September 14, 2022 |
2022 |
WIN2F06353 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100316000
Project ID: P00638953LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Del Rosario - Tablon Road, Ligao City/Oas, Albay
Physical Target: CW1 - Construction of Concrete Road - 1.51 Lane Km
Allocation (Php): 250,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Del Rosario - Tablon Road, Ligao City/Oas, Albay
Physical Target: CW1 - Construction of Gravel Road - 3.63774 Lane Km
CW2 - Construction of Road Slope Protection Structure - 25699.58 Square meters
|
September 14, 2022 |
2022 |
WIN2F06516 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100317000
Project ID: P00638954LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Doña Mercedez - Palanas Road, Guinobatan/Ligao City, Albay
Physical Target: CW1 - Construction of Concrete Road - 15.79736 Lane Km
CW2 - Construction of Drainage Structure along Road - 6961.34 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 14942.5 Square meters
Allocation (Php): 250,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Doña Mercedez - Palanas Road, Guinobatan/Ligao City, Albay
Physical Target: CW1 - Construction of Concrete Road - 5.61868 Lane Km
CW2 - Construction of Drainage Structure along Road - 3528.02 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1650.24 Square meters
|
September 14, 2022 |
2022 |
WIN2F06363 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100318000
Project ID: P00638955LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Flores - Abella Road, Ligao City, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.6 Lane Km
CW2 - Construction of Drainage Structure along Road - 2003.2 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 14544.38 Square meters
Allocation (Php): 110,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Flores - Abella Road, Ligao City, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.12 Lane Km
CW2 - Construction of Gravel Road – 4.4 Lane Km
CW3 - Construction of Road Slope Protection Structure – 1125.2 Square meters
|
September 14, 2022 |
2022 |
WIN2F06499 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300217100029000
Project ID: P00639281LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Lidong to Quirangay Road, Sto. Domingo/Camalig, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.600 Lane Km
Allocation (Php): 129,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Lidong to Quirangay Road, Sto. Domingo/Camalig, Albay
Physical Target: CW1 - Construction of Concrete Road - 8.22094 Lane Km
CW2 - Construction of Road Slope Protection Structure - 4569.54 Square meters
|
September 14, 2022 |
2022 |
WIN2F06512 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300217100030000
Project ID: P00639282LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Miisi - Lidong Road, Daraga/Sto. Domingo, Albay
Physical Target: CW1 - Construction of Concrete Road – 6 Lane Km
Allocation (Php): 99,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Miisi - Lidong Road, Daraga/Sto. Domingo, Albay
Physical Target: CW1 - Construction of Concrete Road - 1.83612 Lane Km
CW2 - Construction of Road Slope Protection Structure - 3634.62 Square meters
CW3 - Construction of Drainage Structure along Road - 1197.07 Lineal meters
|
September 14, 2022 |
2022 |
WIN2F06462 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300217100031000
Project ID: P00639283LZ
AS PER GAA: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Road, Miisi - Bonga - Buyoan - Lidong, Daraga, Daraga/Legazpi City/Sto. Domingo, Albay
Physical Target: CW1 - Construction of Concrete Road - 14.99 Lane Km
CW2 - Construction of Road Slope Protection Structure - 28016.8 Square meters
CW3 - Construction of Drainage Structure along Road – 14990 – Lineal meters
Allocation (Php): 299,000,000
AS MODIFIED: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Road, Miisi - Bonga - Buyoan - Lidong, Daraga, Daraga/Legazpi City/Sto. Domingo, Albay
Physical Target: CW1 - Construction of Concrete Road - 6.57168 Lane Km
CW2 - Construction of Road Slope Protection Structure - 9302.79 Square Km
CW3 - Construction of Drainage Structure along Road - 4489.44 Lineal meters
CW4 - Construction of Dike – 177.2 Lineal meters
|
September 12, 2022 |
2022 |
WIN2F06445 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310108200373000
Project ID: P00561199LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Drainage/Protection Works – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Seawall, Municipality of Caramoan, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 208 Square meters
Allocation: Php 30,000,000.00
AS MODIFIED:
Local Program – Flood Control and Drainage – Drainage/Protection Works – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Seawall, Municipality of Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 208 Square meters
Allocation: Php 30,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06517 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310111100435000
Project ID: P00604142LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Roads –Secondary Roads Jct Catanduanes Cir Rd – Panganiban – Sabluyon Rd – K0060 + 000 – K0061 + 443
Physical Target: CW1 – Construction of Drainage Structure along Road – 1,527 Linear meters
Allocation: Php 20,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Roads –Secondary Roads Jct Catanduanes Cir Rd – Panganiban – Sabluyon Rd – K0060 + 000 – K0061 + 443
Physical Target: CW1 – Construction of Drainage Structure along Road – 567 Linear meters
Allocation: Php 20,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06440 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310208100440000
Project ID: P00606425LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Secondary Roads – Catanduanes Cir Rd – K0008 + 000 – K0010 + 625
Physical Target: CW1 – Off-Carriageway Improvement: Shoulder Paving/Construction – 3599 Square meter
Allocation: Php 15,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Secondary Roads – Catanduanes Cir Rd – K0008 + 000 – K0010 + 625
Physical Target: CW1 – Off-Carriageway Improvement: Shoulder Paving/Construction – 3639 Square meter
Allocation: Php 15,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06505 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300211100088000
Project ID: P00609358LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads – Secondary Roads – Jct Catanduanes Cir Rd-Panganiban Sabloyon Rd – K0081 + 400 – K0082 + 372
Physical Target: CW1 – Paving of Unpaved Roads – 0.958 Lane Km
Allocation: Php 40,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads – Secondary Roads – Jct Catanduanes Cir Rd-Panganiban Sabloyon Rd – K0081 + 973– K0082 + 372
Physical Target: CW1 – Paving of Unpaved Roads – 0.77 Lane Km
Allocation: Php 40,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06375 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310108101158000
Project ID: P00611272LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Catanduanes Cir Rd – K0012 + 600 – K0012 + 620, K0012 + 800 – K0012 + 820
Physical Target: CW1 – Construction of Road Slope Protection Structure – 277.78 Square meters
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Catanduanes Cir Rd – K0012 + 600 – K0012 + 625
