Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
September 8, 2021 2021 WIN1E02828 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200284000
Project ID: P00550446MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+467 - Sta. 39+735, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+550 - Sta. 39+696.49, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,958.60 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 23,889.76 / Square meter
September 8, 2021 2021 WIN1E02818 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200285000
Project ID: P00550447MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+773 - Sta. 39+953, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+780 - Sta. 39+904.38, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,838.46 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 23,883.28 / Square meter
September 8, 2021 2021 WIN1E02819 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200286000
Project ID: P00550448MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+368 - Sta. 40+505, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+368 - Sta. 40+502.82, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,837.87 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 23,886.95 / Square meter
September 8, 2021 2021 WIN1E02816 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200288000
Project ID: P00550450MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 36+430 - Sta. 36+748, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 36+430 - Sta. 36+685.8, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.11 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.49 / Square meter
September 8, 2021 2021 WIN1E02826 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200289000
Project ID: P00550451MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 42+200 - Sta. 42+320, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 42+200 - Sta. 42+320, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.11 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.55 / Square meter
September 8, 2021 2021 WIN1E02815 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200292000
Project ID: P00550454MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+820 - Sta. 44+970, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 29+072 - Sta. 29+222.68, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.14 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.31 / Square meter
September 8, 2021 2021 WIN1E02814 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100732000
Project ID: P00502023MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 428


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,250.00 Square meter

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P 19,600 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 406.38

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,814.32 Square meter

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P 24,306.63 / Square meter
September 8, 2021 2021 WIN1E02825 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310108100757000
Project ID: P00502025MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1189 + 750 - K1189 + 900


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,571.429 Square meter

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 15,244.44 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Surigao-Davao Coastal Rd - K1189 + 750 - K1189 + 819.51

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,601.53 Square meter

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 24,476.59 / Square meter
September 8, 2021 2021 WIN1E02817 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100578000
Project ID: P00509859MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134 + 705 - K1134 + 770

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 345.58 - K1133 + 360, K1134 + 705 - K1134 + 770

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,029.26 Square meter

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 23,891.97 / Square meter
September 8, 2021 2021 WIN1E02829 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100579000
Project ID: P00509860MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1149 + 000 - K1149 + 248

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1149 + 067 - K1149 + 146.83

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,430.19 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 23,912.67 / Square meter
September 8, 2021 2021 WIN1E02820 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100580000
Project ID: P00509861MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1149 + 818 - K1149 + 930

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1149 + 150 - K1149 + 203.17

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,223.68 Square meter

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 23,947.79 / Square meter
September 8, 2021 2021 WIN1E02824 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100581000
Project ID: P00509862MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1174 + 705 - K1174 + 850

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1174 + 705 - K1174 + 821.89

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,430 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 23,913.99 / Square meter
September 8, 2021 2021 WIN1E02823 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300111200350000
Project ID: P00550589MN

Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips Slope Collapse and Landslide Dinagat - Loreto Road, Dinagat Islands

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of National Roads with Slips Slope Collapse and Landslide Dinagat - Loreto Road, Dinagat Islands

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 12,418.71 Square meter

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 19,426.33 / Square meter
September 6, 2021 FY2021 WIN1E02641 300204100716000 April 12, 2021 Region IX Regional Office IX
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Access Road at Sitio Anuling, Pamucutan to Sta. Rita in support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City, Package III

CW1: Construction of Concrete Road
Physical Target (Road): 0.86 Lane Km.
Unit Cost (Road): Php 90,895,516.15/lane km.
CW2: Construction of Slope Protection Structure
Physical Target (Slope Protection: 2,085.50 Sq. M.
Unit Cost (Slope Protection): Php 16,127.87/sq.m.
EAO: Php 3,913,169.08
Total Allocation: Php 115,718,000.00
September 6, 2021 FY2021 WIN1E02311 300204100717000 April 20, 2021 Region IX Regional Office IX
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Barangay San Juan-Dampalan-San Isidro Road connecting National Road and Marapong in support of Rubber, Coconut and Abaca Industries, Sergio Osmeña, Zamboanga del Norte, Package II

CW1: Construction of Concrete Bridge
Physical Target: 1,156.248 Sq. M.
Unit Cost: Php 84,947.498/sq. m.
EAO: Php 3,570,000.00
Excess: Php 209,625.40
Total Allocation: Php 102,000,000.00
September 6, 2021 FY2021 WIN1E02665 300111200357000 May 31, 2021 Region IX Regional Office IX
Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects

Jct. Blancia-Molave-Josefina Road, K1673+000 - K1676+057.57

CW1: Road Widening
Physical Target: 6.115 Lane Km.
Unit Cost: Php 14,790,238.35/lane km.
ROW Acquisition: 20,000.00 Sq. M. (Php 6,000,000.00)
EAO: Php 3,500,000.00
Excess: Php 57,692.49
Total Allocation: Php 100,000,000.00
September 6, 2021 FY2021 WIN1E02688 300116203724000 June 17, 2021 Region IX Regional Office IX
Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects

Labangan-Midsalip Road, Sta. 17+540 - Sta. 20+200, (Package 2), Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 5.320 Lane Km.
Unit Cost: Php 17,770,169.33/Lane Km.
ROW Acquisition: 6,542.330467 Sq. M. (Php 1,962,699.14)
EAO: Php 3,500,000.00
Total Allocation: Php 100,000,000.00
September 3, 2021 FY2021 WIN1E02600 310204101151000 April 13, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Conctruction of Bypass and Diversion Roads

Sominot - Mahayag Road, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.020 Lane Km.
Unit Cost: Php 48,679,016.20/lane km.
EAO: Php 3,441,606.45
Excess: Php 226,780.83
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02385 310204101142000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Balucot - Lower Usugan - Tungawan Bypass Road, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.80 Lane Km.
Unit Cost: Php 35,153,571.43/lane km.
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02315 310205100732000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 3.706 Lane Km.
Unit Cost: Php 21,909,667.14/lane km.
EAO: Php 2,947,000.00
Excess: Php 55,773.59
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1E02402 310205100734000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 3.60 Lane Km.
Unit Cost: Php 22,560,441.24/lane km.
EAO: Php 2,947,000.00
Excess: Php 35,411.54
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1E02444 310205100735000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 3, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.20 Lane Km.
Unit Cost: Php 36,900,876.44/lane km.
EAO: Php 2,947,000.00
Excess: Php 71,071.83
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1G02990 310204101145000 May 31, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Zamboanga Sibugay, Phase III

CW1: Construction of Concrete Road
Physical Target: 1.62 Lane Km.
Unit Cost: Php 44,687,590.48/lane km.
ROW Acquisition: 88,333.0 Sq. M. (Php 25,572,500.00)
EAO: Php 3,570,000.00
Excess: Php 463,603.42
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02561 310204101143000 May 31, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-pass Road, Package 3, Zamboanga City

CW1: Construction of Concrete Road
Physical Target: 1.50 Lane Km.
Unit Cost: Php 62,286,666.67/lane km.
ROW Acquisition: 16,666.67 Sq. M. (Php 5,000,000.00)
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02416 310204101148000 April 20, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-pass Road, Zamboanga City

CW1: Construction of Concrete Road
Physical Target: 5.74 Lane Km.
Unit Cost: Php 17,148,083.62/lane km
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1G02982 310306100188000 May 24, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Bridges - Construction of New Bridges

Liba Br. along Sindangan - Bayog - Lakewood Rd

CW1: Construction of Concrete Road
Physical Target: 867.186 Sq. M.
Unit Cost: Php 155,590.535/sq.m.
EAO: Php 4,900,000.00
Excess: Php 174,066.03
Total Allocation: Php 140,000,000.00
September 3, 2021 FY2021 WIN1E02394 310305101245000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Limpapa Parallel Br. along Zamboannga City-Labuan-Limpapa Road

CW1: Construction of Parallel Bridge
Physical Target: 867.186 Sq. M.
Unit Cost: Php 166,919.2076/sq. m.
EAO: Php 5,250,000.00
Total Allocation: Php 150,000,000.00
September 3, 2021 FY2021 WIN1E02474 320101106238000 April 13, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Baybay River, along Sindangan-Liloy Road, K1964+000, Brgy, Baybay, Liloy, Zamboanga del Norte

CW1: Construction of Flood Mitigation Structure
Physical Target: 510.0 Ln. M.
Unit Cost: Php 98,878.10/ln.m.
ROW Acquisition: 2,273.983 Sq. M. (Php 682,194.87)
EAO: Php 1,764,974.09
Total Allocation: Php 52,875,000.00
September 3, 2021 2021 WIN1C04455 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation/Improvement of Villaviciosa Road Phase 2, Villaviciosa, Abra;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: CW1: 12 Lane Km;
Allocation= Php 50,000,000

To: Rehabilitation/Improvement of Villaviciosa Road Phase 2, Villaviciosa, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 7 Lane Km
CW2: 870 Square meters;
Allocation= Php 50,000,000



September 3, 2021 2021 WIN1C04479 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Patiao Flood Control, Sta. 67+300 - 67+800, Peñarrubia, Abra;
Physical Target: CW1: 354 Lineal meters;
Allocation= Php 30,000,000

To: Construction of Patiao Flood Control, Sta. 67+300 - 67+800, Peñarrubia, Abra;
Physical Target: CW1: 292 Lineal meters;
Allocation= Php 30,000,000

