergence and Special Support Program

Special Road Fund-Motor Vehicle User’s Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance – Secondary Roads – Allen-Catarman Rd - K0717+478 - K0717+780, K0717+804 - K0717+658, K0719+693 - K720+264, K0720+284 - K0720+460, K0720+480 - K0721+000, K0722+604 - K0722+681, K0722+751 - K0723+000, (S00005SM), Northern Samar

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: Lane Km

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Preventive Maintenance – Secondary Roads – Allen-Catarman Rd - K0717+478 - K0717+780, K0717+804 - K0719+658, K0719+693 - K0720+264, K0720+284 - K0720+460, K0720+480 - K0721+000, K0722+604 - K0722+681, K0722+751 - K0723+000, (S00005SM), Northern Samar

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: 7.508 Lane Km

EAO P 3.500 M

Total P 100.00 M
October 11, 2021 FY 2021 GAA WIN1E02767 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Sasa Creek Outfall, Davao City
Physical Target:
CW1: 250.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Sasa Creek Outfall, Davao City
Physical Target:
CW1: 235.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
October 8, 2021 FY 2021 GAA WIN1F06580 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310107100212000
Project ID : P00516152LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide -
Primary Roads

FROM :

Itabiak - San Vicente Road, Palawan
K0169 + 013 - K0169 + 143
Physical Target - CW1 - Construction of Road Slope Protection :
9,984.00 Square Meters
Allocation - Php 99.840 Million

TO :

Itabiak - San Vicente, Palawan
K0169 + 000 - K0169 + 181
Physical Target - CW1 - Construction of Road Slope Protection :
4,520.00 Square Meters
Allocation - Php 99.840 Million
October 8, 2021 FY 2021 GAA WIN1F06575 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 310107100215000
Project ID : P00516155LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide -
Primary Roads

FROM :

Itabiak - San Vicente Road, Palawan
K0170 + 353 - K0173 + 433
Physical Target - CW1 - Construction of Road Slope Protection :
7,776.00 Square Meters
Allocation - Php 77.760 Million

TO :

Itabiak - San Vicente Road, Palawan
K0170 + 300 - K0170 + 580
Physical Target - CW1 - Construction of Road Slope Protection :
3,293.00 Square Meters
Allocation - Php 77.760 Million
October 8, 2021 FY 2021 GAA WIN1F06581 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 30010620057500
Project ID : P00561448LZ

LOCAL PROGRAM


Local - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Taguis Flood Control along
Looc (Cogon - Tulay) Odiongan Road, Brgy Progreso Este,
Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
0.00 Lineal Meter
Allocation - Php 90.00 Million

TO :

Construction of Tuguis Flood Control along
Loc (Cogon-Tulay) Odiongan Riad, Brgy. Progreso Este,
Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
439.00 Lineal Meter
Allocation - Php 90.00 Million
October 8, 2021 FY 2021 GAA WIN1F06696 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310205100569000
Project ID : P00506147LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Bulalacao - San jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.28 Lane Km
- CW2 - Construction of Concrete Bridge :
286.20 Square Meter
- CW3 - Construction of Concrete Bridge :
286.20 Square Meter
Allocation - Php 100.00 Million

TO :

Bulalacao - San Jose (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.4824 Lane Km
- CW2 - Construction of Concrete Bridge :
580.03 Square Meter
Allocation - Php 100.00 Million
October 4, 2021 FY 2021 WIN1E02438 310103100752000 April 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310103100752000
Project ID : P00501737MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

RT Lim Blvd - K1940 + 2056 - K1940 + 2209

CW1 - Preventive Maintenance of Road: Asphalt Overlay : 0.306 lane-km
Unit Cost : P 7,722,438.27 /lane-km
EAO : P 49,900.00
EXCESS : P 82,033.89
Allocation : P 2,495,000.00
October 4, 2021 FY 2021 WIN1E02758 310305101418000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310305101418000
Project ID : P00502328MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Latap Br. (New) (B01770MN) along Zamboanga City-Labuan-Limpapa Rd

CW1 - Widening of Bridge : 179.734 sq.m.
Unit Cost : P 113,412.04 /sq.m.

