Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 10, 2022 FY 2022 GAA WIN2G02821 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100818000
Project ID : P00609335LZ

001 : Asset Preservation - Preventive Maintenance

FROM :

Puerto Princesa North Road
K0257+000 - K0262+546
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 11.07 Lane Km
Allocation - Php 108.017 Million

TO :

Puerto Princesa North Road
K0257+000 - K0261+812
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.60 Lane Km
Allocation - Php 108.017 Million
May 6, 2022 2022 WIN2C03540 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0997 + 814 - K0998 + 400

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.156 Lane Km

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0997 + 814 - K0999 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.575 Lane Km

EAO P 0.300 M

Total P 15.00 M
May 6, 2022 2022 WIN2C03543 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 485 - K1040 + 935

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 3.920 M
along Road: 450 Lineal meters

EAO P 0.080 M

Total P 4.00 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 488 - K1040 + 578, K1041 + 924 – K1042 + 085, K042 + 843 – K1043 + 115

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 3.920 M
along Road: 437 Lineal meters

EAO P 0.080 M

Total P 4.00 M
May 6, 2022 2022 WIN2C03531 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1055 + 757.17 - K1056 + 115, K1058 + 000 - K1058 + 167

Physical Target: Allocation:

CW1-Road Widening: 0.976 Lane Km P 12.7155 M

EAO P 0.2595 M

Total P 12.975 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1049 + 729 - K1049 + 927, K1054 + 836 - K1055 + 080

Physical Target: Allocation:

CW1-Road Widening: 0.796 Lane Km P 8.5709796 M

CW2-Construction of Road Slope Protection P 4.1445204 M
Structure: 1,121 Square meters

EAO P 0.2595 M

Total P 12.975 M
May 6, 2022 2022 WIN2C03530 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply

AS PER GAA/ORIGINAL:

Construction of Level III Water Supply System, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Level III Water Supply System, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 6.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M
May 6, 2022 2022 WIN2C03533 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 315, K1053 + 887 - K1055 + 711, K1056 + 000 - K1056 + 070

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 4.409 Lane Km

EAO P 0.480 M

Total P 24.00 M

AS MODIFIED:

Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 305, K1053 + 382 - K1053 + 829, K1054 + 000 - K1055 + 019

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 3.152 Lane Km

EAO P 0.480 M

Total P 24.00 M
May 6, 2022 2022 WIN2C03541 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services


AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building , Bato, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 7.920 M
: 1.00 Number of Buildings

EAO P 0.080 M

Total P 8.00 M

AS MODIFIED:

Construction of Multi-Purpose Building , Bato, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 7.920 M
: 2.00 Number of Buildings

EAO P 0.080 M

Total P 8.00 M
May 6, 2022 FY 2022 GAA WIN2G2893 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100878000
Project ID : P00604386LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Construction of Road Slope Protection Structure -
Calapan North Road
K0042+720 - K0042+820,
K0042+880 - K0043+100
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 16,050 square meter
Allocation - Php 160.500 Million

TO :

Construction of Road Slope Protection Structure -
Calapan North Road
K0042+740 - K0042+1008,
K0043+060 - K0043+170
Physical Target - CW1 - Construction of Road Slope protection
Structure : 7,612 square meter
Allocation - Php 160.500 Millionn
May 6, 2022 FY 2022 GAA WIN2G02866 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100985000
Project ID : P00606202LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0012+180 - K0014+000
Physical Target - CW1 - Road Widening : 3.854 Lane Km
Allocation - Php 80.00 Million

TO :

Puerto Princesa South Road
K0012+180 - K0013+780
Physical Target - CW1 - Road Widening : 3.408 Lane Km
Allocation - Php 80.00 Million
May 6, 2022 FY 2022 GAA WIN2G02820 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202101129000
Project ID : P00606203LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0014+000 - K0014+853
Physical Target - CW1 - Road Widening : 1.706 Lane Km
Allocation - Php 35.00 Million

TO :

Puerto Princesa South Road
K0013+967 - K0014+740
Physical Target - CW1 - Road Widening : 1.552 Lane Km
Allocation - Php 35.00 Million
May 6, 2022 FY 2022 GAA WIN2G02915 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :310202100966000
Project ID : P00606270LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Marinduque Circumferential Road
K0039+633 - K0042+000
Physical Target - CW1 - Road Widening : 4.630 Lane Km
Allocation - Php 105.00 Million

TO :

Marinduque Circumferential Road
K0039+000 - K0041+359
Physical Target - CW1 - Road Widening : 4.718 Lane km
- CW2 - Road Safety - Pavement Markings :
4.718 Lane Km
Allocation - Php 105.00 Million

May 6, 2022 FY 2022 GAA WIN2G02849 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :310202100978000
Project ID : p00606273LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road
K0128+000 - K0131+870
Physical Target - CW1 - Road Widening : 7.766 Lane Km
Allocation - Php 116.490 million

TO :

Puerto Princesa North Road
K0128+000 - K0131+150
Physical Target - CW1 - Road Widening : 6.326 Lane Km
Allocation - Php 116.490 Million
May 6, 2022 FY 2022 GAA WIN2G02838 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100980000
Project ID : P00606275LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road
K0142+841 - K0147+000
Physical Target - CW1 - Road Widening : 8.342 Lane Km
Allocation - Php 125.130 million

TO :