Physical Target: CW1 – Construction of Road Slope Protection Structure – 325 Square meters
Allocation: Php 5,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06468 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310108101159000
Project ID: P00611273LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Catanduanes Cir Rd – K0036 + 080 – K0036 + 230
Physical Target: CW1 – Construction of Road Slope Protection Structure – 1,388.89 Square meters
Allocation: Php 25,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Catanduanes Cir Rd – K0036 + 080 – K0036 + 180
Physical Target: CW1 – Construction of Road Slope Protection Structure – 1,164 Square meters
Allocation: Php 25,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06503 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300225100484000
Project ID: P00632972LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Control, Barangay Mabini, Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 354.201 Lineal Meters
Allocation: Php 40,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Control, Barangay Mabini, Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 167 Lineal Meters
Allocation: Php 40,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06443 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300203101675000
Project ID: P00635747LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – San Andres-Pandan-Sitio Cagnipa Access Road leading to Tuwad-Tuwadan Blue Lagoon and Rock Formation, Cagnipa Rolling Hills, Cagnipa Cove and Muraw Beach, Pandan, Catanduanes
Physical Target: CW1 – Construction of Concrete Road – 2.424 Lane Km
Allocation: Php 26,153,000.00
AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – San Andres-Pandan-Sitio Cagnipa Access Road leading to Tuwad-Tuwadan Blue Lagoon and Rock Formation, Cagnipa Rolling Hills, Cagnipa Cove and Muraw Beach, Pandan, Catanduanes
Physical Target: CW1 – Construction of Concrete Road – 2.150 Lane Km
Allocation: Php 26,153,000.00
|
September 12, 2022 |
2022 |
WIN2F06466 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 3002141002540000
Project ID: P00636010LZ
AS PER GAA:
Convergence and Special Support Program – Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Preventive Maintenance (Asphalt Overlay) along Catanduanes Cir Rd – K0187 +000 – K0190 + 500 (with exceptions), San Andres – Virac Road Section, Catanduanes
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.746 Lane Km
Allocation: Php 30,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Preventive Maintenance (Asphalt Overlay) along Catanduanes Cir Rd – K0187 +000 – K0187 + 873 (with exceptions), San Andres – Virac Road Section, Catanduanes
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.746 Lane Km
Allocation: Php 30,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06438 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300215101792000
Project ID: P00636989LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities – Rehabilitation of Benticayan – Macutal Diversion Road, Baras, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 5.476 Lane Km
Allocation: Php 50,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities – Rehabilitation of Benticayan – Macutal Diversion Road, Baras, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 4.202 Lane Km
Allocation: Php 50,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06504 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310218100051000
Project ID: P00636998LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Coastal Roads/Causeway for Environmental Protection/Conservation – Construction of Coastal Road Traversing Brgy. Divino Rostro – Agojo, San Andres, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 5.064 Lane Km
Allocation: Php 50,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Coastal Roads/Causeway for Environmental Protection/Conservation – Construction of Coastal Road Traversing Brgy. Divino Rostro – Agojo, San Andres, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 2.284Lane Km
CW2 – Construction of Road Slope Protection Structure – 361.92 Square meters
Allocation: Php 50,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06444 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300221101316000
Project ID: P00640388LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities – Construction of Road, Barangay Carorian – Bote, Bato, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 2.026Lane Km
Allocation: Php 20,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities – Construction of Road, Barangay Carorian – Bote, Bato, Catanduanes
Physical Target: CW1 – Construction to Concrete Road – 1.566 Lane Km
Allocation: Php 20,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06508 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310224100007000
Project ID: P00640452LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Coastal Roads/Causeway for Environmental Protection/Conservation – Improvement (Completion) of Coastal Road, Barangay Divino Rostro to Barangay Agojo, San Andres, Catanduanes
Physical Target: CW1 – Rehabilitation of Paved Road – 0.329 Lane Km
Allocation: Php 3,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Coastal Roads/Causeway for Environmental Protection/Conservation – Improvement (Completion) of Coastal Road, Barangay Divino Rostro to Barangay Agojo, San Andres, Catanduanes
Physical Target: CW1 – Rehabilitation of Paved Road – 0.108 Lane Km
Allocation: Php 3,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06504 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300225100485000
Project ID: P00640583LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction (Completion) of Flood Control, Pandan River, Libod, Pandan, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 26.565 Lineal Meters
Allocation: Php 3,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction (Completion) of Flood Control, Pandan River, Libod, Pandan, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 23.0 Lineal Meters
Allocation: Php 3,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06505 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300225100488000
Project ID: P00640586LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Seawall (Phase II), Barangay J.M. Alberto, Baras, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 88.55 Lineal Meters
Allocation: Php 10,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Seawall (Phase II), Barangay J.M. Alberto, Baras, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure – 52.00 Lineal Meters
Allocation: Php 10,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06515 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 3rd District Engineering Office |
UACS No.: 310105100718000
Project ID: P00610203LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads – Buenavista - Kawayan Rd – K0058 + 449 – K0059 + 400
Physical Target: CW1 – Reconstruction to Concrete Pavement – 1.918 Lane Km
Allocation: Php 13,878,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads – Buenavista - Kawayan Rd – K0057 + 127 – K0057 + 719
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.474 Lane Km
CW2 – Off-Carriageway Improvement: Shoulder Paving/Construction – 1,766.00 sq.m.
