December 6, 2019 |
CY 2019 |
WIN9F05969 |
UACS No. 320101102550000 |
May 2, 2019 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 320101102550000
Project ID: P00320038LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 0.cu.m.
Unit Cost (P’000):
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 1.492 cu.m.
Unit Cost (P’000): P38.81/ cu.m.
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
WIN9F05969
|
December 6, 2019 |
CY 2019 |
WIN9F05969 |
UACS No. 320101102550000 |
May 2, 2019 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 320101102550000
Project ID: P00320038LZ
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 0.cu.m.
Unit Cost (P’000):
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 1.492 cu.m.
Unit Cost (P’000): P38.81/ cu.m.
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
WIN9F05969
|
December 6, 2019 |
CY 2019 |
WIN9F05968 |
UACS No. 310103100260000 |
May 2, 2019 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100260000
Project ID: P00302591LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Camp Aguinaldo Rd Network – (S05547LZ) Ch. 890 – Ch. 960
Physical Target – CW – Preventive Maintenance of Road: Asphalt Overlay –L= 0.430 lane km
Unit Cost (P’000): 8,131/lane km
Allocation (P’000): P3,496.64
EAO – P71.36
Total: P3,568.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Camp Aguinaldo Rd Network – (S05547LZ) Ch. 912 – Ch. 1010
Physical Target – CW – Preventive Maintenance of Road: Asphalt Overlay –L= 0.589 lane km
Unit Cost (P’000): 5,936/lane km
Allocation (P’000): P3,496.64
EAO – P71.36
Total: P3,568.00
WIN9F05968
|
December 2, 2019 |
FY 2019 |
WIN9G02794 |
300104211208000 |
October 9, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300104211208000
Project ID: P00351912MN
Local Program - Buildings and Other Structures - Multipurpose / Facilites - Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Linabo, Dapitan City, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Multipurpose Building : 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00821 |
300111200046000 |
August 29, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200046000
Project ID: P00345272MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ Rehabilitation of Various Projects in Sulu
Physical Target:
CW-1 - Rehabilitation of Concrete Road: 4.80 lane km
Unit Cost: P 16,075,512.11 /lane km
Physical Target:
ROW: 456.18 sq.m
Unit Cost: 300.00 /sq.m
EAO: P 2,700,686.04
Allocation: P 80,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00818 |
300119200279000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300119200279000
Project ID: P00355922MN
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program
Concrete Footbridge of Barangay Lahat Dampong, South Ubian, Tawi-Tawi
Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m.
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00819 |
300119200281000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300119200281000
Project ID: P00355924
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program
Concrete Footbridge of Barangay Tampakan Dampong, South Ubian, Tawi-Tawi
Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m.
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00826 |
300119200284000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300119200284000
Project ID: P00355927MN
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program
Concrete Footbridge with Pier Head, Bunah Bunaan, Luuk Buntal, Panglima, Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Bridge : 175.00 sq.m.
Unit Cost: P 28,285.71 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00823 |
300117204889000 |
August 29, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204889000
Project ID: P00355522MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ Concreting of Road, Laum, Maimbung-Darul Jambangan, Sulu
Physical Target:
CW-1 - Construction of Concrete Road : 1.24 lane km
Unit Cost: P 15,542,746.75 /lane km
EAO: P 200,000.00
EXCESS: 526,994.03
Allocation: P 20,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00816 |
300117204891000 |
September 17, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204891000
Project ID: P00347601MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ Reblocking of Camp Andres-Romandier National Road
K26+670.00 - K26+784.26
K27+011.46 - K28+100.00
Physical Target:
CW-1 - Preventive Maintenance of Concrete Road: 2.4056 lane km
Unit Cost: P 16,028,457.24 /lane km
EAO: P 400,000.00
EXCESS: 1,041,943.27
Allocation: P 40,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00825 |
300119200283000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300119200283000
Project ID: P00355926MN
Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program
Concrete Footbridge of Sitio Malinsik, Barangay Kulape, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00822 |
300107200592000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300107200592000
Project ID: P00353542MN
Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program
Construction of Slope Protection, Kabukan Proper, Hadji Panglima Tahil, Sulu
Physical Target:
CW-1 - Construction of Flood Mitigation Structure :542.50 ln.m
Unit Cost: P 18,250.67 /ln.m
EAO: P 99,009.90
Allocation: P 10,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00820 |
300107200591000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300107200591000
Project ID: P00353541MN
Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program
Construction of Nunukan Seawall, Parang, Sulu
Physical Target:
CW-1 - Construction of Flood Mitigation Structure :675.00 ln.m
Unit Cost: P 14,668.13 /ln.m
EAO: P 99,009.90
Allocation: P 10,000,000.00 |
November 18, 2019 |
FY 2019 |
WIN9B00824 |
300117204893000 |
August 30, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204893000
Project ID: P00347603MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road, Bangas, Hji Panglima Tahil, Sulu
Physical Target:
CW-1 - Rehabilitation of Concrete Road : 0.93 lane km
Unit Cost: P 10,646,225.91 /lane km
EAO: P 99,009.00
Allocation: P 10,000,000.00 |
November 7, 2019 |
2019 |
WIN9C03522 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 310104100098000
Project ID: P00301443LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando R Andaya Highway - K0326 + 000 - K0326 + 193, K0327 + 731 - K0327 + 982, K0328 + 852 - K0328 + 998, K0329 + 522 - K0330 + 250, K0330 + 824 - K0333 + 357
Physical Target: 0.888 Lane Km
Amount: Php 149,683,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando A Andaya Highway - K0326 + 000 - K0326 + 193, K0327 + 731 - K0327 + 982, K0328 + 852 - K0328 + 1001, K0329 + 500 - K0330 + 245, K0330 + 824 - K0331 + 480, K0331+740 – K0333+368.7, K0334+417 – K0335+038, K0335+654 – K0335+819
Physical Target: 0.888 Lane Km
Amount: Php 149,683,000.00
|
November 7, 2019 |
2019 |
WIN9C03706 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 310204100461000
Project ID: P00303737LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development - Construction of By-Pass and Diversion Roads - Sorsogon City Coastal By-Pass Road, Package 4, Sorsogon Physical Target: CW1 - 0.86 Lane Km Construction of Concrete Road
CW2 – 585.60 sq.m. Construction of Concrete Bridge
Amount: Php 100,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System Network Development - Construction of By-Pass and Diversion Roads - Sorsogon City Coastal By-Pass Road, Package 4, Sorsogon Physical Target: CW1 – 0.3908 Lane Km Construction of Concrete Road
CW2 – 915.00 sq.m. Construction of Concrete Bridge
Amount: Php 100,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03712 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 310205100253000
Project ID: P00304078LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development - Network Development - Construction of Missing Links/ New Roads - Poblacion Morocborocan-Guindahap Road, Masbate
Physical Target: CW1 - Construction of Concrete Road – 2.480Lane Km
Amount: Php 100,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System Network Development - Network Development - Construction of Missing Links/ New Roads - Poblacion Morocborocan-Guindahap Road, Masbate
Physical Target: CW1 - Construction of Concrete Road – 1.052 Lane Km
CW2 – Construction of Road Slope Protection Structure – 27,178.44 Square meters
CW2 – Construction of Drainage Structure along Road – 976.26 lineal meters
Amount: Php 100,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03523 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 310104100095000
Project ID: P00304225LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando R. Andaya Highway K0282 + (-186) - K0282 + (-181), K0282 + 160 - K0282 + 245, K0282 + 341.50 - K0282 + 376, K0282 + 758.40 - K0282 +911.50, K0283 + 109 - K0283 + 464.50, K0283 + 671 - K0284 + 008, K0284 + 213.50 - K0284 + 491.30, K0284 + 784.50 - K0285 + 002, K0287 +000 - K0287 + 742.50, K0288 + 095 - K0288 + 376, K0291 + 000 - K0291 + 601.50, K0291 + 857 - K0291 + 960, K0295 + 400 - K0295 + 976.50, K0296 + 468 - K0296 +739, K0296 + 981 - K0297 + 255.60, K0297 + 470 - K0297 + 560, K0297 + 671.80 - K0297 + 781, K0299 + 047 - K0299 + 108.5, K0308 + 435.20 - K0308 + 444.20, K0309 + 055.60 - K0309 + 088.8, K0309 + 447 - K0309 + 597, K0315 + 993 - K0316 + 263, K0319 + 938 -K0320 + 959, K0321 + 992 - K0322 + 131, K0322 + 592 - K0323 + 452, K0323 + 650.7 - K0323 + 773
Physical Target: CW1 - Reconstruction of Concrete Pavement – 43.310 Lane Km
Amount: Php 250,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads – Rolando A Andaya Highway K0282 + (-186) - K0282 + (-181), K0282 + 160 - K0282 + 245, K0282 + 341.50 - K0282 + 376, K0282 + 758.40 - K0282 +911.50, K0283 + 109 - K0283 + 464.50, K0283 + 671 - K0284 + 008, K0284 + 213.50 - K0284 + 491.30, K0284 + 784.50 - K0285 + 002, K0287 +000 - K0287 + 742.50, K0288 + 095 - K0288 + 376, K0288 + 737 - K0288 + 996, K0291 + 857 - K0291 + 960, K0295 + 400 - K0295 + 976.50, K0296 + 468 - K0296 +739, K0296 + 981 - K0297 + 255.60, K0297 + 470 - K0297 + 560, K0297 + 671.80 - K0297 + 781, K0299 + 047 - K0299 + 108.5, K0308 + 435.20 - K0308 + 444.20, K0309 + 055.60 - K0309 + 088.8, K0309 + 447 - K0309 + 597, K0315 + 993 - K0316 + 263, K0319 + 938 -K0320 + 959, K0321 + 992 - K0322 + 131, K0322 + 592 - K0323 + 452, K0323 + 650.7 - K0322+681.50
Physical Target: CW1 - Reconstruction of Concrete Pavement – 12.992 Lane Km
Amount: Php 250,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03702 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 320101102653000
Project ID: P00320158LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Nicolas River Control (Right Side), Brgy Cabanbanan, San Vicente,
Camarines Norte
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,167.0 Lineal meters
Amount: Php 100,000,000.00
TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Nicolas River Control (Right Side), Brgy Cabanbanan, San Vicente,
Camarines Norte
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,160.50 Lineal meters
Amount: Php 100,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03691 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 320101102664000
Project ID: P00320170LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Somal-ot Seawall and Embankment, Phase III, Casiguran, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 460.0 Lineal meters
Amount: Php 100,000,000.00
TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Somal-ot Seawall and Embankment, Phase III, Casiguran, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 467.81 Lineal meters
Amount: Php 100,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03726 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 320102100648000
Project ID: P00322254LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike along Libmanan River, Bicol River Basin, Brgy. Mancawayan, Libmanan, Camarines Sur
Physical Target: CW1 - Construction of Dike Structure – 130.00 Lineal meters