Puerto Princesa North Road
K0142+961 - K0146+065
Physical Target - CW1 - Road Widening ; 6.236 Lane Km
Allocation - Php 125.130 Million
May 6, 2022 FY 2022 GAA WIN2G02830 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100982000
Project ID : P00606280LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road,
K0166+000 - K0166+097,
K0166+108 - K0166+509,
K0166+1306 - K0168+087,
K0166+534 - K0166+1295,
K0168+109 - K0168+666,
K0168+681 - K0170+000
Physical Target - CW1 - Road Widening ; 7.920 lane Km
Allocation - Php 118.800 Million

To :

Puerto Princesa North Road

K0166+000 - K0166+084,
K0166+152 - K0166+496,
K0166+632 - K0166+1274,
K0166+1335 - K2168+065,
K0168+137 - K0168+544,
K0168+799 - K0169+563
Physical Target - CW1 - Road Widening : 6.002 Lane km
Allocation - Php 118.800 million
May 6, 2022 2022 WIN2C03554 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0966 + 100 - K0967 + 193, K0967 + 209 - K0969 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 11.592 Lane Km

EAO P 2.0286 M

Total P 57.960 M

AS MODIFIED:

Daang Maharlika (LT) - K0966 + 100 - K0967 + 188, K0967 + 217 - K0967 + 980

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 7.412 Lane Km

EAO P 2.0286 M

Total P 57.960 M
May 6, 2022 2022 WIN2C03552 SR2022-03-007313 March 23, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0978 + 200 - K0978 + 400, K0979 + 300 - K0979 + 500, K1001 + 850 -K1002 + 100, K1002 + 800 - K1002 + 939

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Daang Maharlika (LT) – K1000 + 888 – K1000 + 920, K1002 + 810 – K1002 + 939

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,044.70 Square meters
EAO P 3.500 M

Total P 100.00 M
May 6, 2022 2022 WIN2C03553 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 1,686 Square meters

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 600 Square meters

EAO P 0.600 M

Total P 30.00 M
May 6, 2022 FY 2022 GAA P00608155LZ DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100569000
Project ID : P00608155LZ

001: Ensure Safe and Reliable National Road System

Network Development - Construction of missing Links/New Roads

FROM :

Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
5.73 Lane Km
Allocation - Php 86.00 Million

TO :

Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
3.72 Lane Km
- CW2 - Construction of New Bridge :
286.20 sq.m.
- CW3 - Construction of New Bridge :
238.50 sq.m.
Allocation - Php 86.00 Million


May 6, 2022 FY 2022 GAA WIN2G02935 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100816000
Project ID : P00608161LZ

001: Ensure Safe and Reliable national Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Victoria Sablayan (Mindoro Cross Island Road), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.392 Lane Km
- CW2 - Construction of Concrete Bridge :
678.771 square meter
Allocation - Php 150.00 Million

TO :

Victoria Sablayan ( Mindoro Cross Island Road ), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.202 Lane Km
- CW2 - Construction of Concrete Bridge :
1,863.456 square meter
Allocation - Php 150.00 Million
May 6, 2022 FY 2022 GAA WIn2G02938 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No, ; 310205100814000
Project ID : P00608164LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
5.102 lane Km
Allocation - 50.00 Million

To :

Sofronio Espanola -Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
7.730 Lane Km
Allocation - Php 50.00 Million
May 6, 2022 2022 WIN2F06310 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A Castañeda - Ma Aurora - San Luis Rd - K0207+658 - K0208+000
May 6, 2022 2022 WIN2F06315 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0276+168.70 - K0276+241.00 , K0276+253.00 - K0276.+298.20, K0276+529.10 - K0276+580.00, K0276+623.20 - K0276+872.90, K0277+174.50 - K0277+220.00, K0277+325.90 - K0277+348.50, K0277+943.00 - K0277+954.00, K0278+474.20 - K0278+508.30, K0278+607.40 - K0278+689.00, K0278+708.15 - K0278+75810, K0278+902.80 - K0278+946.50, K0279+208.5 - K0279+450.20, K0279+842.50 - K0280+000.00, K0280+000.00 - K0280+150.00, K0280+272.80 - K0280+340.80 (Left Side)
K0276+000.00 - K0276+241.00, K0276+253.00 - K0276+740.00, K0276+800.00 - K0277+300.00, K0277+375.70 - K0277+511.70, K0277+529.30 - K0277+562.40, K0277+574.20 - K0277+742.10, K0277+746.00 - K0277+911.90, K0277+942.90 - K0277+954.00, K0278+000.00 - K0278+246.30, K0278+260.00 - K0278+265.50, K0278+300.00 - K0278+688.00, K0278+708.40 - K0278+775.00, K0278+792.00 - K0278+811.90, K0278+834.20 - K0278+845.30, K0278+854.60 - K0278+882.20, K0278+940.00 - K0279+000.00, K0279+000.00 - K0279+029.90, K0279+058.90 - K0279+171.20, K0279+188.10 - K0279+226.20, K0279+258.20 - K0279+310.00, K0279+320.60 - K0279+809.50, K0279+840.50 - K0279+910.70, K0279+921.10 - K0280+000.00, K0280+000.00 - K0280+075.90, K0280+097.40 - K0280+101.50, K0280+114.90 - K0280.324.70, K0280+336.90 - K0280+437.00 (Right Side)
00
May 5, 2022 FY 2022 GAA WIN2G02677 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310202101131000
Project ID : P00606206LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0039+698 - K0040+000\
K0044+846 - K0045+108
Physical Target - CW1 - Road Widening : 1.136 lane km
Allocation - Php 20.00 million

