Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
December 6, 2019 CY 2019 WIN9F05969 UACS No. 320101102550000 May 2, 2019 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 320101102550000
Project ID: P00320038LZ

OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 0.cu.m.
Unit Cost (P’000):
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 1.492 cu.m.
Unit Cost (P’000): P38.81/ cu.m.
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
WIN9F05969
December 6, 2019 CY 2019 WIN9F05969 UACS No. 320101102550000 May 2, 2019 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 320101102550000
Project ID: P00320038LZ

OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 0.cu.m.
Unit Cost (P’000):
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/ Rehabilitation of Waterways, University of the Philippines, Diliman, Quezon City
Physical Target – CW Channelization – 1.492 cu.m.
Unit Cost (P’000): P38.81/ cu.m.
Allocation (P’000): P57,900.00
EAO – P2,100.00
Total: P60,000,000.00
WIN9F05969
December 6, 2019 CY 2019 WIN9F05968 UACS No. 310103100260000 May 2, 2019 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310103100260000
Project ID: P00302591LZ

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads

Camp Aguinaldo Rd Network – (S05547LZ) Ch. 890 – Ch. 960
Physical Target – CW – Preventive Maintenance of Road: Asphalt Overlay –L= 0.430 lane km
Unit Cost (P’000): 8,131/lane km
Allocation (P’000): P3,496.64
EAO – P71.36
Total: P3,568.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads

Camp Aguinaldo Rd Network – (S05547LZ) Ch. 912 – Ch. 1010
Physical Target – CW – Preventive Maintenance of Road: Asphalt Overlay –L= 0.589 lane km
Unit Cost (P’000): 5,936/lane km
Allocation (P’000): P3,496.64
EAO – P71.36
Total: P3,568.00
WIN9F05968
December 2, 2019 FY 2019 WIN9G02794 300104211208000 October 9, 2019 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300104211208000
Project ID: P00351912MN

Local Program - Buildings and Other Structures - Multipurpose / Facilites - Local Infrastructure Program

Construction of Multi-Purpose Building (Covered Court), Linabo, Dapitan City, Zamboanga del Norte

Physical Target:
CW-1 - Construction of Multipurpose Building : 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00
November 18, 2019 FY 2019 WIN9B00821 300111200046000 August 29, 2019 Region IX Regional Office IX
UACS No. 300111200046000
Project ID: P00345272MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/ Rehabilitation of Various Projects in Sulu

Physical Target:
CW-1 - Rehabilitation of Concrete Road: 4.80 lane km
Unit Cost: P 16,075,512.11 /lane km
Physical Target:
ROW: 456.18 sq.m
Unit Cost: 300.00 /sq.m
EAO: P 2,700,686.04
Allocation: P 80,000,000.00
November 18, 2019 FY 2019 WIN9B00818 300119200279000 August 30, 2019 Region IX Regional Office IX
UACS No. 300119200279000
Project ID: P00355922MN

Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

Concrete Footbridge of Barangay Lahat Dampong, South Ubian, Tawi-Tawi

Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m.
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
November 18, 2019 FY 2019 WIN9B00819 300119200281000 August 30, 2019 Region IX Regional Office IX
UACS No. 300119200281000
Project ID: P00355924

Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

Concrete Footbridge of Barangay Tampakan Dampong, South Ubian, Tawi-Tawi

Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m.
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
November 18, 2019 FY 2019 WIN9B00826 300119200284000 August 30, 2019 Region IX Regional Office IX
UACS No. 300119200284000
Project ID: P00355927MN

Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

Concrete Footbridge with Pier Head, Bunah Bunaan, Luuk Buntal, Panglima, Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Bridge : 175.00 sq.m.
Unit Cost: P 28,285.71 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
November 18, 2019 FY 2019 WIN9B00823 300117204889000 August 29, 2019 Region IX Regional Office IX
UACS No. 300117204889000
Project ID: P00355522MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Concreting of Road, Laum, Maimbung-Darul Jambangan, Sulu

Physical Target:
CW-1 - Construction of Concrete Road : 1.24 lane km
Unit Cost: P 15,542,746.75 /lane km
EAO: P 200,000.00
EXCESS: 526,994.03
Allocation: P 20,000,000.00
November 18, 2019 FY 2019 WIN9B00816 300117204891000 September 17, 2019 Region IX Regional Office IX
UACS No. 300117204891000
Project ID: P00347601MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Reblocking of Camp Andres-Romandier National Road
K26+670.00 - K26+784.26
K27+011.46 - K28+100.00

Physical Target:
CW-1 - Preventive Maintenance of Concrete Road: 2.4056 lane km
Unit Cost: P 16,028,457.24 /lane km
EAO: P 400,000.00
EXCESS: 1,041,943.27
Allocation: P 40,000,000.00
November 18, 2019 FY 2019 WIN9B00825 300119200283000 August 30, 2019 Region IX Regional Office IX
UACS No. 300119200283000
Project ID: P00355926MN

Local Program - Local Roads and Bridges - Local Bridges - Local Infrastructure Program

Concrete Footbridge of Sitio Malinsik, Barangay Kulape, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Bridge : 225.00 sq.m
Unit Cost: P 22,000.00 /sq.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
November 18, 2019 FY 2019 WIN9B00822 300107200592000 August 30, 2019 Region IX Regional Office IX
UACS No. 300107200592000
Project ID: P00353542MN

Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program

Construction of Slope Protection, Kabukan Proper, Hadji Panglima Tahil, Sulu

Physical Target:
CW-1 - Construction of Flood Mitigation Structure :542.50 ln.m
Unit Cost: P 18,250.67 /ln.m
EAO: P 99,009.90
Allocation: P 10,000,000.00
November 18, 2019 FY 2019 WIN9B00820 300107200591000 August 30, 2019 Region IX Regional Office IX
UACS No. 300107200591000
Project ID: P00353541MN

Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program

Construction of Nunukan Seawall, Parang, Sulu

Physical Target:
CW-1 - Construction of Flood Mitigation Structure :675.00 ln.m
Unit Cost: P 14,668.13 /ln.m
EAO: P 99,009.90
Allocation: P 10,000,000.00
November 18, 2019 FY 2019 WIN9B00824 300117204893000 August 30, 2019 Region IX Regional Office IX
UACS No. 300117204893000
Project ID: P00347603MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Road, Bangas, Hji Panglima Tahil, Sulu

Physical Target:
CW-1 - Rehabilitation of Concrete Road : 0.93 lane km
Unit Cost: P 10,646,225.91 /lane km
EAO: P 99,009.00
Allocation: P 10,000,000.00
November 7, 2019 2019 WIN9C03522 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 310104100098000
Project ID: P00301443LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando R Andaya Highway - K0326 + 000 - K0326 + 193, K0327 + 731 - K0327 + 982, K0328 + 852 - K0328 + 998, K0329 + 522 - K0330 + 250, K0330 + 824 - K0333 + 357
Physical Target: 0.888 Lane Km
Amount: Php 149,683,000.00

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando A Andaya Highway - K0326 + 000 - K0326 + 193, K0327 + 731 - K0327 + 982, K0328 + 852 - K0328 + 1001, K0329 + 500 - K0330 + 245, K0330 + 824 - K0331 + 480, K0331+740 – K0333+368.7, K0334+417 – K0335+038, K0335+654 – K0335+819
Physical Target: 0.888 Lane Km
Amount: Php 149,683,000.00
November 7, 2019 2019 WIN9C03706 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 310204100461000
Project ID: P00303737LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development - Construction of By-Pass and Diversion Roads - Sorsogon City Coastal By-Pass Road, Package 4, Sorsogon Physical Target: CW1 - 0.86 Lane Km Construction of Concrete Road
CW2 – 585.60 sq.m. Construction of Concrete Bridge
Amount: Php 100,000,000.00

TO:
OO1: Ensure Safe and Reliable National Road System Network Development - Construction of By-Pass and Diversion Roads - Sorsogon City Coastal By-Pass Road, Package 4, Sorsogon Physical Target: CW1 – 0.3908 Lane Km Construction of Concrete Road
CW2 – 915.00 sq.m. Construction of Concrete Bridge
Amount: Php 100,000,000.00
November 7, 2019 2019 WIN9C03712 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 310205100253000
Project ID: P00304078LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development - Network Development - Construction of Missing Links/ New Roads - Poblacion Morocborocan-Guindahap Road, Masbate
Physical Target: CW1 - Construction of Concrete Road – 2.480Lane Km
Amount: Php 100,000,000.00

TO:
OO1: Ensure Safe and Reliable National Road System Network Development - Network Development - Construction of Missing Links/ New Roads - Poblacion Morocborocan-Guindahap Road, Masbate
Physical Target: CW1 - Construction of Concrete Road – 1.052 Lane Km
CW2 – Construction of Road Slope Protection Structure – 27,178.44 Square meters
CW2 – Construction of Drainage Structure along Road – 976.26 lineal meters
Amount: Php 100,000,000.00
November 7, 2019 2019 WIN9C03523 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 310104100095000
Project ID: P00304225LZ
FROM:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Rolando R. Andaya Highway K0282 + (-186) - K0282 + (-181), K0282 + 160 - K0282 + 245, K0282 + 341.50 - K0282 + 376, K0282 + 758.40 - K0282 +911.50, K0283 + 109 - K0283 + 464.50, K0283 + 671 - K0284 + 008, K0284 + 213.50 - K0284 + 491.30, K0284 + 784.50 - K0285 + 002, K0287 +000 - K0287 + 742.50, K0288 + 095 - K0288 + 376, K0291 + 000 - K0291 + 601.50, K0291 + 857 - K0291 + 960, K0295 + 400 - K0295 + 976.50, K0296 + 468 - K0296 +739, K0296 + 981 - K0297 + 255.60, K0297 + 470 - K0297 + 560, K0297 + 671.80 - K0297 + 781, K0299 + 047 - K0299 + 108.5, K0308 + 435.20 - K0308 + 444.20, K0309 + 055.60 - K0309 + 088.8, K0309 + 447 - K0309 + 597, K0315 + 993 - K0316 + 263, K0319 + 938 -K0320 + 959, K0321 + 992 - K0322 + 131, K0322 + 592 - K0323 + 452, K0323 + 650.7 - K0323 + 773
Physical Target: CW1 - Reconstruction of Concrete Pavement – 43.310 Lane Km
Amount: Php 250,000,000.00