Amount: Php 30,000,000.00
TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike along Libmanan River, Bicol River Basin, Brgy. Mancawayan, Libmanan, Camarines Sur
Physical Target: CW1 - Construction of Dike Structure – 158.20 Lineal meters
Amount: Php 30,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03618 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300203100713000
Project ID: P00330363LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package I) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 2.5 Lane Km
Amount: Php 50,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package I) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.706 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,129 Lineal meters
CW3 – Construction of Slope Protection Structure – 7,210.48 Square meters
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03597 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300203100714000
Project ID: P00330364LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package II) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 4.0 Lane Km
Amount: Php 50,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package II) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.956 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,022.42 Lineal meters
CW3 – Construction of Slope Protection Structure – 9,846.72 Square meters
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03602 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300203100710000
Project ID: P00330382LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Matnog-Bulan-Magallanes Tourism West Coast Highway (Section 3), Magallanes, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 5.892 Lane Km
CW2 – Construction of Slope Protection Structure – 7,231.67 Square meters
Amount: Php 110,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Matnog-Bulan-Magallanes Tourism West Coast Highway (Section 3), Magallanes, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 5.892 Lane Km
CW2 – Construction of Slope Protection Structure – 7,231.67 Square meters
Amount: Php 110,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03636 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300204100150000
Project ID: P00330998LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.067 Lane Km
Amount: Php 10,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.06674 Lane Km
CW2 – Construction of Slope Protection Structure – 302.42 Square meters
Amount: Php 10,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03636 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300204100150000
Project ID: P00330998LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.067 Lane Km
Amount: Php 10,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.06674 Lane Km
CW2 – Construction of Slope Protection Structure – 302.42 Square meters
Amount: Php 10,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03630 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300204100160000
Project ID: P00330999LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy.2-Brgy. 1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.56 Lane Km
Amount: Php 10,000,000.00
TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy.2-Brgy. 1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.0708 Lane Km
CW2 – Construction of Slope Protection Structure – 365.99 Square meters
Amount: Php 10,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03732 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300105200146000
Project ID: P00340168LZ
FROM:
Local Program – Building and Other Structures – National Building Program - Construction of Two-Storey PRC Testing Center Building Phase II, Government Regional Center, Rawis, Legazpi City
Physical Target: CW1 - Construction of Multi Purpose Building/ 1 Number of Building
Amount: Php 38,726,000.00
TO:
Local Program – Building and Other Structures – National Building Program - Construction of Two-Storey PRC Testing Center Building Phase I, Government Regional Center, Rawis, Legazpi City
Physical Target: CW1 - Construction of Multi Purpose Building/ 1 Number of Building
Amount: Php 38,726,000.00
|
November 7, 2019 |
2019 |
WIN9C03680 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300106200159000
Project ID: P00344760LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Gimagaan River Control Structure, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,214.895 Lineal meters
Amount: Php 100,000,000.00
TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Gimagaan River Control Structure, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure –740.97 Lineal meters
Amount: Php 100,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03705 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300106200218000
Project ID: P00344903LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Constructiion of San Juan-Roro-Borabot River Control, Sorsogon City, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 242.979 Lineal meters
Amount: Php 20,000,000.00
TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of San Juan Roro-Borabod River Control, Sorsogon City, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 155.42 Lineal meters
Amount: Php 20,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03723 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300106200191000
Project ID: P00346009LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Opening/Concreting/Widening Improvement of Malbog Burabot Road, Pilar, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 10.0 Lane KM
Amount: Php 50,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Opening/Concreting/Widening Improvement of Malbog Burabod Road, Pilar and Castilla, Sorsogon
Physical Target: CW1 - Construction of Concrete Road –3.754 Lane KM
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03700 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201911000