Allocation: Php 13,878,000.00
|
September 12, 2022 |
2022 |
WIN2F06376 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100348000
Project ID: P00641236LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Provincial Road (Pantao to Camarines Sur), Pantao to Macabugos Section, Libon, Albay
Physical Target: CW1 - Construction of Road Slope Protection Structure – 9830.67 Square meters.
Allocation: Php 249,000,000.00
AS MODIFIED:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Provincial Road (Pantao to Camarines Sur), Pantao to Macabugos Section, Libon, Albay
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3754.76 Lane Km
CW2 - Construction of Concrete Road – 0.4000 Lane Km
CW3 - Construction of Gravel Road – 2.93 Lane Km
Allocation: Php 249,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06356 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100349000
Project ID: P00641237LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM- Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)– Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities - Construction of Road, Marcial O. Rañola - Ongo - Palanas (Phase 2), Guinobatan, Albay
Physical Target: CW1- Construction of Concrete Road – 4.789 Lane Km
CW2- Construction of Road Slope Protection Structure- 2759.66- Square meters
Allocation: Php 149,000,000.00
AS MODIFIED:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM- Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)– Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities - Construction of Road, Marcial O. Rañola - Ongo - Palanas (Phase 2), Guinobatan, Albay
Physical Target: CW1- Construction of Concrete Road – 5.461 Lane Km
CW2- Construction of Road Slope Protection Structure 2180- Square meters
Allocation: Php 149,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06378 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100270000
Project ID: P00638907LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM- Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Marcial O. Rañola to Ongo Road, Guinobatan, Albay
Physical Target: CW1- Construction of Concrete Road – 6.063 Lane Km
CW2- Construction of Road Slope Protection Structure – 16038.33 Square meters
Allocation: Php 250,000,000.00
AS MODIFIED:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM- Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Marcial O. Rañola to Ongo Road, Guinobatan, Albay
Physical Target: CW1- Construction of Concrete Road – 4.921Lane Km
CW2- Construction of Road Slope Protection Structure – 2871.6 Square meters
Allocation: Php 250,000,000.00
|
September 12, 2022 |
2022 |
WIN2F06377 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100273000
Project ID: P00638910LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities Construction of Moroponros - Talisay Road, Oas, Albay
Physical Target: CW1 - Construction of Concrete Road - 3.46 Lane Km
Allocation: 250,000,000.00
AS MODIFIED:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities Construction of Moroponros - Talisay Road, Oas, Albay
Physical Target: CW1 - Construction of Gravel Road - 6.92 Lane Km
CW2 - Construction of Drainage Structure along Road - 1240 Lineal meters
CW3 Construction of Road Slope Protection Structure - 2488.46 Square meters
|
September 12, 2022 |
2022 |
WIN2F06403 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300215100345000
Project ID: P00641233LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Cagbulacao to Tanagan, Albay
Physical Target: CW1 Construction of Gravel Road - 1.679 Lane Km
Allocation: 249,000,000.00
AS MODIFIED:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Cagbulacao to Tanagan, Albay
Physical Target: CW1 - Construction of Gravel Road - 1.796 Lane Km
|
September 12, 2022 |
2022 |
WIN2F06400 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107568000
Project ID: P00620306LZ
AS PER GAA:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Rehabilitation of Nasisi River Flood Mitigation Structure (Brgy. Mahaba), Ligao City, Albay
Physical Target: CWI 1 Construction of Flood Mitigation Structure - 672.6 Lineal meters
Allocation: 110,000,000
AS MODIFIED:
AS PER GAA: ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Rehabilitation of Nasisi River Flood Mitigation Structure (Brgy. Mahaba), Ligao City, Albay
Physical Target: CW1 Construction of Flood Mitigation Structure - 543.5 Lineal meters
|
September 12, 2022 |
2022 |
WIN2F06410 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300219100222000
Project ID: P00631446LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Hitoma River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes
Physical Target: CW1 Construction of Flood Mitigation Structure 116 Lineal meters
Allocation: 40,000,000
As Modified:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Hitoma River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure - 91 Lineal meters
Allocation: 40,000,000
|
September 12, 2022 |
2022 |
WIN2F06372 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300219100223000
Project ID: P00631447LZ
AS PER GAA :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Obi River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure -284.29 Lineal meters
Allocation: 40,000,000
As Modified:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Obi River Flood Control Structure System (Downstream), Barangay Obi, Caramoran, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure – 216.76 Lineal meters
Allocation: 40,000,000
|
September 12, 2022 |
2022 |
WIN2F06460 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107584000
Project ID: P00620324LZ
AS PER GAA:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of San Rafael Storm Surge Protection, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure -452.91 Lineal meters
Allocation: 140,000,000
As Modified :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of San Rafael Storm Surge Protection, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 384.6 Lineal meters
CW2 - Construction of Concrete Road 0.7692 Lane Km
Allocation: 140,000,000
|
September 12, 2022 |
2022 |
WIN2F06417 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No 320101107585000
Project ID: P00620325LZ
AS PER GAA: ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Sta. Cruz Storm Surge Protection, Donsol, Sorsogon