TO :

Puerto Princesa South Road
K0039+698 - K0040+000
K0045+700 - K0046+000
Physical Target - CW1 - Road Widening : 1.204 lane km
Allocation - Php 20.00 million
May 5, 2022 FY 2022 GAA WIN2G02819 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310202100987000
Project ID : P00606207LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0046+000 - K0047+364
Physical Target - CW1 - Road Widening - 2.638 Lane Km
Allocation - Php 55.00 Million

TO :

Puerto Princesa South Road
K0046+000 - K0047+300
K0047+440 - K0047+522
Physical Target - CW1 - Road Widening : 20674 Lane Km
Allocation - Php 55.00 Million
May 5, 2022 FY 2022 GAA WIN2G02755 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 320102104630000
Project ID : P00620901LZ

002 : Protect Lives and Properties

Flood Management - Construction/Maintenance of Mitigation Structures and Drainage

FROM :

Construction of Flood Mitagation Structure -
Iraan River Waterways Phase 3,
Sta. 0+000 - Sta. 0+642
Aborlan, Palawan
Physical Target - CW1 - Flood Management : 751 lineal meters
Allocation - Php 100.00 Million

TO :

Construction of Flood Mitigation Structure,
Iraan River Waterways Phase 3,
Left Bank, Sta. 0+000 - Sta. 0+380,
Right Bank, Sta. 0+107 - Sta. 0+364,
Upper Left Bank Sta. 0+389 - Sta. 0+503
Aborlan, Quezon
May 5, 2022 2022 WIN2E02294 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300215100603000
Project ID: P00630140MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.400 Lane Km

Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000

Unit Cost:
CW1: P 46,239,583.33/ Lane Km

TO:

Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 4.800 Lane Km

Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000

Unit Cost:
CW1: P 23,119,791.67/ Lane Km
May 5, 2022 FY 2022 WIN2E02290 310104100361000 March 23, 2022 Region IX Regional Office IX
UACS No. 310104100361000
Project ID: P00601146MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1860 + 000 - K1860 + 996.62, K1862 + 041.88 - K1863 + 044.99, K1872 + 980.21 - K1878 + 100
CW1- Reconstruction to Concrete Pavement
Physical Reserved: 14.24 Lane Km
Unit Cost: ₱ 7,454,353.93
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 WIN2E02295 310204101594000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101594000
Project ID: P00604234MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section), Phase II, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 5.159 Lane Km
Unit Cost: ₱ 18,317,503.39
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Total Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 GAA WIN2G02715 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310105100701000
Project ID : P00603928LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0114+652 - K0114+850
Physical Target - CW1 - Reconstruction of Concrete
Pavement : 0.396 Lane Km
Allocation - Php 5.950 Million

TO :

Tablas Circumferential Road
K0114+652 - K0114+786.50
Physical Target - CW1 - Reconstruction to Concrete
Pavement : 0.269 Lane Km
Allocation - Php 5.950 Million
May 5, 2022 FY 2022 WIN2E02289 310204101578000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101578000
Project ID: P00604241MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Zamboanga City Package 3, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 0.958 Lane km
Unit Cost: ₱ 77,770,116.63
CW2- Construction of Concrete Bridge
Physical Reserved: 198.81 sq.m.
Unit Cost: ₱ 100,579.59
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 WIN2E02292 310204101582000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101582000
Project ID: P00604248MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Labangan - Pagadian City - Dumalinao By-Pass Road, Zamboanga Del Sur
CW1- Construction of Concrete Road
Physical Reserved: 7.44 Lane Km
Unit Cost: ₱ 12,352,150.54
ROW- Right-Of-Way Acquisition
Physical Reserved: 16,666.666 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
May 5, 2022 FY 2022 GAA WIN2G02717 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310105100702000
Project ID : P00603929LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0124+884 - K0125+000
K0125+300 - K0126+521
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.688 Lane Km
Allocation - Php 48.810 Million

To :

Tablas Circumferential Road
K0124+884.00 - K0125+000
K0125+860.73 - K0126+716
K0126+818.86 - K0126+900
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.12082 Lane Km
Allocation - Php 48.810 Million
May 5, 2022 FY 2022 GAA WIN2G02837 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. ; 310105100699000
Project ID : P00603930LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Sibuyan Circumferential Road
K0091+427 - K0092+033
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.242 Lane Km
Allocation - Php 22.530 Million

TO :

Sibuyan Circumferential Road
K0091+427 - K0092+151
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.478 Lane Km
Allocation - 22.530 Million
May 5, 2022 FY 2022 GAA WIN2G02763 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310111100427000
Project ID : P00604075LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0013+093 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 600.00 lineal meters
Allocation - Php 5.00 Million

TO :

Tablas Circumferential Road
K0013+154 - K0013+484,
K0013+570 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 453.00 lineal meters
Allocation - Php 5.00 Million

May 5, 2022 FY 2022 GAA WIN2G02758 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 320101107509000
Project ID : P00620263LZ

002 : Protect Lives and Properties

Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+000 - Sta. 0+363.50
Sta. Maria Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million

TO :

Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+271 - Sta. 0+698 (R/S),
Sta. 0+470 - Sta. 0+510(L/S),
Sta. 0+525 - Sta. 0+700(L/S),
Sta. Maria, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million

May 5, 2022 FY 2022 GAA WIN2G02767 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300214100247000
Project ID : P00635995LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239

Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0001+350 - K0001+365
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.974 lane km
Allocation - Php 22.00 Million

TO :

Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0005+938.90 - K0005+980.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 328.22 square meters
Allocation - Php 22.00 Million
May 5, 2022 FY 2022 GAA WIN2G02835 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310111100426000
Project ID : P00604076LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads

FROM :

Tablas Circumferential Road
K0002+991 - K0003+792,
K0005+309.50 - K0005+835,
K0006+919 - K0007+054,
K0008+703 - K0009+103.50,
K0009+117 - K000-+324
Physical Target - CW1 - Construction of Drainage Structure
along Road ; 2,053.00 lineal meters
Allocation - Php 9.996 million

To :

Tablas Circumferential Road
K0002+997 - K0003+799,
K0006+919 - K0007+053,
K0008+703 - K0009+121
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,358.00 lineal meters
Allocation - Php 9.996 Million
May 5, 2022 FY 2022 GAA WIN2G02712 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 310105100694000
Project ID : P00603919LZ

001 : Ensure Safe and Reliable national Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads

FROM ;

Jct, MWCR - San Jose Airport - Jct. Bubog Road
K0238+000 - K0238+216
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.432 Lane Km
Allocation - Php 7.396 Million

TO :

Jct. MWCR - San Jose Airport - Jct. Bubog Road
K0238+(-226) - K0238+289
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.030 Lane Km
Allocation - Php 7.396 Million
May 5, 2022 FY 2022 GAA WIN2G02757 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320101108176000
Project ID : P00620653LZ

002 : Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers -
Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure -
Patrick River, Lagnas Section,
Sta. 0+000 - Sta. 0+471,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m
Allocation - Php 50.00 million

TO :

Construction of Flood Control Structure -
Patrick River, Lagnas Section
Sta. 0+000 - Sta. 0+390
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m.
Allocation - Php 50.00 Million

May 5, 2022 2022 WIN2E02239 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105117000
Project ID: P00620293MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+010.00 R/S, Brgy. Azpetia, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 620.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 72,710.00/Lineal meters

TO:

Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+540.00 R/S, Sta. 0+000.00 – Sta. 0+080.00 L/S, Brgy. Azpetia, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 620.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 72,710.00/Lineal meters
May 5, 2022 2022 WIN2E02252 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105119000
Project ID: P00620295MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+160.00, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.400 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 108,261.29/Lineal meters

TO:

Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+350 Upstream, Sta. 0+000.00 - Sta. 0+066.40 Downstream, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.400 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 108,261.29/Lineal meters
May 4, 2022 FY 2022 GAA WIN2G02631 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310202100968000
Project ID : P00606271LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Marinduque Circumferential Road
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 1.852 Lane Km
Allocation - Php 60.00 Million

TO :

Road Widening - Marinduque Circumferential Road
K0046+704 - K0047+589,
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 3.644 Lane Km
Allocation - Php 60.00 Million
May 4, 2022 FY 2022 GAA Win2G02718 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100808000
Project ID : P00611462LZ

001 ; Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads -


FROM :

Construction of Missing Links/New Roads
- Dr. Damian Reyes Memorial Road,
Sta. 32+150 - Sta. 33+150
Physical Target - CW1 - Construction of Concrete Road :
1.122 lane km
Allocation - Php 97.80 million

TO :

Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 35+940 - Sta. 36+890
Physical Target - CW1 - Construction of Gravel Road :
1.900 Lane Km
Allocation - Php 97.80 Million



May 4, 2022 FY 2022 GAA WIN2G02793 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100809000
Project ID : P00611463LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing Links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 33+150 - Sta. 34+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - Php 99.50 Million

TO :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road,
Sta. 36+890 - Sta. 37+860
Physical Target - CW1 - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million
May 4, 2022 FY 2022 GAA WIN2G02750 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100810000
Project ID : P00611464LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 34+150 - Sta. 35+150
Physical Target - CW1 - Construction of Concrete Road ;
1.141 lane km
Allocation - Php 99.50 Million

TO :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 37+860 - Sta. 38+830
Physical Target - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million

May 4, 2022 FY 2022 GAA WIN2G02632 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 300215100229000
Project ID : P00630097LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

FROM ::

Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million

TO :

Construction of Dampulan - Malibago Road
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million
May 4, 2022 FY 2022 GAA WIN2G02746 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100811000
Project ID : P00611465LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 35+150 - Sta. 36+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - 99.50 Million

TO :

Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 38+830 - Sta. 39+800
Physical Target - Construction of gravel Road :
1.940 lane km
Allocation - Php 99.50 Million

May 4, 2022 FY 2022 GAA WIN2G02843 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 1st District Engineering Office
UACS No. : 310203100511000
Project ID : P00606199LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

Road Widening - Coron - Busuanga Road
K0049+000 - K0050+000
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 2.014 lane km
Allocation - Php 34.50 Million

TO :

Road Widening - Coron-Busuanga Road
K0041+461.50 - K0042+000.00
K0047+383.00 - K0047+585.00
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 1.427 lane km
Allocation - Php 34.50 Million
May 4, 2022 FY 2022 GAA WIN2G02855 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 1st District Engineering Office
UACS No. : 310203100512000
Project ID : P00606284LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

Road Widening - Coron - Busiuanga Road
K0059+458 - K0059+823
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 0.730 lane km
Allocation - Physical Target - 8.934 Million

TO :