Project ID: P00346010LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects Widening Improvement of Road, Burabod, Maracabac, San Rafael Junction, San Rafael-Daang Maharlika National Road
Physical Target: CW1 - Construction of Concrete Road – 10.0 Lane KM
Amount: Php 50,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects Widening Improvement of Road, Burabod, Maracabac, San Rafael Junction, San Rafael-Daang Maharlika National Road
Physical Target: CW1 - Construction of Concrete Road – 3.076 Lane KM
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03598 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300106200216000
Project ID: P00353271LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Danicop Flood Control, Virac, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure - 0 Lineal Meter
Amount: Php 20,000,000.00
TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Danicop Flood Control, Virac, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure – 115.530 Lineal Meter
Amount: Php 20,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03675 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201854000
Project ID: P00353898LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 1 -District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 1 -District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.08 Lane Km
CW2 – Construction of Drainage Structure along Road – 817.90 Lineal meters
CW3 – Construction of Slope Protection Structure – 3,336.00 Square meters
Amount: Php 40,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03735 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201855000
Project ID: P00353899LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 3 - District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 3 - District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 0.804 Lane Km
CW2 – Construction of Drainage Structure along Road – 822 Lineal meters
CW3 – Construction of Slope Protection Structure – 4,863.00 Square meters
Amount: Php 40,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03595 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201856000
Project ID: P00353900LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Brgy. Lictin - Bonot, San Andres, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Brgy. Lictin - Bonot, San Andres, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.3174 Lane Km
Amount: Php 40,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03545 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201857000
Project ID: P00353901LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Cavinitan - Pajo San Isidro Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 50,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Cavinitan - Pajo San Isidro Road, Virac, CatanduanesPhysical Target: CW1 - Construction of Concrete Road – 3.038 Lane Km
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03676 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201858000
Project ID: P00353902LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Hawan - Mamangal Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 50,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Hawan - Mamangal Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 4.230 Lane Km
Amount: Php 50,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03638 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201859000
Project ID: P00353903LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Sta. Elena - Sto. Niño Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Sta. Elena - Sto. Niño Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.73564 Lane Km
Amount: Php 40,000,000.00
|
November 7, 2019 |
2019 |
WIN9C03603 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Regional Office V |
UACS No.: 300116201860000
Project ID: P00353904LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Road Concreting (Junction National Road to Nahulugan Falls), Gigmoto, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 20,000,000.00
TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Concreting (Junction National Road to Nahulugan Falls), Gigmoto, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.190 Lane Km
Amount: Php 20,000,000.00
|
November 4, 2019 |
2019 |
WIN9C03714 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction/Rehabilitation/Upgrading/Improvement of Chico River Flood Control (Talubin Section) Talubin, Bontoc, Mountain Province;
Physical Target: CW1 : 92 Lineal Meter; Allocation= Php 5,000,000
To: Construction/Rehabilitation/Upgrading/Improvement of Talubin River Flood Control (Talubin Section) Talubin, Bontoc, Mountain Province;
Physical Target: CW1 : 92 Lineal Meter; Allocation= Php 5,000,000
|
October 30, 2019 |
2019 |
WIN9C03721 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction/Continuation of Sitio Pata, Taga Flood Control along Chico River, Poblacion, Taga, Pinukpuk, Kalinga;
Physical Target: CW1 : 260 Lineal Meter;
Allocation= Php 20,000,000
To: Construction/Continuation of Sitio Pata, Taga Flood Control along Saltan River, Poblacion, Taga, Pinukpuk, Kalinga;
Physical Target: CW1 : 260 Lineal Meter;
Allocation= Php 20,000,000
|
October 30, 2019 |
2019 |
WIN9C03717 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Bulanao-Paracelis Rd - K0510 + 297 - K0510 + 314, K0510 + 633 - K0510 + 674;
Physical Target: CW1: 0.116 Lane Km;
Allocation= Php 2,533,000
To: Bulanao-Paracelis Rd - K0510 + 297 - K0510 + 314, K0510 + 765 - K0510 + 797;
Physical Target: CW1: 0.069 Lane Km;
Allocation= Php 2,533,000
|
October 18, 2019 |
GAA 2019 |
WIN9F05956 |
UACS No. 300104205777000 |
July 5, 2019 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300104205777000
Project ID: P00340925LZ
Local Program
Local – Buildings and Other Structures – Multi-Purpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Barangay Sto. Rosario Kaunlaran, Pateros, Metro Manila
Physical Target – CW Construction of Multi-Purpose Building L=1 bldg
Unit Cost (P’000): P3,960.00/bldg.