September 3, 2021 2021 WIN1C04476 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Sinalang Flood Control, Peñarrubia, Abra;
Physical Target: CW1: 611.20 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Sinalang Flood Control, Peñarrubia, Abra;
Physical Target: CW1: 663.20 Lineal meters;
Allocation= Php 100,000,000
September 3, 2021 2021 WIN1C04480 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Pawa Flood Control, Lagangilang, Abra;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Pawa Flood Control, Lagangilang, Abra;
Physical Target: CW1: 534 Lineal meters;
Allocation= Php 50,000,000
September 3, 2021 2021 WIN1C04478 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 891.189 Lineal meters;
Allocation= Php 100,000,000


To: Construction of Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 768.80 Lineal meters;
Allocation= Php 100,000,000
September 3, 2021 2021 WIN1C04481 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Botnong Flood Control, Tineg, Abra;
Physical Target: CW1: 522 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Botnong Flood Control, Tineg, Abra;
Physical Target: CW1: 440 Lineal meters;
Allocation= Php 50,000,000

September 3, 2021 2021 WIN1C04450 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Badas-Lam-ag Flood Control, San Juan, Abra;
Physical Target: CW1: 891.189 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Badas-Lam-ag Flood Control, San Juan, Abra;
Physical Target: CW1: 432.80 Lineal meters;
Allocation= Php 100,000,000

September 3, 2021 2021 WIN1C04458 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0434 + 650 - K0434 + 750;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0434 + 300 - K0434 + 450;
Physical Target: CW1: 4,063.5 Square meters;
Allocation= Php 100,000,000


September 3, 2021 2021 WIN1C04446 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0431 + 850 - K0431 + 920;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0432 + 080 - K0432 + 480;
Physical Target: CW1: 4,064 Square meters;
Allocation= Php 100,000,000

September 3, 2021 2021 WIN1C04485 GAA 2021 August 16, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Carumsing Bridge, Carumsing, Dangtalan, Pasil, Kalinga;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 102,000,000

To: Construction of Carumsing Bridge, Carumsing, Dangtalan, Pasil, Kalinga;
Physical Target: CW1 : 1,159.11 Square meters;
Allocation= Php 102,000,000

September 3, 2021 2021 WIN1C04495 GAA 2021 August 19, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0348 + 760 - K0349 + 068;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 110,000,000

To: Gov. Bado Dangwa National Rd - K0348 + 760 - K0348 + 908;
Physical Target: CW1 : 4898.40 Square meters;
Allocation= Php 110,000,000

September 3, 2021 2021 WIN1C04459 GAA 2021 August 10, 2021 Cordillera Administrative Region CAR - Regional Office
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0275 + 350 - K0275 + 456, K0275 + 509 - K0275 + 635, K0275 + 690 - K0275 + 848;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 290,000,000

To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0275 + 510 - K0275 + 635, K0275 + 690 - K0275 + 810;
Physical Target: CW1 : 11,945 Square meters;
Allocation= Php 290,000,000

September 3, 2021 2021 WIN1C04447 GAA 2021 August 10, 2021 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 560 - K0362 + 720, K0372 + 210 - K0372 + 310;
Physical Target: CW1 : 5,200 Square meters;
Allocation= Php 102,762,000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 560 - K0362 + 675, K0372 + 210 - K0372 + 310;
Physical Target: CW1 : 4,874.23 Square meters;
Allocation= Php 102,762,000

September 3, 2021 FY2021 WIN1E02650 320101106239000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Kumalarang, Zamboanga del Sur

CW1: Construction of Flood Mitigation Structure
Physical Target: 550.50 Ln. M.
Unit Cost: Php 184,285.6955/ln. m.
EAO: Php 3,550,724.64
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1E02705 320101106242000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures with Esplanade at Limpapa River, Zamboanga City-Labuan-Limpapa Road (Limpapa Br. Section)

CW1: Construction of Flood Mitigation Structure
Physical Target: 259.79 Ln. M.
Unit Cost: Php 371,909.4557/ln.m.
EAO: Php 3,381,642.51
Total Allocation: Php 100,000,000.00
September 3, 2021 FY2021 WIN1G02954 320101106243000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Labason Flood Control at Antonino, Labason, Zamboanga del Norte (Upstream) Package 1

CW1: Construction of Flood Mitigation Structures
Physical Target: 557.0 Ln. M.
Unit Cost: Php 181,398.69/ln. m.
ROW Acquisition: 953.1065 Sq. M. (Php 285,931.96)
EAO: Php 3,675,000.00
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1G02958 320101106244000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Labason Flood Control at Antonino, Labason, Zamboanga del Norte (Upstream) Package 2

CW1: Construction of Flood Mitigation Structure
Physical Target: 440.0 Ln. M.
Unit Cost: 225,854.55/ln.m.
ROW Acquisition: 830.0003 Sq. M. (Php 249,000.09)
EAO: Php 3,675,000.00
Excess: Php 1,700,000.00
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1E02327 320101106246000 April 13, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Kumalarang River, Isabela City