Physical Target: CW1 Construction of Flood Mitigation Structure - 493 Lineal meters
Allocation: 150,000,000
As Modified :
AS PER GAA: ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Sta. Cruz Storm Surge Protection, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 415.5 Lineal meters
CW2 - Construction of Concrete Road - 0.831 Lane Km
|
September 12, 2022 |
2022 |
WIN2F06397 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No 320101107523000
Project ID: P00620317LZ
AS PER GAA:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Improvement of Kilbay River Flood Mitigation Structure, Del Gallego, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure - 371.59 Lineal meters
Allocation: 92,627,000
As Modified:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Improvement of Kilbay River Flood Mitigation Structure, Del Gallego, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 328.49 Lineal meters
|
September 12, 2022 |
2022 |
WIN2F06402 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No 300219100214000
Project ID: P00631456LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM : Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Flood Control Structure along Alcantara River, San Jacinto, Masbate
Physical Target: CW1 Construction of Flood Mitigation Structure - 300.52 Lineal meters
Allocation: 50,000,000
As Modified:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM : Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Flood Control Structure along Alcantara River, San Jacinto, Masbate
Physical Target: CW1 Construction of Flood Mitigation Structure – 226.52 Lineal meters
Allocation: 50,000,000
|
September 12, 2022 |
2022 |
WIN2F06404 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No 300219100215000
Project ID: P00631457LZ
AS PER GAA:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Construction of Flood Control Structure along Alisoso River, San Jacinto, Masbate
Physical Target: CW1 Construction of Flood Mitigation Structure 315.7 Lineal meters
Allocation: 50,000,000
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)- Construction of Flood Control Structure along Alisoso River, San Jacinto, Masbate
Physical Target: CW1 Construction of Flood Mitigation Structure - 233 Lineal meters
Allocation: 50,000,000
|
September 12, 2022 |
2022 |
WIN2F06398 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Regional Office V |
UACS No : 320101107561000
Project ID: P00620299LZ
AS PER GAA:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Jacinto River Control, San Jacinto, Masbate
Physical Target: CW1- Construction of Flood Mitigation Structure - 438.65 Lineal meters
Allocation: 70,409,000
As Modified:
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Jacinto River Control, San Jacinto, Masbate
Physical Target: CW1- Construction of Flood Mitigation Structure – 336.40 Lineal meters
Allocation: 70,409,000
|
September 10, 2022 |
2022 |
WIN2F06357 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300215101680000
Project ID: P00630749LZ
AS PER GAA:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to major/Strategic Public Buildings/Facilities – Construction of Brgy. Quitinday-Brgy. Taplacon Road, Daraga, Albay
Physical Target: CW1 – Construction of Concrete Road –1.06 Lane Km
Allocation: Php 20,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to major/Strategic Public Buildings/Facilities – Construction of Brgy. Quitinday-Brgy. Taplacon Road, Camalig Albay
Physical Target: CW1 – Construction of Concrete Road –1.06 Lane Km
Allocation: Php 20,000,000.00
|
September 10, 2022 |
2022 |
WIN2F06365 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 3002141002520000
Project ID: P00636001LZ
AS PER GAA:
Convergence and Special Support Program – Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Preventive Maintenance along Daang Maharlika (LZ) - K0527 + 760 – K0528 +460
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.80 Lane Km
Allocation: Php 9,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Preventive Maintenance along Daang Maharlika (LZ) - K0527 + 005 – K0527 +405
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.80 Lane Km
Allocation: Php 9,000,000.00
|
September 10, 2022 |
2022 |
WIN2F06365 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300223100043000
Project ID: P00637751LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) – Construction/Improvement of Pawa-Bonga-Matanag-Buyuan Road, Daraga, Albay
Physical Target: CW1 – Construction to Concrete Road – 1.333 Lane Km
Allocation: Php 20,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) – Construction/Improvement of Pawa-Bonga-Matanag-Buyuan Road, Legazpi City, Albay
Physical Target: CW1 – Construction to Concrete Road – 1.333 Lane Km
Allocation: Php 20,000,000.00
|
September 10, 2022 |
2022 |
WIN2F06379 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 310108100898000
Project ID: P00604434LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Primary Roads – Daang Maharlika (LZ) – K0296 + 050 – K0296 + 130
Physical Target: CW1 – Construction of Road Slope Protection Structure – 800 Square meters
Allocation: Php 8,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Primary Roads – Daang Maharlika (LZ) – K0296 + 050 – K0296 + 130
Physical Target: CW1 – Construction of Road Slope Protection Structure – 360 Square meters
Allocation: Php 8,000,000.00
|
September 10, 2022 |
2022 |
WIN2F06370 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 310107100391000
Project ID: P00604421LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Primary Roads – Quirino H-way – K0250 + 043 – K0250 + 138, K0250 + 391 – K0250 + 461
Physical Target: CW1 – Construction of Road Slope Protection Structure – 1,530 Square meters
Allocation: Php 12,375,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Primary Roads – Quirino H-way – K0250 + 060 – K0250 + 137
Physical Target: CW1 – Construction of Road Slope Protection Structure – 924 Square meters
Allocation: Php 12,375,000.00
|
September 10, 2022 |
2022 |
WIN2F06373 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300203101666000
Project ID: P00635734LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Daet – San Vicente – San Lorenzo Road leading to Daculang Danaw, Mananap Falls, Mountain Range & Mampurog River, Camarines Norte