Road Widening - Coron - Busuanga Road
K0059+458.00 - K0059+707.00
Physical Target - CW1 - Road Widening : 0.498 lane km
Allocation - Php 8.934 Million
May 4, 2022 FY 2022 GAA WIN2G02818 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310108100888000
Project ID : P00604399LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, slope Collapse, and Landslide
- Secondary Roads


FROM :

PPSR Jct -Napsan - Apurawan Road,
K0048+005 - K0048+175
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,250 square meters
Allocation - Php 85.00 Million

TO :

PPSR Jct - napsan - Apurawan Road
K0048+005 - K0048+335
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,701 square meters
Allocation - Php 85.00 Million
May 4, 2022 FY 2022 GAA WIN2G02782 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310202100986000
Project ID : P00606205LZ

001 : Ensure Safe and Reliable national Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Puerto Princesa South Road
K0036+529 - K0038+000
Physical Target - CW1 - Road Widening : 2.948 lane km
Allocation - Php 60.00 Million

To :

Road Widening - Puerto Princesa South Road
K0036+529 - K0037+498
Physical Target - CW1 - Road Widening : 1.938 lane km
Allocation - Php 60.00 Million
May 4, 2022 2022 310109100967000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure and Safe Reliable National Road System - Rehabilitation /Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads

Construction od Road Slope Protection Structure - Port Irene Access Road - K0263+157 - K0623+457
May 3, 2022 2022 WIN2F06316 SR2022-02-000120 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0292 + 880, K0292 + 961 - K0297 + 000;
Physical Target: 45.332 Lane Km;
Allocation: Php 250,000,000.000

To: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0288 + 980;
Physical Target: 27.664 Lane Km;
Allocation: Php 250,000,000.000

May 3, 2022 2022 WIN2F06291 SR2022-03-007584 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0293 + 020 - K0293 + 300;
Physical Target: 15,000.000 Square meters;
Allocation: Php 270,000,000.000

To: Benguet-Nueva Vizcaya Rd - K0293 + 010 - K0293 + 245;
Physical Target: 10,950.000 Square meters;
Allocation: Php 270,000,000.000

May 3, 2022 2022 WIN2F06252 SR2022-02-001726 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0264 + 370, K0265 + 200 - K0281 + 920;
Type of Work: Road Safety: Pavement Markings;
Physical Target: 64.309 Lane Km;
Allocation: Php 80,000,000.000

To: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0268 + 000, K0269 + 000 - K0277 + 780;
Type of Work: Road Safety: Street Lighting;
Physical Target: 17.616 Km;
Allocation: Php 80,000,000.000

May 3, 2022 2022 WIN2F06301 SR2022-03-007639 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0456 + 100 - K0456 + 200;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0456 + 100 - K0456 + 200;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

May 3, 2022 2022 WIN2F06287 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra;
Physical Target: 404.000 Lineal meters;
Allocation: Php 50,000,000.000

May 3, 2022 2022 WIN2F06348 SR2022-03-007578 March 23, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads;
Project Description: along Claveria - Calanasan Road KO663+275 - KO663+376;
Physical Target: 3,888.890 Square meters;
Allocation: Php 70,000,000.000

To: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads;
Project Desciption: Claveria-Calanasan-Kabugao Road - K0663+275 - K0663+376;
Physical Target: 3,599.500 Square meters;
Allocation: Php 70,000,000.000

May 3, 2022 2022 WIN2F06318 SR2022-03-007580 March 23, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads;
Project Description: along Claveria - Calanasan Road KO662+423 - KO662+667;
Physical Target: 3,333.330 Square meters;
Allocation: Php 60,000,000.000

To: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads;
Project Desciption: Claveria-Calanasan-Kabugao Road - K0662+423 - K0662+667;
Physical Target: 3,212.500 Square meters;
Allocation: Php 60,000,000.000
May 3, 2022 2022 WIN2F06233 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+710, K0262+900, K0263+090, K0264+250, K0264+620;
Physical Target: 2,800.000 Lineal Meters;
Allocation: Php 20,000,000.000

To: Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+900, K0263+090, K0264+170 - K0264+280, K0264+552;
Physical Target: 1,631.000 Lineal Meters;
Allocation: Php 20,000,000.000

May 3, 2022 2022 WIN2F06339 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio - Bontoc Rd - K0336 + 400 - K0339+200;
Physical Target: 5.584 Lane Km;
Allocation: Php 35,000,000.000

To: Baguio - Bontoc Rd - K0336 + 400 - K0339+285;
Physical Target: 5.754 Lane Km;
Allocation: Php 35,000,000.000


May 3, 2022 2022 WIN2F06236 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Gov. Bado Dangwa National Rd - K0338+600 - K0338+731;
Type of Work: CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.131 Lane Km
CW2: 242 Square meters;
Allocation: Php 6,000,000.000

To: Gov. Bado Dangwa National Rd - K0343+498 - K0344+000;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 1.048 Lane Km;
Allocation: Php 6,000,000.000

May 3, 2022 2022 WIN2F06238 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0297+144 - K0297+163, K0298+902 - K0298+908, K0298+924 - K0298+952;
Physical Target: 272.000 Square meters;
Allocation: Php 2,700,000.000

To: Baguio-Bontoc Rd - K0297+144 - K0297+200, K0298+924 - K0298+952;
Physical Target: 325 Square meters;
Allocation: Php 2,700,000.000