CW1: Construction of Flood Mitigation Structure
Physical Target: 888.40 Ln. M.
Unit Cost: Php 162,716.5296/ln.m.
ROW Acquisition: 1,277.09 Sq. M. (Php 383,127.29)
EAO: Php 5,059,507.77
Total Allocation: 150,000,000.00
September 3, 2021 2021 WIN1E02803 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200287000
Project ID: P00550449MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+576 - Sta. 40+830, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+596 - Sta. 40+712.56, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.15 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.25 / Square meter
September 3, 2021 FY2021 WIN1E02475 320101106247000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase III), Tungawan, Zamboanga Sibugay

CW1: Construction of Flood Mitigation Structure
Physical Target: 641.0 Ln. M.
Unit Cost: Php 165,319.75/ln.m.
ROW Acquisition: 600.1378 Sq. M. (Php 180,041.34)
EAO: Php 3,850,000.00
Total Allocation: Php 110,000,000.00
September 3, 2021 2021 WIN1E02797 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200290000
Project ID: P00550452MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+107 - Sta. 44+300, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects


Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 44+170 - Sta. 44+262.92, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.16 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.19 / Square meter
September 3, 2021 2021 WIN1E02798 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200291000
Project ID: P00550453MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+360 - Sta. 44+590, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 44+360 - Sta. 44+468.5, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.15 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.25 / Square meter
September 3, 2021 FY2021 WIN1E02530 300211100199000 April 12, 2021 Region IX Regional Office IX
CSSP: Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Repair/Maintenance National Roads and Bridges, Painting/Repainting of Centerline and Edge Line along: Dipolog-Orquieta Rd (K1795+(-437)-K1829+543 Intermittent Section);
Dipolog-Punta-Dansullan Sergio Osmena Road (K1857+(-1123)-K1893+775 Intermittent Section); Rizal-Dakak-Dapitan Coastal Loop Road (K1798+(-893)-K1868+881 Intermittent Section); Dipolog-Polanco-Pinan Jct Oroq Road (K1810+(-471)-K1828+800 Intermittent Section); Pinan-Mutia Rd (K1817+000-K1830+000); Jct. Polo-Dapitan Park Road (K1825+(-305) - K1829+000 Intermittent Section); Dipolog-Polanco-Macleodes Rd. (K1828+(-220)-K1848+952 Intermittent Section); Jct. Polo-Pulauan Port Road (K1827+(-320)-K1828+438 Intermittent Section)

CW1: Road Safety: Pavement Markings
Physical Target: 408.316 Lane Km.
Unit Cost: Php 108,775.0916/lane km.
EAO: Php 1,554,511.36
Excess: Php 30,878.32
Total Allocation: Php 46,000,000.00
September 3, 2021 FY2021 WIN1E02278 310201100683000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1777+980.00 - K1778+580.00, K1778+660.00 - K1782+580.00

CW1: Road Widening
Physical Target: 9.040 Lane Km.
Unit Cost: Php 10,481,823.98/lane km.
ROW Acquisition: 13,092.874 Sq. M. (Php 3,927,862.10)
EAO: Php 3,316,449.10
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1G02899 310201100684000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Liloy-Ipil Road - K1981+373 - K1984+460, K1984+497.65 - K1984+800.00

CW1: Road Widening
Physical Target: 6.779 Lane Km.
Unit Cost: Php 15,288,220.27/lane km.
ROW Acquisition: 9,112.651 Sq. M. (Php 2,733,795.20)
EAO: Php 3,627,359.58
Total Allocation: Php 110,000,000.00
September 2, 2021 FY2021 WIN1G02961 310202100720000 April 20, 2021 Region IX Regional Office IX
OO1:Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Basilan Circumferential Rd - K0006+635.45 - K0007+585.50, K0008+544.96 - K0009+380.00, K0009+640.00 - K0011+049.95

CW1: Road Widening
Physical Target: 6.39 Lane Km.
Unit Cost: Php 17,793,077.81/lane km.
ROW Acquisition: 39,174.1093 Sq. M. (Php 11,752,232.79)
EAO: Php 4,550,000.00
Total Allocation: Php 130,000,000.00
September 2, 2021 FY2021 WIN1E02379 310212100171000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads

Zamboanga del Sur Coastal Road - (S01167MN) Chainage 16134 - Chainage 16791, (S01167MN) Chainage 18571 - Chainage 20180, (S01168MN) Chainage 10160 - Chainage 11160

CW1: Paving of Unpaved Roads
Physical Target: 6.532 Lane Km.
Unit Cost: Php 15,087,373.64/lane km.
EAO: Php 3,449,275.37
Total Allocation: Php 102,000,000.00
September 2, 2021 FY2021 WIN1E02450 310108100567000 April 13, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Zamboanga City - Labuan - Limpapa Road - K1976+300 - K1977+063.04