ROW Acquisition : 1,800 sq.m.
Unit Cost : P 1,111.11 /sq.m.

EAO : P 416,000.00
Allocation : P 22,800,000.00
October 4, 2021 FY 2021 WIN1E02572 310204101370000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101370000
Project ID : P00502119MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City

CW1 - Construction of Concrete Road : 1.18 lane-km
Unit Cost : P 30,557,728.01 /lane-km

ROW Acquisition : 11,800.00 sq.m.
Unit Cost : P 155.93 /sq.m.

EAO : P 735,880.00
Allocation : P 38,634,000.00
October 4, 2021 FY 2021 WIN1E02361 310103100749000 April 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310103100749000
Project ID : P00501735MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Edwin Andrews Airbase Rd - Chainage 0 - Chainage 250

CW1- Preventive Maintenance of Road: Asphalt Overlay : 0.50 lane-km
Unit Cost : P 7,783,620.20 /lane-km

EAO : P 80,920.00
EXCESS : P 73,269.00
Allocation : P 4,046,000.00
October 4, 2021 FY 2021 WIN1E02590 300117210083000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210083000
Project ID : P00551092MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Damaged Paved Roads, Barangay Culianan, Zamboanga City

CW1 - Rehabilitation of Concrete Road : 0.80 lane-km
Unit Cost : P 4,874,734.375/ lane-km

EAO : P 40,000.00
EXCESS : P 60,212.50
Allocation : P 4,000,000.00
October 4, 2021 FY 2021 WIN1E02506 300117210082000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210082000
Project ID : P00551091MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Damaged Paved Roads, Barangay Cabaluay, Zamboanga City

CW1 - Rehabilitation of Concrete Road : 0.7546 lane-km
Unit Cost : P 5,152,051.259 /lane-km

EAO : P 40,000.00
EXCESS : P 72,262.12
Allocation : P 4,000,000.00
October 4, 2021 FY 2021 WIN1E02620 320101107051000 June 3, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101107051000
Project ID : P00522143MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Shoreline Protection, Sinunuc Section, Zamboanga City

CW1 - Construction of Flood Mitigation Structure : 213.10 ln.m.
Unit Cost : P 211,543.8761 /ln.m.

EAO : P 920,000.00
Allocation : P 46,000,000.00
October 4, 2021 FY 2021 WIN1E02751 320101107052000 June 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101107052000
Project ID : P00522144MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection, Sitio Uwak River, San Roque, Zamboanga City

CW1 - Construction of Flood Mitigation Structure : 266.96 ln.m.
Unit Cost : P 18,354.81 /ln.m.

EAO : P 100,000.00
Allocation : P 5,000,000.00
October 4, 2021 FY 2021 WIN1E02540 320101107050000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101107050000
Project ID : P00522142MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Shoreline Protection, San Ramon Section, Talisayan, Zamboanga City

CW1 - Construction of Flood Mitigation Structure : 350.36 ln.m.
Unit Cost : P 139,856.14796 /ln.m.

EAO : P 1,000,000.00
EXCESS : P 50,000,000.00
October 4, 2021 FY 2021 WIN1E02717 300117210048000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210048000
Project ID : P00551057MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road at Camp Abendan, Barangay Mercedes, Zamboanga City

CW1 - Construction of Concrete Road : 0.7577 lane-km
Unit Cost : P 13,065,221.58

EAO : P 100,000.00
EXCESS : P 481.61
Allocation : P 10,000,000.00
October 4, 2021 FY 2021 WIN1G02965 300117210049000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210049000
Project ID : P00551058MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Access Road at Sitio Anuling, Pamucutan to Sta.Rita in support of High Value Crops, Barangay Upper La Paz, Zamboanga City

CW1 - Construction of Concrete Road : 0.528 lane-km
Unit Cost : P 75,000,000.00

EAO : P 400,000.00
Allocation : P 40,000,000.00
October 4, 2021 FY 2021 WIN1E02546 320101107049000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101107049000
Project ID : P00522141MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Shoreline Protection, Limpapa Section, Zamboanga City

CW1 - Construction of Flood Mitigation Structure : 317.55 ln.m.
Unit Cost : P 145,048.02 /ln.m.