Physical Target: CW1 – Construction of Concrete Road – 0.333 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Daet – San Vicente – San Lorenzo Road leading to Daculang Danaw, Mananap Falls, Mountain Range & Mampurog River, Camarines Norte
Physical Target: CW1 – Construction of Concrete Road – 0.333 Lane Km
CW2 – Construction of Road Slope Protection Structure – 374 Square meters
Allocation: Php 5,000,000.00 |
September 10, 2022 |
2022 |
WIN2F06374 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300203102155000
Project ID: P00635735LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Daet – Vinzons leading to Mantigbi – Sula – Sabang – Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target: CW1 – Construction of Concrete Road – 1.00 Lane Km
Allocation: Php 14,752,000.00
AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Daet – Vinzons leading to Mantigbi – Sula – Sabang – Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target: CW1 – Construction of Concrete Road – 0.065Lane Km
CW2 – Construction of Road Slope Protection Structure – 535.07 Square meters
Allocation: Php 14,752,000.00
|
September 9, 2022 |
2022 |
WIN2F06268 |
FY 2022 GAA |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310104100407000
Project ID: P00608785LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0532+000 – K0532+880
Physical Target: CW1 – Rehabilitation of Concrete – 1.760 Lane km.
Allocation: Php 11,459,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0532+000 – K0532+624
Physical Target: CW1 – Rehabilitation of Concrete – 1.248 Lane km.
Allocation: Php 11,459,000.00
|
September 9, 2022 |
2022 |
WIN2F06267 |
FY 2022 GAA |
December 29, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 310106100670000
Project ID: P00603951LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads – Milaor – Minalabac - Pili Rd – K0436 + 155 – K0436 + 320, K0440 + 070 – K0441 + 570
Physical Target: CW1 – Reconstruction of Concrete Pavement – 5.368 Lane km.
Allocation: Php 88,475,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads – Milaor – Minalabac - Pili Rd – K0436 + 155 – K0436 + 320, K0440 + 070 – K0441 + 570
Physical Target: CW1 – Reconstruction of Concrete Pavement – 3.33 Lane km.
Allocation: Php 88,475,000.00
|
September 9, 2022 |
2022 |
WIN2XY00048 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300217100102000
Project ID: P00630448MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
FROM:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), Package 2, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 6.880 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 25,247,093.02/Lane Km
TO:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), Package 2, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 6.560 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 26,478,658.54/Lane Km
|
September 9, 2022 |
2022 |
WIN2XY00062 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300217100100000
Project ID: P00630446MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
FROM:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 2, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 10.080 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 17,232,142.86/Lane Km
TO:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 2, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 8.800 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 19,738,636.36/Lane Km |
September 9, 2022 |
2022 |
WIN2XY00060 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300217100103000
Project ID: P00630449MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
FROM:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), Package 3, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 6.640 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 26,159,638.55/Lane Km
TO:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), Package 3, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 13.520 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 12,847,633.14/Lane Km
|
September 9, 2022 |
2022 |
WIN2XY00082 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101107788000
Project ID: P00620104MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+360.00, Nasipit, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 416.667 Lineal meters
Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000
Unit Cost:
CW1: P 289,499.77/Lineal meters
TO:
Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 519.000 Lineal meters
Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000
Unit Cost:
CW1: P 232,418.11/Lineal meters
|
September 9, 2022 |
2022 |
WIN2XY00079 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300218100062000
Project ID: P00630470MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Coastal Roads/Causeway for environmental protection/conservation
FROM:
Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 139.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 352,517.99/Lineal meters
TO:
Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 227.600 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 215,289.98/Lineal meters
|
September 9, 2022 |
2022 |
WIN2F06326 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100965000
Project ID: P00603968LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0025 + 240
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 2.536 Lane Km
Allocation: Php 16,511,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0024 +274
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.096 Lane Km
Allocation: Php 16,511,000.00
|
September 9, 2022 |
2022 |
WIN2F06306 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100963000
Project ID: P00603969LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-721) – K0028 + 944
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 3.33 Lane Km
Allocation: Php 21,681,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-714) – K0028 + (-360)
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.416 Lane Km
Allocation: Php 21,681,000.00
|
September 9, 2022 |
2022 |
WIN2F06303 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310105100715000
Project ID: P00603971LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 721 – K0065 + 800, K0065 + 891 – K0066 + 209