TO:
OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads – Rolando A Andaya Highway K0282 + (-186) - K0282 + (-181), K0282 + 160 - K0282 + 245, K0282 + 341.50 - K0282 + 376, K0282 + 758.40 - K0282 +911.50, K0283 + 109 - K0283 + 464.50, K0283 + 671 - K0284 + 008, K0284 + 213.50 - K0284 + 491.30, K0284 + 784.50 - K0285 + 002, K0287 +000 - K0287 + 742.50, K0288 + 095 - K0288 + 376, K0288 + 737 - K0288 + 996, K0291 + 857 - K0291 + 960, K0295 + 400 - K0295 + 976.50, K0296 + 468 - K0296 +739, K0296 + 981 - K0297 + 255.60, K0297 + 470 - K0297 + 560, K0297 + 671.80 - K0297 + 781, K0299 + 047 - K0299 + 108.5, K0308 + 435.20 - K0308 + 444.20, K0309 + 055.60 - K0309 + 088.8, K0309 + 447 - K0309 + 597, K0315 + 993 - K0316 + 263, K0319 + 938 -K0320 + 959, K0321 + 992 - K0322 + 131, K0322 + 592 - K0323 + 452, K0323 + 650.7 - K0322+681.50
Physical Target: CW1 - Reconstruction of Concrete Pavement – 12.992 Lane Km
Amount: Php 250,000,000.00
November 7, 2019 2019 WIN9C03702 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 320101102653000
Project ID: P00320158LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Nicolas River Control (Right Side), Brgy Cabanbanan, San Vicente,
Camarines Norte
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,167.0 Lineal meters
Amount: Php 100,000,000.00

TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of San Nicolas River Control (Right Side), Brgy Cabanbanan, San Vicente,
Camarines Norte
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,160.50 Lineal meters
Amount: Php 100,000,000.00
November 7, 2019 2019 WIN9C03691 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 320101102664000
Project ID: P00320170LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Somal-ot Seawall and Embankment, Phase III, Casiguran, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 460.0 Lineal meters
Amount: Php 100,000,000.00

TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Somal-ot Seawall and Embankment, Phase III, Casiguran, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 467.81 Lineal meters
Amount: Php 100,000,000.00
November 7, 2019 2019 WIN9C03726 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 320102100648000
Project ID: P00322254LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike along Libmanan River, Bicol River Basin, Brgy. Mancawayan, Libmanan, Camarines Sur
Physical Target: CW1 - Construction of Dike Structure – 130.00 Lineal meters
Amount: Php 30,000,000.00

TO:
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike along Libmanan River, Bicol River Basin, Brgy. Mancawayan, Libmanan, Camarines Sur
Physical Target: CW1 - Construction of Dike Structure – 158.20 Lineal meters
Amount: Php 30,000,000.00
November 7, 2019 2019 WIN9C03618 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300203100713000
Project ID: P00330363LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package I) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 2.5 Lane Km
Amount: Php 50,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package I) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.706 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,129 Lineal meters
CW3 – Construction of Slope Protection Structure – 7,210.48 Square meters
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03597 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300203100714000
Project ID: P00330364LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package II) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 4.0 Lane Km
Amount: Php 50,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White Sand Beaches (Balatan Section - Package II) Camarines Sur
Physical Target: CW1 - Construction of Concrete Road – 1.956 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,022.42 Lineal meters
CW3 – Construction of Slope Protection Structure – 9,846.72 Square meters
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03602 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300203100710000
Project ID: P00330382LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Matnog-Bulan-Magallanes Tourism West Coast Highway (Section 3), Magallanes, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 5.892 Lane Km
CW2 – Construction of Slope Protection Structure – 7,231.67 Square meters
Amount: Php 110,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations - Matnog-Bulan-Magallanes Tourism West Coast Highway (Section 3), Magallanes, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 5.892 Lane Km
CW2 – Construction of Slope Protection Structure – 7,231.67 Square meters
Amount: Php 110,000,000.00
November 7, 2019 2019 WIN9C03636 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300204100150000
Project ID: P00330998LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.067 Lane Km
Amount: Php 10,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.06674 Lane Km
CW2 – Construction of Slope Protection Structure – 302.42 Square meters
Amount: Php 10,000,000.00
November 7, 2019 2019 WIN9C03636 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300204100150000
Project ID: P00330998LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.067 Lane Km
Amount: Php 10,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.06674 Lane Km
CW2 – Construction of Slope Protection Structure – 302.42 Square meters
Amount: Php 10,000,000.00
November 7, 2019 2019 WIN9C03630 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300204100160000
Project ID: P00330999LZ
FROM:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy.2-Brgy. 1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.56 Lane Km
Amount: Php 10,000,000.00

TO:
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - Brgy. 3-Brgy.2-Brgy. 1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 - Construction of Concrete Road – 0.0708 Lane Km
CW2 – Construction of Slope Protection Structure – 365.99 Square meters
Amount: Php 10,000,000.00
November 7, 2019 2019 WIN9C03732 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300105200146000
Project ID: P00340168LZ
FROM:
Local Program – Building and Other Structures – National Building Program - Construction of Two-Storey PRC Testing Center Building Phase II, Government Regional Center, Rawis, Legazpi City
Physical Target: CW1 - Construction of Multi Purpose Building/ 1 Number of Building
Amount: Php 38,726,000.00

TO:
Local Program – Building and Other Structures – National Building Program - Construction of Two-Storey PRC Testing Center Building Phase I, Government Regional Center, Rawis, Legazpi City
Physical Target: CW1 - Construction of Multi Purpose Building/ 1 Number of Building
Amount: Php 38,726,000.00
November 7, 2019 2019 WIN9C03680 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300106200159000
Project ID: P00344760LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Gimagaan River Control Structure, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1,214.895 Lineal meters
Amount: Php 100,000,000.00

TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Gimagaan River Control Structure, Donsol, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure –740.97 Lineal meters
Amount: Php 100,000,000.00
November 7, 2019 2019 WIN9C03705 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300106200218000
Project ID: P00344903LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Constructiion of San Juan-Roro-Borabot River Control, Sorsogon City, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 242.979 Lineal meters
Amount: Php 20,000,000.00

TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of San Juan Roro-Borabod River Control, Sorsogon City, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 155.42 Lineal meters
Amount: Php 20,000,000.00
November 7, 2019 2019 WIN9C03723 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300106200191000
Project ID: P00346009LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Opening/Concreting/Widening Improvement of Malbog Burabot Road, Pilar, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 10.0 Lane KM
Amount: Php 50,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Opening/Concreting/Widening Improvement of Malbog Burabod Road, Pilar and Castilla, Sorsogon
Physical Target: CW1 - Construction of Concrete Road –3.754 Lane KM
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03700 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201911000
Project ID: P00346010LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects Widening Improvement of Road, Burabod, Maracabac, San Rafael Junction, San Rafael-Daang Maharlika National Road
Physical Target: CW1 - Construction of Concrete Road – 10.0 Lane KM
Amount: Php 50,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects Widening Improvement of Road, Burabod, Maracabac, San Rafael Junction, San Rafael-Daang Maharlika National Road
Physical Target: CW1 - Construction of Concrete Road – 3.076 Lane KM
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03598 FY 2019 GAA April 29, 2019 Region V Regional Office V

UACS No.: 300106200216000
Project ID: P00353271LZ
FROM:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Danicop Flood Control, Virac, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure - 0 Lineal Meter
Amount: Php 20,000,000.00

TO:
Local Program – Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Danicop Flood Control, Virac, Catanduanes
Physical Target: CW1 - Construction of Flood Mitigation Structure – 115.530 Lineal Meter
Amount: Php 20,000,000.00
November 7, 2019 2019 WIN9C03675 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201854000
Project ID: P00353898LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 1 -District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 1 -District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.08 Lane Km
CW2 – Construction of Drainage Structure along Road – 817.90 Lineal meters
CW3 – Construction of Slope Protection Structure – 3,336.00 Square meters
Amount: Php 40,000,000.00
November 7, 2019 2019 WIN9C03735 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201855000
Project ID: P00353899LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 3 - District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of District 3 - District 2 Road, San Miguel, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 0.804 Lane Km
CW2 – Construction of Drainage Structure along Road – 822 Lineal meters
CW3 – Construction of Slope Protection Structure – 4,863.00 Square meters
Amount: Php 40,000,000.00
November 7, 2019 2019 WIN9C03595 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201856000
Project ID: P00353900LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Brgy. Lictin - Bonot, San Andres, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Brgy. Lictin - Bonot, San Andres, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.3174 Lane Km
Amount: Php 40,000,000.00
November 7, 2019 2019 WIN9C03545 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201857000
Project ID: P00353901LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Cavinitan - Pajo San Isidro Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 50,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Cavinitan - Pajo San Isidro Road, Virac, CatanduanesPhysical Target: CW1 - Construction of Concrete Road – 3.038 Lane Km
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03676 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201858000
Project ID: P00353902LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Hawan - Mamangal Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 50,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Hawan - Mamangal Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 4.230 Lane Km
Amount: Php 50,000,000.00
November 7, 2019 2019 WIN9C03638 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201859000
Project ID: P00353903LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Sta. Elena - Sto. Niño Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 40,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Construction of Road, Sta. Elena - Sto. Niño Road, Virac, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.73564 Lane Km
Amount: Php 40,000,000.00
November 7, 2019 2019 WIN9C03603 FY 2019 GAA April 29, 2019 Region V Regional Office V
UACS No.: 300116201860000
Project ID: P00353904LZ
FROM:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects - Road Concreting (Junction National Road to Nahulugan Falls), Gigmoto, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 2.0 Lane Km
Amount: Php 20,000,000.00

TO:
Local Program – Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects – Road Concreting (Junction National Road to Nahulugan Falls), Gigmoto, Catanduanes
Physical Target: CW1 - Construction of Concrete Road – 1.190 Lane Km
Amount: Php 20,000,000.00
November 4, 2019 2019 WIN9C03714 GAA 2019 May 6, 2019 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction/Rehabilitation/Upgrading/Improvement of Chico River Flood Control (Talubin Section) Talubin, Bontoc, Mountain Province;
Physical Target: CW1 : 92 Lineal Meter; Allocation= Php 5,000,000

To: Construction/Rehabilitation/Upgrading/Improvement of Talubin River Flood Control (Talubin Section) Talubin, Bontoc, Mountain Province;
Physical Target: CW1 : 92 Lineal Meter; Allocation= Php 5,000,000

October 30, 2019 2019 WIN9C03721 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction/Continuation of Sitio Pata, Taga Flood Control along Chico River, Poblacion, Taga, Pinukpuk, Kalinga;
Physical Target: CW1 : 260 Lineal Meter;
Allocation= Php 20,000,000

To: Construction/Continuation of Sitio Pata, Taga Flood Control along Saltan River, Poblacion, Taga, Pinukpuk, Kalinga;
Physical Target: CW1 : 260 Lineal Meter;
Allocation= Php 20,000,000