EAO : P 940,000.00
Allocation : P 47,000,000.00
October 4, 2021 FY 2021 WIN1E02547 320101107048000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101107048000
Project ID : P00522140MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Shoreline Protection, Ayala Section, Zamboanga City

CW1 - Construction of Flood Mitigation Structure : 295.80 ln.m.
Unit Cost : P 155,713.32 /ln.m.

EAO : P 940,000.00
Allocation : P 47,000,000.00
October 4, 2021 FY 2021 WIN1E02634 310204101373000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101373000
Project ID : P00509754MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

NRJ Sangali Bypass Road, Zamboanga City

CW1 - Construction of Concrete Road : 1.1366 lane-km
Unit Cost : P 11,886,764.73 /lane-km

ROW Acquisition : 10,800.00 sq.m.
Unit Cost : P 555.56 /sq.m.

EAO : P 280,000.00
EXCESS : P 209,503.21
Allocation : P 20,000,000.00
October 4, 2021 FY 2021 WIN1E02464 300117210084000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210084000
Project ID : P00551093MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Damaged Paved Roads, Barangay Mampang, Zamboanga City

CW1 - Rehabilitation of Concrete Road : 0.508 lane-km
Unit Cost : P 5,404,101.575 /lane-km

EAO : P 30,000.00
EXCESS : P 224,716.40
Allocation : P 3,000,000.00
October 4, 2021 FY 2021 WIN1E02498 300117210085000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117210085000
Project ID : P00551094MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Damaged Paved Roads, Barangay Pasobolong, Zamboanga City

CW1 - Rehabilitation of Concrete Road : 0.40 lane-km
Unit Cost : P 4,429,522.175 /lane-km

EAO : P 20,000.00
EXCESS : P 208,191.13
Allocation : P 2,000,000.00
October 4, 2021 FY 2021 WIN1E02793 300107201306000 June 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300107201306000
Project ID : P00550566MN

Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Construction of Revetment along Limpapa River, Barangay Limpapa, Zamboanga City

CW1 - Construction of Revetment : 82.36 ln.m.
Unit Cost : P 293,181.85 /ln.m.

CW2 - Construction of Concrete Road : 0.165 lane-km
Unit Cost : P 33,657,835.09 /lane-km

EAO : P 300,000.00
Allocation : P 30,000,000.00
October 1, 2021 FY 2021 GAA WIN1F06557 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No.: 300117209168000
Project ID : P00564721LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM :

Construction of Road Slope Protection along
Calapan South Road
K0127 + 553.50 - K0127 + 642.30,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0 square meter
Allocation - Php 50.00 Million

TO :

Construction of Road Slope Protection along
Calapan South Road,
K0118 + 080 - K0118 + 208,
K0118 + 240 - K0118 + 267,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,174.32 square meter
Allocation - Php 50.00 Million
October 1, 2021 FY 2021 GAA WIN1F06578 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203456000
Project ID : P00561898LZ

LOCAL PROGRAM

Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Santa Fe - Guinbirayan Road (Section 1),
Santa Fe, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0 square meters
Allocation - Php 90.00 Million

TO :

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Santa Fe - Guinbirayan Road (Section 1),
Santa Fe, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,314 square meters
Allocation - Php 90.00 Million
October 1, 2021 FY 2021 GAA WIN1F06577 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203457000
Project ID : P00561899LZ

LOCAL PROGRAM

Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Santa Fe - Guinbirayan Road (Section 2),
Santa Fe, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0 square meters
Allocation - Php 90.00 Million

TO :