CW1:Construction of Slope Protection Structure
Physical Target: 8,059.39 Lane Km.
Unit Cost: Php 17,957.90061/Square Meter
EAO: Php 5,065,540.36
Total Allocation: Php 150,000,000.00
September 2, 2021 FY2021 WIN1E02562 310108100566000 April 13, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Rizal - Dakak - Dapitan Coastal Loop Rd - K1852+210 - K1852+250, K1852+530 - K1852+580, K1822+500 - K1823+200, K1827+400 - K1827+881

CW1: Construction of Slope Protection Structure
Physical Target: 6,521.0 Sq. M.
Unit Cost: Php 16,101.08665/sq. m.
ROW Acquisition: 939.9415 Sq. M. (Php 281,982.46)
EAO: Php 3,674,831.51
Total Allocation: Php 108,952,000.00
September 2, 2021 FY2021 WIN1E02440 310205100731000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga del Norte

CW1: Construction of Concrete Road
Physical Target: 3.596 Lane Km.
Unit Cost: Php 27,869,938.92/lane km.
EAO: Php 139,699.63
Total Allocation: Php 104,000,000.00
September 2, 2021 FY2021 WIN1E02471 310205100733000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Norte

CW1: Construction of Concrete Road
Physical Target: 1.26 Lane Km.
Unit Cost: Php 66,296,896.37/lane km.
EAO: Php 3,035,025.00
Excess: Php 145,885.57
Total Allocation: Php 86,715,000.00
August 31, 2021 FY2021 WIN1B01143 300116203731000 April 17, 2021 Region IX Regional Office IX
Local - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Timbangan to Pantao Road, Barangay Timbangan, Indanan, Sulu.

CW1: Construction of Concrete Road
Physical Target: 4.40 Lane Km.
Unit Cost: Php 14,255,013.70/lane km.
EAO: Php 2,195,272.11
Excess: Php 82,667.62
Total Allocation: Php 65,000,000.00
August 31, 2021 FY2021 WIN1E02274 310204101155000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Road

Zamboanga City Diversion Road, Zamboanga City

CW1: Road Widening
Physical Target (Road): 6.06 Lane Km.
Unit Cost (Road): Php 12,438,392.49/lane km.
CW2: Construction of Concrete Bridge
Physical Target (Bridge): 352.026 Sq. M.
Unit Cost (Bridge): Php 65,830.5527/sq.m.
EAO: Php 3,449,275.36
Total Allocation: Php 102,000,000.00
August 31, 2021 FY2021 WIN1B01144 300116203730000 April 17, 2021 Region IX Regional Office IX
Local - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Jolo-Buansa Road, Barangay Buansa, Indanan, Sulu

CW1: Construction of Concrete Road
Physical Target: 10.20 Lane Km.
Unit Cost: Php 13,234,242.44/lane km.
EAO: Php 4,900,000.00
Excess: Php 110,727.08
Total Allocation: Php 140,000,000.00
August 31, 2021 FY2021 WIN1B01139 310105100506000 April 17, 2021 Region IX Regional Office IX
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo-Indanan-Parang-Silangkan Rd - K0012+0000 - K0013+690

CW1: Rehabilitation of Paved Road
Physical Target: 3.38 Lane Km.
Unit Cost: Php 17,122,798.65/lane km.
EAO: Php 2,025,627.08
Excess: Php 99,313.47
Total Allocation: Php 60,000,000.00
August 31, 2021 FY2021 WIN1B01145 310105100508000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo-Taglibi-Tiptipon Rd - K0008+000 - K0008+507

CW1: Rehabilitation of Paved Road
Physical Target: 1.014 Lane Km.
Unit Cost: Php 23,709,243.18/lane km.
EAO: Php 841,441.04
Excess: Php 17,386.38
Total Allocation: Php 24,900,000.00
August 31, 2021 FY2021 WIN1B01138 310202100726000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road

Camp Andres-Sucuban Rd - Sta. 6+480 - Sta. 8+180

CW1: Road Widening
Physical Target: 3.40 Lane Km.
Unit Cost: Php 21,164,164.33/lane km.
ROW Acquisition: 1,744.352467 Sq. M. (Php 523,305.74)
EAO: Php 2,518,535.55
Total Allocation: Php 75,000,000.00
August 31, 2021 FY2021 WIN1B01142 310202100727000 April 17, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road

Karungdong-Kulay-Kulay Rd - Sta. 6+480 - Sta. 8+045

CW1: Road Widening
Physical Target: 3.13 Lane Km.
Unit Cost: Php 18,241,795.49/lane km.
ROW Acquisition: 1,012.971 Sq. M. (Php 304,791.41)
EAO: Php 1,998,388.70
Total Allocation: Php 59,400,000.00
August 31, 2021 FY2021 WIN1E02244 300117210043000 April 17, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Tandu-Bato-Kan Allayon Road, Luuk, Sulu

CW1: Construction of Concrete Road
Physical Target: 1.76 Lane Km.
Unit Cost: Php 14,045,301.35
EAO: Php 250,000.00
Excess: Php 30,269.62
Total Allocation: Php 25,000,000.00
August 31, 2021 FY2021 WIN1E02242 300117210043000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Suligpang-Garid Road, Luuk, Sulu