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.614Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 981 – K0065 + 117
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.272 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06226 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310105100717000
Project ID: P00603972LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 612 – K0012 + 340
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.17 Lane Km
Allocation: Php 50,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 554 – K0011 + 1004
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.9 Lane Km
CW2 - Construction of Slope Protection – 1,386.00 Square Meters
Allocation: Php 50,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06248 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310108100898000
Project ID: P00604434LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 5,555.56 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 4,000.00 Square meters
Allocation: Php 100,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06328 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101144000
Project ID: P00606426LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 565 – K0034 + 000
Physical Target: CW1 – Road Widening – 0.718 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 193 – K0033 + 307
Physical Target: CW1 – Road Widening – 0.228 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06245 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101146000
Project ID: P00606427LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0009 + 625 – K0009 + 803
Physical Target: CW1 – Road Widening – 0.356 Lane Km
Allocation: Php 12,983,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0008 + 859 – K0009 + 055
Physical Target: CW1 – Road Widening – 0.27 Lane Km
Allocation: Php 12,983,000.00
|
September 9, 2022 |
2022 |
WIN2F06327 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101145000
Project ID: P00606428LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 270 – K0029 + 910
Physical Target: CW1 – Road Widening – 1.28 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 064 – K0029 + 163
Physical Target: CW1 – Road Widening – 0.198 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06307 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101147000
Project ID: P00606429LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0006 +365 – K0006 + 428
Physical Target: CW1 – Road Widening – 0.126 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0005 + 840 – K0005 + 894
Physical Target: CW1 – Road Widening – 0.108 Lane Km
Allocation: Php 5,000,000.00
|
September 8, 2022 |
FY 2022 |
WIN2F06604 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100201000
Project ID : P00638867LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 3+558 - Sta. 3+611,
Sta. 3+935 - Sta. 4+025,
Sta. 4+091 - Sta. 4+177,
Sta. 4+240 - Sta. 4+351,
Sta. 4+365 - Sta. 4+426,
Sta. 4+446 - Sta. 4+498
Physical Target - CW1 - Construction of Concrete Road :
14.649 Lane Km
Allocation - Php 176.80 Million
TO :
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 13+490.00 - Sta. 13+783.60,
Sta. 14+590.00 - Sta. 14+886.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,761.00 square meter
Allocation - Php 176.80 Million
|
September 8, 2022 |
FY 2022 |
WIN2F006599 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300225100022000
Project ID : P00641899LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Flood Mitigation Structures
protecting Public Infrastructures/Facilities
FROM :
Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
623.976 lineal meter
Allocation - Php 75.00 Million
TO :
Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
426.00 lineal meter
Allocation - Php 75.00 Million
|
September 8, 2022 |
FY 2022 |
WIN2F06606 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310204101076000
Project ID : P00608635LZ
OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and
Diversion Roads
FROM :
Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Concrete Road :
4.930 Lane Km
Allocation - Php 145.565 Million
TO :
Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Drainage Structure along
Road : 3,000.00 lineal meter
CW2 - Construction of Road Slope Protection
Structure : 4,471.02 square meter
CW3 - Road Safety : Pavement Markings :
3.00 Lane km
Allocation - Php 145.565 Million
|
September 7, 2022 |
FY 2022 |
WIN2F06598 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 300226101980000
Project ID : P00634212LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Multi-Purpose Building/Facilities to Support Social Services
FROM :
Construction of Multi-Purpose Building,
Brgy. Boton, Mogpog, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million
TO :
Construction of Multi-Purpose Buildinh,
Brgy. Boton, Boac, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million |
September 7, 2022 |
FY 2022 |
WIN2F06600 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100817000
Project ID : P00608158LZ
OO1 : Ensure Safe and Reliable National Road System
Network Development Program -
Construction of missing Links/New Roads
FROM :
Victoria Sablayan ( Mindoro Cross island Road ), package VIII,
Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.869 lane Km
Allocation - Php 105.00 Million
TO :
Victoria Sablayan ( Mindoro Cross Island Road ), Package VIII
Occidental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
2.200 lane Km
CW2 - Construction of Road Slope Protection
Structure : 12,757.00 Square Meter
CW3 - Construction of Drainage Structure along
Road : 2,200.00 Lineal Meters
Allocation - Php 105.00 Million |
September 5, 2022 |
2022 |
WIN2E02507 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 5.452 Lane Km (Construction of Gravel Road)
ROW Acquisition: 27,260 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 137,384,155.00 (Construction of Gravel Road)
ROW Acquisition: P 7,365,845.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 3.292 Lane Km (Construction of Gravel Road)
ROW Acquisition: 16,460 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 140,291,700.00 (Construction of Gravel Road)
ROW Acquisition: P 4,458,300.00
EAO: P 5,250,000.00 |
September 5, 2022 |
2022 |
WIN2E02508 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
ROW Acquisition: 36,944.000 sq. m.