October 30, 2019 2019 WIN9C03717 GAA 2019 May 6, 2019 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Bulanao-Paracelis Rd - K0510 + 297 - K0510 + 314, K0510 + 633 - K0510 + 674;
Physical Target: CW1: 0.116 Lane Km;
Allocation= Php 2,533,000

To: Bulanao-Paracelis Rd - K0510 + 297 - K0510 + 314, K0510 + 765 - K0510 + 797;
Physical Target: CW1: 0.069 Lane Km;
Allocation= Php 2,533,000
October 18, 2019 GAA 2019 WIN9F05956 UACS No. 300104205777000 July 5, 2019 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300104205777000
Project ID: P00340925LZ

Local Program
Local – Buildings and Other Structures – Multi-Purpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Barangay Sto. Rosario Kaunlaran, Pateros, Metro Manila

Physical Target – CW Construction of Multi-Purpose Building L=1 bldg
Unit Cost (P’000): P3,960.00/bldg.
Allocation (P’000): P3,960.00
EAO – P40.00
Total: P4,000,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multi-Purpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Barangay Sto. Rosario Kanluran, Pateros, Metro Manila

Physical Target – CW Construction of Multi-Purpose Building L=1 bldg
Unit Cost (P’000): P3,960.00/bldg.
Allocation (P’000): P3,960.00
EAO – P40.00
Total: P4,000,000.00
WIN9F05956
October 17, 2019 2019 WIN9G02783 FY2019 GAA RA 11260 April 29, 2019 Region XIII Regional Office XIII
UACS No. 300111200068000
Project ID: P00345294MN

LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Asphalt overlay Daang Maharlika (Surigao – Agusan Road), Angtongalon - Sumilihon - Los Angeles – Sto Nino Section, Intermittent Sections, K1217+000 - K1217+331.80, K1219+412.33 – K1219+621.67, K1219+647.71 – K1220+358.80, K1220+382.91 – K1221+560, K1

CW1 - Construction of Asphalt Road / 15.001 lane-km
Unit Cost - P 9.64935671M / lane-km
Allocation - P 144.750M

EAO - P 5.250M

TOTAL - P 150M

TO:

Asphalt overlay Daang Maharlika (Surigao – Agusan Road), Antongalon - Sumilihon - Los Angeles – Sto Nino Section, Intermittent Sections, K1222+(-016) - K1223+644, K1226+000 – K1227+549, K1227+549 – K1227+843, K1233+199 – K1234+448, K1234+448 - K1235+727, K1240+159 - K1240+632, K1240+632 - K1240+696

CW1 - Construction of Asphalt Road / 15.001 lane-km
Unit Cost - P 9.64935671M / lane-km
Allocation - P 144.750M

EAO - P 5.250M

TOTAL - P 150M
October 16, 2019 FY 2019 WIN9G02720 300109200477000 July 24, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200477000
Project ID: P00345241MN

Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program

Construction/Rehabilitation of Drainage Facilities, Barangay Baliwasan, Zamboanga City

Physical Target:
CW1- Rehabilitation/Major Repair of Drainage Structure: 465.62 lm
Unit Cost: P 10,630.00/lm
EAO: P 50,000.00
Allocation: P 5,000,000.00
October 16, 2019 FY 2019 WIN9G02747 300109200484000 August 15, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200484000
Project ID: P00353226MN

Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program

Construction of Drainage System at Tugbungan Elementary School, Barangay Tugbungan, Zamboanga City

Physical Target:
CW1- Construction of Drainage Structure: 157.00 lm
Unit Cost: P 12,611.46/lm
EAO: P 20,000.00
Allocation: P 2,000,000.00
October 16, 2019 FY 2019 WIN9G02716 300107200593000 July 22, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300107200593000
Project ID: P00353543MN

Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program

Construction of Flood Control at Barangay Sibulao, Zamboanga City

Physical Target:
CW1- Construction of Flood Mitigation Structure: 395.68 ln.m.
Unit Cost: P 37,530.33/ln.m.
EAO: P 150,000.00
Allocation: P 15,000,000.00
October 16, 2019 FY 2019 WIN9G02713 310305100709000 July 24, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310305100709000
Project ID: P00301556MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Pamingitan Br. 1 (B00570MN) along Pagadian City - Zamboanga City Rd

CW1- Widening of Bridge: 125.1068 sq.m.
Unit Cost: P 121,710.00/sq.m.
ROW: 372 sq.m.
Unit Cost: P 1,259.00
EAO: P 304,535.53
Allocation: P 16,000,000.00
October 16, 2019 FY 2019 WIN9G02712 310305100710000 July 24, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310305100710000
Project ID: P00301557MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Pamingitan Br. 2 (B00569MN) along Pagadian City - Zamboanga City Rd

CW1- Widening of Bridge: 125.1068 sq.m.
Unit Cost: P 119,302.00/sq.m.
ROW: 372 sq.m.
Unit Cost: P 2,080.00
EAO: P 300,000.00
Allocation: P 16,000,000.00
October 16, 2019 FY 2019 WIN9G02739 300117204923000 July 23, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117204923000
Project ID: P00347619MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Road Concreting, Barangay Tolosa, Zamboanga City