May 3, 2022 2022 WIN2F06340 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0313+625 - K0313+649, K0315+605 - K0315+710, K0315+900 - K0315+927, K0320+780 - K0320+815, K0322+285 - K0322+300, K0328+900 - K0328+915;
Physical Target: 2,755.000 Square meters;
Allocation: Php 16,000,000.000

To: Baguio-Bontoc Rd - K0313+589 - K0313+649, K0315+661 - K0315+710, K0315+900 - K0315+933, K0320+780 - K0320+830, K0322+270 - K0322+305, K0328+900 - K0328+921;
Physical Target: 1456 Square meters;
Allocation: Php 16,000,000.000

May 3, 2022 2022 WIN2F06292 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Gov. Bado Dangwa National Rd - K0279+659 - K0279+674, K0280+275 - K0280+310, K0292+141 - K0292+156, K0292+466 - K0292+511, K0293+074 - K0293+109, K0299+454 - K0299+489, K0300+824 - K0300+859, K0304+027 - K0304+067;
Physical Target: 1,630.000 Square meters;
Allocation: Php 19,000,000.000

To: Gov. Bado Dangwa National Rd - K0299+454 - K0299+489, K0304+027 - K0304+067;
Physical Target: 789 Square meters;
Allocation: Php 19,000,000.000

May 3, 2022 2022 WIN2F06234 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Cong. Andres Acop Cosalan Rd - K0354+580 - K0354+581, K0355+400 - K0355+401,K0362+230 - K0362+233;
Physical Target: 660.000 Lineal meters;
Allocation: Php 8,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0355+400 - K0355+401,K0362+230 - K0362+233;
Physical Target: 475 Lineal meters;
Allocation: Php 8,000,000.000

May 3, 2022 2022 WIN2F06251 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0309+800 - K0313+000;
Type of Work: Rehabilitation / Major Repair of Drainage Structure along Road;
Physical Target: 3,960.000 Lineal meters;
Allocation: Php 40,000,000.000

To: Baguio-Bontoc Rd - K0309+088 - K0309+500, K0309+800 - K0311+350, K0312+040 - K0312+855, K0313+015 - K0313+780, K0314+180 - K0315+030, K0315+146 - K0315+958, K0316+292 - K0316+661 , K0317+560 - K0317+609;
Type of Work: Construction of Drainage Structure along Road;
Physical Target: 2828 Lineal meters;
Allocation: Php 40,000,000.000

May 3, 2022 2022 WIN2F06237 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Cong. Andres Acop Cosalan Rd - K0364+000 - K0365+865;
Physical Target: 1,900.000 Square meters;
Allocation: Php 15,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0365+000 - K0365+679;
Physical Target: 1697.500 Square meters;
Allocation: Php 15,000,000.000

May 3, 2022 2022 WIN2F06249 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Multi-Purpose Building at Toludan Elementary School, Barangay Cattubo, Atok, Benguet;
Physical Target: 1.000 Number of Building;
Allocation: Php 7,000,000.000

To: Construction of Multi-Purpose Building at Rufino Alawas Elementary School, Barangay Cattubo, Atok, Benguet;
Physical Target: 1.000 Number of Building;
Allocation: Php 7,000,000.000


May 3, 2022 2022 WIN2F06256 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 0.989 Lane Km;
Allocation: Php 10,000,000.000

To: Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Norte, Buguias, Benguet;
Physical Target: 0.989 Lane Km;
Allocation: Php 10,000,000.000

May 3, 2022 2022 WIN2F06232 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Balbalan-Pinukpuk Rd - K0517 + 274 - K0517 + 308, K0522 + 830 - K0522 + 862 ;
Physical Target: 650.000 Square meters;
Allocation: Php 9,500,000.000

To: Balbalan-Pinukpuk Rd - K0522 + 830 - K0522 + 866 ;
Physical Target: 559.800 Square meters;
Allocation: Php 9,500,000.000

May 3, 2022 2022 WIN2F06266 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668,K0515 + 233 - K0515 + 280 ;
Physical Target: 449.000 Square meters;
Allocation: Php 5,500,000.000

To: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668, K0502 + 752 - K0502 + 763, K0513 + 172 - K0513 + 211;
Physical Target: 597.000 Square meters;
Allocation: Php 5,500,000.000

May 3, 2022 2022 WIN2F06297 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 461 - K0512 + 472, K0514 + 169 - K0514 + 207, K0518 + 645 - K0518 + 695, K0536 + 808 - K0536 + 833, K0542 + 621 - K0542 + 658;
Physical Target: 1,385.000 Square meters;
Allocation: Php 16,500,000.000

To: Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 333 - K0512 + 408, K0527 + 254 - K0527 + 274, K0532 + 637 - K0532 + 687, K0532 + 795 - K0532 + 840;
Physical Target: 1,220.000 Square meters;
Allocation: Php 16,500,000.000

May 3, 2022 2022 WIN2F06243 SR2022-02-001457 DTD February 4, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga ;
Physical Target: 866.617 Lineal meters;
Allocation: Php 60,000,000.000

To: Construction of Mega Dike Project along Chico River Sta. 92 + 230 - Sta. 92 + 830 (Right Bank), Tabuk City, Kalinga ;
Physical Target: 600.000 Lineal meters;
Allocation: Php 60,000,000.000

May 3, 2022 2022 WIN2F06269 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0395 + 935 - K0396 + 574;
Physical Target: 1.324 Lane Km;
Allocation: Php 22,255,000.000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0396 + 223 - K0396 + 800;
Physical Target: 1.154 Lane Km;
Allocation: Php 22,255,000.000