Allocation:
TOTAL: P 90,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 1.41788 Lane Km (Construction of Concrete Road)
ROW Acquisition: 26,191.000 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00 |
September 5, 2022 |
2022 |
WIN2E02509 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 0.200 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Reconstruction to Concrete Pavement)
CW3: 0.094 Lane Km (Construction of Gravel Road)
CW4: 1,138.050 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 15,102,250.00 (Road Widening)
CW2: P 6,071,780.00 (Reconstruction to Concrete Pavement)
CW3: P 2,867,015.00 (Construction of Gravel Road)
CW4: P 149,658,955.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 1,095.900 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00 |
August 31, 2022 |
FY 2022 |
WIN2G03115 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100022000
Project ID : P00639304LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Preservation/Conservation
FROM :
Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.292 Lane Km
Allocation - Php 97.00 Million
|
August 31, 2022 |
FY 2022 |
WIN2G03150 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100024000
Project ID : P00639305LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/causeway for Environmental Preservation/Conservation
FROM :
Construction of Storm Surge Protection/Causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Milliojn
TO :
Construction of Storm Surge Protection/causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.260 Lane Km
Allocation - Php 100.00 Million
|
August 31, 2022 |
FY 2022 |
WIN2G03057 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300225100433000
Project ID : P00640565LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Flood Mitigation Structures
Protecting Public Infrastructures/Facilities
FROM :
Construction of Seawall, Brgy. Calabasahan, Concepcion,Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
120.0 Lineal meters
Allocation - Php 20.00 Million
TO :
Construction of Seawall, Brgy. Calabasahan, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
228.20 Lineal meters
Allocation - Php 20.00 million
|
August 25, 2022 |
FY 2022 |
WIN2G03088 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100019000
Project ID : P00639301LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.340 Lane Km
Allocation - Php 99.00 Million
TO :
Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 99.00 Million
|
August 25, 2022 |
FY 2022 |
WIN2G03090 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UAVS No. : 300218100020000
Project ID : P00639302LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads. Causeway for Environmental Protection/Conservation
FROM :
Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 98.190 Lane Km
TO :
Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.304 Lane Km
Allocation - Php 98.190 Million
|
August 25, 2022 |
FY 2022 |
WIN2G03060 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100021000
Project ID : P00639303LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
coastal Roads/causeway for Environmental Protection/Conservation
FROM :
Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.350 Lane Km
Allocation - Php 100.00 Million
|
August 25, 2022 |
FY 2022 |
WIN2B00895 |
300221100053000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100053000
Project ID: P00630774MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Sapang road, Barangay Tandu-bato, Luuk, Sulu
CW1 - Construction of concrete road : 0.93 lane km
Unit Cost: P 10,645,160.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00891 |
310202101021000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310202101021000
Project ID: P00602304MN
Network Development - Road Widening - Secondary Roads
Jolo - Indanan - Parang - Silangkan Road (Package 2) - Sta. 6+060 - Sta. 9+560
CW1 - Road Widening : 7.0 lane km
Unit Cost: P 16,857,142.86 /lane km
ROW Acquisition : 50,000.00 sq.m.
Unit Cost : 300.00 /sq.m.
EAO: P 4,900,000.00
EXCESS : P 2,100,000.00
Allocation: P 140,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00888 |
300225100047000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300225100047000
Project ID: P00631071MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Shore Protection at Maimbung Tourism Site at Barangay Poblacion (Phase 2), Maimbung, Sulu
CW1 - Construction of Flood Mitigation Structure : 72.52 ln.m
Unit Cost: P 95,559.00 /ln.m
EAO: P 70,000.00
Allocation: P 7,000,000.00 |
August 25, 2022 |
FY2022 |
WIN2B00887 |
300225100048000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300225100048000
Project ID: P00631072MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Shore Protection of Maimbung Tourism Site, Barangay Poblacion, Maimbung, Sulu (Phase 1)
CW1 - Construction of Flood Mitigation Structure : 72.60 ln.m
Unit Cost: P 95,454.54 /ln.m
EAO: P 70,000.00
Allocation: P 7,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00898 |
300221100052000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100052000
Project ID: P00630773MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road (Phase 2), Barangay Jakarta, Languyan, Tawi-Tawi
CW1 - Construction of Concrete Road : 2.78 lane km
Unit Cost: P 17,086,330.94 /lane km
EAO: P 500,000.00
EXCESS : P 2,000,000.00
Allocation: P 50,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00911 |
300221100065000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100065000
Project ID: P00630786MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Laum Maimbung - Kanjal Access Road from Parang - Maimbung - Talipao Road, Barangay Bualo Lipid, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.92 lane km
Unit Cost: P 9,684,780.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.0 |
August 25, 2022 |
FY 2022 |
WIN2B00915 |
300221100062000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100062000
Project ID: P00630783MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Barangay Matatal Road leading to Matatal Elementary School, Barangay Matatal, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.91 lane km
Unit Cost: P 10,879,120.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00910 |
300222100010000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300222100010000
Project ID: P00631051MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Rehabilitation of Kulasi Junction - Batu Ugis - Lapa Road connecting to Badjao Indigenous People (IP) Community, Barangay Lapa, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.89 lane km