Allocation (P’000): P3,960.00
EAO – P40.00
Total: P4,000,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multi-Purpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Barangay Sto. Rosario Kanluran, Pateros, Metro Manila
Physical Target – CW Construction of Multi-Purpose Building L=1 bldg
Unit Cost (P’000): P3,960.00/bldg.
Allocation (P’000): P3,960.00
EAO – P40.00
Total: P4,000,000.00
WIN9F05956
|
October 17, 2019 |
2019 |
WIN9G02783 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Regional Office XIII |
UACS No. 300111200068000
Project ID: P00345294MN
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Asphalt overlay Daang Maharlika (Surigao – Agusan Road), Angtongalon - Sumilihon - Los Angeles – Sto Nino Section, Intermittent Sections, K1217+000 - K1217+331.80, K1219+412.33 – K1219+621.67, K1219+647.71 – K1220+358.80, K1220+382.91 – K1221+560, K1
CW1 - Construction of Asphalt Road / 15.001 lane-km
Unit Cost - P 9.64935671M / lane-km
Allocation - P 144.750M
EAO - P 5.250M
TOTAL - P 150M
TO:
Asphalt overlay Daang Maharlika (Surigao – Agusan Road), Antongalon - Sumilihon - Los Angeles – Sto Nino Section, Intermittent Sections, K1222+(-016) - K1223+644, K1226+000 – K1227+549, K1227+549 – K1227+843, K1233+199 – K1234+448, K1234+448 - K1235+727, K1240+159 - K1240+632, K1240+632 - K1240+696
CW1 - Construction of Asphalt Road / 15.001 lane-km
Unit Cost - P 9.64935671M / lane-km
Allocation - P 144.750M
EAO - P 5.250M
TOTAL - P 150M |
October 16, 2019 |
FY 2019 |
WIN9G02720 |
300109200477000 |
July 24, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200477000
Project ID: P00345241MN
Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Rehabilitation of Drainage Facilities, Barangay Baliwasan, Zamboanga City
Physical Target:
CW1- Rehabilitation/Major Repair of Drainage Structure: 465.62 lm
Unit Cost: P 10,630.00/lm
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
October 16, 2019 |
FY 2019 |
WIN9G02747 |
300109200484000 |
August 15, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200484000
Project ID: P00353226MN
Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System at Tugbungan Elementary School, Barangay Tugbungan, Zamboanga City
Physical Target:
CW1- Construction of Drainage Structure: 157.00 lm
Unit Cost: P 12,611.46/lm
EAO: P 20,000.00
Allocation: P 2,000,000.00
|
October 16, 2019 |
FY 2019 |
WIN9G02716 |
300107200593000 |
July 22, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300107200593000
Project ID: P00353543MN
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Flood Control at Barangay Sibulao, Zamboanga City
Physical Target:
CW1- Construction of Flood Mitigation Structure: 395.68 ln.m.
Unit Cost: P 37,530.33/ln.m.
EAO: P 150,000.00
Allocation: P 15,000,000.00 |
October 16, 2019 |
FY 2019 |
WIN9G02713 |
310305100709000 |
July 24, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100709000
Project ID: P00301556MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pamingitan Br. 1 (B00570MN) along Pagadian City - Zamboanga City Rd
CW1- Widening of Bridge: 125.1068 sq.m.
Unit Cost: P 121,710.00/sq.m.
ROW: 372 sq.m.
Unit Cost: P 1,259.00
EAO: P 304,535.53
Allocation: P 16,000,000.00 |
October 16, 2019 |
FY 2019 |
WIN9G02712 |
310305100710000 |
July 24, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100710000
Project ID: P00301557MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pamingitan Br. 2 (B00569MN) along Pagadian City - Zamboanga City Rd
CW1- Widening of Bridge: 125.1068 sq.m.
Unit Cost: P 119,302.00/sq.m.
ROW: 372 sq.m.
Unit Cost: P 2,080.00
EAO: P 300,000.00
Allocation: P 16,000,000.00
|
October 16, 2019 |
FY 2019 |
WIN9G02739 |
300117204923000 |
July 23, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117204923000
Project ID: P00347619MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Barangay Tolosa, Zamboanga City
Physical Target:
CW1- Construction of Concrete Road: 0.252 lane km
Unit Cost: P 5,892,857.14
EAO: P 15,000.00
Allocation: P 1,500,000.00
|
October 14, 2019 |
FY 2019 |
WIN9G02782 |
310204100494000 |
October 1, 2019 |
Region IX |
Regional Office IX |
UACS No. 310204100494000
Project ID: P00304412MN
OO1: Ensure Safe and Reliable National Road System -
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road, (Cabaluay - Zambowood - Mampang Section), Mercedes Br. 1, Zamboanga City
Physicat Target:
CW1- Construction of Concrete Bridge: 645.75 Sq.m.