CW1: Construction of Concrete Road
Physical Target: 1.90 Lane Km.
Unit Cost: Php 13,000,013.88/lane km.
EAO: Php 250,000.00
Excess: Php 49,973.63
Total Allocation: Php 25,000,000.00
August 31, 2021 2021 WIN1E02809 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. : 300116203510000
Project ID: P00550690MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Bunawan - Varuela Road (Phase 4), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 12.151 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 10,324,253.15 / Lane Km

TO:

Construction of Bunawan - Veruela Road (Phase 4), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure

Physical Target:
CW1- 2.54 Lane Km
CW2- 16,205.2 Square meters

Allocation:
TOTAL: P 130,000,000
CW1: P 105,170,193.55
CW2: P 20,279,806.45
EAO: P 4,550,000

Unit Cost:
CW1: P 41,405,588.01 / Lane Km
CW2: P 1,251.44 /Square meters
August 31, 2021 2021 WIN1E02808 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. : 300116203511000
Project ID: P00550691MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Bunawan - Varuela Road (Phase 5), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 12.151 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 10,324,253.15 / Lane Km

TO:

Construction of Bunawan - Veruela Road (Phase 5), Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure

Physical Target:
CW1- 2.633 Lane Km
CW2- 11,716.85 Square meters

Allocation:
TOTAL: P 130,000,000
CW1: P 108,192,373.11
CW2: P 17,257,626.89
EAO: P 4,550,000

Unit Cost:
CW1: P 41,090,912.69 / Lane Km
CW2: P 1,472.89 /Square meters
August 31, 2021 FY2021 WIN1E02240 300116203722000 April 17, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure - including Local Projects

Construction/Re-blocking of Romandier Camp Andres-Tandu Bato National Road, Km 26+000.00 - Km 27+000.00, Km 44+000.00 - Km 45+510.00, 2nd District, Sulu

CW1: Preventive Maintenance of Road (Concrete Reblocking)
Physical Target: 5.020 Lane Km.
Unit Cost: Php 19,192,180.64/lane km.
EAO: Php 3,500,000.00
Excess: Php 155,253.17
Total Allocation: Php 100,000,000.00
August 31, 2021 FY2021 WIN1E02239 300112200190000 April 17, 2021 Region IX Regional Office IX
Local - National Roads and Bridges - National Bridge - Local Infrastructure Program - Reblocking of Camp Andres Lahing-Lahing Road, Luuk, Sulu

Km 04+000 - Km 07+080

CW1: Preventive Maintenance of Road (Concrete Reblocking)
Physical Target: 6.16 Lane Km.
Unit Cost: Php 11,235,827.97/lane km.
EAO: Php 700,000.00
Excess: Php 87,299.73
Total Allocation: Php 70,000,000.00
August 31, 2021 FY2021 WIN1E02238 300111200355000 April 17, 2021 Region IX Regional Office IX
Local - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Widening of Jolo-Taglibi-Tiptipo National Road, Panamao, Sulu

CW1: Road Widening
Physical Target: 5.920 Lane Km.
Unit Cost: Php 16,227,552.91/lane km.
ROW Acquisition: 1,901.792 Sq. M. (Php 570,537.83)
EAO: Php 3,362,348.96
Total Allocation: Php 100,000,000.00
August 31, 2021 FY2021 WIN1B01150 300116204458000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction/ Concreting of Kan-Imbas Road Camp Andres, Luuk, Sulu

CW1: Construction of Concrete Road
Physical Target: 1.160 Lane Km.
Unit Cost: Php 16,773,738.42/lane km.
EAO: Php 500,000.00
Excess: Php 42,463.43
Total Allocation: Php 20,000,000.00
August 31, 2021 FY2021 WIN1B01149 310105100507000 April 17, 2021 Region IX Regional Office IX
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo-Taglibi-Tiptipon Road, K0002+000 - K0003+035

CW1: Rehabilitation of Paved Road
Physical Target: 2.070 Lane Km.
Unit Cost: Php 16,325,626.26/lane km.
EAO: Php 1,182,791.62
Excess: Php 23,162.02
Total Allocation: Php 35,000,000.00
August 31, 2021 FY2021 WIN1B01151 300116203723000 April 17, 2021 Region IX Regional Office IX
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects

Construction/Concreting of Kan-Bah-Kan Bulak Road, Luuk, Sulu

CW1: Construction of Concrete Road
Physical Target: 5.020 Lane Km.
Unit Cost: Php 17,969,967.08/lane km.
EAO: Php 2,800,000.00
Excess: Php 48,456.79
Total Allocation: Php 80,000,000.00
August 31, 2021 FY2021 WIN1B01152 300117210035000 April 17, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Salimbangun, Barangay Pandan Niog, Pangutaran, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.930 Lane Km.
Unit Cost: Php 10,645,161.29
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
August 31, 2021 FY2021 WIN1B01153 300117210012000 April 17, 2021 Region IX Regional Office IX
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Barangay Bangas Likud, Hadji Panglima Tahil, Sulu