Unit Cost: P 10,011,230.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00906 |
300222100007000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300222100007000
Project ID: P00631048MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Improvement of Maimbung - Kanjal Road from Parang - Maimbung - Talipao Road connecting to Badjao Indigenous People (IP) Community, Barangay Bualo Lipid, Maimbung, Sulu
CW1 - Construction of concrete road : 0.84 lane km
Unit Cost: P 10,607,140.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00923 |
300221100050000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100050000
Project ID: P00630771MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Lahing-lahing- Junction National Road, KM 55+180-56+300 Luuk, Sulu
CW1 - Construction of concrete road : 2.24 lane km
Unit Cost: P 16,964,285.00 /lane km
EAO: P 400,000.00
EXCESS: P 1,600,000.00
Allocation: P 40,000,000.00 |
August 23, 2022 |
2022 |
WIN2XY00018 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300215102367000
Project ID: P00634952MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0047 + 590 - K0047 + 625, K0037 + 500 - K0037 + 550, Garcia, Libjo, Dinagat Islands
Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target:
CW1- 837.541 Square meters
Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000
Unit Cost:
CW1: P 22,816.82/Square meters
TO:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0051 + 860 - K0051+ 935, K0052 + 500 - K0052 + 535, Garcia, Libjo, Dinagat Islands
Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target:
CW1- 1,615.900 Square meters
Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000
Unit Cost:
CW1: P 11,826.23/Square meters |
August 22, 2022 |
FY 2022 |
WIN2G03059 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100014000
Project ID : P00639296LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.424 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.398 Lane Km
Allocation - Php 97.00 Million |
August 22, 2022 |
FY 2022 |
WIN2G03096 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100015000
Project ID : P00639297LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.270 Lane Km
Allocation - Php 100.00 Million |
August 22, 2022 |
FY 2022 |
WIN2G03092 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100016000
Project ID : P00639298LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road:
0.400 Lane Km
Allocation - Php 97.800 Million
TO :
Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.376 Lane Km
Allocation - Php 97.80 Million
; |
August 22, 2022 |
FY 2022 |
WIN2G03104 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100018000
Project ID : P00639300LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Shore Protection/Causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road ;
0.380 Lane Km
Allocation - Php 99.50 Million
TO :
Construction of Shore Protection/causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.342 Lane Km
Allocation - Php 99.50 Million
|
August 16, 2022 |
FY 2022 |
WIN2G03100 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100010000
Project ID : P00639292LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million |
August 16, 2022 |
FY 2022 |
WIN2G03091 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100011000
Project ID : P00639293LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Causeway,
Pobalcion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 99.00 Million
TO :
Construction of Causeway,
Poblacion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.344 Lane Km
Allocation - Php 99.00 Million |
August 16, 2022 |
2022 |
WIN2XY00031 |
SR2022-02-001394 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 5+000, San Jose, Alfonso Lista, Ifugao;
Physical Target: 1,344.000 Lineal meters;
Allocation: Php 68,166,000.000
To: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 4+503, San Jose, Alfonso Lista, Ifugao;
Physical Target: 694.300 Lineal meters;
Allocation: Php 68,166,000.000
|
August 16, 2022 |
2022 |
WIN2XY00033 |
SR2022-03-007765 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure along Lagawe River, Sta. 0+000-1+060, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,200.000 Lineal meters;
Allocation: Php 76,400,000.000
To: Construction of Flood Control Structure along Lagawe River, Sta. 0+000- Sta. 1+219, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,244.000 Lineal meters;
Allocation: Php 76,400,000.000
|
August 16, 2022 |
2022 |
WIN2XY00039 |
SARO-BMB-A-22-0002937 |
March 21, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Boliwong Flood Control Structure, Sta. 3+750-Sta. 3+900 and Sta. 4+782-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 590.000 Lineal meters;
Allocation: Php 40,660,000.000
To: Construction of Boliwong Flood Control Structure, Sta. 3+858-Sta. 3+900 and Sta. 4+869-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 380.000 Lineal meters;
Allocation: Php 40,660,000.000
|
August 16, 2022 |
2022 |
WIN2XY00035 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+850 (Pieza Side), Lamut, Ifugao;
Physical Target: 550.000 Lineal meters;
Allocation: Php 39,500,000.000
To: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+800 and Sta. 18+985 - Sta. 19+111 (Pieza Side), Lamut, Ifugao;
Physical Target: 629.000 Lineal meters;
Allocation: Php 39,500,000.000
|
August 16, 2022 |
2022 |
WIN2XY00032 |
SR2022-03-007776 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 6.666 Lane Km;
Allocation: Php 100,000,000.000
To: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 5.440 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00040 |
SR2022-03-007825 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 4.020 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00034 |
SR2022-03-007835 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 6.840 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00038 |
SR2022-03-007818 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 6.480 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00037 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0437 + 000;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0435 + 254;
Physical Target: 7.406 Lane Km;
Allocation: Php 50,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00030 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0463 + 200;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0461 + 360;
Physical Target: 7.400 Lane Km;
Allocation: Php 50,000,000.000
|