Unit Cost: P 73,608.87/sq.m.
EAO: P 1,750,000.00
Excess: P 717,070.76
Allocation; P 50,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02753 |
320102100944000 |
August 5, 2019 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100944000
Project ID: P00323033MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Conception, Alicia, Zamboanga Sibugay
Physical Target:
CW1 - Construction of Flood Mitigation Structure: 311.000 ln.m.
Unit Cost: P 85,080.00 /ln.m.
EAO: P 540,000.00
Allocation: P 27,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02755 |
300117204936000 |
August 13, 2019 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300117204936000
Project ID: P00347626MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Purok 2, Brgy. Lugdungan, Dipolog City, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 0.350 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 17,500.00
Allocation: P 1,750,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02748 |
300121200447000 |
August 13, 2019 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300121200447000
Project ID: P00348106MN
Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Level II Water System, Sitio San Vicente, Brgy. East Poblacion, Manukan, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Water Supply Systems : 1.0 unit
Unit Cost: P 1,000,000.00 /unit
Allocation: P 1,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02745 |
300116202022000 |
August 6, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300116202022000
Project ID: P00353956MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Upgrading/ Concreting of NRJ Canunan-Guling-Payag-Mabuhay-Pongapong-Poblacion-Guipos-San Pablo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 3.26292 lane km
Unit Cost: P 9,010,000.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02750 |
300117204958000 |
August 6, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300117204958000
Project ID: P00355560MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ Concreting of Sugbay Uno - Kagawasan - Poblacion - Bacayawan, Dimataling, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.0 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
October 14, 2019 |
CY 2019 |
WIN9G02744 |
300104211319000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211319000
Project ID: P00351964MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Covered Court, Brgy. Limbayan, Pitogo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02746 |
300116202021000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300116202021000
Project ID: P00353955MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Opening/ Improvement of Barangay Road from Purok Gabi Tubo - Pait, Dumalinao to Barangay Bag-ong Misamis, San Pablo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 0.864 lane km
Unit Cost: P 6,240,000.00 /lane km
EAO: P 110,000.00
Allocation: P 5,500,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02749 |
300104211280000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211280000
Project ID: P00343668MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Brgy. Guinicolalay Elementary School, Guinicolalay, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,584,000.00 /building
EAO: P 16,000.00
Allocation: P 1,600,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02743 |
300104211281000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211281000
Project ID: P00343669MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Hall), Bacayawan, Dimataling, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,980,000.00 /building
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02772 |
320102100940000 |
August 19, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320102100940000
Project ID: P00322289MN
Local Program - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Tumaga River Basin, Tetuan Section, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 162.03 lm
Unit Cost: P 126,064.00 /lm
EAO: P 416,860.00
Allocation: P 20,843,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02766 |
300116202023000 |
August 22, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116202023000
Project ID: P00353957MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Provincial Road Connecting Brgys. Canacan, Sininan. Banker, Tampilisan, Diampak and Shiolan, Kabasalan, Zamboanga Sibugay (Package 1)
Physical Target:
CW-1 - Construction of Concrete Road: 2.402 lane km
Unit Cost: P 12,239,800.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 11, 2019 |
2019 |
WIN9C03703 |
SR2019-06-003791 |
June 7, 2019 |
Region III |
Regional Office III |
Network Development - Constructions of By-pass and Diversion Roads
Lubao-Guagua-Minalin-Sto. Tomas Road (Lubao-Guagua Section), Pampanga |
October 11, 2019 |
2019 |
WIN9C03731 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Regional Office III |
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/ Destinations, Brgy. Ditawini, Dinalungan, Aurora |
October 11, 2019 |
2019 |
WIN9C03718 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Baliwag-Candaba-Sta Ana Rd
K0058 + (-050) - K0058 + 042, K0059 + 060 - K0059 + 452,
K0061 + 951 - K0062 + 979, K0063 + 000 - K0063 + 041,
K0063 + 169 - K0063 + 210, K0063 + 236 - K0063 + 593,
K0063 + 757 - K0063 + 772 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02775 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.322 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.064 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02779 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Composela Valley
Physical Target:
CW1: 2.320 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Compostela Valley
Physical Target:
CW1: 1.880 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02778 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.520 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.180 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
October 11, 2019 |
2019 |
WIN9C03729 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads
Malolos City Circumferential Road, Bulacan (Sto. Cristo-Sto. Niño) By pass Road, Bulacan |
October 11, 2019 |
2019 |
WIN9C03725 |
SR2019-06-004681 |
June 18, 2019 |
Region III |
Bulacan 1st District Engineering Office |
National Roads and Bridges - National Roads
Construction of Guiguinto By-Pass Road (Sta. Rita Kabilang Bakood-Cutcut Road), Guiguinto, Bulacan |
October 9, 2019 |
CY 2019 |
WIN9F05953 |
UACS No. 320101102838000 |
May 30, 2019 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101102838000
Project ID: P00322721LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along Irasan Creek Brgy. Sto. Niñ, District I, Parañaque City
Physical Target – CW Construction of Drainage Structure 320.00 lineal meters
Unit Cost: P127,176.44 /l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems.