CW1: Construction of Concrete Road
Physical Target: 0.834 Lane Km.
Unit Cost: Php 11,870,503.60/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00
August 31, 2021 FY2021 WIN1E02272 310201100680000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña Rd, Zamboanga del Norte/Sur Bdry Rd - K1882+220 - K1885+560

CW1: Road Widening
Physical Target: 6.72 Lane Km.
Unit Cost: Php 15,417,758.34/lane km.
ROW Acquisition: 9,221.357 Sq. M. (Php 2,766,407.20)
EAO: Php 3,626,256.76
Total Allocation: Php 110,000,000.00
August 27, 2021 FY 2021 WIN1C04227 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320101106861000
Project ID: P00526227LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Mitigation and Drainage Systems – Rehabilitation/Improvement of Flood Control Structures along Laniton Bridge in Barangay Laniton, Basud, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 522 Lineal Meters
Allocation: Php 43,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Mitigation and Drainage Systems – Rehabilitation/Improvement of Flood Control Structures along Laniton Bridge in Barangay Laniton, Basud, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 380 Lineal Meters
Allocation: Php 43,000,000.00
August 27, 2021 FY 2021 GAA WIN1E02721 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - K1377+(-201) - K1377+(-198),
K1377+655 - K1377+665, K1377+683 - K1378+000
Physical Target:
CW1: 3.654 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,876,000.00
CW1: P 21,438,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 437,520.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - K1392+287 - K1392+872
Physical Target:
CW1: 3.510 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,876,000.00
CW1: P 21,438,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 437,520.00
August 27, 2021 FY 2021 WIN1C04016 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320101106855000
Project ID: P00526221LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Barangay Taba-Taba to Barangay Mangcamagong, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Barangay Taba-Taba to Barangay Mangcamagong, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00
August 27, 2021 FY 2021 WIN1C04205 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320101106856000
Project ID: P00526222LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Phase I, Barangay Cayucyucan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Phase I, Barangay Cayucyucan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 210 Lineal Meters
Allocation: Php 43,000,000.00
August 27, 2021 2021 WIN1E02766 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 300204101157000
Project ID: P00537703MN

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

FROM:

Road connecting Brgys. Mat-i and E.G. Montilla, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.843 Lane Km

Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000

Unit Cost:
CW1: P 4,694,610.78/Lane Km

TO:

Road Connecting Brgys. Mat-i and E.G. Montilla, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.843 Lane Km

Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000

Unit Cost:
CW1: P 4,694,610.78/Lane Km
August 27, 2021 FY 2021 WIN1C04304 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320102104344000
Project ID: P00526488LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Flood Control Project along Daet River (Brgy. 1 Section), Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 75.819 Lineal Meters
Allocation: Php 17,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Flood Control Project along Daet River (Brgy. 1 Section), Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 73.00 Lineal Meters
Allocation: Php 17,000,000.00
August 27, 2021 2021 WIN1E02737 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100733000
Project ID: P00509865MN

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 428

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0.000 Square meters

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P -

TO:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134+300 - K1134+590, K1134+700 – K1134+860

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,946.50 Square meters

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P 14,966.91/ Square meters
August 27, 2021 2021 WIN1E02725 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300211100240000
Project ID: P00533131MN

Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

FROM:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Asphalt Overlay along Surigao - San Juan Coastal Road, K1116+059.00 - K119+816, Brgy. Sabang, Surigao

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 2.359 Lane Km

Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000

Unit Cost:
CW1: P 16,362,865.62/Lane Km

TO:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Asphalt Overlay along Surigao - San Juan Coastal Road, K1116+059.00 – K1117+000, K1117+171 - K1117+582.37, Brgy. Sabang, Surigao

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 2.727 Lane Km

Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000

Unit Cost:
CW1: P 14,154,748.81/Lane Km
August 27, 2021 2021 WIN1E02757 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300116204631000
Project ID: P00550981MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation/Concreting of Road, from Barangay Pili to Barangay Karihatag, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.812 Lane Km

Allocation:
TOTAL: P 33,000,000
CW1: P 32,340,000
EAO: P 660,000

Unit Cost:
CW1: P 17,847,682.12/Lane Km

TO:

Rehabilitation/Concreting of Road, from Barangay Pili to Barangay Karihatag, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1.423 Lane Km
CW2- 483.29 Square meters

Allocation:
TOTAL: P 33,000,000
CW1: P 29,026,530
CW2: P 3,313,470
EAO: P 660,000

Unit Cost:
CW1: P 2,398,123.68/Lane Km
CW2: P 6,856.07/Square meters
August 27, 2021 FY 2021 WIN1C04084 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 320102104345000
Project ID: P00526489LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Mabulao River Control Structure, Barangay Calasgasan – Magang Section, Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 290 Lineal Meters
Allocation: Php 43,000,000.00

AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Mabulao River Control Structure, Barangay Calasgasan – Magang Section, Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 239 Lineal Meters
Allocation: Php 43,000,000.00
August 27, 2021 FY 2021 GAA WIN1F06521 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310205100728000
Project ID : P00506139LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Mindoro Island Circumferential Road (Puerto Galera - Abra De Ilog)
Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.546 Lane Km
- CW2 - Construction of Concrete Bridge :
1,436.724 Square Meters
Allocation : Php 110.00 Million

TO :

Mindoro Island Circumferential Road (Puerto Galera - Abra De Ilog)
Occidental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
0.934 Lane Km
Allocation : Php 110.00 Million
August 27, 2021 FY 2021 WIN1C04303 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300107200973000
Project ID: P00561592LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction of Flood Control Structure (River Bank Stabilization), Brgy. Bakiad, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,267.664 Lineal Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction of Flood Control Structure (River Bank Stabilization), Brgy. Bakiad, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 388.0 Lineal Meters
Allocation: Php 100,000,000.00
August 27, 2021 FY 2021 WIN1C04280 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300107200982000
Project ID: P00561598LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Improvement of River Bank in Brgy. Dalas, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,267.664 Lineal Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Improvement of River Bank in Brgy. Dalas, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 399.0 Lineal Meters
Allocation: Php 100,000,000.00
August 27, 2021 FY 2021 WIN1C04203 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300116203521000
Project ID: P00561929LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Divresion Road, Brgy. Exciban, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 7.98 Lane Km
Allocation: Php 93,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Divresion Road, Brgy. Exciban, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.25278 Lane Km
CW2 - Construction of Road Slope Protection Structure – 3,622.04 Square meters
Allocation: Php 93,000,000.00
August 27, 2021 FY 2021 WIN1C04131 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300116203522000
Project ID: P00561930LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Bypass Road, Brgy. Anahaw, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 7.98 Lane Km
Allocation: Php 93,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Bypass Road, Brgy. Anahaw, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.816 Lane Km
CW2 - Construction of Road Slope Protection Structure – 4,818.40 Square meters
Allocation: Php 93,000,000.00
August 27, 2021 FY 2021 WIN1C04113 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300116203727000
Project ID: P00561995LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road with Seawall (Cong. Eming Panotes Boulevard) Barangay Mambungalon, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road with Seawall (Cong. Eming Panotes Boulevard) Barangay Mambungalon, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.89 Lane Km
CW2 - Construction of Road Slope Protection Structure – 2,202.75 Square meters
Allocation: Php 100,000,000.00
August 27, 2021 FY 2021 WIN1C04085 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300116203733000
Project ID: P00561998LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of By-pass Road with Seawall at Brgy. Parang – South Poblacion, Jose Panganiban, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of By-pass Road with Seawall at Brgy. Parang – South Poblacion, Jose Panganiban, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.87 Lane Km
CW2 - Construction of Road Slope Protection Structure – 2,175 Square meters
Allocation: Php 100,000,000.00
August 27, 2021 FY 2021 WIN1C04097 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300116204253000
Project ID: P00562514LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Seawall with Roads (cong. Elmer Panotes Blvd.), Leading to Cory Aquino Blvd., Lanot Section, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 2.476 Lane Km
Allocation: Php 25,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Seawall with Roads (cong. Elmer Panotes Blvd.), Leading to Cory Aquino Blvd., Lanot Section, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.24 Lane Km
CW2 - Construction of Road Slope Protection Structure – 564 Square meters
Allocation: Php 25,000,000.00
August 27, 2021 FY 2021 WIN1C04086 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300117207600000
Project ID: P00562560LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Lukbanan, Capalonga Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0 Lane Km
Allocation: Php 100,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Lukbanan, Capalonga Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 3.406Lane Km
CW2 - Construction of Road Slope Protection Structure – 5,359.93 Square meters
Allocation: Php 100,000,000.00
August 27, 2021 FY 2021 WIN1C04087 FY 2021 GAA RA 11518 March 27, 2021 Region V Camarines Norte District Engineering Office
UACS No.: 300117209236000
Project ID: P00564789LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Purok 3 to Purok 5, Barangay San Antonio to Barangay Bautista, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 1.592 Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Purok 3 to Purok 5, Barangay San Antonio to Barangay Bautista, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 1.752 Lane Km
Allocation: Php 10,000,000.00
August 27, 2021 FY 2021 WIN1C04265 FY 2021 GAA RA 11518 March 27, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310108100528000
Project ID: P00505991LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Masbate-Milagros Rd – K0004+743 – K0004+994
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,133.50 Square meters
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Masbate-Milagros Rd – K0004+743 – K0004+994, K0007+775 – K0007+890
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,259 Square meters
Allocation: Php 10,000,000.00

Pages