Physical Target:
CW1- Construction of Concrete Road: 0.252 lane km
Unit Cost: P 5,892,857.14
EAO: P 15,000.00
Allocation: P 1,500,000.00
October 14, 2019 FY 2019 WIN9G02782 310204100494000 October 1, 2019 Region IX Regional Office IX
UACS No. 310204100494000
Project ID: P00304412MN

OO1: Ensure Safe and Reliable National Road System -
Network Development - Construction of By-Pass and Diversion Roads

Zamboanga City Diversion Road, (Cabaluay - Zambowood - Mampang Section), Mercedes Br. 1, Zamboanga City

Physicat Target:
CW1- Construction of Concrete Bridge: 645.75 Sq.m.
Unit Cost: P 73,608.87/sq.m.
EAO: P 1,750,000.00
Excess: P 717,070.76
Allocation; P 50,000,000.00
October 14, 2019 FY 2019 WIN9G02753 320102100944000 August 5, 2019 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320102100944000
Project ID: P00323033MN

OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Conception, Alicia, Zamboanga Sibugay

Physical Target:
CW1 - Construction of Flood Mitigation Structure: 311.000 ln.m.
Unit Cost: P 85,080.00 /ln.m.
EAO: P 540,000.00
Allocation: P 27,000,000.00
October 14, 2019 FY 2019 WIN9G02755 300117204936000 August 13, 2019 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300117204936000
Project ID: P00347626MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Purok 2, Brgy. Lugdungan, Dipolog City, Zamboanga del Norte

Physical Target:
CW-1 - Construction of Concrete Road: 0.350 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 17,500.00
Allocation: P 1,750,000.00
October 14, 2019 FY 2019 WIN9G02748 300121200447000 August 13, 2019 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300121200447000
Project ID: P00348106MN

Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program

Construction of Level II Water System, Sitio San Vicente, Brgy. East Poblacion, Manukan, Zamboanga del Norte

Physical Target:
CW-1 - Construction of Water Supply Systems : 1.0 unit
Unit Cost: P 1,000,000.00 /unit
Allocation: P 1,000,000.00
October 14, 2019 FY 2019 WIN9G02745 300116202022000 August 6, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300116202022000
Project ID: P00353956MN


Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Upgrading/ Concreting of NRJ Canunan-Guling-Payag-Mabuhay-Pongapong-Poblacion-Guipos-San Pablo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 3.26292 lane km
Unit Cost: P 9,010,000.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00
October 14, 2019 FY 2019 WIN9G02750 300117204958000 August 6, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300117204958000
Project ID: P00355560MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Concreting of Sugbay Uno - Kagawasan - Poblacion - Bacayawan, Dimataling, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 2.0 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00
October 14, 2019 CY 2019 WIN9G02744 300104211319000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211319000
Project ID: P00351964MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Covered Court, Brgy. Limbayan, Pitogo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00
October 14, 2019 FY 2019 WIN9G02746 300116202021000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300116202021000
Project ID: P00353955MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Opening/ Improvement of Barangay Road from Purok Gabi Tubo - Pait, Dumalinao to Barangay Bag-ong Misamis, San Pablo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 0.864 lane km
Unit Cost: P 6,240,000.00 /lane km
EAO: P 110,000.00
Allocation: P 5,500,000.00
October 14, 2019 FY 2019 WIN9G02749 300104211280000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211280000
Project ID: P00343668MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Multi-Purpose Building (Covered Court), Brgy. Guinicolalay Elementary School, Guinicolalay, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,584,000.00 /building
EAO: P 16,000.00
Allocation: P 1,600,000.00
October 14, 2019 FY 2019 WIN9G02743 300104211281000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211281000
Project ID: P00343669MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Multi-Purpose Building (Hall), Bacayawan, Dimataling, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,980,000.00 /building
EAO: P 20,000.00
Allocation: P 2,000,000.00
October 14, 2019 FY 2019 WIN9G02772 320102100940000 August 19, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320102100940000
Project ID: P00322289MN

Local Program - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Tumaga River Basin, Tetuan Section, Zamboanga City

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 162.03 lm
Unit Cost: P 126,064.00 /lm
EAO: P 416,860.00
Allocation: P 20,843,000.00
October 14, 2019 FY 2019 WIN9G02766 300116202023000 August 22, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116202023000
Project ID: P00353957MN


Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Provincial Road Connecting Brgys. Canacan, Sininan. Banker, Tampilisan, Diampak and Shiolan, Kabasalan, Zamboanga Sibugay (Package 1)

Physical Target:
CW-1 - Construction of Concrete Road: 2.402 lane km
Unit Cost: P 12,239,800.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00
October 11, 2019 2019 WIN9C03703 SR2019-06-003791 June 7, 2019 Region III Regional Office III
Network Development - Constructions of By-pass and Diversion Roads

Lubao-Guagua-Minalin-Sto. Tomas Road (Lubao-Guagua Section), Pampanga
October 11, 2019 2019 WIN9C03731 FY 2019 GAA April 15, 2019 Region III Regional Office III
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/ Destinations, Brgy. Ditawini, Dinalungan, Aurora
October 11, 2019 2019 WIN9C03718 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Baliwag-Candaba-Sta Ana Rd
K0058 + (-050) - K0058 + 042, K0059 + 060 - K0059 + 452,
K0061 + 951 - K0062 + 979, K0063 + 000 - K0063 + 041,
K0063 + 169 - K0063 + 210, K0063 + 236 - K0063 + 593,
K0063 + 757 - K0063 + 772
October 11, 2019 FY 2019 GAA WIN9G02775 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao City District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.322 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.064 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00
October 11, 2019 FY 2019 GAA WIN9G02779 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Composela Valley
Physical Target:
CW1: 2.320 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Compostela Valley
Physical Target:
CW1: 1.880 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
October 11, 2019 FY 2019 GAA WIN9G02778 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.520 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.180 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
October 11, 2019 2019 WIN9C03729 FY 2019 GAA (RA 11260) April 15, 2019 Region III Bulacan 1st District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads

Malolos City Circumferential Road, Bulacan (Sto. Cristo-Sto. Niño) By pass Road, Bulacan
October 11, 2019 2019 WIN9C03725 SR2019-06-004681 June 18, 2019 Region III Bulacan 1st District Engineering Office
National Roads and Bridges - National Roads

Construction of Guiguinto By-Pass Road (Sta. Rita Kabilang Bakood-Cutcut Road), Guiguinto, Bulacan
October 9, 2019 CY 2019 WIN9F05953 UACS No. 320101102838000 May 30, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102838000
Project ID: P00322721LZ

OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along Irasan Creek Brgy. Sto. Niñ, District I, Parañaque City
Physical Target – CW Construction of Drainage Structure 320.00 lineal meters
Unit Cost: P127,176.44 /l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems.
Construction of Box Culvert along Irasan Creek, Brgy. San Dionisio, District I, Parañaque City
Physical Target: CW1 – Construction of Drainage Structure 420.00 Lineal meters
Unit Cost: P96,896.33/l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
WIN9F05953
October 9, 2019 FY 2019 WIN9B00797 300117204886000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204886000
Project ID: P00355519MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/concreting of Pang, Kalingalan Caluang-Lubhang, Tubig Putih, Luuk, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 2.86 lane km.
Unit Cost: P 16,873,465.03 /lane km
EAO: P 500,000.00
EXCESS: P 1,241,890.01
Allocation: P 50,000,000.00
October 9, 2019 FY 2019 WIN9B00794 300111200067000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200067000
Project ID: P00345284MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panamao, Sulu
K32+000.00 - K33+870.00

Physical Target:
CW-1 - Road Widening: 3.74 lane km
Unit Cost: P 18,049,999.45 /lane km
Physical Target:
ROW: 434.19 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,744.93
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00784 300111200042000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200042000
Project ID: P00345264MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/Concreting of Batu-Batu - Kulape Road, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.858 lane km
Unit Cost: P 32,988,928.21 /lane km
Physical Target:
ROW: 2,500 Sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,299,882.49
Excess: P 1,667,760.68
Allocation: P 100,000,000.00
October 9, 2019 FY 2019 WIN9B00785 300111200047000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200047000
Project ID: P00345273MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Continuation of Boleh Sallang Road, Sibutu, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.44 lane km
Unit Cost: P 15,776,384.34 /lane km
EAO: P 1,400,000.00
Excess: P 105,622.21
Allocation: P 40,000,000.00
October 9, 2019 FY 2019 WIN9B00802 300117204892000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204892000
Project ID: P00347602MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Poblacion Road, Maimbung, Sulu, K0+000.00 - K0+520.00

Physical Target:
CW-1 - Rehabilitation of Concrete Road: 1.04 lane km.
Unit Cost: P 13,891,984.63 /lane km
EAO: P 150,000.00
EXCESS : P 402,335.98
Allocaation : P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00780 300111200064000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200064000
Project ID: P00345281MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K26+000.00 - K27+880.00

Physical Target:
CW-1 - Road Widening: 3.76 lane km
Unit Cost: P 17,939,616.61 /lane km
Physical Target:
ROW: 620.63 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 236,853.55
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00800 300117204879000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204879000
Project ID: P00347597MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Duhul Kabbun Road, Maimbung, Sulu
K0+000.00 - K0+640.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.28 lane km.
Unit Cost: P 15,048,521.63 /lane km
EAO: P 200,000.00
EXCESS: P 537,892.31
Allocation: P 20,000,000.00
October 9, 2019 FY 2019 WIN9B00801 300111200044000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200044000
Project ID: P00345267MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/ concreting of Tawi-Tawi Circumferential Road, Parangan - Magsaggaw Section, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.72 lane km
Unit Cost: P 34,037,623.35 /lane km
Physical Target:
ROW: 9,500 Sq.m.
Unit Cost: P 1000.00 /sq.m.
EAO: P 3,850,000.00
Excess: P 4,067,664.48
Allocation: P 110,000,000.00
October 9, 2019 FY 2019 WIN9B00791 300111200043000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200043000
Project ID: P00345263MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/ concreting of Sumangday - Baunu Garing Road, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 4.52 lane km
Unit Cost: P 20,429,137.21 /lane km
EAO: P 3,500,000.00
Excess: P 4,160,299.81
Allocation: P 100,000,000.00
October 9, 2019 FY 2019 WIN9B00798 300117204878000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204878000
Project ID: P00347596MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Darul Jambangan, Maimbung, Sulu, K0+000.00 - K0+580.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.16 lane km.
Unit Cost: P 12,482,197.88 /lane km
EAO: P 150,000.00
EXCESS: P 370,650.46
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00796 300111200056000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200056000
Project ID: P00345278MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Pahut - Sanga-Sanga - Batu-Batu Road with ROW, Bonggao, Tawi-Tawi