May 3, 2022 2022 WIN2F06242 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1830 - Chainage 2265;
Physical Target: 0.435 Lane Km;
Allocation: Php 9,570,000.000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1340 - Chainage 1640;
Physical Target: 0.600 Lane Km;
Allocation: Php 9,570,000.000

May 3, 2022 2022 WIN2F06260 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3015 - Chainage 4015;
Physical Target: 1.000 Lane Km;
Allocation: Php 22,000,000.000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3415 - Chainage 4015;
Physical Target: 1.200 Lane Km;
Allocation: Php 22,000,000.000

April 29, 2022 FY 2022 WIN2E02244 310201100901000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100901000
Project ID: P00602313MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd - K1900 + 583 - K1902 + 820, K1902 + 990.00 - K1903 + 736.00
CW1- Road Widening
Physical Target: 5.966 Lane Km
Unit Cost: ₱ 16,568,172.54/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 24,347.61 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,850,000.00
Total Allocation: ₱ 110,000,000.00
April 29, 2022 FY 2022 WIN2E02250 310201100910000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100910000
Project ID: P00602314MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Sindangan-Liloy Rd - K1935 + 000 - K1935 + 240, K1935 + 500 - K1937 + 611.90, K1938 + 393.00 - K1938 + 895.65, K1942+500.00 - K1942+860.00
CW1- Road Widening
Physical Target: 6.429 Lane Km
Unit Cost: ₱ 15,411,171.91/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 7,372.786 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,673,740.00
Total Allocation: ₱ 104,964,000.00
April 29, 2022 FY 2022 WIN2E02246 310211100086000 March 23, 2022 Region IX Regional Office IX
UACS No. 310211100086000
Project ID: P00602318MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads

Liloy-Siocon Rd - K2034 + 005.00 - K2034 + 779.68, K2035 + 218.50 - K2037 + 020.00
CW1- Paving of Unpaved Roads
Physical Target: 5.152 Lane Km
Unit Cost: ₱ 19,054,013.63/Lane Km
EAO: ₱ 3,570,000.00
Excess: ₱ 263,721.76
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02182 310201100898000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100898000
Project ID: P00602320MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1879 + 000 - K1882 + 000
CW1- Road Widening
Physical Target: 6.000 Lane Km
Unit Cost: ₱ 13,866,245.97/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 60,425.08 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,675,000.00
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02202 310202101024000 March 23, 2022 Region IX Regional Office IX
UACS No. 310202101024000
Project ID: P00602322MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1864 + 000 - K1866 + 800
CW1- Road Widening
Physical Target: 5.600 Lane Km
Unit Cost: ₱ 16,297,413.70/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.333 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,675,000.00
Excess: ₱ 59,483.26
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02176 310201100905000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100905000
Project ID: P00602324MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1710 + 100.00 - K1712 + 960.00
CW1- Road Widening
Physical Target: 5.72 Lane Km
Unit Cost: ₱ 15,450,405.45/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.333 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 53,680.84
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02213 310212100201000 March 22, 2022 Region IX Regional Office IX
UACS No. 310212100201000
Project ID: P00602331MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads

Zamboanga del Sur Coastal Rd - (S01186MN) Chainage 10653.00 - Chainage 13640.00
CW1- Paving of Unpaved Roads
Physical Target: 5.97 Lane Km
Unit Cost: ₱ 15,393,634.84/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02218 310201100903000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100903000
Project ID: P00602333MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1789 + 738 - K1790 + 500.00, K1790 + 720.00 - K1791 + 864.00, K1793 + 100.00 - K1793 + 870.00, K1794 + 215.00 - K1795 + 240.00, K1795 + 500.00 - K1795 + 800.00
CW1- Road Widening
Physical Target: 8.00 Lane Km
Unit Cost: ₱ 11,468,101.76/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 21,666.667 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 185,185.96
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02238 310205100731000 March 22, 2022 Region IX Regional Office IX
UACS No. 310205100731000
Project ID: P00603740MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga Del Norte
CW1- Construction of Concrete Road
Physical Target: 2.34 Lane Km
Unit Cost: ₱ 27,500,000.00/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.667 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,555,000.00
Excess: ₱ 1,095,000.00
Total Allocation: ₱ 73,000,000.00
April 29, 2022 FY 2022 WIN2E02222 310204101595000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101595000
Project ID: P00604237MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-pass Road, (Widening of San Ramon Bridge including approaches), Zamboanga City
CW1- Widening of Bridge
Physical Target: 437.886 sq.m.
Unit Cost: ₱ 219,006.77/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 3,333.333 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02224 320101107686000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107686000
Project ID: P00620010MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section (B00549MN) (Downstream Rightside) along Pagadian City - Zamboanga City Road (S01453MN), Brgy. Bogayo, Kumalarang, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 448.00 Lineal Meters
Unit Cost: ₱ 216,294.65/Lineal Meters
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02249 320101107689000 March 23, 2022 Region IX Regional Office IX
UACS No. 320101107689000
Project ID: P00620013MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Rebokon River, Rebokon Bridge Section along Zamboanga del Sur Coastal National Road (S01101MN), Brgy. Rebokon, Dumalinao, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 267.50 Lineal Meters
Unit Cost: ₱ 254,828.54/Lineal Meters
EAO: ₱ 2,472,365.00
Total Allocation: ₱ 70,639,000.00
April 29, 2022 FY 2022 WIN2E02207 320101107693000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107693000
Project ID: P00620017MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Tukuran River, Militar Br. Section (B00470MN) (Upstream - Right Side), along Jct. Tukuran - Jct. Karomatan Road (S01103MN), Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 610.00 Lineal Meters
Unit Cost: ₱ 163,524.59/Lineal Meters
EAO: ₱ 3,675,000.00
Excess: ₱ 1,575,000.00
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02225 320101106250000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101106250000
Project ID: P00620022MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Extension of Flood Control Structure along Siocon River (Upstream), Siocon, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure
Physical Target: 470.00 Lineal Meters
Unit Cost: ₱ 204,058.70/Lineal Meters
ROW- Right-Of-Way Acquisition
Physical Target: 141.368 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,535,000.00
Excess: ₱ 1,515,000.00
Total Allocation: ₱ 101,000,000.00
April 29, 2022 FY 2022 WIN2E02192 310108100968000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310108100968000
Project ID No.: P00601378MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Zamboanga City - Labuan - Limpapa Rd - K1973 + 218.74 - K1973 + 282.45, K1973 + 940 - K1974 + 030, K1974 + 535 - K1974 + 580.53, K1974 + 740 - K1974 + 784.13
CW1- Construction of Road Slope Protection Structure
Physical Target: 2,236.76 sq.m.
Unit Cost: ₱ 23,519.66479/Sq.m.
EAO: ₱ 2,100,000.00
Excess: ₱ 5,292,154.59
Total Allocation: ₱ 60,000,000.00
April 29, 2022 FY 2022 WIN2E02242 310204101786000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101786000
Project ID: P00604480MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-Pass Road Package 2, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 2 Lane km
Unit Cost: ₱ 20,895,198.33/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 5,000 sq.m.
Unit Cost: ₱ 1,440.00/sq.m.
EAO: ₱ 1,000,000.00
Excess: ₱ 9,603.36
Total Allocation: ₱ 50,000,000.00
April 29, 2022 FY 2022 WIN2E02211 310204101787000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101787000
Project ID: P00604481MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-Pass Road Package 3, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 2 Lane km
Unit Cost: ₱ 20,137,042.27/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 6,055 sq.m.
Unit Cost: ₱ 1,440.00/sq.m.
EAO: ₱ 1,000,000.00
Excess: ₱ 5,915.45
Total Allocation: ₱ 50,000,000.00
April 29, 2022 FY 2022 WIN2E02195 310110100330000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310110100330000
Project ID: P00601320MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Dipolog - Oroquieta National Rd - K1831 + 440 - K1831 + 967.7

CW1 - Construction of Drainage Structure along Road: 519.56 l.m.
Unit Cost: P 13,664.21/l.m.
ROW: 1,714.55 sq.m.
Unit Cost: P 1,608.95/sq.m
EAO: P 141,987.57
Allocation: P 10,000,000.00
April 29, 2022 FY 2022 WIN2E02107 310110100331000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310110100331000
Project ID: P00601321MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Dipolog - Oroquieta National Rd - K1834 + 190.09 - K1834 + 807.72

CW1 - Construction of Drainage Structure along Road: 883.17 l.m.
Unit Cost: P 11,509.88/l.m.
ROW: 1,478.40 sq.m.
Unit Cost: P 1,748.00/sq.m
EAO: P 203,303.61
Allocation: P 12,953,000.00
April 29, 2022 FY 2022 WIN2E02051 310109100907000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310109100907000
Project ID: P00601382MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Sindangan - Bayog - Lakewood Rd (S01059MN)
Chainage 10542.2 - Chainage 10650,
Chainage 11244.8 - Chainage 11347

CW1- Construction of Slope Protection Structure
Physical Target: 11,483.13 sq.m.
Unit Cost: ₱ 5,126.22/Sq.m.
EAO: ₱ 2,135,000.00
Total Allocation: ₱ 61,000,000.00
April 29, 2022 FY 2022 WIN2E02200 310203100523000 March 30, 2022 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 310203100523000
Project ID: P00602301MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Sindangan - Bayog - Lakewood Rd - K1734 + 422 - K1735 + 000, K1735 + 362 - K1736 + 000, K1736 + 559 - K1737 + 288

CW1- Road Widening
Physical Target: 3.89 Lane Km
Unit Cost: ₱ 15,075,334.19/Lane km
EAO: ₱ 2,126,950.00
Total Allocation: ₱ 60,770,000.00
April 29, 2022 FY 2022 WIN2E02251 300217100042000 March 22, 2022 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300217100042000
Project ID: P00633884MN

CSSP: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Preventive Maintenance along Imelda-Bayog-Kumalarang-Margosatubig Rd. K1751 + (-602) - K1752 + 430.5

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 4.065 lane-km
Unit Cost : P 16,617,466.17/lane-km
EAO : P 2,450,000.00
Allocation : P 70,000,000.00
April 29, 2022 FY 2022 WIN2E02187 310106100824000 March 23, 2022 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310106100824000
Project ID: P00601164MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Crossing Sta. Clara - Sandayong Rd - K1796 + 050 - K1796 + 098

CW1 : Reconstruction to Concrete Pavement
Physical Target: 0.096 lane-km
Unit Cost : P 20,416,666.67/lane-km
EAO : P 40,000.00
Allocation : P 2,000,000.00