Construction of Box Culvert along Irasan Creek, Brgy. San Dionisio, District I, Parañaque City
Physical Target: CW1 – Construction of Drainage Structure 420.00 Lineal meters
Unit Cost: P96,896.33/l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
WIN9F05953
|
October 9, 2019 |
FY 2019 |
WIN9B00797 |
300117204886000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204886000
Project ID: P00355519MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/concreting of Pang, Kalingalan Caluang-Lubhang, Tubig Putih, Luuk, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 2.86 lane km.
Unit Cost: P 16,873,465.03 /lane km
EAO: P 500,000.00
EXCESS: P 1,241,890.01
Allocation: P 50,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00794 |
300111200067000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200067000
Project ID: P00345284MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panamao, Sulu
K32+000.00 - K33+870.00
Physical Target:
CW-1 - Road Widening: 3.74 lane km
Unit Cost: P 18,049,999.45 /lane km
Physical Target:
ROW: 434.19 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,744.93
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00784 |
300111200042000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200042000
Project ID: P00345264MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Concreting of Batu-Batu - Kulape Road, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.858 lane km
Unit Cost: P 32,988,928.21 /lane km
Physical Target:
ROW: 2,500 Sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,299,882.49
Excess: P 1,667,760.68
Allocation: P 100,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00785 |
300111200047000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200047000
Project ID: P00345273MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Continuation of Boleh Sallang Road, Sibutu, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.44 lane km
Unit Cost: P 15,776,384.34 /lane km
EAO: P 1,400,000.00
Excess: P 105,622.21
Allocation: P 40,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00802 |
300117204892000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204892000
Project ID: P00347602MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Poblacion Road, Maimbung, Sulu, K0+000.00 - K0+520.00
Physical Target:
CW-1 - Rehabilitation of Concrete Road: 1.04 lane km.
Unit Cost: P 13,891,984.63 /lane km
EAO: P 150,000.00
EXCESS : P 402,335.98
Allocaation : P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00780 |
300111200064000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200064000
Project ID: P00345281MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K26+000.00 - K27+880.00
Physical Target:
CW-1 - Road Widening: 3.76 lane km
Unit Cost: P 17,939,616.61 /lane km
Physical Target:
ROW: 620.63 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 236,853.55
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00800 |
300117204879000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204879000
Project ID: P00347597MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Duhul Kabbun Road, Maimbung, Sulu
K0+000.00 - K0+640.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.28 lane km.
Unit Cost: P 15,048,521.63 /lane km
EAO: P 200,000.00
EXCESS: P 537,892.31
Allocation: P 20,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00801 |
300111200044000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200044000
Project ID: P00345267MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ concreting of Tawi-Tawi Circumferential Road, Parangan - Magsaggaw Section, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.72 lane km
Unit Cost: P 34,037,623.35 /lane km
Physical Target:
ROW: 9,500 Sq.m.
Unit Cost: P 1000.00 /sq.m.
EAO: P 3,850,000.00
Excess: P 4,067,664.48
Allocation: P 110,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00791 |
300111200043000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200043000
Project ID: P00345263MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ concreting of Sumangday - Baunu Garing Road, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 4.52 lane km
Unit Cost: P 20,429,137.21 /lane km
EAO: P 3,500,000.00
Excess: P 4,160,299.81
Allocation: P 100,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00798 |
300117204878000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204878000
Project ID: P00347596MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Darul Jambangan, Maimbung, Sulu, K0+000.00 - K0+580.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.16 lane km.
Unit Cost: P 12,482,197.88 /lane km
EAO: P 150,000.00
EXCESS: P 370,650.46
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00796 |
300111200056000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200056000
Project ID: P00345278MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Pahut - Sanga-Sanga - Batu-Batu Road with ROW, Bonggao, Tawi-Tawi
Physical Target:
CW-1 - Road Widening: 3.604 lane km
Unit Cost: P 18,930,439.28 /lane km
Physical Target:
ROW: 75,000 sq.m
Unit Cost: P 1,000.00 / sq.m.