Physical Target:
CW-1 - Road Widening: 3.604 lane km
Unit Cost: P 18,930,439.28 /lane km
Physical Target:
ROW: 75,000 sq.m
Unit Cost: P 1,000.00 / sq.m.
EAO: P 5,250,000.00
Excess: P 1,524,696.80
Allocation: P 150,000,000.00
October 9, 2019 FY 2019 WIN9B00793 300111200041000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200041000
Project ID: P00345262MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Romandier - Camp Andres National Road, Panamao,Sulu, K31+600.00 - K32+600.00, K34+000.00 - K36+000.00, K39+000.00 - K39+110.00

Physical Target:
CW-1 - Construction of Concrete Road: 6.22 lane km
Unit Cost: P 17,886,367.25 /lane km
Physical Target:
ROW: 1,176.45 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 3,893,862.15
Allocation: P 115,500,000.00
October 9, 2019 FY 2019 WIN9B00786 300117204882000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204882000
Project ID: P00355516MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road along Gulangan, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.09 lane km.
Unit Cost: P 13,261,122.50 /lane km
EAO: P 150,000.00
EXCESS: P 395,376.48
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00795 300117204890000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204890000
Project ID: P00355523MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ concreting of Road, Tubig Samin, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.03 lane km.
Unit Cost: P 14,040,108.65 /lane km
EAO: P 150,000.00
EXCESS: P 388,688.09
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00782 300111200066000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200066000
Project ID: P00345283MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K30+000.00 - K31+850.00

Physical Target:
CW-1 - Road Widening: 3.70 lane km
Unit Cost: P 18,243,023.71 /lane km
Physical Target:
ROW: 461.14 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,471.57
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00787 300111200065000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200065000
Project ID: P00345282MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K28+000.00 - K29+820.00

Physical Target:
CW-1 - Road Widening: 3.64 lane km
Unit Cost: P 18,556,622.84 /lane km
Physical Target:
ROW: 299.26 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,364,113.75
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00790 300117204883000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204883000
Project ID: P00355517MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road along Pataw, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.08 lane km.
Unit Cost: P 13,377,147.04 /lane km
EAO: P 150,000.00
EXCESS: P 402,681.20
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00788 300117204880000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204880000
Project ID: P00355515MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Garid - Kan Mindus Road, Luuk, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.59 lane km.
Unit Cost: P 18,193,346.38 /lane km
EAO: P 300,000.00
EXCESS: P 772,579.26
Allocation: P 30,000,000.00
October 9, 2019 FY 2019 WIN9B00783 300117204884000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204884000
Project ID: P00347599MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Pandan Niog to Lumah Dapdap, Pangutaran, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 0.79 lane km.
Unit Cost: P 14,637,365.24 /lane km
EAO: P 120,000.00
EXCESS: P 316,481.46
Allocation: P 12,000,000.00
October 9, 2019 FY 2019 WIN9B00789 300111200063000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200063000
Project ID: P00345280MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Jolo - Taglibi - Tiptipon National Road, Panamao, Sulu
K22+000.00 - K24+790.00

Physical Target:
CW-1 - Road Widening: 5.58lane km
Unit Cost: P 18,041,161.49 /lane km
Physical Target:
ROW: 1,022.93 sq.m
Unit Cost: P 300.00 /sq.m
EAO: P 3,523,438.84
Allocation: P 104,500,000.00
October 9, 2019 FY 2019 WIN9B00792 300117204888000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204888000
Project ID: P00355521MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/concreting of Road, Laum, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 0.95 lane km.
Unit Cost: P 15,230,395.22 /lane km
EAO: P 150,000.00
EXCESS: P 381,124.54
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00781 300117204877000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204877000
Project ID: P00355514MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Brgy. Alu Layag-Layag Road, Parang, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.21 lane km.
Unit Cost: P 15,889,803.02 /lane km
EAO: P 200,000.00
EXCESS: P 573,338.35
Allocation: P 20,000,000.00
October 9, 2019 FY 2019 WIN9B00799 300117204876000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204876000
Project ID: P00347595MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Batu Ugis Road, Maimbung, Sulu
K0+000.00 - K0+610.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.22 lane km.
Unit Cost: P 15,793,028.20 /lane km
EAO: P 200,000.00
EXCESS: P 532,505.59
Allocation: P 20,000,000.00
October 8, 2019 2019 WIN9C03719 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection / Flood Control, Bangan Seawall, Sta. 0+365 - Sta. 0+455, Botolan, Zambales
October 8, 2019 2019 WIN9C03707 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Local Roads and Bridges - Local Roads

Construction of road leading to tourism port and facilities at freeport area, Mariveles, Bataan
October 8, 2019 2019 WIN9C03716 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Road - Naval St., Cupang North, City of Balanga, Bataan
October 8, 2019 2019 WIN9C03710 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Elliptical Rd - K0165+(-060) - K0165+060, K0166+000 - K0166+200, K0166+400 - K0166+610
October 8, 2019 CY 2019 WIN9F05948 UACS No. 300116201499000 May 28, 2019 National Capital Region North Manila District Engineering Office
UACS No. 300116201499000
Project ID: P00345616LZ
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.796 lane km
Unit Cost: P17,236,180/ lane km
Allocation: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00

As Modified
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.831 lane km
Unit Cost: P16,510,228/ lane km
Estimated Cost: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
WIN9F05948