Rahabilitation/Reconstruction of Roads with Slips,
Slope Collapse, and Landslide along
Santa Fe - Guinbirayan Road (Section 2),
Santa Fe, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,332 square meters
Allocation - Php 90.00 Million
October 1, 2021 FY 2021 GAA WIN1F06552 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203726000
Project ID : P00561994LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Naujan to Pola Bypass Road - Melgar B
to Montelago to Montemayor,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0 Lane Km
Allocation - Php 100.00 Million

TO :

Construction of Naujan to Pola Bypass Road - Melgar B
to Montelago to Montemayor,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.08 Lane Km
Allocation - Php 100.00 Million
October 1, 2021 FY 2021 GAA WIN1F06586 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310107100210000
Project ID : P00516150LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Primary Roads

FROM :

Itabiak - San Vicente Road, Palawan
K0166 + 278 - K0166 + 478
Physical Target - CW1 - Construction of Road Slope Protection :
9,840.0 square meters
Allocation - Php 98.40 Million

TO :

Itabiak - San Vicente Road, Palawan
K0166 + 260 - K0166 + 480
Physical Target - CW1 - Construction of Road Slope Protection :
4,491.00 Square meters
Allocation - 98.40 Million

October 1, 2021 FY 2021 GAA WIN1F06554 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310108100519000
Project ID : P00516173LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Secondary Roads

FROM :

Puerto Princesa South Road,
K0034 + 008 - K0034 + 180,
K0034 + 450 - K0034 + 610,
K0035 + 000 - K0035 + 260,
K0035 + 265 - K0035 + 370
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0.00 Square meters
Allocation - Php 100.00 Million

TO :

Puerto Princesa South Road,
K0034 + 060 - K0034 + 100,
K0034 + 440 - K0034 + 480,
K0034 + 580 - K0034 + 660,
K0035 + 020 - K0035 + 127
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,136.00 Square meters
Allocation - Php 100.00 Million
September 30, 2021 FY 2021 WIN1E02759 310201100689000 June 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310201100689000
Project ID : P00501403MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1885 + 000 - K1886 + 188

CW1 - Road Widening : 2.334 lane-km
Unit Cost : P 13,930,346.11/lane-km

CW2 - Construction of Drainage Structure along Road : 1,167.0 ln. m.
Unit Cost : P 4,859.47 /ln. m.

ROW Acquisition : 23,690.0 sq.m.
Unit Cost : P 1,283.27 /sq.m.

EAO : P 1,384,927,34
Allocation : P 69,970,000.00
September 30, 2021 FY 2021 WIN1E02592 310204101372000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101372000
Project ID : P00502117MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

NRJ Sangali By-Pass Road (Victoria-Sangali Section), Zamboanga City

CW1 - Construction of Concrete Road : 0.40 lane-km
Unit Cost : P 29,267,732.48 /lane-km

ROW Acquisition : 8,800 sq.m
Unit Cost : P 347.0439489 /sq.m.

EAO: P 238,920.26
Allocation : P 15,000,000.00
September 30, 2021 FY 2021 WIN1E02564 310204101371000 May 13, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101371000
Project ID : P00502118MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

NRJ Boalan - Tugbungan Diversion Road, Zamboanga City

CW1 - Construction of Concrete Road : 0.620 lane-km
Unit Cost : P 17,896,629.39 /lane-km

ROW Acquisition : 5,120.00 sq.m
Unit Cost : P 683.59375 /sq.m.

EAO: P 238,920.26
EXCESS : P 174,089.78
Allocation : P 15,000,000.00
September 30, 2021 FY 2021 WIN1E02662 310104100325000 June 17, 2021 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310104100325000
Project ID : P00501740MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Pagadian City-Zamboanga City Rd - K1857 + 528 - K1858 + 803, K1860 + 000 - K1860 + 437

CW1 : Reconstruction to Concrete Pavement : 3.418 lane-km
Unit Cost : P 9,339,356.38 /lane-km

EAO : P 667,280.00
EXCESS : P 774,799.89
Allocation : P 33,364,000.00