EAO: P 5,250,000.00
Excess: P 1,524,696.80
Allocation: P 150,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00793 |
300111200041000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200041000
Project ID: P00345262MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Romandier - Camp Andres National Road, Panamao,Sulu, K31+600.00 - K32+600.00, K34+000.00 - K36+000.00, K39+000.00 - K39+110.00
Physical Target:
CW-1 - Construction of Concrete Road: 6.22 lane km
Unit Cost: P 17,886,367.25 /lane km
Physical Target:
ROW: 1,176.45 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 3,893,862.15
Allocation: P 115,500,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00786 |
300117204882000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204882000
Project ID: P00355516MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road along Gulangan, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.09 lane km.
Unit Cost: P 13,261,122.50 /lane km
EAO: P 150,000.00
EXCESS: P 395,376.48
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00795 |
300117204890000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204890000
Project ID: P00355523MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ concreting of Road, Tubig Samin, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.03 lane km.
Unit Cost: P 14,040,108.65 /lane km
EAO: P 150,000.00
EXCESS: P 388,688.09
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00782 |
300111200066000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200066000
Project ID: P00345283MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K30+000.00 - K31+850.00
Physical Target:
CW-1 - Road Widening: 3.70 lane km
Unit Cost: P 18,243,023.71 /lane km
Physical Target:
ROW: 461.14 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,471.57
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00787 |
300111200065000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200065000
Project ID: P00345282MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K28+000.00 - K29+820.00
Physical Target:
CW-1 - Road Widening: 3.64 lane km
Unit Cost: P 18,556,622.84 /lane km
Physical Target:
ROW: 299.26 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,364,113.75
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00790 |
300117204883000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204883000
Project ID: P00355517MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road along Pataw, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.08 lane km.
Unit Cost: P 13,377,147.04 /lane km
EAO: P 150,000.00
EXCESS: P 402,681.20
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00788 |
300117204880000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204880000
Project ID: P00355515MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Garid - Kan Mindus Road, Luuk, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.59 lane km.
Unit Cost: P 18,193,346.38 /lane km
EAO: P 300,000.00
EXCESS: P 772,579.26
Allocation: P 30,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00783 |
300117204884000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204884000
Project ID: P00347599MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Pandan Niog to Lumah Dapdap, Pangutaran, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 0.79 lane km.
Unit Cost: P 14,637,365.24 /lane km
EAO: P 120,000.00
EXCESS: P 316,481.46
Allocation: P 12,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00789 |
300111200063000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200063000
Project ID: P00345280MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Jolo - Taglibi - Tiptipon National Road, Panamao, Sulu
K22+000.00 - K24+790.00
Physical Target:
CW-1 - Road Widening: 5.58lane km
Unit Cost: P 18,041,161.49 /lane km
Physical Target:
ROW: 1,022.93 sq.m
Unit Cost: P 300.00 /sq.m
EAO: P 3,523,438.84
Allocation: P 104,500,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00792 |
300117204888000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204888000
Project ID: P00355521MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/concreting of Road, Laum, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 0.95 lane km.
Unit Cost: P 15,230,395.22 /lane km
EAO: P 150,000.00
EXCESS: P 381,124.54
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00781 |
300117204877000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204877000
Project ID: P00355514MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Brgy. Alu Layag-Layag Road, Parang, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.21 lane km.
Unit Cost: P 15,889,803.02 /lane km
EAO: P 200,000.00
EXCESS: P 573,338.35
Allocation: P 20,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00799 |
300117204876000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204876000
Project ID: P00347595MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Batu Ugis Road, Maimbung, Sulu
K0+000.00 - K0+610.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.22 lane km.
Unit Cost: P 15,793,028.20 /lane km
EAO: P 200,000.00
EXCESS: P 532,505.59
Allocation: P 20,000,000.00 |
October 8, 2019 |
2019 |
WIN9C03719 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection / Flood Control, Bangan Seawall, Sta. 0+365 - Sta. 0+455, Botolan, Zambales |
October 8, 2019 |
2019 |
WIN9C03707 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Local Roads and Bridges - Local Roads
Construction of road leading to tourism port and facilities at freeport area, Mariveles, Bataan |
October 8, 2019 |
2019 |
WIN9C03716 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Road - Naval St., Cupang North, City of Balanga, Bataan
|
October 8, 2019 |
2019 |
WIN9C03710 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Elliptical Rd - K0165+(-060) - K0165+060, K0166+000 - K0166+200, K0166+400 - K0166+610 |
October 8, 2019 |
CY 2019 |
WIN9F05948 |
UACS No. 300116201499000 |
May 28, 2019 |
National Capital Region |
North Manila District Engineering Office |
UACS No. 300116201499000
Project ID: P00345616LZ
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.796 lane km
Unit Cost: P17,236,180/ lane km
Allocation: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
As Modified
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.831 lane km
Unit Cost: P16,510,228/ lane km
Estimated Cost: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
WIN9F05948
|